Loading...
HomeMy WebLinkAbout20192089.tiffHEARING CERTIFICATION DOCKET NO. 2019-71 RE: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT, USR19-0008, FOR A GREATER THAN 12 -INCH HIGH PRESSURE NATURAL GAS PIPELINE (24 -INCH NATURAL GAS PIPELINE) APPROXIMATELY 13.65 MILES IN LENGTH IN THE A (AGRICULTURAL) ZONE DISTRICT - ROCKY MOUNTAIN MIDSTREAM, LLC A public hearing was conducted on June 12, 2019, at 10:00 a.m., with the following present: Commissioner Barbara Kirkmeyer, Chair Commissioner Mike Freeman, Pro-Tem Commissioner Sean P. Conway Commissioner Scott K. James — EXCUSED Commissioner Steve Moreno — EXCUSED Also present: Acting Clerk to the Board, Jessica Reid Assistant County Attorney, Bob Choate Planning Services Department representative, Angela Snyder Public Works Department representative, Hayley Balzano Health Department representative, Lauren Light The following business was transacted: I hereby certify that pursuant to a notice dated April 26, 2019, and duly published May 1, 2019, in the Greeley Tribune, a public hearing was conducted to consider the request of Rocky Mountain Midstream, LLC, for a Site Specific Development Plan and Use by Special Review Permit, USR19-0008, for a greater than 12 -inch High Pressure Natural Gas Pipeline (24 -inch natural gas pipeline) approximately 13.65 miles in length in the A (Agricultural) Zone District. Bob Choate, Assistant County Attorney, made this a matter of record. Chair Kirkmeyer instructed the applicant and reviewed for the public, with two (2) of the five (5) commissioners being excused, the vote must be unanimous for the case to be approved. Angela Snyder, Department of Planning Services, presented a brief summary of the proposal and stated the East Greeley Pipeline will connect the proposed Lathem and Auburn compressor stations. She indicated a permanent, 50 -foot easement has been acquired for this pipeline and future pipeline projects through the same corridor, 100 percent of the property owner easements have been acquired, and a specific site assessment of the biological, aquatic, and cultural resources, adjacent to the proposed pipeline route was done. She stated 14 referrals were sent out and seven (7) responded, and mentioned the Department of Planning Services did recieve phone calls and correspondence from the Lower Lathem Reservoir and Irrigation Company, regarding the application. She noted some construction was done without permits, specifically boring under irrigation ditches, and agreements with the Farmers Reservoir and Irrigation Company (FRICO) and the Lower Lathem Reservoir and Irrigation Company were in place prior Pl-(GQs(TP). PwCHglTs) , E1-IOCCUDSI 19 (LLJ 2019-2089 PL2676 HEARING CERTIFICATION - ROCKY MOUNTAIN MIDSTREAM, LLC (USR19-0008) PAGE 2 to the Planning Commission hearing. She displayed images of pipeline route and entered the favorable recommendation of the Planning Commission into the record as written. • Hayley Balzano, Department of Public Works, explained all access for the USR must be permitted, and provided all of the County Roads (CR) the pipeline crosses. She indicated the Department of Public Works (PW) is requiring tracking control, a Road Maintenance Agreement during construction, and stated pipelines are excepted from the requirement of a drainage report. • Lauren Light, Department of Public Health and Environment, stated portable toilets may be used along the construction route, an Air Emissions Permit is required when they disturb more than 25 acres, and Development Standards (DS) #12-18 address Environmental Health (EH) items. • Lito White, applicant, displayed a PowerPoint presentation that provided specific information about the pipeline, including width, length, and geographic location. He stated all Right -of -Way (ROW) agreements are in place, and described the design and construction of the pipeline, as well as depth of coverage. In response to Commissioner Conway, Mr. White stated they bored prior to permits being issued at the request of a landowner who wanted them off of his field by a certain date and confirmed they will be more diligent in the future. • No public testimony was offered concerning this matter. • The Board added screening language to DS #17 (portable toilets). In response to Chair Kirkmeyer, Mr. White indicated he had reviewed, and agreed to abide by, the Conditions of Approval and Development Standards, as amended. No public testimony was offered with regard to changes made to the Conditions of Approval and Development Standards. • Commissioner Freeman moved to approve the request of Rocky Mountain Midstream, LLC, for a Site Specific Development Plan and Use by Special Review Permit, USR19-0008, for a greater than 12 -inch High Pressure Natural Gas Pipeline (24 -inch natural gas pipeline) approximately 13.65 miles in length in the A (Agricultural) Zone District, based on the recommendations of Planning staff and the Planning Commission, with the Conditions of Approval and Development Standards, as amended. The motion was seconded by Commissioner Conway, and it carried unanimously. There being no further discussion, the hearing was completed at 10:40 a.m. 2019-2089 PL2676 HEARING CERTIFICATION - ROCKY MOUNTAIN MIDSTREAM, LLC (USR19-0008) PAGE 3 This Certification was approved on the 17th day of June, 2019. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, CO •RADO ATTEST: t x104:4 Weld County Clerk to the Board BY puty CI k to e Board APPROVED AS TO FORM. Barbara(KKirkmmeyer, Chair 1 1 Mike Freeman, Pro-Tem can P. Conway County Attorney , r , XCUSED Steve Moreno Date of signature: D7//4`!' 2019-2089 PL2676 ATTENDANCE LIST (PIPPC/7 NAME - PLEASE PRINT LEGIBLY ADDRESS (CITY, STATE ZIP) COUNTY OF SPEAKING EMAIL RESIDENCE (Y/N)? - c ' , , !--IkLAAJLS31.3 4) 1--1 " ' a act4:Ir 4- Ld‘) t 'all, 'Ill 12-1::_ I A- t': . ., ‘.--.Act WID . 1,4 AtLtitzp [AA ,--a.. 4.\t. cer) 42),,,sas-prirp , , \._ ``l Al I LC- .. _ " ` -/-Q '4 `e�-S , ,.� 6 - 5 f e vs-^_, &r n te&c s-ic,rg li t -C S; i /nom i L okv i t-1. (1)("‘ 1 •a- -2-40 4-i)c CZ h u 11 4(/17"jmilf (w l 1e\AlI�tkIte ;,Js 1 i.... j D- Hello