HomeMy WebLinkAbout20183780.tiff ?dizezrnt
/ / ' - / 1
WELD COUNTY
CODE ORDINANCE 2018 - 11
IN THE MATTER OF REPEALING AND REENACTING , WITH AMENDMENTS , CHAPTER 5
REVENUE AND FINANCE , OF THE WELD COUNTY CODE
BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF
WELD , STATE OF COLORADO :
WHEREAS , the Board of County Commissioners of the County of Weld , State of
Colorado , pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with
the authority of administering the affairs of Weld County , Colorado , and
WHEREAS , the Board of County Commissioners , on December 28 , 2000 , adopted Weld
County Code Ordinance 2000 - 1 , enacting a comprehensive Code for the County of Weld ,
including the codification of all previously adopted ordinances of a general and permanent nature
enacted on or before said date of adoption , and
WHEREAS , the Weld County Code is in need of revision and clarification with regard to
procedures . terms , and requirements therein .
NOW, THEREFORE , BE IT ORDAINED by the Board of County Commissioners of the
County of Weld , State of Colorado , that certain existing Chapters of the Weld County Code be ,
and hereby are . repealed and re-enacted , with amendments . and the various Chapters are
revised to read as follows .
CHAPTER 5
REVENUE AND FINANCE
Appendix 5-A Commercial Rental Schedule — NO CHANGE
Appendix 5- B Reserved
Appendix 5-C Missile Site Park Fees — NO CHANGE
Appendix 5- D Weld County Government Fees — ATTACHED
Appendix 5- E Rates for Clerk to the Board — NO CHANGE
Appendix 5- F GIS Fee Schedule — ATTACHED
Appendix 5 - H Fees for 3 . 2 % Beer License or Liquor License — ATTACHED
Appendix 5- I Clerk and Recorder Fees — ATTACHED
Appendix 5-J Land Use Application Fees — ATTACHED
Appendix 5- K Building Permit and Electrical Permit Application Fees — NO CHANGE
Appendix 5- L Required Bid Amount — NO CHANGE
Appendix 5- M Department of Public Works Permit Application Fees — NO CHANGEATTACHED
Appendix 5- N Development Impact Fees — NO CHANGE
Appendix 5-O Criminal Justice Records Retrieval — NO CHANGE
PAGE 1
2018 - 3780
ORD2018 - 11
BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is,
directed to arrange for Municode to supplement the Weld County Code with the amendments
contained herein, to coincide with chapters, articles, divisions, sections, and subsections as they
currently exist within said Code, and to resolve any inconsistencies regarding capitalization,
grammar, and numbering or placement of chapters, articles, divisions, sections, and subsections
in said Code
BE IT FURTHER ORDAINED by the Board, if any section, subsection, paragraph,
sentence, clause, or phrase of this Ordinance is for any reason held or decided to be
unconstitutional, such decision shall not affect the validity of the remaining portions hereof The
Board of County Commissioners hereby declares that it would have enacted this Ordinance in
each and every section, subsection, paragraph, sentence, clause, and phrase thereof irrespective
of the fact that any one or more sections, subsections, paragraphs, sentences, clauses, or
phrases might be declared to be unconstitutional or invalid
The above and foregoing Ordinance Number 2018-11 was, on motion duly made and
seconded, adopted by the following vote on the 17th day of December, A D , 2018
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST
Steve Moreno, Chair
Weld County Clerk to the Board
Barbara Kirkmeyer, Pro-Tern
BY
Deputy Clerk to the Board
Sean P Conway
APPROVED AS TO FORM
Julie A Cozad
County Attorney
Mike Freeman
Date of signature
PAGE 2
2018-3780
ORD2018-11
I
,
First Reading November 5, 2018
Publication November 14, 2018, in the Greeley Tribune
Second Reading November 26, 2018
Publication December 5, 2018, in the Greeley Tribune
Final Reading December 17, 2018
Publication December 26, 2018, in the Greeley Tribune
Effective January 1, 2019
PAGE 3
2018-3780
ORD2018-11
APPENDIX 5-D -WELD COUNTY GOVERNMENT FEES
Service Provided Fee Established
1 For the copying of public documents
where the fee for such copying is not $0 25 per copy, or actual cost
otherwise specified by statute
2 For the copying of public documents
via laser jet printer, if feasible, and where
the fee for such copying is not otherwise $0 25 per page, or actual cost
specified by statute
3 Copy of the Home Rule Charter $5 00 + $3 00 postage if mailed
4 For Weld County road maps By size, as determined by Geographical
Information Services Department
5 For the taking of fingerprints by the
Weld County Sheriffs Office $10 00 per person (limit of 2 cards)
The actual cost up to $30 00 per hour of time spent
by custodian's staff performing such research and
6 For all research and retrieval of public retrieval, however, first hour of time spent is free
records requested pursuant to the and custodian must be paid the estimated cost prior
Colorado Open Records Act
to custodian's staff commencing such research and
retrieval
Fees to be set by Board Resolution to recover full
7 Weed spraying truck and labor
cost
8 District Attorney fee schedule (mailing fees may be added)
The actual cost up to $30 00 per hour of time spent
For all research and retrieval of public by custodian's staff performing such research and
records requested pursuant to the retrieval, however, first hour of time spent is free
Colorado Open Records Act and to the and custodian must be paid the estimated cost prior
Colorado Criminal Justice Records Act to custodian's staff commencing such research and
retrieval
PAGE 4
2018-3780
ORD2018-11
For the copying of public documents, if
feasible, and where the fee for such
copying is not otherwise specified by $0 25 per page, or actual cost
statute
9 Planning and building inspection Fee shall be actual cost of items plus handling and
materials postage when mailed
10 Assignment of oil and gas lease $100 00 per lease, per assignment
11 Pretrial release supervision fee $20 00 per defendant
12 Returned checks $20 00 per check
13 Special transport permit fee $20 00
14 Drilling rig permit fee $1,000 00 per move
15 Motor vehicle identification number
inspections
Certified inspections $20 00
Noncertified inspections $12 00
16 Special district service plan filing fee $500 00
(Section 32-1-202(3), C R S )
Amended special district service plan $250 00
filing fee (Section 32-1-207, C R S )
Fee of$45 00 per hour of recording time If
17 Copying audiotape of public safety recording time exceeds one hour, copies shall be at
a rate to fully recover the cost of the staff time
telephone and radio voice recordings
required and CD costs incurred to copy the CD as
determined by the department head
Minimum fee $45 00
PAGE 5
2018-3780
ORD2018-11
18 Sheriffs fees—copies of reports
and/or other documents maintained by
Criminal Justice Records
VALE Surcharge $10 00
Report retrieval fee (to copy or to view) $3 00
Copy fee (first 2 pages free) $0 25 per page, or actual cost
Mail request (first 2 pages) $3 50
(additional pages) $0 50 per page
From archived medium (NO CHARGE
TO VICTIMS) $1 00 per page
Faxed copies Additional $1 00 per page
19 Co-pay for inmate medical services $10 00 per clinic visit
$10 00 per prescription filled/refilled
20 Requests for clearance or immigration
letters letter will include arrest records
for all RMS contract agencies
In-person requests (self) $7 00
Mail requests $7 50
Second party request or requests $12 00
requiring dispositions
Second party request by mail or $12 50
requests requiring dispositions
21 Requests for broad computerized $7 50 per 15 minutes of search time, so as not to
searches by name or location exceed $30 00 per hour
PAGE 6
2018-3780
ORD2018-11
Additional fee if programming is
$60 00 minimum and $60 00 each subsequent hour
required
22 Assessor/Treasurer items
Aerial maps $15 00 per map
Printouts (copies) $0 25 per page, or actual cost
Reports $200 00 setup and $50 00 per hour
Rebilling delinquent accounts $5 00
23 Sheriff bond processing fee $10 00 per bond
24 Mug shot photo processing fee $10 00 per photo
$100 00 (includes $52 50 for fingerprinting charge
25 CCW application
for CO and FBI clearance)
$38 00 for renewal (includes $13 00 CO insta-
check fee)
$15 00 late fee
$39 50 for CCW Name Change
$15 00 to replace lost or stolen CCW
26 Notary service No fee shall be charged by County staff
27 Independent fee calculation study $500 00
administrative cost fee
Mileage charges reflected in separate Resolution,
28 Civil processing which will be reviewed annually
PAGE 7
2018-3780
ORD2018-11
Mileage zones were created to introduce a flat rate
and establish consistency in mileage rates from
year to year The mileage zone is based on the
distance from the Weld County Sheriff's Office Law
Administration Building to the Post Office based on
Zip Code The mileage fee will be charged based
on the Zip Code of the mailing address of the Civil
paperwork, and will only be charged once
regardless of how many attempts are made or the
miles actually driven
29 Temporary assemblage permit
issued by the Board of County $100 00 per event
Commissioners
30 Sex offender registration
Annual fee for fingerprinting and photo,
per Section 16-22-108(6), C R S $20 00 annually
31 Committing and discharging $30 00
prisoners in County jail
32 Justice Services work release fee $15 00 per day
33 Sheriffs documentation of $3 00 for one page
incarceration
$0 50 per additional page
34 Sex offender registration $25 00 to register
$25 00 to re-register
Copies shall be at a rate not to exceed $30 00 per
35 Copies of records (via burning of hour after the first hour, to recover the cost of the
CDs) staff time required and CD costs incurred to copy
the CD as determined by the department head
36 Reserved
PAGE 8
2018-3780
ORD2018-11
The hourly rate shall be calculated on a full cost
'37 Staff time for applicants or
recovery basis of the County's costs for the staff
positions involved in the assistance The full cost
constituents that propose novel uses or
development that does not fit into recovery rate shall be determined by the Director of
established fee categories where staff Finance and Administration and shall include
salary, fringe benefits, support costs (services and
will spend 4 or more hours of review, supplies) and indirect costs calculated in
oversight or assistance accordance with the County-wide cost allocation
plan per Federal OMB-87 methodologies
Constituents shall deposit the estimated amount of
the costs prior to assistance The County will draw
upon it based on the standard hourly rate for each
staff providing the review, oversight or assistance
38 Coroner fee schedule Consistent with Colorado Open Records Act and
items#1, #2, and #6, of this Appendix D
PAGE 9
2018-3780
ORD2018-11
APPENDIX 5-F - GIS FEE SCHEDULE
Panted Products Fee Established
Photocopy or Property Portal prints $0 25 per page
Custom print, up to tabloid size paper $1 00 per page
Large format print up to 36" Minimum Dimension $5 00 per foot
Large format print over 36" Minimum Dimension $10 00 per foot
County Road Map—Large $15 00
County Road Map—Small $10 00
Property Ownership Map Book $30 00
Digital Maps $10 00 per digital file
PAGE 10
2018-3780
ORD2018-11
APPENDIX 5-H - FEES FOR LIQUOR LICENSES
(The fees listed in Appendix 5-H are to be considered in conjunction with the fees assigned by
the Colorado Department of Revenue, Liquor Enforcement Division Contact the Weld County
Clerk to the Board's Office for listing of current State fees )
PAGE 11
2018-3780
ORD2018-11
Application Fees
("N/A" Signifies No Local Fee —State Fee Payable to the Colorado Department of Revenue)
Application Fee Equal to Maximum
Allowable State Fee
Application Fee with Concurrent Review Equal to Maximum
Allowable State Fee
Application Fee Transfer of Ownership $750 00
Application Fee for a Temporary Permit (Transfer of Ownership) $100 00
Application Fee Additional Liquor-Licensed Drugstore Equal to Maximum
Allowable State Fee
Application Fee Additional Liquor-Licensed Drugstore with Equal to Maximum
Concurrent Review Allowable State Fee
Application Fee Manager Permit N/A
Application Late Renewal Fee (not more than 90-days of license $500 00
expiration date)
Application Reissue Fee (more than 90-days but less than 180- $500 00
days of license expiration date)
Application Reissue Fine (more than 90-days but less than 180- $25 00 Per Day Beyond
days of license expiration date) 90-Day Expiration Date
Annual Renewal Application Fee $100 00
Annual Art Gallery Fee $100 00
Retail License Fees
("N/A" Signifies No Local Fee —State Fee Payable to the Colorado Department of Revenue)
Art $41 25
Beer &Wine $63 75
Brew Pub $75 00
Club $41 25
Distillery Pub $75 00
Hotel & Restaurant $75 00
Hotel Restaurant with one Optional Premises $75 00
Each Additional Optional Premises License N/A
Resort Complex $75 00
Campus Liquor Complex $75 00
Related Facility— Resort Complex $15 00
Related Facility— Campus Liquor Complex $15 00
Liquor-Licensed Drugstore $37 50
PAGE 12
2018-3780
ORD2018-11
1
Lodging & Entertainment $75 00
Optional Premises $75 00
Racetrack $75 00
Retail Gaming Tavern $75 00
Retail Liquor Store $37 50
Tavern $75 00
Vintner's Restaurant $75 00
Fermented Malt Beverage On-Premises $7 50
Fermented Malt Beverage Off-Premises $7 50
Local and State Issued Permit Fees
Art Gallery Permit $3 75
Bed & Breakfast Permit $3 75
Each Resort-Complex-Related Facility Permit $15 00
Special Events Permit
Malt, Vinous and Spirituous Liquor $100 00
Fermented Malt Beverage (3 2% Beer) $100 00
Mini Bar Permit with Hotel Restaurant License $48 75
State License Fees
("N/A" Signifies No Local Fee —State Fee Payable to the Colorado Department of Revenue)
Limited Winery License N/A
Manufacturer's License (Distillery or Rectifier) N/A
On or After August 10, 2016, and Before August 10, 2017 N/A
On or After August 10, 2017 N/A
Manufacturer's License (Brewery) N/A
Manufacturer's License (Winery) N/A
Nonresident Manufacturer's License (Malt Liquor) N/A
Importer License - N/A
Wholesaler's Liquor License N/A
On or After August 10, 2016, and Before August 10, 2017 N/A
On or After August 10, 2017 N/A
PAGE 13
2018-3780
' ORD2018-11
Wholesaler's Beer License N/A
Public Transportation (dining, club or parlor car, plane, bus or N/A
other vehicle)
3 2 % Beer Wholesaler License N/A
3 2% Beer Manufacturer's License N/A
3 2% Beer Importer's License N/A
3 2% Nonresident Manufacturer License N/A
Additional Fees
("N/A" Signifies No Local Fee—State Fee Payable to the Colorado Department of Revenue)
Alternating Proprietor Licensed Premises N/A
Change of Location Equal to Maximum
Allowable State Fee
Change of Trade Name/Corporate Name N/A
Corporate/LLC Change (per person) $100 00
Duplicate License N/A
Add Optional Premises to Hotel & Restaurant License N/A
Limited Liability Change N/A
Manager Registration (Hotel & Restaurant, Tavern, Lodging & $75 00
Entertainment, Campus Liquor Complex)
Master File Background N/A
Master File Location Fee (per location) N/A
Modification of Premises N/A
Sole Source Registration N/A
State Only Issued Permits
("N/A" Signifies No Local Fee—State Fee Payable to the Colorado Department of Revenue)
Winery Direct Shipper Permit N/A
Wine Packaging Permit N/A
Wine Festival Permit N/A
Branch Warehouse or Warehouse Storage Permit N/A
Retail Warehouse Storage Permit N/A
Manager Permit Registration (Liquor-Licensed Drugstore) N/A
PAGE 14
2018-3780
ORD2018-11
APPENDIX 5-I - CLERK AND RECORDER FEES
Description Fee
RECORDING DEPARTMENT FEES
GENERAL RECORDING
81/" x 11"-81/2" x 14"
First page $13 00
Each additional page $5 00
EXCEPTIONS
Oversized pages (Larger than 81/" x 14" Plats/Surveys)
First page $13 00
Each additional page $10 00
$0 01 per$100 00
Documentary fee on all documents granting or conveying title to consideration if
real property per Section 39-13-102, C R S consideration is greater
than $500 00
OTHER GENERAL RECORDING FEES
Federal tax liens and releases $8 00
School bonds, first page $13 00
Each additional page $5 00
Military discharge No charge
UCCs (real estate only)
PAGE 15
2018-3780
ORD2018-11
One or two pages $11 00
Three or more pages $16 00
All e-Recorded UCC statements $8 00
MARRIAGE/CIVIL UNION FEES
Marriage licenses/Civil unions (cash only) $30 00
Copy of marriage license $3 00
COPY FEES
Per page (Smaller than 8 5" x 14") $0 25
,
Oversized pages (larger than 8W x 14") $5 00
Certification—per document $1 00
Certified school record $1 75
Military discharge No charge
Postage fees 1-7 pages $1 00
Postage fees 8-60 pages $3 00
Postage fees 61+ pages $5 00
To avoid paying a postage fee, please include a self-addressed
stamped envelope with your request The envelope must be large
enough to accommodate the number of copies requested
RETURNED CHECKS (per check) $20 00
SPECIAL SERVICES
Share file (FTP per month) $500 00
PAGE 16
2018-3780
ORD2018-11
Deed report subscription (per year) $200 00
Paper reports—per page $0 05
Certificate of magistracy $2 00
Each additional year $2 00
Document images on compact disc
Daily $10 00
Weekly $25 00
Monthly $100 00
EAGLE WEB
One month subscription (unlimited access) $300 00
Web copies without a subscription
First page $0 50
Each additional page $0 25
ELECTION DEPARTMENT FEES
Voter certification $1 00
Electronic voter list on compact disc or email ( csv or txt format) $50 00
Voter list on paper (per page) $0 25
Locator (each) $30 00
Maps (each) colored copy $15 00
Copies (per page) $0 25
PAGE 17
2018-3780
ORD2018-11
Certified copies (per page) $1 25
Statement of votes cast
Electronic copy $10 00
Paper copy (per page) $0 25
Mail-in ballot status subscription ( csv or txt format) per $150 00
election cycle
Early voting list subscription ( csv or txt format) per election $150 00
cycle
Voter address labels
Setup fee $50 00
Per label $0 02
PAGE 18
2018-3780
ORD2018-11
APPENDIX 5-J - PLANNING FEE SCHEDULE 2012
Land Use Application Fee
Use by Special Review $ 1 , 200 . 00
- Single-family dwelling units ( other than those permitted
under Subsection 23- 3-20 . A . )
- Expansion of a nonconforming use
- Home business
- Animal boarding as permitted in Paragraph 23- 3 -40 . B . 10
- Bed and breakfast facility
- Oil and gas storage facilities
1 . - Accessory buildings with a gross floor area larger than set
forth in Subsection 23-3-40 . Q
- Composting facilities $2 , 415 . 00
- Confined animal feedlot operation
-
Less than or equal to 1 , 000 animal units $2 , 415 . 00
Up to and including each additional 1 . 000 animal units 1 $500 . 00
- Sanitary sewer facility $ 10 , 000 . 00
$5 , 000 . 00 for the first
10 acres plus $20 . 00
- Mining permit per acre or fraction
thereof in excess of 10
acres
PAGE 19
2018- 3780
ORD2018 - 11
- Solid waste disposal 2 $20,000 00
- Hazard waste disposal site $100,000 00
- Non-1041 major facility of a utility $5,000 00
- 1041 facilities as defined in Chapter 21 of this Code $10,000 00
-All other use by special review permits $2,500 00
- Minor use by special review amendment $500 00
-Weld Oil and Gas Land Assessment Permit (WOGLA) $500 00
- WOGLA's that require BOCC review Additional $2,500 00
Location Assessment for Pipelines (LAP)
- Pipelines less than 25 miles in length $1,000 00
- Pipelines greater than 25 miles in length $1,500 00
- Pipelines that require BOCC review Additional $2,500 00
Flood Hazard Development Permit (FHDP) $180 00
Planned Unit Development (1-9 lots)
- Sketch plan $2,100 00
- Change of zone $1,500 00 plus $50 00
per buildable lot
2
- Final plat $1,500 00 plus $100 00
per buildable lot3
Planned Unit Development (10 or more lots)
- Sketch plan $5,000 00
PAGE 20
2018-3780
ORD2018-11
- Change of zone $3,000 00 plus $50 00
per buildable lot
- Final plat $3,000 00 plus $100 00
per buildable lot3
Minor Subdivision (1-9 lots)
- Sketch plan $2,100 00
- Change of zone $1,500 00 plus $50 00
per buildable lot
- Final plat $1,500 00 plus $100 00
per buildable lot3
Major Subdivision (10 or more lots)
3
- Sketch plan $5,000 00
- Preliminary plan $2,100 00
- Change of zone $3,000 00 plus $50 00
per buildable lot
- Final plat $3,000 00 plus $100 00
per buildable lot3
Resubdivision
- Lot line changes only $500 00
4
- Vacation of roads, streets or alleys only $500 00
$500 00 + $150 00 per
- Redesign, additional lots or vacation of lots buildable lot
PAGE 21
2018-3780
ORD2018-11
Subdivision Exemptions
- Used with recorded exemptions $180 00
- Property line adjustment $180 00
5
- Financing $180 00
- Temporary use $180 00
- Public and private utility $400 00
Recorded Exemptions (2-, 3- and 4-lot)
- 2'lot RE $1,000 00
16 - 3 lot RE $1,300 00
- 4 lot RE $1,600 00
-Amendments $180 00
Zoning Permit
- Mobile homes, manufactured homes, accessory dwellings, $300 00
7 temporary dwellings
-Temporary storage (6 months) of a mobile home $75 00
- Change of use (if mobile home is existing) $75 00
Accessory Storage/ Semi-Trailer (ZPAS) $75 00
- Commercial Vehicle (ZPCV) $75 00
8 Zoning Permit for Second Family Dwelling $500 00
9 Zoning Permit for Telecommunication Antenna Tower $500 00
PAGE 22
2018-3780
ORD2018-11
110 Zoning Permit for Noncommercial Tower $500 00
11 Zoning Permit for Home Occupation - Class II $300 00
I
112 Zoning Permit for Home Occupation - Class I $50 00
13 Zoning Permit for Wind Generator $300 00
14 Temporary Seasonal Permit $75 00
Board of Adjustment
115 - Variance $710 00
-Appeal $200 00
1 Change of Zone
- Residential and agricultural uses $2,100 00 plus $150 00
16 per buildable lot
- Commercial/industrial $5,500 00 plus $150 00
per buildable lot
1 Site Plan Review
-Amendment $500 00
- Buildings <10,000 gross sq ft $1,300 00
17 - Buildings between 10,000-25,000 gross sq ft $2,800 00
- Building >25,000 gross sq ft $5,000 00
-Tenant finish $60 00
I
118 Substantial Change Hearing $2,000 00
PAGE 23
2018-3780
ORD2018-11
19 Administrative Handling Fee - Special Request $100 00
20 Building Permit/Illegal Parcel $250 00
50% of the established
21 Investigation Fee
application fee
/ A fee will be charged by the County to future applicants when
County staff members are asked to assist professional
consultants in the preparation of land use applications The fee
shall be an hourly rate charged in 15-minute increments The
hourly rate shall be calculated on a full cost recovery basis of the
County's costs for the staff positions involved in the assistance
22 The full cost recovery rate shall be determined by the Director of
Finance and Administration and shall include salary, fringe
benefits, support costs (services and supplies) and indirect costs
calculated in accordance with the County-wide cost allocation
plan per Federal OMB-87 methodologies Preapplicants shall
deposit an estimated amount of the costs prior to the assistance
A final settlement of costs will be determined by the DPS once all
the work has been completed
I
23 Incidental, Nontechnical Land Use Application Assistance $50 00 per hour
Amendment to Any Regional Urbanization Area Map and $1,500 00 minimum or
24 $700 00 per parcel,
Comprehensive Plan
whichever is greater
25 Creation of a Regional Urbanization Area $25 00 per acre
Administrative Process
- Case continuance $150 00
26
- Hearing continuance $500 00
- Recording continuance $50 00 per 3 months
27 Additional_Fees May Be Assessed to Cover Publication Costs Market rate
PAGE 24
2018-3780
ORD2018-11
28 Outside Consultant for Professional Review Necessity for professional rate
Review to Be Determined by the Director
For those applications for uses identified to be of high complexity
or intensity where a determination is made that County staff will
be committing time and resources The applicant shall deposit an
estimated amount of the costs prior to assistance The fee will be
held and charged against by the County based on the standard
hourly rate for each department administering or reviewing the
permit The departments shall include, but not be limited to, the
Department of Planning Services, Health Department, Public
Works and the County Attorney's Office The standard hourly
rate shall be established by the Finance Department for the
actual time spent on the review of the application The rate shall
29 be calculated on a full cost recovery basis of the County's cost
and shall include salary, fringe benefits, support costs (services
and supplies) and indirect costs calculated in accordance with
the County-wide cost allocation plan per Federal OMB-87
methodologies The applicant shall be provided copies of the
billing 5 days prior to the cost actually being billed The
applicant's sole remedy to appeal any billing shall be to the
Board of County Commissioners The unused portion of the
submitted application fee shall be returned to the applicant within
30 days of recording the Special Review plan map, within 30
days after denial of the application by the Board of County
Commissioners, or 30 days after the applicant submits a written
request to withdraw the application
'Animal units as defined in Section 23-1-90 of this Code
PAGE 25
2018-3780
ORD2018-11
2 The fee to amend an application for a Special Review Permit for Solid Waste Disposal Sites
and Facilities shall not exceed $20,000 00 The full amount shall be submitted to the
Department of Planning Services at the time a complete application is submitted The fee will be
held and charged against by the County based on the standard hourly rate for each department
administering or reviewing the permit The departments shall include, but not be limited to, the
Department of Planning Services, Health Department, Public Works and the County Attorney's
Office The standard hourly rate shall be established by the Weld County Finance Department
for the actual time spent on the review of the application and facility The rate shall be calculated
on a full cost recovery basis of the County's cost and shall include salary, fringe benefits,
support costs (services and supplies) and indirect costs calculated in accordance with the
County-wide cost allocation plan per Federal OMB-87 methodologies The applicant shall be
provided copies of the billing 5 days prior to the cost actually being billed The applicant's sole
remedy to appeal any billing shall be to the Board of County Commissioners The unused
portion of the submitted application fee shall be returned to the applicant within 30 days of
recording the amended Special Review plan map, within 30 days after denial of the application
by the Board of County Commissioners, or 30 days after the applicant submits a written request
to withdraw the application
325% of this fee is due at the time of application, and the remaining 75% due at the time of
building permit issuance
Development Impact Fees
1 Road Impact Fee Fee Schedule in Chapter 20 of this Code
2 County Facilities Impact Fee Fee Schedule in Chapter 20 of this Code
3 Drainage Impact Fee Fee Schedule in Chapter 20 of this Code
PAGE 26
2018-3780
ORD2018-11
APPENDIX 5 - M - DEPARTMENT OF PUBLIC WORKS PERMIT APPLICATION FEES
Type Fee
1 . Development Construction Permit
Dwelling units $ 150 . 00/lot
Nondwelling units ! $ 750 . 00/lot
2 . Offsite Road Agreements/Haul Route Agreement 500 . 00
Review $
3 . Flood Hazard Development Permit $ 180 . 00
4 . Stormwater Permit 4 $ 180 . 00
5 . Geologic Hazard Permit [ Fee TBD by State Geological Survey
� g
6 . Nonexclusive License Agreements $ 100 . 00
g � _
7 . Nonexclusive Cross Road Signs ( Installation and
Fabrication )
$ 150 . 00
8 . Access Permit Fees
a ) Field Access Permit ( agricultural only ) Exempt
b ) Single residential access $75 . 00
c) Subdivision access 1 $ 150 . 00
d ) Commercial or oil and gas access ( up to 50
$75 . 00
veh/day )
e ) Industrial or commercial access ( more than 50
$ 150 . 00
veh/day)
f) Temporary access (expires within 6 months ) ! $75 . 00
p g ) Inspection outside normal work hours $ 50 . 00/hr
h ) Working prior to permit approval Subtotal x 2
i ) Public safety violation $200 . 00
Type Fee Unit I Minimum
9 . Right-of-Way Use Permit Fees
A ) Permit fee
Admin , review and inspection $ 125150 . 00
*Admin , review and no 75 . OON/A
inspection
Permit revision $75 . 00
PAGE 27
2018- 3780
ORD2018 - 11
Permit extension $ 150 . 00
B ) Annual permit
Admin , review and inspection 1 $2-50300 . 00 ON 1
-
C ) Road bore
$75 . 00
Line outside diameter < 12" -
Road bore with bore its located in $75 . 00 + 30/LF er
p Line outside diameter 12" to R . O . W . p
� 20" — 100 . 00 + . 30/LF teoatEon
Line outside diameter > 20" —
, $ 125 . 00 + . 30/LF
$2-5700
Line outside diameter < 12"
Road bore with bore pith located $50 . 00 + . 30/LF per _
outside R . O . W . Line outside diameter 12" to location -
20" — $75 . 00 + . 30/LF
Line outside diameter > 20" —
$ 100 . 00 + . 30/LF
Line outside diameter < 12" -
$25 . 00 + . 30/LF
Bore parallel in R . O . W. outside Line outside diameter 12 " to
R . O . W . 20 " — $50 . 00 + . 30/LF
Line outside diameter > 20" —
$75 . 00 + . 30/LF
D ) Work within a hard surface
roadway
$2 . 002 . 50 per sq ft 5 years or
older — min $75 . 00
Trench w/structural fill or flowable fill sq ft newer than 5 sf- $50 . 00
$5 . 00 per
years — min $ 100 . 00
Test hole/pot hole — 8" or less $20 . 0050 . 00 per hole each
E ) Work within a gravel roadway
$0 . 501 . 00 per sq ft $50 . 00
Trench w/ structural fill min $20 . 00
Test hole/pot hole — 8" or less $ 10 . 0025 . 00 per hole each
Trench w/structural fill or flowfill $2 . 50 SF - $50 . 00 min
treated gravel
Test hole/pothole treated gravel $50 . 00 per hole
F ) Work in R . O . W . outside of
roadway
PAGE 28
2018- 3780
ORD2018- 11
$0 . 20Trench width up to 12 " -
$0 . 30/LF
Trenching /plow or cable puller Trench width 12 " to 20" - $ 15 . 00
$0 . 60/LF
Trench width > 20" -
$0 . 90/LF
Test hole/pot hole — 8 " or less $ 10 . 00 per hole each
Occupation Fee $0 . 25/LF $ 50 . 00 min
G ) New appurtenance ( meters ,
vaults , poles , etc . )
3 sq . ft . or less T $250 . 00 each
Greater than 3 sq . ft . J $ 150 . 00175 . 00 each
H ) Abandonment
Abandon n-gment/Retirement of line $75 . 0012 " = < $75 . 00 +
0 . 50/LF each
in R . O . W . 12 " > $ 150 . 00 + 0 . 50/LF
Subtotal x 2Total of all fees *
I ) _Working prior to permit approval number days delinquent
a
Emergency repairs excluded
J ) * Public safety violation $2050 . 00
K ) Inspection outside normal work $50 . 00 . /hr75 . 00 per hour with
hours a 2 hour min
*As determined by Public Works
PAGE 29
2018- 3780
ORD2018- 11
Hello