Loading...
HomeMy WebLinkAbout20253230 r,y, COLORADO 410 Department of Public CDPHE Health Er Environment Weld County - Clerk to the Board RECEIVED 1150 0 St NIZX s 202 PO Box 758 WELD COUNTY Greeley, CO 80632 COMMISSIONERS November 19, 2025 To Whom It May Concern: On November 19, 2025, the Colorado Air Pollution Control Division will begin a 30-day public comment period for PDC Energy, Inc. - Rifle Falls 1 Sec HZ. A copy of this public notice is enclosed. Thank you for assisting the division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public comment period. Please reference the public notice for instructions on submitting comments. OP Cow "w tOp\, 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.cotorado.gov/cdphe N °' Jared Polls Governor I Jill Hunsaker Ryan, MPH, Executive Director �*1876 f -U\OV C- Q1ev`-et--6 GG.VL LtE\rnc \�J%A\ tbs)Dc�l r��> 2025-3230 \ b\ \ aS vw \--D\ \°rnNA\s.- maul\as t Air Pollution Control Division e 4 4-4 Notice of a Proposed Construction Permit Warranting Public Comment CDPHE TM Website Title: PDC Energy, Inc. - Rifle Falls 1 Sec HZ - Weld County Notice Period Begins: November 19, 2025 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Rifle Falls 1 Sec HZ Well Production Facility NWNE Sec 1 T3N R66W Weld County The proposed project or activity is as follows: PDC Energy submitted an application to update site-specific emission factors for the condensate tank at the Rifle Falls 1 Sec HZ facility based on the results of a site-specific sample. The division has determined that this permitting action is subject to public comment requirements under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.0 due to the following reason(s): • This source is requesting a federally-enforceable limit on the potential to emit to avoid other requirements. (Regulation Number 3, Part B, Section III.C.1 .d.) The division has made a preliminary determination of approval of the application. A copy of the application, the division's analysis, and a draft of construction permit number 23WE0091 are available on the division website: Air Permit Public Notices /F Cp�Oq 4300 Cherry Creek Drive S., Denver, CO 80246-1530 I P 303-692-2000 I www.colorado.gov/cdphe \7*. `P-',--?fr**/°) Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director /;764/ The division hereby solicits submission of public comments from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the commission. The division will receive and consider written public comments for thirty (30) calendar days after the date of this notice. Comments may be submitted using the following options: • Submit comments via web form: Form for Public Comment on Draft Permit • Submit comments via email: cdphe_apcd_airpermitcomments@state.co.us • Submit comments via mail: Air Pollution Control Division - Oil E. Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, CO 80246-1530 NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comment(s) and the division's response(s) are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comment(s). 4 0� 4300 Cherry Creek Drive S., Denver, CO 80246-1530 I P 303-692-2000 I www.cotorado.gov/cdphe * °, Jared Potis, Governor I Jilt Hunsaker Ryan, MPH, Executive Director *1876�`/ Hello