Loading...
HomeMy WebLinkAbout20182503.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 54 BETWEEN COUNTY ROADS 15 AND 17 FOR APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 54, between County Roads 15 and 17, be temporarily closed, with said closure being effective August 14, 2018, for approximately four (4) days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. co : 5Oc RS) , D;spo.+ch, CO 5+o-i a +rot Og-So -143 2018-2503 EG0024 TEMPORARY CLOSURE - COUNTY ROAD 54 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 6th day of August, A.D., 2018. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: datic.44) %41 Weld County Clerk to the Board BY: „G (�O.u/ Deputy Clerk to the B APPROVED AS TO FOR Asst. County Attorney Date of signature: 4$'D3-71 Ste_e Moreno, Ch_'r arbara Kirkme -r Pro-Te Sean P. Co way Mike Freeman 2018-2503 EG0024 MEMORANDUM TO: Clerk to the Board DATE: August 2, 2018 FROM: Elizabeth Relford, Public Works Department SUBJECT: BOCC Agenda Item WCR 54 between WCR 15 and WCR 17 is closed from 8/14/2018 thru 8/17/2018 for a culvert replacement. See attached closure diagram(s). 2018-2503 U) HWY 34 a__s._i_i r-- a a s_ a s -_=-_z7 � _ _t t _a >rT� • A,! ..".• WC 15 1 T S WCR 54 WCR 17 WCR155 WCR 17 a a a a s a. a t S Project # AN -59 Road closure description WCR 54 between WCR 15 and WCR 17 closed 8/14/2018 thru 8/17/2018 for culvert replacement Notice to Public Road signs and barricaded during closure Message boards to be used Detour Route WCR 15 between WCR 54 and HWY 34 2 mile paved HWY 34 between WCR 15 and WCR 17 1 mile paved WCR 17 between WCR 54 and HWY 34 2 mile paved Notes ADT of WCR 54 is: 5507/2015 Culvert replaced is irrigation: with new 15" RCPR No dust control required, paved detour Culvert is 200' east of WCR 15.5 on WCR 54 Placement of signs not to scale Date 8/1/2018 Prepared by LEE STEPHEN Approved by county engineer CAMERON PARROTT Hello