Loading...
HomeMy WebLinkAbout20182333.tiff7 1UPON org\e July 5, 2018 VIA ELECTRONIC SUBMISSION, also sent VIA EMAIL AND U.S. MAIL Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver, CO 80202 Re: WCR 46 Proceeding Number: 18A -0317R Request to Delay Closure of Weld County Road 46 Dear Colorado PUC: Pioneer Hi -Bred International, Inc. Corporate Legal 7250 N.W. 62nd Avenue P.O. Box 1014 Johnston, IA 50131-1014 (515) 535-7500 Tel (515) 535-4844 Fax (515} 247-6803 Wats RECEIVED JUL 10 2018 WELD COUNTY COMMISSIONERS Pioneer Hi -Bred International, Inc., "Pioneer" submits the following comments in the above - mentioned proceedings relating to the closure of several rail crossings in Weld County, Colorado. Pioneer conducts corn and wheat research on approximately 250 acres of owned and leased property south of LaSalle, Colorado; centering those efforts from its research station located at 21275 WCR 35 %, Weld, CO 80645. Pioneer coordinates these efforts from its office in Greeley, and its 13 full time employees make multiple trips daily to the field research station. Additionally, Pioneer engages between 4 and 12 seasonal workers to assist with field research operations at the research station. Local representatives from Pioneer have reviewed the plans for the closure of the railroad crossings at WCR 46 as well as the plans for the installation of a new crossing at WCR 44. The closures will severely impact the research operations at the facility by greatly increasing the required travel time from Pioneer's offices to the research station. In addition, the closures will inhibit transportation to and from research fields, and the movement of seed, equipment, and commodities by farmers adjacent to Highway 85. The closure will most severely affect Pioneer, its growers and contractors during the expected construction of the interchange at WCR 44. While this closure is temporary, it will likely require Pioneer's personnel to detour a considerable distance in order to conduct daily visits to the field stations and fields to coordinate operations. The closures will significantly increase the traffic through the town of LaSalle, particularly while the WCR 44 interchange is being constructed. Mun7Crt*ions tr93r (am' 1 CG P(A.KMY)/£RicH) 071(3/(8' 2018-2333 E.C.7OO7 �j Pioneer's preference is that the crossing at WCR 46 remain open permanently. If that is not possible, however, the crossing should not be closed until the interchange at WCR 44 is completed. Simultaneously closing WCR 44, WCR 46, and WCR 37 will cause significant disruption and traffic delays to Pioneer's research efforts, as well as the efforts of area farmers and agribusinesses. We thank you for your consideration of these comments, and welcome further dialogue on the efforts to improve the safety and effectiveness of Colorado and Weld County's highway systems. Regards, Corporate Counsel CC: Weld County Commissioners 1150 O Street P.O. Box 758 Greeley, CO 80631 2 Hello