Loading...
HomeMy WebLinkAbout20183780.tiff ?dizezrnt / / ' - / 1 WELD COUNTY CODE ORDINANCE 2018 - 11 IN THE MATTER OF REPEALING AND REENACTING , WITH AMENDMENTS , CHAPTER 5 REVENUE AND FINANCE , OF THE WELD COUNTY CODE BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF WELD , STATE OF COLORADO : WHEREAS , the Board of County Commissioners of the County of Weld , State of Colorado , pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County , Colorado , and WHEREAS , the Board of County Commissioners , on December 28 , 2000 , adopted Weld County Code Ordinance 2000 - 1 , enacting a comprehensive Code for the County of Weld , including the codification of all previously adopted ordinances of a general and permanent nature enacted on or before said date of adoption , and WHEREAS , the Weld County Code is in need of revision and clarification with regard to procedures . terms , and requirements therein . NOW, THEREFORE , BE IT ORDAINED by the Board of County Commissioners of the County of Weld , State of Colorado , that certain existing Chapters of the Weld County Code be , and hereby are . repealed and re-enacted , with amendments . and the various Chapters are revised to read as follows . CHAPTER 5 REVENUE AND FINANCE Appendix 5-A Commercial Rental Schedule — NO CHANGE Appendix 5- B Reserved Appendix 5-C Missile Site Park Fees — NO CHANGE Appendix 5- D Weld County Government Fees — ATTACHED Appendix 5- E Rates for Clerk to the Board — NO CHANGE Appendix 5- F GIS Fee Schedule — ATTACHED Appendix 5 - H Fees for 3 . 2 % Beer License or Liquor License — ATTACHED Appendix 5- I Clerk and Recorder Fees — ATTACHED Appendix 5-J Land Use Application Fees — ATTACHED Appendix 5- K Building Permit and Electrical Permit Application Fees — NO CHANGE Appendix 5- L Required Bid Amount — NO CHANGE Appendix 5- M Department of Public Works Permit Application Fees — NO CHANGEATTACHED Appendix 5- N Development Impact Fees — NO CHANGE Appendix 5-O Criminal Justice Records Retrieval — NO CHANGE PAGE 1 2018 - 3780 ORD2018 - 11 BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is, directed to arrange for Municode to supplement the Weld County Code with the amendments contained herein, to coincide with chapters, articles, divisions, sections, and subsections as they currently exist within said Code, and to resolve any inconsistencies regarding capitalization, grammar, and numbering or placement of chapters, articles, divisions, sections, and subsections in said Code BE IT FURTHER ORDAINED by the Board, if any section, subsection, paragraph, sentence, clause, or phrase of this Ordinance is for any reason held or decided to be unconstitutional, such decision shall not affect the validity of the remaining portions hereof The Board of County Commissioners hereby declares that it would have enacted this Ordinance in each and every section, subsection, paragraph, sentence, clause, and phrase thereof irrespective of the fact that any one or more sections, subsections, paragraphs, sentences, clauses, or phrases might be declared to be unconstitutional or invalid The above and foregoing Ordinance Number 2018-11 was, on motion duly made and seconded, adopted by the following vote on the 17th day of December, A D , 2018 BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST Steve Moreno, Chair Weld County Clerk to the Board Barbara Kirkmeyer, Pro-Tern BY Deputy Clerk to the Board Sean P Conway APPROVED AS TO FORM Julie A Cozad County Attorney Mike Freeman Date of signature PAGE 2 2018-3780 ORD2018-11 I , First Reading November 5, 2018 Publication November 14, 2018, in the Greeley Tribune Second Reading November 26, 2018 Publication December 5, 2018, in the Greeley Tribune Final Reading December 17, 2018 Publication December 26, 2018, in the Greeley Tribune Effective January 1, 2019 PAGE 3 2018-3780 ORD2018-11 APPENDIX 5-D -WELD COUNTY GOVERNMENT FEES Service Provided Fee Established 1 For the copying of public documents where the fee for such copying is not $0 25 per copy, or actual cost otherwise specified by statute 2 For the copying of public documents via laser jet printer, if feasible, and where the fee for such copying is not otherwise $0 25 per page, or actual cost specified by statute 3 Copy of the Home Rule Charter $5 00 + $3 00 postage if mailed 4 For Weld County road maps By size, as determined by Geographical Information Services Department 5 For the taking of fingerprints by the Weld County Sheriffs Office $10 00 per person (limit of 2 cards) The actual cost up to $30 00 per hour of time spent by custodian's staff performing such research and 6 For all research and retrieval of public retrieval, however, first hour of time spent is free records requested pursuant to the and custodian must be paid the estimated cost prior Colorado Open Records Act to custodian's staff commencing such research and retrieval Fees to be set by Board Resolution to recover full 7 Weed spraying truck and labor cost 8 District Attorney fee schedule (mailing fees may be added) The actual cost up to $30 00 per hour of time spent For all research and retrieval of public by custodian's staff performing such research and records requested pursuant to the retrieval, however, first hour of time spent is free Colorado Open Records Act and to the and custodian must be paid the estimated cost prior Colorado Criminal Justice Records Act to custodian's staff commencing such research and retrieval PAGE 4 2018-3780 ORD2018-11 For the copying of public documents, if feasible, and where the fee for such copying is not otherwise specified by $0 25 per page, or actual cost statute 9 Planning and building inspection Fee shall be actual cost of items plus handling and materials postage when mailed 10 Assignment of oil and gas lease $100 00 per lease, per assignment 11 Pretrial release supervision fee $20 00 per defendant 12 Returned checks $20 00 per check 13 Special transport permit fee $20 00 14 Drilling rig permit fee $1,000 00 per move 15 Motor vehicle identification number inspections Certified inspections $20 00 Noncertified inspections $12 00 16 Special district service plan filing fee $500 00 (Section 32-1-202(3), C R S ) Amended special district service plan $250 00 filing fee (Section 32-1-207, C R S ) Fee of$45 00 per hour of recording time If 17 Copying audiotape of public safety recording time exceeds one hour, copies shall be at a rate to fully recover the cost of the staff time telephone and radio voice recordings required and CD costs incurred to copy the CD as determined by the department head Minimum fee $45 00 PAGE 5 2018-3780 ORD2018-11 18 Sheriffs fees—copies of reports and/or other documents maintained by Criminal Justice Records VALE Surcharge $10 00 Report retrieval fee (to copy or to view) $3 00 Copy fee (first 2 pages free) $0 25 per page, or actual cost Mail request (first 2 pages) $3 50 (additional pages) $0 50 per page From archived medium (NO CHARGE TO VICTIMS) $1 00 per page Faxed copies Additional $1 00 per page 19 Co-pay for inmate medical services $10 00 per clinic visit $10 00 per prescription filled/refilled 20 Requests for clearance or immigration letters letter will include arrest records for all RMS contract agencies In-person requests (self) $7 00 Mail requests $7 50 Second party request or requests $12 00 requiring dispositions Second party request by mail or $12 50 requests requiring dispositions 21 Requests for broad computerized $7 50 per 15 minutes of search time, so as not to searches by name or location exceed $30 00 per hour PAGE 6 2018-3780 ORD2018-11 Additional fee if programming is $60 00 minimum and $60 00 each subsequent hour required 22 Assessor/Treasurer items Aerial maps $15 00 per map Printouts (copies) $0 25 per page, or actual cost Reports $200 00 setup and $50 00 per hour Rebilling delinquent accounts $5 00 23 Sheriff bond processing fee $10 00 per bond 24 Mug shot photo processing fee $10 00 per photo $100 00 (includes $52 50 for fingerprinting charge 25 CCW application for CO and FBI clearance) $38 00 for renewal (includes $13 00 CO insta- check fee) $15 00 late fee $39 50 for CCW Name Change $15 00 to replace lost or stolen CCW 26 Notary service No fee shall be charged by County staff 27 Independent fee calculation study $500 00 administrative cost fee Mileage charges reflected in separate Resolution, 28 Civil processing which will be reviewed annually PAGE 7 2018-3780 ORD2018-11 Mileage zones were created to introduce a flat rate and establish consistency in mileage rates from year to year The mileage zone is based on the distance from the Weld County Sheriff's Office Law Administration Building to the Post Office based on Zip Code The mileage fee will be charged based on the Zip Code of the mailing address of the Civil paperwork, and will only be charged once regardless of how many attempts are made or the miles actually driven 29 Temporary assemblage permit issued by the Board of County $100 00 per event Commissioners 30 Sex offender registration Annual fee for fingerprinting and photo, per Section 16-22-108(6), C R S $20 00 annually 31 Committing and discharging $30 00 prisoners in County jail 32 Justice Services work release fee $15 00 per day 33 Sheriffs documentation of $3 00 for one page incarceration $0 50 per additional page 34 Sex offender registration $25 00 to register $25 00 to re-register Copies shall be at a rate not to exceed $30 00 per 35 Copies of records (via burning of hour after the first hour, to recover the cost of the CDs) staff time required and CD costs incurred to copy the CD as determined by the department head 36 Reserved PAGE 8 2018-3780 ORD2018-11 The hourly rate shall be calculated on a full cost '37 Staff time for applicants or recovery basis of the County's costs for the staff positions involved in the assistance The full cost constituents that propose novel uses or development that does not fit into recovery rate shall be determined by the Director of established fee categories where staff Finance and Administration and shall include salary, fringe benefits, support costs (services and will spend 4 or more hours of review, supplies) and indirect costs calculated in oversight or assistance accordance with the County-wide cost allocation plan per Federal OMB-87 methodologies Constituents shall deposit the estimated amount of the costs prior to assistance The County will draw upon it based on the standard hourly rate for each staff providing the review, oversight or assistance 38 Coroner fee schedule Consistent with Colorado Open Records Act and items#1, #2, and #6, of this Appendix D PAGE 9 2018-3780 ORD2018-11 APPENDIX 5-F - GIS FEE SCHEDULE Panted Products Fee Established Photocopy or Property Portal prints $0 25 per page Custom print, up to tabloid size paper $1 00 per page Large format print up to 36" Minimum Dimension $5 00 per foot Large format print over 36" Minimum Dimension $10 00 per foot County Road Map—Large $15 00 County Road Map—Small $10 00 Property Ownership Map Book $30 00 Digital Maps $10 00 per digital file PAGE 10 2018-3780 ORD2018-11 APPENDIX 5-H - FEES FOR LIQUOR LICENSES (The fees listed in Appendix 5-H are to be considered in conjunction with the fees assigned by the Colorado Department of Revenue, Liquor Enforcement Division Contact the Weld County Clerk to the Board's Office for listing of current State fees ) PAGE 11 2018-3780 ORD2018-11 Application Fees ("N/A" Signifies No Local Fee —State Fee Payable to the Colorado Department of Revenue) Application Fee Equal to Maximum Allowable State Fee Application Fee with Concurrent Review Equal to Maximum Allowable State Fee Application Fee Transfer of Ownership $750 00 Application Fee for a Temporary Permit (Transfer of Ownership) $100 00 Application Fee Additional Liquor-Licensed Drugstore Equal to Maximum Allowable State Fee Application Fee Additional Liquor-Licensed Drugstore with Equal to Maximum Concurrent Review Allowable State Fee Application Fee Manager Permit N/A Application Late Renewal Fee (not more than 90-days of license $500 00 expiration date) Application Reissue Fee (more than 90-days but less than 180- $500 00 days of license expiration date) Application Reissue Fine (more than 90-days but less than 180- $25 00 Per Day Beyond days of license expiration date) 90-Day Expiration Date Annual Renewal Application Fee $100 00 Annual Art Gallery Fee $100 00 Retail License Fees ("N/A" Signifies No Local Fee —State Fee Payable to the Colorado Department of Revenue) Art $41 25 Beer &Wine $63 75 Brew Pub $75 00 Club $41 25 Distillery Pub $75 00 Hotel & Restaurant $75 00 Hotel Restaurant with one Optional Premises $75 00 Each Additional Optional Premises License N/A Resort Complex $75 00 Campus Liquor Complex $75 00 Related Facility— Resort Complex $15 00 Related Facility— Campus Liquor Complex $15 00 Liquor-Licensed Drugstore $37 50 PAGE 12 2018-3780 ORD2018-11 1 Lodging & Entertainment $75 00 Optional Premises $75 00 Racetrack $75 00 Retail Gaming Tavern $75 00 Retail Liquor Store $37 50 Tavern $75 00 Vintner's Restaurant $75 00 Fermented Malt Beverage On-Premises $7 50 Fermented Malt Beverage Off-Premises $7 50 Local and State Issued Permit Fees Art Gallery Permit $3 75 Bed & Breakfast Permit $3 75 Each Resort-Complex-Related Facility Permit $15 00 Special Events Permit Malt, Vinous and Spirituous Liquor $100 00 Fermented Malt Beverage (3 2% Beer) $100 00 Mini Bar Permit with Hotel Restaurant License $48 75 State License Fees ("N/A" Signifies No Local Fee —State Fee Payable to the Colorado Department of Revenue) Limited Winery License N/A Manufacturer's License (Distillery or Rectifier) N/A On or After August 10, 2016, and Before August 10, 2017 N/A On or After August 10, 2017 N/A Manufacturer's License (Brewery) N/A Manufacturer's License (Winery) N/A Nonresident Manufacturer's License (Malt Liquor) N/A Importer License - N/A Wholesaler's Liquor License N/A On or After August 10, 2016, and Before August 10, 2017 N/A On or After August 10, 2017 N/A PAGE 13 2018-3780 ' ORD2018-11 Wholesaler's Beer License N/A Public Transportation (dining, club or parlor car, plane, bus or N/A other vehicle) 3 2 % Beer Wholesaler License N/A 3 2% Beer Manufacturer's License N/A 3 2% Beer Importer's License N/A 3 2% Nonresident Manufacturer License N/A Additional Fees ("N/A" Signifies No Local Fee—State Fee Payable to the Colorado Department of Revenue) Alternating Proprietor Licensed Premises N/A Change of Location Equal to Maximum Allowable State Fee Change of Trade Name/Corporate Name N/A Corporate/LLC Change (per person) $100 00 Duplicate License N/A Add Optional Premises to Hotel & Restaurant License N/A Limited Liability Change N/A Manager Registration (Hotel & Restaurant, Tavern, Lodging & $75 00 Entertainment, Campus Liquor Complex) Master File Background N/A Master File Location Fee (per location) N/A Modification of Premises N/A Sole Source Registration N/A State Only Issued Permits ("N/A" Signifies No Local Fee—State Fee Payable to the Colorado Department of Revenue) Winery Direct Shipper Permit N/A Wine Packaging Permit N/A Wine Festival Permit N/A Branch Warehouse or Warehouse Storage Permit N/A Retail Warehouse Storage Permit N/A Manager Permit Registration (Liquor-Licensed Drugstore) N/A PAGE 14 2018-3780 ORD2018-11 APPENDIX 5-I - CLERK AND RECORDER FEES Description Fee RECORDING DEPARTMENT FEES GENERAL RECORDING 81/" x 11"-81/2" x 14" First page $13 00 Each additional page $5 00 EXCEPTIONS Oversized pages (Larger than 81/" x 14" Plats/Surveys) First page $13 00 Each additional page $10 00 $0 01 per$100 00 Documentary fee on all documents granting or conveying title to consideration if real property per Section 39-13-102, C R S consideration is greater than $500 00 OTHER GENERAL RECORDING FEES Federal tax liens and releases $8 00 School bonds, first page $13 00 Each additional page $5 00 Military discharge No charge UCCs (real estate only) PAGE 15 2018-3780 ORD2018-11 One or two pages $11 00 Three or more pages $16 00 All e-Recorded UCC statements $8 00 MARRIAGE/CIVIL UNION FEES Marriage licenses/Civil unions (cash only) $30 00 Copy of marriage license $3 00 COPY FEES Per page (Smaller than 8 5" x 14") $0 25 , Oversized pages (larger than 8W x 14") $5 00 Certification—per document $1 00 Certified school record $1 75 Military discharge No charge Postage fees 1-7 pages $1 00 Postage fees 8-60 pages $3 00 Postage fees 61+ pages $5 00 To avoid paying a postage fee, please include a self-addressed stamped envelope with your request The envelope must be large enough to accommodate the number of copies requested RETURNED CHECKS (per check) $20 00 SPECIAL SERVICES Share file (FTP per month) $500 00 PAGE 16 2018-3780 ORD2018-11 Deed report subscription (per year) $200 00 Paper reports—per page $0 05 Certificate of magistracy $2 00 Each additional year $2 00 Document images on compact disc Daily $10 00 Weekly $25 00 Monthly $100 00 EAGLE WEB One month subscription (unlimited access) $300 00 Web copies without a subscription First page $0 50 Each additional page $0 25 ELECTION DEPARTMENT FEES Voter certification $1 00 Electronic voter list on compact disc or email ( csv or txt format) $50 00 Voter list on paper (per page) $0 25 Locator (each) $30 00 Maps (each) colored copy $15 00 Copies (per page) $0 25 PAGE 17 2018-3780 ORD2018-11 Certified copies (per page) $1 25 Statement of votes cast Electronic copy $10 00 Paper copy (per page) $0 25 Mail-in ballot status subscription ( csv or txt format) per $150 00 election cycle Early voting list subscription ( csv or txt format) per election $150 00 cycle Voter address labels Setup fee $50 00 Per label $0 02 PAGE 18 2018-3780 ORD2018-11 APPENDIX 5-J - PLANNING FEE SCHEDULE 2012 Land Use Application Fee Use by Special Review $ 1 , 200 . 00 - Single-family dwelling units ( other than those permitted under Subsection 23- 3-20 . A . ) - Expansion of a nonconforming use - Home business - Animal boarding as permitted in Paragraph 23- 3 -40 . B . 10 - Bed and breakfast facility - Oil and gas storage facilities 1 . - Accessory buildings with a gross floor area larger than set forth in Subsection 23-3-40 . Q - Composting facilities $2 , 415 . 00 - Confined animal feedlot operation - Less than or equal to 1 , 000 animal units $2 , 415 . 00 Up to and including each additional 1 . 000 animal units 1 $500 . 00 - Sanitary sewer facility $ 10 , 000 . 00 $5 , 000 . 00 for the first 10 acres plus $20 . 00 - Mining permit per acre or fraction thereof in excess of 10 acres PAGE 19 2018- 3780 ORD2018 - 11 - Solid waste disposal 2 $20,000 00 - Hazard waste disposal site $100,000 00 - Non-1041 major facility of a utility $5,000 00 - 1041 facilities as defined in Chapter 21 of this Code $10,000 00 -All other use by special review permits $2,500 00 - Minor use by special review amendment $500 00 -Weld Oil and Gas Land Assessment Permit (WOGLA) $500 00 - WOGLA's that require BOCC review Additional $2,500 00 Location Assessment for Pipelines (LAP) - Pipelines less than 25 miles in length $1,000 00 - Pipelines greater than 25 miles in length $1,500 00 - Pipelines that require BOCC review Additional $2,500 00 Flood Hazard Development Permit (FHDP) $180 00 Planned Unit Development (1-9 lots) - Sketch plan $2,100 00 - Change of zone $1,500 00 plus $50 00 per buildable lot 2 - Final plat $1,500 00 plus $100 00 per buildable lot3 Planned Unit Development (10 or more lots) - Sketch plan $5,000 00 PAGE 20 2018-3780 ORD2018-11 - Change of zone $3,000 00 plus $50 00 per buildable lot - Final plat $3,000 00 plus $100 00 per buildable lot3 Minor Subdivision (1-9 lots) - Sketch plan $2,100 00 - Change of zone $1,500 00 plus $50 00 per buildable lot - Final plat $1,500 00 plus $100 00 per buildable lot3 Major Subdivision (10 or more lots) 3 - Sketch plan $5,000 00 - Preliminary plan $2,100 00 - Change of zone $3,000 00 plus $50 00 per buildable lot - Final plat $3,000 00 plus $100 00 per buildable lot3 Resubdivision - Lot line changes only $500 00 4 - Vacation of roads, streets or alleys only $500 00 $500 00 + $150 00 per - Redesign, additional lots or vacation of lots buildable lot PAGE 21 2018-3780 ORD2018-11 Subdivision Exemptions - Used with recorded exemptions $180 00 - Property line adjustment $180 00 5 - Financing $180 00 - Temporary use $180 00 - Public and private utility $400 00 Recorded Exemptions (2-, 3- and 4-lot) - 2'lot RE $1,000 00 16 - 3 lot RE $1,300 00 - 4 lot RE $1,600 00 -Amendments $180 00 Zoning Permit - Mobile homes, manufactured homes, accessory dwellings, $300 00 7 temporary dwellings -Temporary storage (6 months) of a mobile home $75 00 - Change of use (if mobile home is existing) $75 00 Accessory Storage/ Semi-Trailer (ZPAS) $75 00 - Commercial Vehicle (ZPCV) $75 00 8 Zoning Permit for Second Family Dwelling $500 00 9 Zoning Permit for Telecommunication Antenna Tower $500 00 PAGE 22 2018-3780 ORD2018-11 110 Zoning Permit for Noncommercial Tower $500 00 11 Zoning Permit for Home Occupation - Class II $300 00 I 112 Zoning Permit for Home Occupation - Class I $50 00 13 Zoning Permit for Wind Generator $300 00 14 Temporary Seasonal Permit $75 00 Board of Adjustment 115 - Variance $710 00 -Appeal $200 00 1 Change of Zone - Residential and agricultural uses $2,100 00 plus $150 00 16 per buildable lot - Commercial/industrial $5,500 00 plus $150 00 per buildable lot 1 Site Plan Review -Amendment $500 00 - Buildings <10,000 gross sq ft $1,300 00 17 - Buildings between 10,000-25,000 gross sq ft $2,800 00 - Building >25,000 gross sq ft $5,000 00 -Tenant finish $60 00 I 118 Substantial Change Hearing $2,000 00 PAGE 23 2018-3780 ORD2018-11 19 Administrative Handling Fee - Special Request $100 00 20 Building Permit/Illegal Parcel $250 00 50% of the established 21 Investigation Fee application fee / A fee will be charged by the County to future applicants when County staff members are asked to assist professional consultants in the preparation of land use applications The fee shall be an hourly rate charged in 15-minute increments The hourly rate shall be calculated on a full cost recovery basis of the County's costs for the staff positions involved in the assistance 22 The full cost recovery rate shall be determined by the Director of Finance and Administration and shall include salary, fringe benefits, support costs (services and supplies) and indirect costs calculated in accordance with the County-wide cost allocation plan per Federal OMB-87 methodologies Preapplicants shall deposit an estimated amount of the costs prior to the assistance A final settlement of costs will be determined by the DPS once all the work has been completed I 23 Incidental, Nontechnical Land Use Application Assistance $50 00 per hour Amendment to Any Regional Urbanization Area Map and $1,500 00 minimum or 24 $700 00 per parcel, Comprehensive Plan whichever is greater 25 Creation of a Regional Urbanization Area $25 00 per acre Administrative Process - Case continuance $150 00 26 - Hearing continuance $500 00 - Recording continuance $50 00 per 3 months 27 Additional_Fees May Be Assessed to Cover Publication Costs Market rate PAGE 24 2018-3780 ORD2018-11 28 Outside Consultant for Professional Review Necessity for professional rate Review to Be Determined by the Director For those applications for uses identified to be of high complexity or intensity where a determination is made that County staff will be committing time and resources The applicant shall deposit an estimated amount of the costs prior to assistance The fee will be held and charged against by the County based on the standard hourly rate for each department administering or reviewing the permit The departments shall include, but not be limited to, the Department of Planning Services, Health Department, Public Works and the County Attorney's Office The standard hourly rate shall be established by the Finance Department for the actual time spent on the review of the application The rate shall 29 be calculated on a full cost recovery basis of the County's cost and shall include salary, fringe benefits, support costs (services and supplies) and indirect costs calculated in accordance with the County-wide cost allocation plan per Federal OMB-87 methodologies The applicant shall be provided copies of the billing 5 days prior to the cost actually being billed The applicant's sole remedy to appeal any billing shall be to the Board of County Commissioners The unused portion of the submitted application fee shall be returned to the applicant within 30 days of recording the Special Review plan map, within 30 days after denial of the application by the Board of County Commissioners, or 30 days after the applicant submits a written request to withdraw the application 'Animal units as defined in Section 23-1-90 of this Code PAGE 25 2018-3780 ORD2018-11 2 The fee to amend an application for a Special Review Permit for Solid Waste Disposal Sites and Facilities shall not exceed $20,000 00 The full amount shall be submitted to the Department of Planning Services at the time a complete application is submitted The fee will be held and charged against by the County based on the standard hourly rate for each department administering or reviewing the permit The departments shall include, but not be limited to, the Department of Planning Services, Health Department, Public Works and the County Attorney's Office The standard hourly rate shall be established by the Weld County Finance Department for the actual time spent on the review of the application and facility The rate shall be calculated on a full cost recovery basis of the County's cost and shall include salary, fringe benefits, support costs (services and supplies) and indirect costs calculated in accordance with the County-wide cost allocation plan per Federal OMB-87 methodologies The applicant shall be provided copies of the billing 5 days prior to the cost actually being billed The applicant's sole remedy to appeal any billing shall be to the Board of County Commissioners The unused portion of the submitted application fee shall be returned to the applicant within 30 days of recording the amended Special Review plan map, within 30 days after denial of the application by the Board of County Commissioners, or 30 days after the applicant submits a written request to withdraw the application 325% of this fee is due at the time of application, and the remaining 75% due at the time of building permit issuance Development Impact Fees 1 Road Impact Fee Fee Schedule in Chapter 20 of this Code 2 County Facilities Impact Fee Fee Schedule in Chapter 20 of this Code 3 Drainage Impact Fee Fee Schedule in Chapter 20 of this Code PAGE 26 2018-3780 ORD2018-11 APPENDIX 5 - M - DEPARTMENT OF PUBLIC WORKS PERMIT APPLICATION FEES Type Fee 1 . Development Construction Permit Dwelling units $ 150 . 00/lot Nondwelling units ! $ 750 . 00/lot 2 . Offsite Road Agreements/Haul Route Agreement 500 . 00 Review $ 3 . Flood Hazard Development Permit $ 180 . 00 4 . Stormwater Permit 4 $ 180 . 00 5 . Geologic Hazard Permit [ Fee TBD by State Geological Survey � g 6 . Nonexclusive License Agreements $ 100 . 00 g � _ 7 . Nonexclusive Cross Road Signs ( Installation and Fabrication ) $ 150 . 00 8 . Access Permit Fees a ) Field Access Permit ( agricultural only ) Exempt b ) Single residential access $75 . 00 c) Subdivision access 1 $ 150 . 00 d ) Commercial or oil and gas access ( up to 50 $75 . 00 veh/day ) e ) Industrial or commercial access ( more than 50 $ 150 . 00 veh/day) f) Temporary access (expires within 6 months ) ! $75 . 00 p g ) Inspection outside normal work hours $ 50 . 00/hr h ) Working prior to permit approval Subtotal x 2 i ) Public safety violation $200 . 00 Type Fee Unit I Minimum 9 . Right-of-Way Use Permit Fees A ) Permit fee Admin , review and inspection $ 125150 . 00 *Admin , review and no 75 . OON/A inspection Permit revision $75 . 00 PAGE 27 2018- 3780 ORD2018 - 11 Permit extension $ 150 . 00 B ) Annual permit Admin , review and inspection 1 $2-50300 . 00 ON 1 - C ) Road bore $75 . 00 Line outside diameter < 12" - Road bore with bore its located in $75 . 00 + 30/LF er p Line outside diameter 12" to R . O . W . p � 20" — 100 . 00 + . 30/LF teoatEon Line outside diameter > 20" — , $ 125 . 00 + . 30/LF $2-5700 Line outside diameter < 12" Road bore with bore pith located $50 . 00 + . 30/LF per _ outside R . O . W . Line outside diameter 12" to location - 20" — $75 . 00 + . 30/LF Line outside diameter > 20" — $ 100 . 00 + . 30/LF Line outside diameter < 12" - $25 . 00 + . 30/LF Bore parallel in R . O . W. outside Line outside diameter 12 " to R . O . W . 20 " — $50 . 00 + . 30/LF Line outside diameter > 20" — $75 . 00 + . 30/LF D ) Work within a hard surface roadway $2 . 002 . 50 per sq ft 5 years or older — min $75 . 00 Trench w/structural fill or flowable fill sq ft newer than 5 sf- $50 . 00 $5 . 00 per years — min $ 100 . 00 Test hole/pot hole — 8" or less $20 . 0050 . 00 per hole each E ) Work within a gravel roadway $0 . 501 . 00 per sq ft $50 . 00 Trench w/ structural fill min $20 . 00 Test hole/pot hole — 8" or less $ 10 . 0025 . 00 per hole each Trench w/structural fill or flowfill $2 . 50 SF - $50 . 00 min treated gravel Test hole/pothole treated gravel $50 . 00 per hole F ) Work in R . O . W . outside of roadway PAGE 28 2018- 3780 ORD2018- 11 $0 . 20Trench width up to 12 " - $0 . 30/LF Trenching /plow or cable puller Trench width 12 " to 20" - $ 15 . 00 $0 . 60/LF Trench width > 20" - $0 . 90/LF Test hole/pot hole — 8 " or less $ 10 . 00 per hole each Occupation Fee $0 . 25/LF $ 50 . 00 min G ) New appurtenance ( meters , vaults , poles , etc . ) 3 sq . ft . or less T $250 . 00 each Greater than 3 sq . ft . J $ 150 . 00175 . 00 each H ) Abandonment Abandon n-gment/Retirement of line $75 . 0012 " = < $75 . 00 + 0 . 50/LF each in R . O . W . 12 " > $ 150 . 00 + 0 . 50/LF Subtotal x 2Total of all fees * I ) _Working prior to permit approval number days delinquent a Emergency repairs excluded J ) * Public safety violation $2050 . 00 K ) Inspection outside normal work $50 . 00 . /hr75 . 00 per hour with hours a 2 hour min *As determined by Public Works PAGE 29 2018- 3780 ORD2018- 11 Hello