HomeMy WebLinkAbout20193238.tiffRESOLUTION
RE: APPROVE EMERGENCY BID #B1900110, COUNTY ROAD 39 EXTENSION PROJECT
AND WAIVER OF TEN-DAY WAITING PERIOD FOR CONSIDERATION AND
INVESTIGATION - DEPARTMENT OF PUBLIC WORKS
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Department of Purchasing has requested waiver of the ten-day waiting
period for Emergency Bid Request #61900110, County Road 39 Extension Project, for the
Department of Public Works, since this is a grant project, paving needs to occur before the end
of year and needs to start on August 19, 2019, to meet the design and construction schedules,
and
WHEREAS, the Board of County Commissioners deems it advisable to waive the ten-day
waiting period for said emergency bid.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld
County, Colorado, that the ten-day waiting period for Emergency Bid Request #B1900110, County
Road 39 Extension Project, for the Department of Public Works, be, and hereby is, waived.
BE IT FURTHER RESOLVED by the Board that the low bid from DeFlaco Construction
Company, in the amount of $3,753,538.27, be, and hereby is, accepted on an emergency basis.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 22nd day of July, A.D., 2019.
BOARD OF COUNTY COMMISSIONERS
ATTEST: dat,f4,t) �,�, •�C,lato•�
Weld County Clerk to the Board
BY:
eputy Clerk to the Board
APP AS T
County torney
Date of signature: 8%3 /I cl
WELD COUNTY, COLORADO
Barbara Kirkmeyer, Chair
Mike Freeman, Pr )_-_,
m�
K. James
Steve Moreno
e-�- Pcv(OO1C1-Il£R', PUCaII),
pocrCSc/CO,)
9-11-19
2019-3238
PO0022
EG0076
MEMaiANDLJM
TO: Rob Turf, Purchasing Manager DATE: July 18, 2019
FROM: Don Dunker, County Engineer l Erich Green, Project
Manager, Public Works
SUBJECT: Bid Request No. B1900110
WCR 39 Extension Project
BOCC Emergency Bid Approval
Bids were received and opened on July 17, 2019 for contracted construction of the Weld County
Road 39 Extension Project. Two (2) bids were received; one for $3,753,538.27 and another for
$4,536,239.00 with the lowest bid submitted by DeFalco Construction Company. The total
Engineer's Estimate for this work was $2,847,203.42. Most of the difference from the Engineer's
Estimate to the lowest bid is driven by the construction schedule; the 74 -calendar day
construction contract needs to be completed by October 31, 2019. A portion of the construction
costs will be reimbursed to Weld County by the Town of LaSalle based on their DOLA grant and
a match provided by Union Pacific Railroad totaling $1,530,000.
The submitted bids have been reviewed for errors and completeness. Both bids were complete,
and no errors were found. The bid tabulation has been attached for your information.
The reason for requesting emergency award is that this is a grant project and paving needs to
occur before the end of this year to ensure paving can be accomplished before cold weather.
There is also a 2 -week .minimum time frame to receive the Union Pacific Railroad permit. This
permit is required before construction can begin and the contractor needs the award to start this
process. The design and construction schedules have been condensed as much as possible.
Therefore, construction must begin as soon as possible. We have specified a 74 -calendar day
contract beginning August 19, 2019 and ending on October 31, 2019. The only way to achieve a
beginning date of August 19, 2019 is by utilizing the emergency award process.
Staff recommends awarding the construction contract to DeFalco Construction Company for a
total amount of $3,753,538.27. DeFalco Construction Company is a civil infrastructure
contractor who has completed many transportation projects and is well qualified for this project.
2019-3238
BID TABULATION 7-17-19
WCR 39 EXTENSION PROJECT B1900110
ITEM
NUMBER
CONTRACT ITEM
UNIT
ESTIMATED
QUANTITY
UNIT PRICE TOTAL
Engineer'. Engineer's
UNIT PRICK TOTAL
DeFalco Cong. Co. DeFak o Conrt- Cu.
UNIT PRICE TOTAL
American Chit American Cn it
2W
Clearing and Grubbing
LS
I
$)8,000.00
018,000.00
5313,900.00
$313,900.00
$24.500,00
$24,500.00
202
Removal of Tree
EACH
25
$500.00
512,500.00
5812.00
$20,300.00
0385.00
59,625.00
202
Ronroval of Ditch Lining
LF
390
510.00
$3,900.00
512.00
04,680.00
$14 00
05,46000
202
Removal of Asphalt Mat
SY
42.3
030.00
$1,20400
021.00
0888.30
030 00
01.26900
202
Removal of Ground Signs
EACH
2
5200.00
5400.00
090.00
5180 00
0139.0(1
027000
202
Removal of Sign Panels
EACH
I
$50.00
$50.00
836.00
536.00
045.00
055.00
202
Removal of Fence
I,F
2126
52 00
54,252 00
$3.00
$6,378 00
$5 00
0)0,630.00
202
Removal of Double Gale
EACH
I
$1,50000
06,500.00
9700.00
$30000
445000
0450.00
203
Unclassified Excavation (Complete in Place)
CY
1928
520.00
538,560.00
$7.00
017 490.16)
06.50
012,53200
203
Unsuitable Matnal (Muck)
CY
3611
$20.90
57?220.00
8)41X1
550.554.0
S2700
097,497.05
203
3 -inch Minus Rook
CY
4474
$60.00
0268,440.00
$65.00
5790,810,00
581.00
0362,394.00
203
No. 57 / 67 Rock
CY
3244
160 00
$194,640.00
$63 00
5204,372.00
$82 00
4266,008 00
203
R-40 Embankment (Complete in Place)
CY
3825
82500
095,625.00
$35.00
013387500
$5200
$198,90000
203
Potholing (Special)
EACH
10
5291.00
52,500.00
024500
52,450,(X7
51070 00
510,700 0
203
Proofrolling
HOUR
30
0)20.00
03,600.00
517600
05,250-00
0)67.00
$5,010.00
203
Sweeping
DAY
30
020000
56,00000
026700
58,01000
01,765,00
$52,950.00
206
Fluwtill
CY
210
0200.00
$42,000.00
$27000
$56,70000
$92200
$193,62000
206
Structure Excavauon
CY
1105
$75.00
582,874.00
01000
01105(100
532.00
435,360.00
207
Stockpile Topsoil
CY
2310
51200
927,792.00
$22.07
850,952.00
$3.00
553268.00
207
Redumbute'fopsotl (6' Thick)
CY
1010
53500
535,35000
SWU00
0)0,10000
51000
010,10000
208
Concrete Washout Structure
EACH
2
52.00000
8x.00000
4752.00
$1.50400
$2.800.00
45,60000
208
Vehicle Tracking Pods
EACH
2
$2.700.00
55.400.(x'
1),490.00
$2,980.00
02,60.1X)
05,20.00
208
Sediment Control Logs (8 -inch) (Typo 2) (10')
LF
30
04.00
$120.00
05.00
$150.00
516.00
4480.00
208
Erosion Control Management
1.S
I
$30,000.00
830,000.00
462,525.00
5)2,52500
416,00000
516,000.00
208
Temporary Din Bonus
LF
GAL
3712
15250
48 00
01.50
529,696.00
022,875.00
53 00
92.00
$11.136 00
$30,500.00
0250
4260
09,280 00
039,59100
209
Dust Palliative
210
Rest Double Gatc
EACH
I
$1.500.06
$1.500.00
0545.0
0545.00
$869.00
0869,00
210
Reset Ground Signs
EACH
2
4100.00
5200.00
4152.00
0304 00
022200
5444,00
211
Dnvatering
DAY
74
$1,000.00
574,000.00
81,500 00
0)17,000.00
81,00000
$74,000.00
2)2
Se.ling(Natve)(Sterile Wheat)
ACRE
5.42
$1.300.00
87.046.00
54,30.00
$23,306.00
52,650,00
014,303.00
213
Mulching (Crimped Straw)
ACRE
5.42
$3.325.00
018,02150
81,150.01
$6,23300
81,900.00
S10,298,00
216
Soil Retention Blanket (S -C) (BiaD CL 2)
SY
2184
43.50
47,644.00
$3.00
$6,552,00
06,00
$13,104.00
216
Turf Remforccment Mat (Class 3)
SY
2094
5550
011,1871X)
82000
040,68000
0900
018,306.06
304
Aggregate Bare Course (Class 6) (1351.M/CF)
HMA (Grading S) (75) (PG 64.22) (Bottom Lift
3" @147Lbs/CF)
TON
TON
3271
1272.9
438 00
455.0
.4124,293 00
$112,015.20
029 00
593170
594.85900
0118,379.70
047 00
5140.00
$153.737 00
$178,206.00
403
403
I IMA (Grading SX) (75) (PG 64-22) (Tap Lt0
2" g 147LbsfCF)
TON
8493
$110.00
$93,423.00
$)00.90
084,930.00
$150.00
$127,395-00
420
Gcotcxti)c Separator (Class I) Mtrafi 05580i
SY
29800
$5 13
4152,874 00
$6 IB
4184.164 00
012 20
0303,560.00
420
00otaule Sp+ostor Mirafi 112Rr
SY
6236
$722
545,023.92
410.00
$62,36000
42000
0)24,720.00
420
Gcogrid Tens. TriAX 100
SY
8604
$9.00
077,436.00
4300
043,020.00
411.50
098,946.00
501
Steel Sheet Piling (Type I) (Coll''rdam)
SF
10560
026.00
5274,560.00
534.00
$359,040.0
539.50
0417,120.00
506
Sol Rtprap Type H Die 18"
CY
113
558 00
06,554 00
0138.00
915,594 00
0131 00
014,803 00
506
Rprap Type M Dm 12"
CY
4
.6130.00
$520.00
$492.00
41,968 00
.017500
$70000
601
Concrete (Class D)
CY
105
01,100.00
0115,500.00
$1,333X)
$140,17500
01,30.00
0136,500.0)
602
Reinforcing Ste. (Epoxy Coated)
LBS
9718
02.00
$19,436.00
0200
019,436,.00
51.50
814.577.00
603 (Complete
43" 5 68° 14E RCP - Strength Clan III
in Place)
LF
337
0250.00
084,250.00
0324.00
$109,188.00
5526.00
5177,262.00
603 (Complete
23" x 14" HE RCP - Strength Class IV
to Place)
LF
63
0)3000
58,190.00
015600
$9,82800
516900
$10,64700
603 23"
x )4" HE RCP End Sections
EACH
2
$1,00(1.00
$2,000.00
$1,980.0(1
$3,X0.00
$1,67000
03,34(1.00
l2"
603 in
Cintular RCP - Strength Class ( V (Complete
Place)
T
LF
84
$10(1.00
08.41X)191
41000
50,4000
0129(X)
010,836 00
603 12"
Circular RCP End Sections
I)ACII
2
01,00.00
02,000.00
$1,245.00
52,490.00
01,35000
02,700.00
607 Temp
5 -Stand Barbed Wire Fence
LF
393
S8 00
53,141.0
85 00
41,965 W
07 00
02,751,0)
607
Construction Fence (Plastic)
LF
1916
$7.00
51)1600
54.00
57.664 00
54 50
$8,622 DO
607
Barbal Wire Fencing (5 -Strand)
LF
3061
56.00
518,366.60
57.00
521427.00
510.0
530610.(x1
612
IWImeawru (Type III)
EACH
IU
5175.00
SI,75O.W
$55.06
$55000
$53.00
5530.00
6)4
Sign Panels (Class I)
SF
221.5
$25.00
$5,537.30
$22.151
$4,87300
333.00
57,309.50
614
Steel Sign Post (2.25x2.25 Inch Square Post)
LE
301.25
$13.28
54.00060
$23,110
56,928.75
$30.00
$9,03750
614
Tspco Blinker Stop Signs
EACH
2
$1.50006
53.00 00
$3,150.00
$6,300.(10
04,700 00
89,400.00
614
Barricade (Type 3) (F -A)
EACH
3
$5(x).OO
51.506.00
5350 W
51 115O.1x)
51,000.00
$3,00000
620
Field Office
EACH
$20,0500
520,000.0
8(7,55000
517,550.00
8(8100.00
5180110.00
625
Construction Surveying
LS
I
$15000.00
$15.001100
523,5011.00
$23,5110.00
$35,500.00
535,500,06
626
Mobilization
LS
1
$20,000.00
$20,001.00
5444,560,(10
$444,560.00
$440,1100.00
0440,000.00
027
Pavement Malang (White)
GAL
12.86
$45.00
5578.70
$242.00
83,112.12
$30000
53,_858.00
627
Pxverncmt Marking (Yellow)
GAL
I (.2
54500
5504.06
$24210
52,710.40
$300 00
$3,360.00
627
Preformed Thermoplastic Pavement Marking
SF
172
51240
52.004.(X)
524.00
54,128.00
03500
56,020.00
629
Survey Munumentation (Type 4)
EACH
13
5500.0
56 5OO.(XO
561.00
0793.06
51 ,000.1x1
513,000.00
629
Survey Monumentation
EACH
4
$500.00
$2.00000
512 LW
$484.00
$1,00001.1
$4,000.00
630
Traffic Control Management
LS
I
$25,7000
$25,700.00
$48,325.00
048,325.00
$87.000.00
$87,000.00
630
Portable Variable Message Sign Panels
DAY
50
$200.60
810.006110
$242.00
$12,100.06
5100.06
$5,IX%LW
700
Wetland Restoration
FA
1
518,000.00
518,!0x110
018,000.00
518,101.00
$18.00.06
518,00.00
700
Wetland Mitigation (Fine Grading)
FA
I
0(2,00000
512,000.00
512,001.00
812,0500
$12.000.06
$12,000.0
706
51x8'xl" Steel Plates
FA
I
$30,00.00
530,000.00
530,0011.00
$30,000.60
830.000.00
530,000.00
700
Minor Contract Revisions
FA
I
5230.060(X1
8730.000,00
$230,00.00
$230,000.0
$230(xO,00
82314000,01)
700
Asphalt Pavement Quality
Incentive/Disincentive
FA
I
$8.060.00
88.000.00
$8,00.00
58,000 W
S8,OOO.O1)
58,000.00
706
Eason Control
FA
1
$30,00.06
5300(x).00
530,61x)06
530000.06
530,000.W
$30,000.00
700
Asphalt Pavement Smoothness Inum0ve
FA
I
$18,000.00
518,0(x1.0
518,(00.00
518.000.00
818.1100.00
518,000.00
706
Paring Spring 2020
FA
I
$I00.000.00
5100,000.06
510,0001x1
$100,(xO,00
016,0(x)00
$100,000.00
700
Fiber Optic Lowering (al Main Culvert)
(CcnturyLink)
FA
I
$10,000.00
510()00.00
010,60)1,60
510,000.00
$10.440.00
$10,000.00
TOTAL $2,847,203.42 TOTAL $3,763,638.27 TOTAL $4,536,239.00
NIA No Errors No Errors
El Cirt'U ::T 1 PURCHASING
1150 O Street, Room 107, Greeley, CO 80631
E -Mail: cmpeters(6)%weldgov.com
E-mail: reverett weldgov.com
E-mail: rturf@weldgov.com
Phone: (970) 400-4223, 4222 or 4216
Fax: (970) 336-7226
DATE OF BID: JULY 17, 2019
E ; EST FO A WCR 9 E TENSION PR JECT
DEPARTMENT: PUBLIC WORKS DEPT
NO: itL1900110
PRESENT DATE: JULY 22,2019
aPP'.0L SATE: JULY 2, 2019 - E ' GE CY AP VAL
s�
P,
E
LCC P% ST UCT1 N Co
820
L ',yNG.wrTCO 80502
ERICCIVIL CONSTRUCTORS
4901 S UTH WI ER E .E STREET
LUTTLET
•
PU LAC
N C I 80120
srS DEPT IS E aE ' NG BIDS.
TOTAL
ID
$3,753,53817
$4,536,239.00
Hello