HomeMy WebLinkAbout20183922.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 18 BETWEEN COUNTY ROADS 31 AND 37 FOR
APPROXIMATELY TWELVE (12) DAYS, FOR FOUR (4) CULVERT REPLACEMENTS
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 18, between County Roads 31 and 37,
be temporarily closed, with said closure being effective December 10, 2018, for approximately
twelve (12) days for four (4) culvert replacements, and further, that standard official traffic control
devices shall be erected at said closure giving notice of the restrictions.
CC'.50(5,bis ve.h,
CO surrE ►�►' `-
1124I1q
2018-3922
EG0024
TEMPORARY CLOSURE - COUNTY ROAD 18
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 5th day of December, A.D., 2018.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: C� c,
r ine� c �rjstl
Weld County Clerk to the Board
BY:
Deputy CI
AP .`QED AS
my Forney
Date of signature: t161/IA
Steve Moreno, Chair
can P. Conway
lie A. Cozad
EXCUSED
Mike Freeman
, Pro-Tem
2018-3922
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: November 30, 2018
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 18 between WCR 31 and WCR 37 is closed from 12/10/2018 thru 12/21/2018 for four culvert
replacements.
WCR 96 between WCR 35 and WCR 37 is closed from 12/10/2018 thru 12/14/2018 for a culvert
replacement.
See attached closure diagram(s).
2018-3922
EGoozy
N
VVCT 3
MMMfI 14544'i
iJ
4
WCR 22
WCR 37
WCR 20
—145404 4 a 44 +14MM464b4 044I4$.IMeM04" I's 4144 54umM*M MM+I-if-i.4SM MMibi*:-o iri "'1 — — —
s
r//
Pr
fir_i_m• ) se 154 gm
_ + I
- ,te.�Mf MMIMM4"M Merl"
• 444 M MMF1iM.i 101.44 Oil. i_
-1+M M ; .+ML iM $iM 4M i*
M. 14 MM 454i TVAM�*46
M i�i1 M M 04 M4P�'i'
T t .
.8 EAST
ROAD CLOSED
LOCAL
TRAFFIC ONLY
//
JrAF
Jr#
1
4 4 4 4
}" t w
M • fI;}� ;s4Mf/M 4414 54 j4I4M+MMM+M
I„ ser .
1.2 EAST 1.8 EAST
1.0 EAST
WCR 18
' MM4MMM'
S
Project# AN -59
Road closure description
WCR 18 between WCR 31 and WCR 37
closed 12/10/2018 thru 12/21/2018
for 4 culvert replacements
Notice to Public
Road signs and barricaded during closure
Message boards to be used
Detour Route
WCR 31 between WCR 18 and WCR 22
WCR 22 between WCR 31 and WCR 37
WCR 37 between WCR 18 and WCR 22
2 mile paved
3 mile paved
2 mile paved
Notes
ADT of WCR 18 is: 427/2017
Culverts replaced are drainage: replace 4 culverts
I Paved detour no dust control required
4 Culverts replaced ahead of next years pave project
Placement of signs not to scale
Date
11/30/2018
Prepared by
LEE STEPHEN
Approved by county engineer
CAMERON PARROTT
Hello