Loading...
HomeMy WebLinkAbout20190031.tiffMEMORANDUM TO: Chris Gathman, Planning Services FROM: Hayley Balzano, Public Works DATE: November 6, 2018 SUBJECT: PUDZ18-0002 18-0002 Union Estates The Weld County Department of Public Works has reviewed this PUD proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS GENERAL PROJECT INFORMATION/LOCATION Project description: A Planned Unit Development (PUD) change of zone application from A (Agricultural) to PUD for nine (9) residential lots with Estate Zone District uses along with 5.916 acres of open space. This project is south of and adjacent to CR 50 and is west of and adjacent to CR 41. Parcel number 105505100035. Access is from CR 50. ACCESS The subdivision road is proposed to intersect with County Road 50 approximately 1280 feet west of County Road 41. The applicant is also proposing keeping the Oil and Gas horseshoe accesses located approximately 520 and 660 feet west of County Road 41 on County Road 50. Public works is requiring that the applicant coordinate closure of the Oil and Gas horseshoe access and provide an easement to the site through the PUD. Please contact Public Works with questions. Per Chapter 12, Article 5, Section 12-5-30, an Access Permit is required for access to Weld County maintained roadways. We strongly encourage you to discuss your access with Public Works prior to laying out your site plan to ensure the approved accesses are compatible with your layout. Per Chapter 12, Article V, Section 12-5-30. F, when feasible, there shall be no net increase in the number of accesses to a public road. Minimum access spacing widths are shown in Weld County Code Appendix Table 12A-2. Please refer to Chapter 12 of the Weld County Code for more information regarding access. ROADS AND RIGHTS -OF -WAY County Road 50 (Todd Avenue) is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way. The applicant shall delineate on the site map or plat the future and existing right-of-way and the physical location of the road. If the right-of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. County Road 41 is a gravel road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way. The applicant shall delineate on the site map or plat the future and existing right-of-way and the physical location of the road. If the right- of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of- way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. Per Chapter 12, Article 4, Section 12-4-30.B, a Weld County Right -of -Way Use Permit is required for any project that will be occupying, constructing or excavating facilities within, and/or encroaching upon, any County rights -of -way or easement. Right -of -Way Use Permit instructions and application can be found at https://www.weldcov comldepartmentslpublicworks/permits/. Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the County right-of-way. TRAFFIC Latest ADT on CR 50 counted 797 vpd with 25% trucks. The 85th percentile speed is 59. TRACKING CONTROL POLICY The applicant is asking for a waiver from paving the internal subdivision road. If the waiver is granted tracking control may be required where the subdivision road intersects with County Road 50. IMPROVEMENTS AGREEMENT FOR ON -SITE IMPROVEMENTS At Final Plan, Public Works is requiring an Improvements Agreement for on -site PUD improvements, per Chapter 24, Article 9, Section 24-9-20. This agreement will include on -site improvements associated with the development. Collateral is required to ensure the improvements are completed and maintained. Prior to recording the Final Plan, the applicant shall provide construction drawings to be reviewed by Public Works. Once the construction drawings are accepted, a Construction Schedule and a draft Exhibit A-2 AND B-2 are required, outlining the costs of onsite improvements. Improvements Agreement: An example agreement is available at: https://www.weldgov com/UserFiles/Servers/Server 6/File/Departmerits/Publie/020Works/DevelopmentR eviewlsprusr.pdf. DRAINAGE REQUIREMENTS This area IS within a Non -Urbanizing Drainage Area: Non -Urbanizing Drainage Areas typically require detention of runoff from the 1 -hour, 100 -year, storm falling on the developed site and release of the detained water at the historic runoff rate of the 1 -hour, 10 -year storm falling on the undeveloped site for NON - URBANIZING areas. The site meets drainage exceotuib 23-12-30.F.1.a.7 for residential developments. The applicant has submitted a Stormwater Swale and Culvert Design Narrative for the site. In the Final Plan stage of the PUD, Construction Drawings will be required with the submittal. At this time, a grading and drainage plan will be required. In this drawing, please include the design points and culverts referenced in the narrative. The narrative mentions that the site has a natural peaking pond located on the northern portion of the PUD. Page 5 of the narrative indicates that there will be a culvert outlet on the peaking pond. If this is in the right- of-way, a ROW permit will be required for construction. Comments on the submitted narrative are available upon request. Historic Flows: The applicants will be required to maintain the historic drainage flows and run-off amounts that exist from the property. SUBDIVISION ROADS The applicant is proposing a subdivision road (Union Drive) intersecting with County Road 50, approximately 1280 feet west of County Road 41. This location appears to meet spacing criteria. The proposed radii for the subdivision road are 50'. The applicant is asking for a waiver from the requirements of Section 27-2-20 .-Access standards, which states: "All PUD developments will be served by an internally paved road system according to County standards..." This waiver request will be presented at the Board of County Commissioners hearing. If this waiver is not granted, a pavement design will be required prior to recording the Change of Zone plat. With the Change of Zone application, the applicant submitted a road layout. The intersection of Union Drive and Union Street appears that it may raise concerns for drivability and safety. Please address the drivability and safety of this intersection in the Final Plan submittal. With the PUD Final Application submittal the applicant will need to provide the proposed cross section showing the dimensions of the road lanes, shoulders, and right of way to comply with Weld County Code Chapter 24, Appendix 24-E, and a plan and profile for the roadway. If applicable, at that time, the pavement design will be required. At Final Plan, construction drawings will need to show the plan and profile of the roadway, cross sections, and signage. CONSTRUCTION SCHEDULE At Final Plan, a construction schedule will be required with submittal. This shall show the approximate dates when construction of the development is proposed to start and finish. This shall describe the stages in which the development will be constructed, and the number of buildings or structures and the amount of common open space to be completed at each stage. UTILITY MAP At Final Plan, the utility map shall show: gas lines, water, electricity (above or below ground), telecomm (if applicable), sewer (if applicable), utility and drainage easements with labels, culverts, detention areas and structures, and plans, profiles, and typical cross section drawings of streets. The Utility Map shall be recorded with the Final Plan plat. GRADING PERMIT A Weld County Grading Permit will be required if disturbing more than 1 acre. Grading Permit applications are accepted after the planning process is complete (plat recorded). An Early Release Request Form may be entertained only after the applicant, Public Works and Planning Department have reviewed the referral and surrounding property owner comments. The Early Release Request may or may not be granted depending on referral comments and surrounding property owner concerns. Contact an Engineering representative from the Public Works for more information. A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact: Colorado Department of Public Health and Environment, Water Quality Control Division, 303-692-3575. CONDITIONS OF APPROVAL A. The applicant shall provide a pavement design for the subdivision road prior to recording the Change of Zone Plat. (Department of Public Works) B. The plan shall be amended to delineate the following: 1. County Road 50 is a paved road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) 2. County Road 41 is a gravel road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) 1. The property owner shall control noxious weeds on the site. (Department of Public Works) 2. The access on the site shall be maintained to mitigate any impacts to the public road including damages and/or off -site tracking. (Department of Public Works) 3. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works) 4. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Public Works) 5. Weld County is not responsible for the maintenance of onsite drainage related features. (Department of Public Works) 6. Weld County is not responsible for the maintenance on onsite subdivision roads. (Department of Public Works) WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org Memorandum To: Chris Gathman From: Lauren Light, Environmental Health Services Date: November 5, 2018 Re: PUDZ18-0002 Union Estates The Weld County Environmental Health Services Division has reviewed this proposal for a Change of Zone Request from the A (Agricultural) Zone District to the PUD (Planned Unit Development) Zone District for nine (9) residential lots with Estate Zone District uses along with 5.916 acres of open space. The application has satisfied Chapter 27 of the Weld County Code regarding water service. Central Weld County Water District will provide water and an email from the Weld County Attorney's office approving the proposed water source was included in the application. The application has satisfied Chapter 27 of the Weld County Code regarding water service. An On -site Waste Water Treatment System (OWTS) performance report dated April 2017, was completed by Mark Taylor P.E. The soils data provided indicate Julesburg sandy loam and Vona loamy sand on site. Both soils have rapid permeability characteristics which may require engineered septic systems on the lots. Groundwater was encountered at 6.5 feet which should not be an issue with the installation of OWTS. However, groundwater levels fluctuate seasonally so individual test pits are required for each lot when septic permits are applied for. According to the application, the covenants state that activities such as landscaping (i.e. planting of trees and shrubs) and construction (i.e. auxiliary structures, dirt mounds, etc.) activities are expressly prohibited in the designated absorption field site. The minimum lot size of 3.5 acres coupled with an overall density of one on -site wastewater treatment system per 5.9 acres does meet current Department policy. The Environmental Impact Plan (section 27-6-40) adequately addresses all environmental impacts. Health Administration Vital Records lot: 9/0 304 6410 Fax: 9/0-'301-64 I'2 Public Health & Clinical Services cic: 9/0 304 6420 Fax: 910-304-64 16 Environmental Health Services Tele:970-304-6415 Fax, 970-304-6411 Communication, Education & Planning Tele: 970-304-6470 Fox: 970-304-6452 Emergency Preparedness 8 Response Te le: 970-304-6470 Fax: 970-304-6462 Public Health WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org The Division recommends the following notes for the Change of Zone plat: 1. Water service shall be obtained from Central Weld County Water District. 2. The parcel is currently not served by a municipal sanitary sewer system. Sewage disposal may be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. 3. Activity or use on the surface of the ground over any part of the OWTS must be restricted to that which shall allow the system to function as designed and which shall not contribute to compaction of the soil or to structural loading detrimental to the structural integrity or capability of the component to function as designed. 4. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of Weld County Environmental Health Services, a fugitive dust control plan must be submitted. 5. If land development creates more than a 25 -acre contiguous disturbance, or exceeds 6 months in duration, the responsible party shall prepare a fugitive dust control plan, submit an air pollution emissions notice application, and apply for a permit from the Colorado Department of Public Health and Environment. 6. Weld County's "Right to Farm" shall be placed on any recorded plat. Health Administration Vital Records lot: 9/0 304 6410 Fax: 9/0-'301-64 I'2 Public Health & Clinical Services Icic: 9/0 304 6420 Fax: 910-304-64 16 Environmental Health Services Tele:970-304-6415 Fux: 970-304-6411 Communication, Education & Planning Tele: 970-304-6470 Fox: 970-304-6452 Emergency Preparedness 8 Response Te le: 970-304-6470 Fax: 970-304-6462 Public Health From: Chris Gathman To: "sherilockman' what -v re.com" Subject: FW: Union Estates C of Zone Date: Tuesday, August 14, 2018 8:24:00 AM Sheri, I noticed that OWTS report was submitted with the sketch plan already. I spoke to Lauren this addresses her comments. I will proceed once I get the OK from LaSalle. If anything has changed on their end — I will let you know. Regards, Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue tel:: 970-400-3537 fax: 970-400-4098 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Chris Gathman Sent: Tuesday, August 14, 2018 7:55 AM To: 'sherilockman@what-wire.com' <sherilockman@what-wire.com> Subject: RE: Union Estates C of Zone Dear Sheri, Sorry for the delay. We are swamped here. You sure you don't want to come back —you are welcome to Lauren Light is requesting some additional information re: the septic systems. See below: sketch plan stated "There was no preliminary percolation data included in the Geotechnical report by Terracon, dated February 22, 2008. The soils data provided indicate Julesburg sandy loam and Vona loamy sand on site. Both soils have rapid permeability characteristics which may require engineered septic systems on the lots. Percolation data will be required at the change of zone submittal." As the OWTS regulations have changed, test pits and soil typing is now required. Please submit the soils information as requested prior to submittal of COZ. Also — I want to make sure that La Salle's position has not changed in regards to annexation. The original IGA notice of inquiry was from 2016. I sent them an updated notice of inquiry in order to verify whether or not anything has changed in regards to their position re: annexation. I need to make sure nothing has changed. Regards, Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue tel: 970-400-3537 fax: 970-400-4098 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: sherilockman@what-wire.com <sherilockman@what-wire.com> Sent: Saturday, August 11, 2018 10:28 AM To: Chris Gathman <cgathman@weldgov.com> SWALE AND CULVERT REVIEW CHECKLIST Project Name: PUDZ18-0002 Union Estates Comments: Note: This site meets a drainage exception. detention is not required. 1. Please submit drawings showing the design points and culverts referenced in the swale and culvert design narrative. 2. Is the peaking pond mentioned in the ROW? Pg 5 indicates that there will be a culvert outlet. Any work in the ROW requires a ROW permit. Show any drainage features on the drawings referenced in number 2, above. 3. The mannings n used for culverts indicates that concrete culverts will be used. Please confirm if this is the case 4. In several locations, the flow depth is greater than the design depth Once drainage drawings are received, Public Works can determine if these swale/design points are major drainage features requiring 1 foot of freeboard for the swale. At this time. it cannot be determined where these locations are. 4/11/2018 Atii Weld County Department of Public Works! Development Review 1111 H Street, Greeley, CO 80631 I Ph: 970-400-3750 I Fax: 970-304-6497 www.weldgov.com/departments/public works/development_ review/ Submit by Email Weld County Referral October 8, 2018 The Weld County Department of Planning Services has received the following item for review: Applicant: Dave Keiser and Harry Strohhauer Case Number PUDZ18-0002 Please Reply By: November 5, 2018 Planner: Chris Gathman Project. A Planned Unit Development (PUD) change of zone application from A (Agricultural) to PUD for nine (9) residential lots with Estate Zone District uses along with 5.916 acres of open space. Location: South of and adjacent to CR 50 and west of and adjacent to CR 41 Parcel Number: 105505100035-R2846204 Legal. PART NE4 SECTION S. T4N, R65W LOT B REC EXEMPT RE -3703 of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. i _ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter Billie Moore 10/29/2018 Signature Date Agency Weld County Building Dept - Addressing Weld Coi,riy Planning Dept 1555 N 7 7Th Ave Greeley CO 80531 1970i 400-6100 {970 304-6498 fax UNION ESTATES Developer: Dave Keier/Harry Strohhauer PUDZ18-0002 (Change of Zone from Ag to PUD/ESTATE) Planner: Chris Gathman PT NE4 5-4-65 ZONED PUD/ESTATE IS NOT IN FLOOD PLAIN RIF AREA #4 CENTRAL WELD COUNTY WATER DISTRICT ENGINEERED INDIVIDUAL SEPTIC SYSTEMS PROPANE XCEL ENERGY VALLEY SCHOOL DIST RE1 LA SALLE FIRE PROTECTION DISTRICT LASALLE POST OFFICE 9 RESIDENTIAL LOTS **PRELIMINARY ADDRESSING ** 10/29/18 Lot 1 Lot 2 19752 UNION DR 19756 UNION DR OR 19763 UNION DR Lot 3 19770 UNION DR Lot 4 119766 UNION DR ELot 5 119762 UNION DR Lot 6 19758 UNION DR Lot 7 19759 UNION DR l Lot 8 19755 UNION DR Lot 9 ! 19751 UNION DR OUTLOT A OUTLOT B Billie Moore WC Building Tech 10/29/18 Date: November 6, 2017 To: Central Weld Water From: LaSalle Fire Protection District REF: Union Estates The LaSalle Fire Protection District ask that the lines used to provide water to the hydrants within this subdivision be at least six inches. Once we have an updated map of the subdivision we then will decide on placement of the two hydrants. The 1997 Uniform Fire Code requires 2,250 GPM for flow duration of 2 hours for structures this size and building classification. If you have any questions, please contact the LaSalle Fire Protection District. LaSalle Fire Protection District Operations Manager Ben Hulsey Submit by Email Weld County Referral October 8, 2018 The Weld County Department of Planning Services has received the following item for review: Applicant: Dave Keiser and Harry Strohhauer Case Number: PUDZ18-0002 Please Reply By: November 5, 2018 Planner: Chris Gathman Project: A Planned Unit Development (PUD) change of zone application from A (Agricultural) to PUD for nine (9) residential lots with Estate Zone District uses along with 5.916 acres of open space. Location: South of and adjacent to CR 50 and west of and adjacent to CR 41. Parcel Number: 105505100035-R2846204 Legal: PART NE4 SECTION 5, T4N, R65W LOT B REC EXEMPT RE -3703 of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation, Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. E L"J We have reviewed the request and find that it does /does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. Signature Agency Doug Moss CFO/COO Weld County School District RE -1 Date 10/8/2018 Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax Weld County School District RE -1 Gilerest • LaSalle • Platteville P.O. Box 157 14827 W.C.R. 42 Gilcrest, CO 80623 Don Rangel, Superintendent October 8, 2018 Chris Gathman Weld County Plann ;rig Department 1555 North 17th Avenue Greeley, CO 80631 RE: Case Number PUDZ18-0002 Dear Chris: We have reviewed the application by Dave Keiser and Harry Strohhauer for PUDZ18-0002 and have the following comments: Weld County School District RE -1 has developed methodology for Land Dedication and/or In Lieu Payments. The current In Lieu Payment amount per single family unit is $1,054.20. Based on the information provided, it appears that there are plans to add 9 new homes on the existing parcel. Therefore, an in lieu payment in the amount of $9,487.80 is due to the school district prior to approval of the recorded exemption. Respectfully, Dour, loss' Chief Financial Officer BOARD OF EDUCATION Nancy Sarchet Kim Chacon Chris Mast President Vice President Secretary Bridget Holcomb Treasurer Ben Rainbolt Ernie Tann Director Director Our Total Commitment is to Provide an Exemplary Education and Safe Environment for all Students Submit by Email Weld County Referral October 8, 2018 The Weld County Department of Planning Services has received the following item for review: Applicant: Dave Keiser and Harry Strohhauer Case Number: PUDZ18-0002 Please Reply By: November 5, 2018 Planner: Chris Gathman Project: A Planned Unit Development (PUD) change of zone application from A (Agricultural) to PUD for nine (9) residential lots with Estate Zone District uses along with 5.916 acres of open space. Location: South of and adjacent to CR 50 and west of and adjacent to CR 41. Parcel Number: 105505100035-R2846204 Legal: PART NE4 SECTION 5, T4N, R65W LOT B REC EXEMPT RE -3703 of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. O We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. Signature Agency Union Ditch Company Date 10/17/18 Weld County Planning Dept, 1555 N 17th Ave, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax Union Ditch Company Donna L. Coble, Secretary P.O. Box 445 3005 W. 291h Street, Suite G1 Greeley, CO 80632 Greeley, CO 80631 (970) 353-6121 (970) 353-9703 (fax) ditchoffice@gwestoffice.net October 17, 2018 Weld County Planning Dept. ATTN: Chris Gathman, Planner 1555 N. 17th Avenue Greeley, CO 80631 Re: Applicant: Dave Keiser and Harry Strohauer Case Number: PUDZ18-0002 Gentlemen: Union Ditch Company has reviewed the above case. In the Response to Concerns document regarding Union Ditch Company, the applicant indicates that multiple attempts have been made regarding an agreement without success. Recent activity shows that Union Ditch Company submitted a proposed agreement to applicant on July 6, 2018. A response was not received from applicant until August 10, 2018. A revised agreement was sent to the applicant on September 8, 2018. There was no response from applicant, and a follow-up e-mail was sent October 10, 2018. There has still been no response. The Company's concerns have not been addressed. The Company requires a signed agreement and asks that the County not approve the application until an agreement is reached between the applicant and Union Ditch Company. Yours very truly, Donna L. Coble Secretary hand Consulting, 1.1C Sheri Lockman 36509 WCR 41 Eaton, CO 80615 970-381-0526 sherilockman@what-wire.com Union Ditch Company Attn: Donna L. Coble P.O. Box 445 Greeley CO 80632 Donna, November 20, 2017 I have been hired by Dave Keiser and Harry Strohauer to help develop their property adjacent to the Union Ditch. We have completed a Planned Unit Development Sketch Plan through Weld County. You were asked for comments regarding the development and returned the attached letter to the County. I hope the following will address your concerns. You have asked for us to enter into an agreement with the Union Ditch Company. We will be happy to enter into an agreement that ensures that the Union Ditch Company will not be held responsible for any damage caused by water coming from the ditch. The ditch elevation at the site is approximately 10 to 15 feet below ground level and currently basements will not be allowed. Therefore, the likelihood of any water issues should be extremely low. Please send us a copy of an agreement to review. Your attorney has no doubt written similar agreements in the past and can easily amend one to fit this site. The proposed fence will be constructed around the perimeter of the property and will either be a steel or vinyl three rail type fence. This sub -division is targeting and designed for mid to upper end homes and the use of a 6 foot chain link fence would not meet our cosmetic requirements. The layout of the subdivision includes 65' between the ditch and closest fence. Any free space in this area will be planted with natural grass that will be mowed regularly. Currently. there is a road and two cement ditches within the 65'. These barriers should be more than adequate for fire prevention. The developers are well aware of the need for natural grass growth on the property and are quite knowledgeable with what process will be needed to assure the property has a proper ground cover. This has all been addressed in our development plan and is essential for the completion of the project. The drainage plan for the site will be amended at each phase of the development process until it meets Weld County criteria. Water leaving the property should not affect the Union Ditch in any way. The property will drain north and east, away from the Union ditch. You will be able to review the drainage plan at the Change of Zone and Final Plan stages. Weld County will send you a request for comment at both of these phases. If you have concerns regarding the final drainage plan you can include your concerns in the response to Weld County. Sincerley, Sheri Lockman Xcel EnergysM PUBLIC SERVICE COMPANY WILL SERVE LETTER March 1, 2018 David Keiser 22380 Latham View Drive La Salle, CO 80645 Re: Will serve letter for County Road 50 and County Road 41, La Salle, CO 80645 Dear David Keiser, This letter is to confirm that Xcel Energy is your utility provider for electrical service. In accordance with our tariffs, on file with and approved by the Colorado Public Utilities Commission, electric facilities can be made available to serve the project at County Road 50 and County Road 41, La Salle, CO 80645. Your utility service(s) will be provided after the following steps are completed: • Application submitted to Public Service's "Builders Call Line (BCL)" — once your application is accepted you will be assigned a design department representative who will be your primary point of contact • Utility design is completed — you must provide your design representative with the site plan, the one line diagrams, and panel schedules for electric and gas loads if applicable • All documents provided by design representative are signed and returned • Payment is received • Required easements are granted - you must sign and return applicable easement documents to your Right -of -Way agent • Site is ready for utility construction A scheduled in-service date will be provided once these requirements have been met. It is important to keep in mind that the terms and conditions of utility service, per our tariffs, require that you provide adequate space and an easement on your property for all gas and electric facilities required to serve your project, including but not limited to gas and electrical lines and meters, transformers, and pedestals. General guidelines for these requirements can be found at `it:.,! ;Thc, ,_ _ ,, i::. ii.!,. Easement requirements can be found at Xcel Energy looks forward to working with you on your project and if I can be of further assistance, please contact me at the phone number or email listed below. Sincerely, Yarani Vazquez on behalf of Xcel Energy UC Synergetic 5245 Ronald Reagan Blvd Suite 104 Johnstown, CO 80534 Show Full Headers I Print I Close Printer View From: "" <sherilockman@what-wire.com> To: "John Peterson" <john.peterson@nblenergy.com> Subject: RE: development Date: Tue 03/06/18 03:34 PM John, Sorry. Here is the latest plat. It doesn't show outlot c moved to go around the battery. We have no specific questions we just wanted to make sure that you are ok with the plans before we submit to avoid problems later. Sheri john.peterson@nblenergy.com wrote: From: John Peterson <john.peterson@nblenergy.com> To: "sherilockman@what-wire,com" <sherilockman@what-wire.com> Subject: RE: development Date: Tue, 6 Mar 2018 22:17:40 +0000 Sheri, I have been working with Dave and Harry on this project, the attachment did not come through. Could you please send that over. Also, our current plan is to plug the well and pull the flowline in late September or October. When we get closer to that time we can discuss specifics. We will need to make sure that any permanent development will not encroach on out setbacks to the batter location, flowline, and well heads. This is something I've discussed with both Dave and Harry. Please let me know if you have any specific questions or concerns. Regards, John Peterson Operati°tons Landman 2115 1171h Avenue Greeley. CO 80634 Main: 970.304.5000 I Direct: 970.304.5354 John.Peterson@nblenergy.com www.nobieencruyinc.cum noble energy From: sherilockman@what-wire.com (mailto:sherilockman@what-wire.comj Sent: Tuesday, March 06, 2018 3:13 PM To: John Peterson <john.peterson@nbienergy.com> Subject: EXTERNAL: development Mr. Peterson, My name is Sheri Lockman. I am helping Dave Keiser and Harry Strohauer develop a 9 lot subdivision at the corner of Weld County Roads 50 and 41. Dave told me that he has been working with you to resolve any issues that you have with the project. I have attached a copy of the plat for you to take a look at. Dave indicated that you had agreed that the gas flow line going across Lot 1, 8 and 9 would be removed along with the well on the west end of the property. We have also decided to move outlot c to the south side of the tank battery along Weld County Road 50 so that people will walk around that area instead of through it. Please let me know if you have any other concerns that you would like addressed before we submit the application. We appreciate your help, Sheri Lockman Lockman Land Consulting, LLC 36509 CR 41 Eaton, CO 80615 970-381-0526 Attachment: Save View Name: SITE PLAN (WITH OIL AND GAS) 1 18 18.pdf Type: application/pdf COLORADO Division of Water Resources Department of Natural Resources October 10, 2018 Chris Gathman Weld County Department of Planning Services Transmitted via email: cgathman@co.weid.co.us RE: Union Estates Case No. PUDZ18-0002 N1/2 NE1/4 Section 5, T4N, R65W, 6th P.M. Water Division 1, Water District 2 Dear Mr. Gathman: John W. Hickenlooper Governor Robert Randall Executive Director Kevin G. Rein, P.E. Director/State Engineer We have reviewed the materials received October 8, 2018 concerning the above referenced proposal to subdivide 53.88 acres known as Lot B of the Recorded Exemption RE -3703 into 9 residential lots ranging in size from 3.6 acres to 10.12 acres along with 2.22 acres of open space. We have previously provided comments to this proposal by our letters dated June 11, 2008, August 30, 2017, and June 25, 2018. No changes on the proposed water supply water supply for this development were identified in this referral. Therefore, we reiterate our previous opinion that pursuant to Section 30-28-136(1)(h)(I) and Section 30-28- 136(1)(h)(II), C.R.S., the proposed water supply is adequate and can be provided without causing injury to decreed water rights as long as Central Weld County Water District commits to provide water taps to all 9 single-family residential Lots. Our previous comments regarding any storm water detention structure proposed for this planned development still apply. Should you or the applicant have any questions, please contact loana Comaniciu at (303) 866-3581x8246. Sincerely, clirbtazeit4 for Joanna Williams, P.E. Water Resource Engineer Ec: Subdivision file no. 21732 Office of the State Engineer 1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 www.water.state. co. us To Whom it May Concern, We are asking for written verification of the type and location of mailboxes in Union Estates PUD, The PUD is located on Lot B RE -1703 being part of the NE4, Section 5,Township 4 North, Range 65 West of the 6t P.M., Weld County, Colorado. In previously discussions, the Postal Service requested a pull off and group mailbox on the west side of Union Drive. The mailbox is to be of a type approved by the US Postal Service. The developer is in agreement with this plan Please sign below to indicate that you are in agreement Signature Date Position Show Full Headers I Print f Close Printer View From: "" <sherilockman@what-wire.com> To: <Shareen.k.wertz@usps.gov> Subject: Subdivision review Date: Thu 01/18/18 01:36 PM Shareen, I spoke to you on November 28th regarding the postal requirements for the proposed 9 lot residential subdivision located at the southwest corner of County Road 50 and County Road 41. You had indicated that you would let me know of any requirements or concerns with the subdivision after you had a chance to discuss the case with John. A representative for the postal service had previously indicated that a pull -off needed to be placed on the west side of Union Drive. The attached plat shows the proposed pull off location. We are happy to address any concerns or conditions that you may have. You have been unwilling to review the plat unless we have addresses for the tots. At this point the lots are not legal and have not been addressed by the County. Please contact Chris Gathman, Weld County Planner, at 970-353-6100 to discuss addressing the lots. We would appreciate any comments that you have regarding the subdivision. If we do not receive a response we have no option but to go forward with the pull -off location and street names as shown on the attached plat. Sheri Lockman Lockman Land Consulting, LLC 36509 CR 41 Eaton, CO 80615 970-381-0526 Attachment: Save View Name: SITE PLAN 1 18 18.pdf Type: application/pdf Hello