Loading...
HomeMy WebLinkAbout20194489.tiff DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970)304-6531 FAX: (970)304-6532 L T Y WEBSITE: www.co.weld.co.us . GOB 1105 H STREET P.O. BOX 758 GREELEY,COLORADO 80632 October 10,2019 To: Board of County Commissioners From:Toby Taylor Subject:Centennial Courtroom HVAC—Task Order Weld County awarded the design of the Centennial Courtroom design to Cairn Design LLC. During the design process, it was discovered that the 1976 HVAC configuration in the DA space will need substantial improvements to meet current accepted office temperature control of installing Variable Air Volume boxes with reheat capability. To perform this design work,Cairn has quoted$9,000. This amount follows the fees structure rates for the bid they were awarded for conducting on-call design services. Therefore, Buildings & Grounds is recommending approving this task order so design can continue to progress. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director . .0.4,(4.„?.464t.ez (e& (rrls ) 2019-4489 0_,nsent /9 (O (14 /I b000�1 BOARD OF COUNTY COMMISSIONERS PASS-AROUND REVIEW PASS-AROUND TITLE: Centennial Courtroom Design—Task Order DEPARTMENT: B&G DATE: 9-30-2019 PERSON REQUESTING: Toby Taylor Brief description of the problem/issue: Weld County awarded the design of the Centennial Courtroom design to Cairn Design LLC. During the design process, it was discovered that the 1976 HVAC configuration will need substantial improvements to meet current accepted office temperature control of installing Variable Air Volume boxes with reheat capability. To perform this design work, Cairn has quoted $9,000. This amount follows the fees structure rates for the bid they were awarded for conducting on-call design services. Therefore, Buildings & Grounds is recommending approving this task order so design can continue to progress. What options exist for the Board? (include consequences,impacts,costs,etc. of options): 1.Approve the task order request. 2. Disapprove the task order request. Recommendation: Approve task order request and the official task order will be added to an upcoming agenda for official approval. Approve Schedule Recommendation Work Session Other/Comments: Sean P.Conway Mike Freeman,Pro-Tem Scott K.James Barbara Kirkmeyer,Chair Steve Moreno PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Date:September 25, 2019 Task Order Number: Cairn Design LLC—3-2019 Project Title: Weld County District Attorney Office-HVAC Survey&Design Commencement Date: Completion Date: Design Compensation: $9,000.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section2.2- Additional Task Order Work. In addition to that work described in section 2.1,the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed$25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will involve full architectural and engineering design and construction administration of the HVAC system for the Weld County District Attorney's Office in the Centennial Building in Greeley, CO. 1. Architectural, mechanical, electrical and plumbing design for the project. The project scope includes: Complete design and construction administration for a new HVAC distribution system downstream of the main ductwork to consist of branch duct work, VAV and fan powered VAV boxes, electric reheat coils, and electrical. Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. CONTRACTOR: Cairn Design LLC By: Date September 25, 2019 Name: Ken Caudle, PE Title: Engineering Manager PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Weld u y -rk tot B 0" '"''�► WELD COUNTY COLORADO B : �_.' _,�,�i u.��,, �1���. A�._�.4�•,! Deputy �!�erk o th �'�� °" ��``"".4119 arbara Kirkmeye , Chair G CT 1 4 ' 9 APPROVED AST F APPROVED AS SUBSTANCE: Co: CLi)/(2140 ntroller Elected fficial or Department Head APPROVED AS TO FORM: C.7i/u..evh-L Coun Attorney OZo/9- 1/ '1 CAIRN DESIGN, LLC l u n y �i y�t �xJ�OkM1hce G n y & mss, Exhibit September 18, 2019 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County District Attorney's Office HVAC Evaluation and Design -Architectural and Engineering Services In accordance with the fees identified in our bid, our not to exceed price for this on call work for this project is $9,000.00. Scope of Work: The project will involve full architectural and engineering design and construction administration of the HVAC system for the Weld County District Attorney's Office in the Centennial Building in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural, mechanical, electrical and plumbing design for the project. The project scope includes: • Complete design and construction administration for a new HVAC distribution system downstream of the main ductwork to consist of branch duct work, VAV and fan powered VAV boxes, electric reheat coils, and electrical. Scope of Services: The scope of services included in this proposal are limited to the following: • Field verification of existing dimensions and systems as they relate to the project. • Coordination with the client as required to execute the scope of work. • Coordination with the building department as required for the permit. • Submissions: Schematic Design, Design Development, Final Design,and For Construction. • Construction administration to include construction project meetings, RFIs, submittal and shop drawing review and approval, and final construction walk-through and punch list. Compensation: Total Design Fee - Not to exceed $9,000.00 Invoicing will occur with the base contract submissions for the Centennial Courtrooms. 1805 Shealy Drive Fort Collins,Colorado 80526 (9101286-1968 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On-Call contract, unless a fixed fee is agreed to in advance for the specific service. Reimbursable expenses, +1- $200 (mileage and printing services) invoiced at cost + 10%. Exclusions: • Design of any system not listed above. • New or additional heating hot water generating systems. • Design changes, layout changes, or value engineering requested by client or owner after the final submission. Sincerely, Ken Caudle, PE Engineering Principal Approved and Accepted By: c/L7L OCT 1.4 2019 Signature Date Barbara Kirkmeyer, BOCC Chair Name Title XO/f— 44g7 Hello