Loading...
HomeMy WebLinkAbout20183089.tiffMEMORANDUM TO: Esther Gesick, Clerk to the Board September 26th, 2018 FROM: Ryan Rose, Chief Information Officer SUBJECT: B1800139, 35th Ave Fiber Installation BOCC Approval Date: October 10th, 2018 Bids were received and opened on September 20th, 2018 for bid B1800139 35th Ave Fiber Installation (Weld -799). Two (2) bids were received. One in the amount of $1,542,483.94 and the second for $2,527,389.62. Attached is the bid tabulation and a detailed price difference report for your information. The Information Technology staff has reviewed all of the bid responses. Sturgeon Electric Company Inc. proposed the lowest cost solution of $1,542,483.94 and meets the needed functionality documented in the bid process. Based on the above information, I recommend the Board award B1800139 35th Ave Fiber Installation to Sturgeon Electric Company Inc. for a total amount of $1,542,483.94. /0/ 7/O Pathway #1 Pathway #2 Pathway #3 Fiber Optics Cable Total: Fiber Optics Materials Total (Excluding Fiber Optics Cable): Fiber Optics Installation Labor Total: Conduit, Handholds and Associated Materials Total: Boring, Excavation and Conduit Labor Total: Pathway #1 Total: Fiber Optics Cable Total: Fiber Optics Materials Total (Excluding Fiber Optics Cable): Fiber Optics Installation Labor Total: Conduit, Handholds and Associated Materials Total: Boring, Excavation and Conduit Labor Total: Pathway #2 Total: Fiber Optics Cable Total: Fiber Optics Materials Total (Excluding Fiber Optics Cable): Fiber Optics Installation Labor Total: Conduit, Handholds and Associated Materials Total: Boring, Excavation and Conduit Labor Total: Pathway #3 Total: Payment Performance Bond Grand Total: Sturgeon Nexlevel Price Difference $ 32,400.00 $ 38,448.00 $ 6,048.00 $ 9,352.65 $ 7,968.74 $ (1,383.91) $ 58,288.20 $ 58,516.00 $ 227.80 $ 77,976.04 $ 122,278.53 $ 44,302.49 $ 576,026.73 $ 996,274.34 $ 420,247.61 $ 754,043.62 $ 1,223,485.61 $ 469,441.99 $ 27,578.00 $ 25,632.00 $ (1,946.00) $ 8,883.12 $ 7,089.78 $ (1,793.34) $ 49,945.41 $ 49,436.00 $ (509.41) $ 63,437.32 $ 97,822.82 $ 34,385.50 $ 502,931.05 $ 882,625.00 $ 379,693.95 $ 652,774.90 $ 1,062,605.60 $ 409,830.70 $ 4,196.00 $ 4,640.00 $ 444.00 $ 4,744.79 $ 2,601.00 $ (2,143.79) $ 14,368.01 $ 12,672.00 $ (1,696.01) $ 13,737.02 $ 24,455.71 $ 10,718.69 $ 88,811.60 $ 196,929.70 $ 108,118.10 $ 125,857.42 $ 241,298.41 $ 115,440.99 $ 9,808.00 $ 1,542,483.94 $ 2,527,389.62 $ 984,905.68 DATE OF BID: REQUEST FOR: DEPARTMENT: BID NO: PROJECT NAME: PRESENT DATE: APPROVAL DATE: September 20, 2018 35th Ave Fiber Installation INFORMATION TECHNOLOGY #B1800139 Weld -779 Fiber Installation September 26, 2018 October 10, 2018 WELD COUNTY Dept. of Information Technology 1401 North 17th Avenue, Greeley CO 80631 E-mail : achuryk@weldgov.com Phone: (970) 400-2555 Fax:(970) 304-6572 Vendor Name Total Bid Amount Address Sturgeon Electric Company Inc. 12150 East 112th Ave Henderson, CO 80640 $ 1,542,483.94 MP Nexlevel, LLC 500 CR 37 East Maple Lake, MN 55358 $ 2,527,389.62 ** Bids are being reviewed at this time by dept.** 2018-3089 T�c Hello