HomeMy WebLinkAbout20194426.tiff RESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 78 BETWEEN COUNTY ROADS 19 AND 21 FOR
APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW,THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 78, between County Roads 19 and 21,
be temporarily closed, with said closure being effective October 14, 2019, for approximately
four (4) days for a culvert replacement, and further, that standard official traffic control devices
shall be erected at said closure giving notice of the restrictions.
c-G 3OC(Y1J 0;spa+ch, C5 2019-4426
to tea/I9 EG0024
TEMPORARY CLOSURE - COUNTY ROAD 78
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 7th day of October, A.D., 2019.
BOARD OF COUNTY COMMISSIONERS
W LD COUNTY, CO ORADO
ATTEST: datitili) %ok,
arbara Kirkmeyer, Chair
Weld County Clerk to the Board
Mike Freeman, Pr -Tern
BY:
Deputy Clerk to the Board
* qIF,La Sean FJ. Cow
APP:e ED AS •RBI �'
fJ/ $01 �, ,� .c tt . James
ounty A torney
Steve Moreno
Date of signature: 1O/1O/19
2019-4426
EG0024
MEMORANDUM
;86a
TO: Clerk to the Board DATE: October 3, 2019
U N FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 31 between WCR 70 and WCR 72 is closed from 10/14/2019 thru 10/18/2019 for a culvert
replacement.
WCR 78 between WCR 19 and WCR 21 is closed from 10/14/2019 thru 10/17/2019 for a culvert
replacement
WCR 76 between WCR 29 and WCR 31 is closed from 10/14/2019 thru 11/1/2019 for a bridge re-deck.
See attached closure diagrams.
2019-4426
N
a.
w . - E
I
CX:
Q
. H.
: w
O WCR 80
.
rD.ET°LuI . I m „
DET' UR
U
P
.
. U
.
. C
• 1 ROAD CLOSED I
I LOCAL
■
• A TRAFFIC ONLY I
WCR 19 ?� ,r'}� ,e
.
: I o Phil
• 1
. WCR 21 Project #AN-59
II 2 2
•
I Road closure description
.
WCR 78 between WCR. 19 and WCR 21
: closed 10/14/2019 thru 10/17/2019
nolg ,a ' for culvert replacement
NOM o ,ovRint Notice to Public
ova
Road signs and barricaded during closure
>moM .
Va23 No Message boards to be used
.
Detour Route
~j ~� WCR 19 between WCR 78 and WCR 80 1 mile gravel
' - , :, i F `' ;' .la_ , ,, WCR 21 between WCR 78 and WCR 80 1
y�J r . ii,p �w,j mile gravel
WCR 78 WCR 80 between WCR 19 and WCR 21 1 mile gravel
teka � �
Notes
';`���r'M4 ROAD
o WORK ADT of WCR 78 is78/2014
Culvert replaced is irrigation : NEW 15" CSPR
No Water to be used for dust control
Culvert is 100Ft west of WCR 21 on WCR 78
Date
Placement of signs not to scale 10/2/2019
Prepared by
TOM ROSALES
:Approved by county engineer
CAMERON PARROTT
. i
Hello