Loading...
HomeMy WebLinkAbout20182960.tiffBOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW/Regular or Consent Hearing Agenda REQUEST RE: BOCC Agenda Item — Road Maintenance Agreement for: DCP Operating Company, LP — USRI 8-0018 DEPARTMENT: Public Works DATE: 9/5/2018 PERSON REQUESTING: Evan Pinkham Brief description of the issue: The Department of Public Works received a request from the applicant, DCP Operating Company, LP, requesting that the Board of County Commissioners consider approving the Road Maintenance Agreement for the oil and gas facility (USR18-0018). Weld County Public Works, Planning Services and the County Attorney's Office have reviewed the above - mentioned signed original document and observed the following: All Public Works related items, of the "Improvements & Road Maintenance Agreement According To Policy Regarding Collateral For Improvements", are found to be acceptable. What options exist for the Board? 1. Have this BOCC Hearing item be placed on the next available agenda as part of the Consent Agenda. 2. Have this BOCC Hearing item be placed on the next available agenda as part of the Regular Agenda. Recommendation: Option I. The Departments of Public Works, Planning Services and the County Attorney's Office are recommending approval of the Improvements & Road Maintenance Agreement According To Policy Regarding Collateral For Improvements for USRI 8-00 18, and that this item be placed on the next regularly scheduled BOCC Hearing, as part of the Consent Agenda. Approve Recommendation Sean P. Conway Julie A. Cozad Mike Freeman Barbara Kirkmeyer, Pro -Tern Steve Moreno, Chair Schedule as Regular BOCC Hearing Item Other/Comments: e.IO?thef-4-ei (109 2018-2960 IMPROVEMENTS & ROAD MAINTENANCE AGREEMENT ACCORDING TO POLICY REGARDING COLLATERAL FOR IMPROVEMENTS DCP Operating Company, LP — USR18-0018 THIS AGREEMENT is made this Z-1 day of kSk.." , 2018, by and between DCP Operating Company, LP, a Delaware limited partnership, whose address is 3026 4th Ave., Greeley, CO 80634, hereinafter referred to as "Operator," authorized to do business in the State of Colorado, and the County of Weld, a body corporate and politic of the State of Colorado, by and through its Board of County Commissioners, whose address is 1150 "O" Street, Greeley, Colorado 80631 hereinafter referred to as "County." WITNESSETH: WHEREAS, Operator is the Lessee of the following described property in the County of Weld, Colorado: Subdivision Exemption, SUBX18-0001; being part of the NE 1/ of Section 2, Township 6 North, Range 65 West of the 6th P.M., Weld County, Colorado hereinafter referred to as "the Property," and WHEREAS, Operator has received Board of County Commissioner approval of USR18-0018, and WHEREAS, Operator acknowledges that the final approval of USR18-0018 is conditional upon Operator's funding and/or construction of the off -site improvements described in this Agreement and depicted in the following incorporated exhibits: Exhibit A-1 — Off -Site Costs of Construction, Exhibit B-1— Off -Site Construction Schedule, Exhibit A-2 — Future Improvements Costs of Construction (to be attached per section B.3.0), Exhibit B-2 — Future Improvements Construction Schedule Triggers (to be attached per section B.4.0), Exhibit C — Construction Plans, Exhibit D — Plat Map (recorded simultaneously with this Agreement), and WHEREAS, Operator acknowledges it may not operate its facilities as permitted under USR18- 0018 until said improvements have been completed and accepted by County, and WHEREAS, Operator acknowledges that pursuant to the provisions of Weld County Code Sec. 23- 2-290, the failure to commence construction of the improvements outlined herein within three (3) years of the approval of USR18-0018 may result in the revocation or suspension of USR18-0018, upon consideration and order of the Board of County Commissioners, and WHEREAS, the parties agree that the Operator shall provide collateral for off -site improvements required by this Agreement when the Board of County Commissioners approves this Agreement. NOW, THEREFORE, IN CONSIDERATION OF the foregoing and of the promises and covenants contained herein, the parties hereto promise, covenant and agree as follows: 4434251 Pages: 1 of 11 09/27/2018 11:02 AM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO "Ill f 11 o�01��029�� PART 1: SITE SPECIFIC PROVISIONS A. Off -Site Improvements (as required by the BOCC): Operator shall be responsible for the construction of certain off -site safety improvements identified in the USR hearing Resolution, which may include, but are not limited to: construction of adequate turning radii of sixty (60) feet at the main entrances and exits which extend into county road ROW connecting to the county road system, and off -site drainage and signage installations, as indicated on the accepted Exhibits. On -Site improvements that create more run-off than the historical amount may require off -site drainage improvements to roads and ROW. Any approved access point(s) improvements will include standard County approved tracking control, and may include a double cattle guard set (one right after the other), placed back to back across the entire width of the access, to ensure a complete revolution of the truck tires in order minimize the tracking of mud and debris onto the adjacent County road. 1.0 Road Improvements Responsibilities. Operator is solely responsible for all the off -site designated improvements. These responsibilities may include but are not limited to the following: design, surveys, utility locates, acquisition of ROW, if necessary, dedication of ROW, if necessary, ROW and Access Permits and fees, coordination with oil and gas operators and facilities and affected irrigation facilities, and utilities, traffic control, and project safety during construction. Operator shall obey all applicable regulations issued by OSHA, CDOT, CDPHE, and other federal, state, or county regulatory agencies. 2.0 Cost of Construction Exhibit. The cost of construction estimates (engineer's estimate) as identified in Exhibit A-1 detail the costs used in determining the collateral requirement for the off -site improvements related to the development. A registered Colorado Engineer must sign and stamp the construction cost exhibit on Exhibit A-1. If more than three (3) years have passed since the last construction cost estimate was provided, Operator shall provide an updated construction cost estimate prior to the start of construction. 3.0 Construction Schedule Exhibit. Exhibit B-1 is provided by Operator indicating the construction schedule for all off -site improvements, including an anticipated completion date. Operator shall not commence construction of any improvements, record plat, or receive any permitting prior to approval of the of this Agreement, the attached Exhibit C, receipt of the appropriate Grading Permit, Access Permit, and/or ROW Permit, if applicable. Operator shall substantially complete all improvements in accordance with Exhibit B-1 in order to request the warranty period begin. In the event that the construction schedule is not current, Operator shall submit a revised construction schedule. 4.0 Off -site Improvements Collateral. As required, collateral is accepted and released by the Board of County Commissioners pursuant to the Weld County Code. Additional information about collateral is outlined in Part II.B of this Agreement. 5.0 As -Built Plans. "As -built" plans shall be submitted at the time the letter requesting release of collateral is submitted or once Operator has completed improvements as described in Part II.B, Subsection 3.2.3, of this Agreement. Operator shall also provide an electronic copy of the as -built drawings. The as - built drawings shall be stamped, signed, and dated by a licensed and registered Professional Land Surveyor or Professional Engineer. C. Haul Routes: Operator shall be financially responsible for its proportional share of the County's costs associated with maintaining and/or improving designated haul/travel routes during construction. 1.0 Haul Routes. The following roads are designated as haul/travel routes for the Property: 1) North and south along CR 47 4434251 Pages: 2 of 11 09/27/2018 11:02 AM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO VIII 101.43M rL IAMOTI ��4J�'k�. i IBC 6 lk 11111 4'11 2.0 Haul trucks shall enter and exit the site at the approved access(es) on CR 47 and travel north -south to the nearest paved road for further dispersal. Any County roads used by USR18-0018 traffic may become part of the established haul/travel routes. 3.0 Weight Limits. No travel vehicles may exceed CDOT required specifications for pounds per axle and axle configurations unless overweight permits have been applied for and granted. 4.0 Temporary Deviations. In unusual or rare occasions, if projects mandate deviation from the above - mentioned haul/travel route for a limited period (six months or less), Weld County Public Works may authorize, in writing, the deviation. In that circumstance, haul/travel vehicles will utilize paved county roads whenever possible. A deviation from the established haul/travel route lasting more than six (6) months or requests for one (1) or more deviations within a 12 -month period shall authorize the County to change the haul/travel routes designated herein, and provide notice to Operator. 5.0 Haul Route Signage. Operator shall install travel route signs, if applicable, as per Manual of Uniform Traffic Control Devices standards, at all exit points of the Property which can be clearly seen by drivers leaving the facility and which clearly depict County approved travel routes. 6.0 No Deviation from Permitted Haul Routes. Except as authorized by the Board pursuant to this Agreement, no use of any roads other than those specifically authorized for use in this Agreement is permitted without the prior written amendment of this Agreement. D. Maintenance Requirements: e, if applicable, as required by the Board: 2.0 Dust Control. During construction, Operator shall be financially responsible for its proportional share of dust control on unpaved designated haul/travel routes after commencement of operation. The amount and extent of dust control will be determined by site -specific conditions at the time, as determined exclusively by County personnel. Dust abatement along the relevant haul/travel routes is expected to occur approximately two to five times per year. Dust abatement is required for roads with more than 200 vehicles per day, per section 8-6-100 of the Weld County Code. 2.1 Dust Control During Construction. If necessary, as determined by the County, Operator shall cause to be performed within 30 days of notification, at its sole expense, dust control by a contractor approved by Weld County Public Works during the construction period of the development. 3.0 Repair. During construction, Operator shall be financially responsible for its proportional share of excavation, patching, and pavement repair on designated haul/travel routes. The amount and extent of repair and paving measures will be determined by site -specific conditions at the time, as determined exclusively by County personnel. 4.0 Need for Immediate Repairs: In the event of damage to a designated haul/travel route by project traffic that causes an immediate threat to public health and safety or renders the road impassible ("Significant Damage"), County shall, after inspection, notify Operator of such Significant Damage. Operator shall identify the repair required and shall consult with County on the extent, type, timing, materials and quality of repair (i.e. temporary versus permanent) within twenty-four (24) hours after receipt of such notice and shall commence such repair within forty-eight (48) hours after receipt of such notice. If such repair is not commenced within such forty-eight (48) hour period, County shall have the right to draw on the Road Maintenance Collateral and use such funds to perform such repair. If Operator identifies 4434251 Pages: 3 of 11 09/27/2018 11:02 AM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO f11 1111 I4rdl a r4J1riKhid;IIh:MiirktelAilkhM 'iY h "Ill Significant Damage prior to receiving notice thereof from County, Operator may commence repair of such Significant Damage and shall concurrently notify County of the extent, type, timing, materials and quality of repair (i.e. temporary versus permanent). 5.0 Calculation of Operator's Proportional Share of Costs. The County shall notify Operator of County's preliminary determination and assessment of Operator's proportional share of costs of maintenance, repair, or improvements to Operator's designated haul/travel routes. Prior to County's final determination and assessment, County shall provide Operator with a reasonable opportunity to review, comment upon and supplement County's data, collection methodology, and determinations. The County shall review and consider Operator's input prior to making a final determination and assessment. The County shall have sole responsibility for determination of Operator's proportional share of costs. Operator agrees to pay such proportional share of costs within 30 days of receiving an invoice from County. 6.0 Notification. The County shall notify Operator of County's preliminary determination and assessment of Operator's proportionate share of costs of maintenance, repair, or improvements to Operator's designated haul/travel routes. Prior to County's final determination and assessment, County shall provide Operator with a reasonable opportunity to review, comment upon and supplement County's data, collection methodology, and determinations. The County shall review and consider Operator's input prior to making a final determination and assessment. PART 2: GENERAL PROVISIONS A. Engineering and Construction Requirements: 1.0 Engineering Services. Operator shall furnish to County, at its own expense, all engineering services in connection with the design and construction of the off -site improvements and all on -site drainage -related structures if required by any Municipal Separate Storm Sewer System (MS4) permit, identified on the accepted Construction Plans according to the construction schedule set forth in the construction schedule exhibits. The required engineering services shall be performed by a Professional Engineer and Land Surveyor registered in the State of Colorado, and shall conform to the standards and criteria established by the County for public improvements. The required engineering services shall consist of, but not be limited to: surveys, designs, plans and profiles, estimates, construction supervision, and the submission of necessary documents to the County. 2.0 Rights -of -Way and Easements. Before commencing the construction of any off -site improvements herein agreed upon for public ROW or easements, Operator shall acquire, at its sole expense, good and sufficient ROW and easements made necessary for the improvements. The County will not exercise eminent domain on behalf of Operator. All such ROW and easements for the construction of roads to be accepted by the County shall be conveyed to the County on County -approved forms and the documents of conveyance shall be furnished to the County for acceptance with express written authority of the BOCC and recording. 3.0 Construction. Operator shall furnish and install, at its own expense, the improvements (and any drainage -related structures required by any MS4 permit) identified on the accepted Exhibits and shall be solely responsible for the costs listed on the cost of construction exhibits, with the improvements being completed also in accordance with the schedule set forth in the construction schedule exhibits. The Board of County Commissioners, at its option, may grant an extension of the time of completion set forth in construction schedule exhibits stated herein upon application by Operator. Said construction shall be in strict conformance to the plans and drawings accepted by the County and the specifications adopted by the County. 4434251 Pages: 4 of 11 09/27/2018 11:02 AM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO l aPnaB ilairiNtlIglkIdirl@ ri'r Yoh III II 3f 11 4.0 Testing. Operator shall employ, at its own expense, a qualified testing company previously approved by the County to perform all testing of materials or construction; and shall furnish copies of test results to the County. If County discovers inconsistencies in the testing results, Operator shall employ at its expense a third party qualified testing company approved by County. Such third party shall furnish the certified results of all such testing to the County. At all times during said construction, the County shall have the right to test and inspect material and work, or to require testing and inspection of material and work at Operator's expense. Any material or work not conforming to the approved plans and specifications, including but not limited to damages to property adjacent to the construction plan area shall be repaired, removed or replaced to the satisfaction of the County at the expense of Operator. 5.0 Construction Standards. Design and construction of all off -site improvements shall conform to the current version of CDOT's "Standard Specifications for Road and Bridge Construction" and the Weld County Engineering and Construction Guidelines. 6.0 Traffic Control. Prior to any construction in County and/or State ROW, and as a condition of issuance of any ROW or Access Permit, Operator shall submit a traffic control plan for County review. During construction, appropriate safety signage shall be posted in accordance with the then -current version of the Manual of Uniform Traffic Control Devices. B. Collateral: 1.0 General Requirements for Collateral. Operator shall provide to County collateral to guarantee all of Operator's obligations under this Agreement: (1) Project Collateral is required for completion of off - site improvements, as described in this Agreement; (2) Warranty Collateral is required for all off -site improvements during the two-year warranty period; and (3) Road Maintenance Collateral is required to be kept in place for the life of the permit/project. Collateral acceptance and release is governed by the Weld County Code. 1.1 Project Collateral shall be submitted to guarantee completion of off -site improvements identified in the Exhibits. Project Collateral must be submitted in an amount equal to 100% of the value of the improvements, as calculated in the cost of construction exhibits. Project Collateral must be submitted at the time of execution of the Agreement, unless otherwise directed by the Board of County Commissioners. In the event that Operator fails to adequately complete the required improvements, County may, in its sole discretion, access Project Collateral for the purpose of completing such improvements. It may be necessary to provide additional collateral in the event the cost estimate is older than three (3) years. NO WORK SHALL COMMENCE UNTIL PROJECT COLLATERAL HAS BEEN SUBMITTED AND ACCEPTED BY THE COUNTY. 1.2 Warranty Collateral shall be submitted and held by the County until release after the two- year warranty period following the County's initial approval of the improvements. Warranty Collateral shall be in an amount equal to 15% of Project Collateral. In the event that Operator fails to adequately complete or repair improvements during the warranty period, County may, in its sole discretion, access Warranty Collateral for the purpose of completing such improvements. 1.3 Road Maintenance Collateral shall be submitted and held by County for the life of the development. Road Maintenance Collateral is $3,600 for developments with paved designated travel routes, and $2,400 for developments with unpaved designated travel routes. The Road Maintenance Collateral may be accessed by County if, following notification to Operator of required roadway safety related repairs or maintenance (including dust control), Operator fails to perform said repairs within the time allowed in County's notification. If any of this collateral shall be collected by County, Operator shall replace the amount, plus interest, within six (6) months. If 4434251 Pages: 5 of 11 09/27/2018 11 :0 2 AM and Recoee $:0 .0 d CountyCO Carly KopPes Cly I�{!E! `� ,I III. `P�'� ,1,`A�'I'll El no Project Collateral is required to be submitted, Road Maintenance Collateral shall be submitted at the time of execution of this Agreement. 2.0 Form of Collateral. Collateral may be in the form of a letter of credit, a surety bond, or a cash deposit, subject to the requirements and restrictions of section 2-3-30 of the Weld County Code, as that section may be amended from time to time. 3.0 Release of Collateral. Collateral shall be released in accordance with section 2-3-30 of the Weld County Code. For collateral release, the Planning Department conducts inspections for on -site improvements, and the Department of Public Works conducts inspections for off -site improvements. 3.1 Timing of Release. Project Collateral may be released upon completion of all improvements required by the Exhibits after initial approval by the County. Warranty Collateral shall be withheld by County from and at the time of release of Project Collateral, or may be submitted separately by Operator. Warranty Collateral may be released upon the approval of the County at the end of the two-year warranty period. Road Maintenance Collateral may be withheld from and at the time of release of Warranty Collateral, or may be submitted separately by Operator. 3.2 Request for Release of Collateral. Prior to release of collateral by Weld County for the entire project or for a portion of the project, Operator must present a Statement of Substantial Compliance from an Engineer registered in the State of Colorado. The Statement of Substantial Compliance shall state that the project or a portion of the project has been completed in substantial compliance with accepted plans and specifications documenting the following: 3.2.1 Operator's Engineer or his representative has made regular on -site inspections during the course of construction and the construction plans utilized are the same as those accepted by Weld County. 3.2.2 For the improvements to public rights -of -way or easements, test results must be submitted for all phases of this project as per Colorado Department of Transportation (CDOT) Schedule for minimum materials sampling, testing and inspections found in CDOT Materials Manual. 3.2.3 "As -built" plans shall be submitted at the time the letter requesting release of collateral is submitted or at such time as Operator has completed improvements as shown on the Exhibit C and/or Exhibit D, and shall be stamped and approved by an Engineer registered in the State of Colorado, if an Engineer was initially required for the project. Operators Engineer shall certify that the project "as -built - is in substantial compliance with the plans and specifications as approved, or that any material deviations have received prior written acceptance from the County Engineer. 3.3 County's Response to Request for Release of Collateral. Following a written request for release of collateral, County personnel will inspect the improvements as provided in this Agreement. Upon approval, the Board of County Commissioners may release said collateral. C. Acceptance of Improvements: 1.0 Acceptance of Off -Site Improvements: Upon completion of the off -site improvements, Operator shall contact the Weld County Department of Public Works and request an inspection of such improvements. Upon request, County personnel will initiate the inspection, approval, and acceptance 4434251 Pages: 6 of 11 09/27/2018 11:02 AM R Fee:$0.00 1 Carly Koppes, Clerk and Recorder, Weld County, CO gill rurAllik ! m It KTITIPilA IA Ill III process. 2.0 Inspection, Approval, and Acceptance Process: 2.1 Upon completion of construction of all off -site improvements as described in the Construction Plans, Operator shall submit to the Weld County Department of Public Works a Statement of Substantial Compliance by Operator's Engineer along with "as -built" drawings as required in B.3.2.3, above, and shall request County inspection of the Off -Site Improvements. County personnel shall then inspect the improvements. If the County determines the improvements were not constructed in accordance with the Construction Plans, the County shall direct Operator to correct the deficiencies. If the County determines the improvements were constructed in accordance with the Construction Plans, the County shall initially approve the Off -Site Improvements. 2.2 Two -Year Warranty Period. Such initial approval begins the two-year warranty period. Upon completion of the two-year warranty period, County Public Works personnel shall, upon request by Operator, inspect the subject improvements, and notify the Operator of any deficiencies. If any deficiencies are discovered, Operator shall correct the deficiencies. County personnel shall re -inspect the improvements after notification from Operator that said deficiencies have been corrected. If the County personnel finds that the improvements are constructed according to County standards, he or she shall approve the improvements. Such final approval shall authorize Operator to request the Board of County Commissioners to release the Warranty Collateral. 2.3 Placement of Improvements into Service Prior to County Approval. If requested by Operator and agreed by the County, portions of the improvements may be placed in service when completed according to the schedule shown on the construction schedule exhibit, but such use and operation shall not alone constitute an approval or acceptance of said portions of the improvements. County may, at its option, issue building permits for construction for which the improvements detailed herein have been started but not completed according to the schedule shown on the construction schedule exhibit, and may continue to issue building permits so long as the progress of work on the improvements is satisfactory to the County, and all terms of this Agreement have been faithfully kept by Operator. D. Access and Right -of -Way Permits: 1.0 Access Permits. Operator shall not use any access onto any County road unless and until an access permit has been issued by the Department of Public Works. Public Works may condition the issuance of an updated access permit on the amendment of this Agreement if the updated access permit authorizes the use of an additional access point, or if there is a change in use of the current access point, as permitted by Article V of Chapter 12 of the Weld County Code. 2.0 Right -of -Way (ROW) Permits. Per Article IV of Chapter 12 of the Weld County Code, any work occurring within County ROW requires a ROW permit issued by the Department of Public Works. No work shall occur without said ROW permit. E. Enforcement and Remedies: 1.0 Violation of Terms of Agreement. If in County's opinion, Operator has violated any of the terms of this Agreement, County shall notify Operator of its belief that the Agreement has been violated and shall state with specificity the facts and circumstances which County believes constitute the violation. Operator shall have fifteen (15) days within which to either cure the violation or demonstrate compliance. If, after 4434251 Pages: 7 of 11 09/27/2018 11:02 AM R Fee:$0.00 fll Carly Koppes, Clerk and Recorder, Weld County, CO 1111 11 II fifteen (15) days have elapsed, County believes in good faith that the violation is continuing, County may consider Operator to be in breach of this Agreement. 2.0 Remedies for Breach by Operator. In the event that County determines that Operator has violated the terms of this Agreement, and has failed to correct said violation, County may exercise any or all of the following remedies, or any other remedy available in law or equity. 2.1 Access and Use of Collateral. County may access and use collateral to address the issues specific to the violation. For example, the County may access and use Project Collateral in order to complete improvements as required by the Construction Plans, when such improvements have not been completed in accordance with the Construction Schedule. 2.2. Withholding Permits. County may "lock" any or all lots within the Property, which precludes the continued issuance of building permits, zoning permits, septic permits, or any other permit issued by any department of the County. 2.3 Court Action. County may seek relief in law or equity by filing an action in the Weld District Court or Federal District Court for the District of Colorado, except that no such civil action or order shall be necessary to access collateral for the purpose of completing improvements as described above. 2.4 Revocation of USR Permit. Operator acknowledges that failure to comply with the terms of this Agreement constitutes cause to revoke the USR, and County may exercise this option in its sole discretion by proceeding with revocation under the then current provisions of the Weld County Code. 3.0 Termination of Agreement. This Agreement shall terminate upon the earliest of the following events: 3.1 Failure to Commence. County may terminate this Agreement upon or after revocation of the underlying land use approval under Weld County Code section 23-2-290. However, County may still exercise all necessary activities under this Agreement that the County determines necessary to protect the health, safety, and welfare of the residents of Weld County. 3.2 Cessation of all Permit Related Activities. Termination of this Agreement shall occur upon Operator's complete cessation of all activities permitted by the USR including any clean up or restoration required. A partial cessation of activities shall not constitute a Termination of this Agreement, nor shall County's issuance of a partial release/vacation constitute a Termination. Unless informed in writing by Operator of cessation of activities, and verified by the County, cessation shall only be presumed if the County determines that the USR has been inactive for three (3) years. Operator shall not be entitled to a release of Project or Warranty Collateral unless and until the improvements required by this Agreement are completed. 3.3 Execution of Replacement Agreement. This Agreement shall terminate following County's execution of a new Improvements Agreement with a new operator who has purchased the Property or has assumed the operation of the business permitted by the USR, and intends to make use of the rights and privileges available to it through the then existing USR. 3.4 Revocation of USR. This Agreement shall terminate following County's revocation of Operator's USR, except that Operator shall only be released from this Agreement after the successful completion of all improvements required under this Agreement, which may be 4434251 Pages: 8 of 11 09/27/2018 11:02 AM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO of 11 I'll ' * 'NM I I II II completed by County after accessing Operator's collateral if Operator fails to complete such improvements. F. General Provisions: 1.0 Successors and Assigns. 1.1 Operator may not delegate, transfer, or assign this Agreement in whole or in part, without the prior express written consent of County and the written agreement of the party to whom the obligations under this Agreement are assigned. Consent to a delegation or an assignment will not be unreasonably withheld by County. In such case, Operator's release of its obligations shall be accomplished by County's execution of a new Improvements Agreement with the successor owner of the property. 1.2 County's rights and obligations under this Agreement shall automatically be delegated, transferred, or assigned to any municipality which, by and through annexation proceedings, has assumed jurisdiction and maintenance responsibility over all roads affected by this Agreement. 2.0 Severability. If any term or condition of this Agreement shall be held to be invalid, illegal, or unenforceable by a court of competent jurisdiction, this Agreement shall be construed and enforced without such provision, to the extent that this Agreement is then capable of execution within the original intent of the parties. 3.0 Governmental Immunity. No term or condition of this contract shall be construed or interpreted as a waiver, express or implied, of any of the immunities, rights, benefits, protections or other provisions, of the Colorado Governmental Immunity Act §§24-10-101 et seq., as applicable now or hereafter amended. 4.0 No Third -Party Beneficiary. It is expressly understood and agreed that the enforcement of the terms and conditions of this Agreement, and all rights of action relating to such enforcement, shall be strictly reserved to the undersigned parties and nothing in this Agreement shall give or allow any claim or right of action whatsoever by any other person not included in this Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Agreement shall be an incidental beneficiary only. 5.0 Board of County Commissioners of Weld County Approval. This Agreement shall not be valid until it has been approved by the Board of County Commissioners of Weld County, Colorado or its designee. 6.0 Choice of Law/Jurisdiction. Colorado law, and rules and regulations established pursuant thereto, shall be applied in the interpretation, execution, and enforcement of this Agreement. Any provision included or incorporated herein by reference which conflicts with said laws, rules and/or regulations shall be null and void. In the event of a legal dispute between the parties, the parties agree that the Weld County District Court or Federal District Court for the District of Colorado shall have exclusive jurisdiction to resolve said dispute. 7.0 Attorneys' Fees/Legal Costs. In the event of a dispute between County and Operator, concerning this Agreement, the parties agree that each party shall be responsible for the payment of attorney fees and/or legal costs incurred by or on its own behalf. 4434251 Pages: 9 of 11 09/27/2018 11:02 AM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO VIII���'����16G'���E��4�ih�'�liC+lihl�rWh UI III '11 8.0 Release of Liability. Operator shall indemnify and hold harmless the County from any and all liability loss and damage County may suffer as a result of all suits, actions, or claims of every nature and description caused by, arising from, or on account of the design and construction of improvements, and pay any and all judgments rendered against the County on account of any such suit, action or claim, and notwithstanding section 7.0 above, together with all reasonable expenses and attorney fees incurred by County in defending such suit, action or claim whether the liability, loss or damage is caused by, or arises out of the negligence of the County or its officers, agents, employees, or otherwise except for the liability, loss, or damage arising from the intentional torts or the gross negligence of the County or its employees while acting within the scope of their employment. All contractors and other employees engaged in construction of the improvements shall maintain adequate worker's compensation insurance and public liability insurance coverage, and shall operate in strict accordance with the laws and regulations of the State of Colorado governing occupational safety and health. 9.0 Binding Arbitration Prohibited. Weld County does not agree to binding arbitration by any extra- judicial body or person. Any provision to the contrary in this Agreement or incorporated herein by reference shall be null and void. 10.0 Authority to Sign. Each person signing this Agreement represents and warrants that he or she is duly authorized and has legal capacity to execute and deliver this Agreement. Each party represents and warrants to the other that the execution and delivery of the Agreement and the performance of such party's obligations hereunder have been duly authorized and that the Agreement is a valid and legal agreement binding on such party and enforceable in accordance with its terms. If requested by the County, Operator shall provide the County with proof of Operator's authority to enter into this Agreement within five (5) days of receiving such request. 11.0 Acknowledgment. County and Operator acknowledge that each has read this Agreement, understands it and agrees to be bound by its terms. Both parties further agree that this Agreement, with the attached or incorporated Exhibits, is the complete and exclusive statement of agreement between the parties and supersedes all proposals or prior agreements, oral or written, and any other communications between the parties relating to the subject matter of this Agreement. 12.0 Notwithstanding any other provision contained in this Agreement, for any conflict or potential conflict between any term in this Agreement and the Resolution of the Board of County Commissioners approving the underlying land use permit, the provisions of the Board's Resolution shall control. In the event of a discrepancy between this agreement and the Weld County Code in effect at the time of the agreement, the terms of the Weld County Code shall control. 4434251 Pages: 10 of 11 09/27/2018 11:02 AM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO VIII Mr..4'C7 HtiiIM.WiAltlitlih'ill' �IUR NICV Yiyi III III Page 10 of 11 OPERATOR: By: Name: a,z/.1 2;7 r D T ct d ilk 3-64 Title: O l c e ‘P V LG4- et-i+ STATE OF COLORADO County of Weld Date SS. A �.�5 i 23,E 2c y J NICOLAS D. HAGENLOCK NOTARY PUBLIC STATE OF COLORADO NOTARY ID 20094004084 MY COMMISSION EXPIRES FEB. 11, 2021 The foregoing instrument was acknowledged before me this ow/ of August, 2018, b let o� WITNESS my hand and official seal. Notary Public WELD COUNTY: ATTEST:. t ° BOARD OF COUNTY COMMISSIONERS Weld Guns �'erk to the Bo. rd WELD COUNTY, COLORADO BY: Deputy Cler?'o tl e Boar 4434251 Pages: 11 of 11 09/27/2018 11:02 AM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County, CO kratItrPiqly'firilirMlitilillgill. l BIM I teve Moreno, Chair Page 11 of 11 SEP 17 2013 Cheryl Hoffman From: Sent: To: Cc: Subject: Follow Up Flag: Flag Status: Cheryl, Esther, Tisa Juanicorena Friday, November 09, 2018 12:46 PM Frank Haug; Esther Gesick; Cheryl Hoffman; Evan Pinkham Dawn Anderson RE: please advise Follow up Flagged OK, so based on Frank's direction — the three that have already received Board approval and have either been signed or signed and recorded are going to remain as is. Frank is confident the reso trumps the IA and we can put those behind us. None of them have exhibits. For the three that have to go on the Agenda, I will rewrite them with the agreed upon revisions and with Evan's input and then resend to the applicant for signature and then we can move forward with those. None of these have exhibits either. On base - #2096 can go to recording if you have the plat. #2078 and 2079 can go back in the file room I will rewrite #s 2167, 2225 and 2188 -- none of which have exhibits. Let me know if you have any questions. Tisa Juanicorena Engineer Tech II Development Review Public Works 1111 H Street Greeley, CO 80634 tjuanicorena@weldgov.com tjuanicorena@co.weld.co.us tel: 970.400.3778 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. 1 From: Frank Haug Sent: Friday, November 9, 2018 11:18 AM To: Tisa Juanicorena <tjuanicorena@weldgov.com>; Esther Gesick <egesick@weldgov.com>; Cheryl Hoffman <choffman@weldgov.com>; Evan Pinkham <epinkham@weldgov.com> Cc: Dawn Anderson <dranderson@weldgov.com> Subject: RE: please advise If we have an IA for the construction period only, then we need to make sure that we indicate that on the improvements agreement. I think we ought to use the pipeline template for those that are only during construction. We need to make sure that the board specifically directed staff to do the IA for the construction period only. For those that are recorded already, I think we just leave them alone and move on. For ones that aren't recorded, we should figure out whether there are exhibits or not, and then correct them, and if they are for construction only, we should indicate that also. Let me know if that makes sense or if you want to discuss it further, thanks. From: Tisa Juanicorena Sent: Friday, November 9, 2018 7:59 AM To: Frank Haug <fhaug@weldgov.com> Cc: Dawn Anderson <dranderson@weldgov.com> Subject: please advise Hi Frank, Several of the lAs that we discussed in our meeting over at CTB are supposed to only be for the construction period only, so of course there are no exhibits, but it raises the bigger question of the template. Evan told me that Elizabeth would prefer full agreements for anything that is commercial, however the resolution clearly states for the construction period only...??? And that is what was signed by the Board. I am a little confused how to move forward in situations like these. I am attaching both templates which have not been revised yet, as I just reviewed my suggested amendments with both you and Dawn for the big one and received the ok yesterday to update it... but the gist remains the same for both. The pipeline agreement is basically construction period only, and the other is the full agreement. Question #2.... Should we decide to use the temporary language to match the reso, do you want to add the right to amend/modify subsection maybe to be determined upon final inspection to address the possibility of a future full agreement being needed or do we not address that until/if they come in with an amended USR application — then we amend or create a full agreement? Please advise. Tisa Juanicorena Engineer Tech II Development Review Public Works 1111 H Street Greeley, CO 80634 tjuanicorena@weldgov.com tjuanicorena@co.weld.co.us tel: 970.400.3778 2 Cheryl Hoffman To: Cc: Subject: Good morning, Frank and Evan, / Ddc079 Frank Haug; Evan Pinkham Dawn Anderson; Tisa Juanicorena; Esther Gesick; Cheryl Hoffman; Karla Ford Various IAs without Exhibits attached Listed are several lAs that list Exhibits which are not attached (and say they are incorporated herein): 1. 2 that are going thru OnBase right now — Contract ID #2225 Verdad Resources LLC c/o Cureton Midstream, LLC — USR18-0022 and Contract ID #2167 Tallgrass Terminals LLC — USR18-0035. These were sent to Karla yesterday for passaround and are in the Finance queue in OnBase. 2. Contract ID #2188 Stroh Family Trust c/o Discovery DJ Services LLC — USR18-0039 — I have originals and signed passaround. In Finance queue in OnBase. 3. 2 that were on consent agenda 9-17-18, approved by the BOCC and have already been recorded and finalized without exhibits attached — Contract ID #2079 DCP Operating Company LP — USR18-0018 and Contract ID #2078 DCP Operating Company LP — USR18-0017. 4. Contract ID #2096 Anadarko E&P — USR18-0019. This one was on consent agenda 10-15-18 and approved by the BOCC. Have not sent it to Recording because of missing Exhibits. Cheryl Hoffman Deputy Clerk to the Board Weld County Clerk to the Board Office 1150 O Street Greeley, CO 80631 970.400.4227 • Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. 1 Hello