Loading...
HomeMy WebLinkAbout20190456.tiffPLANNED UNIT DEVELOPMENT (PUD) CHANGE OF ZONE APPLICATION FOR PLANNING DEPARTMENT USE RECEIPT # /AMOUNT # 1$ APPLICATION RECEIVED BY DATE RECEIVED: 9/5/18 CASE # ASSIGNED: PUDZ18-0008 PLANNER ASSIGNED: D. AUNGST Parcel Number 080519100022. and a portion of 08051900021 Legal Description: Lot B being part of E1/2 of the E1/2, Section 19, Township 6 North, Range 66 West Property Address (If Applicable) 32550 County Road 27, Greeley, CO 80631 Existing Zone District: A - Ag Proposed Zone District: PUD Total Acreage ,59.19 Acres Open Space: 9.99 AC (17%) Are you applying for Conceptual or Specific Guide? 0 Conceptual ' Specific FEE OWNER(S) OF THE PROPERTY (If additional space is required, attach an additional sheet.) Name: Joe Stricklin Proposed #/Lots: 16 Work Phone # (970)222-7993 Work Phone # ' ' Email Address: joe.stricklin1@gmailecom Address: 32550 County Road 27, Greeley, CO 80631 APPLICANT OR AUTHORIZED AGENT (See Below: Authorization must accompany applications signed by Authorized Agent) Name: Aaron Olson Work Phone # (970)532-5891 Work Phone # ' ' Address: 444 Mountain Ave, Berthoud, CO 80513 UTILITIES: Water: North Weld County Water District Sewer On -Site Septic Gas: Xcel Energy Electric: Poudre Valley REA Phone: Centurylink DISTRICTS: School: RE -4 Windsor Email Address: aarontb9roup.us Fire: Windsor -Severance Post: Greeley I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating the signatory has the legal authority to sign for the corporation. I (we), the undersigned, hereby request hearings before the Weld County Planning Commission and the Board of County Commissioners concerning the proposed Change of Zone for the above described unincorporated area of Weld County, Colorado: 3/I AV Signature: Owner or Authgffzed Agent Date Signature; Owner or Authorized Agent Date DEPARTMENT OF PLANNING AND BUILDING DEPARTMENT OF PUBLIC HEALTH AND ENVIRONNMENT 1555 NORTH 17T" AVENUE GREELEY, CO 80631 AUTHORIZATION FORM FOR BUILDING, PLANNING AND HEALTH DEPARTMENT PERMITS AND SERVICES ..aye l3 &t1ckJ,;, I, (We). Lott c (_C b , �iv�e permission to p (Owner - please print) Tn8 r'uv3/4. (Applicant/Agent — plehse print) to apply for any Planning, Building or Health Department permits or services on our behalf, for the property located at: Z5'Sv Coy zro,43 Legal Description: t of Section /5 , Township op N, Range $1O Subdivision Name: L OA le Srbfrier OtrwroreS Lot Block Property Owners Information: Phone: L;-)0 sinE-mail: _)tr:ClchAI� Applicant/Agent Contact Information; Phone: g7 0- S3?/. 4104j2•41v%J euSaped Email correspondence to be sent to: Owner Applicant/Agent Both Postal service correspondence to be sent to: (choose only one) Owner Applicant/Agent Additional Info: infleasts 00Alerj na 411-4A100 Owner Signature Owner Signature: tA Date: Date: qb)/1:1 August 28, 2018 Aaron Olson TB Group 444 Mountain Ave n u e Berthoud, CO 80513 (970) 532-5891 Ms. Diana Aungst, Planner II, AICP, CFM Weld County Department of Planning SCR/ices 1555 N. 17th Avenue Greeley, CO 80631 RE: Lonestar Estates P.U.D.- Change of Zone Application PUDK18-0002 Sketch Plan Comments Dear Ms. Aungst, The following responses are provided to address the comments stated in the Sketch Plan review letter dated June 1, 2018. This letter is intended to clarify and address the issues identified as part of the PUD Sketch Plan review, as well as fulfill the response requirement for the upcoming P.U.D. Change of Zone application and review. The following responses summarize the comments of each agency that responded to the P.I.D. Sketch Plan Referral process: City of Greeley, referral dated 3/30/18 The City of Greeley Community Development and Planning department commented on the ecological significance area along the Greeley No.2 Canal, suggesting the applicant determine the wildlife habitat and native plantings that may be impacted by developing this area. The existing property is dryland pasture, historically used for livestock grazing, and does not contain any existing trees within the Greeley No. 2 ecological significance area. The (6) proposed lots that fall within this area have an average lot size of 3.46 acres, and the building envelopes for these lots are designed to be on the outer -most edge of this buffer. The proposed design will have little to no impact on wildlife habitat and native plantings. The property is located with the City of Greeley Long Range Expected Growth Area (LREGA) and if in the future, water and sewer services are requested to property, annexation would be required prior to providing services. We acknowledge this, and there are no current City utility services to the property. We have received intent to serve from North Weld County Water District and the proposed lots will be served by On -Site Wastewater Treatment Systems. Town of Severance, referral dated 4/6/18 The Town of Severance reviewed the Sketch Plan request and found no conflicts with their interests. . Town of Windsor, referral dated 3/16/18 The Town of Windsor reviewed the Sketch Plan request and found no conflicts with their interests. 4. School District RE -4, referral dated 3/16/18 Weld RE -4 School District has indicated land dedication is not feasible for this project and will require cash -in -lieu at $2,240 per lot. The applicant acknowledges this request and will coordinate with the School District for collection timeline. The School District has also requested a bus turnaround area at either entrance. We will incorporate a turnaround and design meeting school bus standards through coordination with Stephanie Watson. 5. Greeley #2 Ditch Company, referral dated 4/13/18 The Greeley #2 Greeley Ditch Company has requested a 35' operation and maintenance easement be designated on the Plat. We acknowledge this request and have incorporated into the proposed design. A stormwater agreement has also been requested, outlining allowable historical release amounts. Ongoing coordination efforts and correspondence with Dale Trowbridge are included with the Change of Zone submittal. 6. Colorado Geological Survey, referral dated 4/16 18 The Colorado Geological Survey reviewed the Sketch Plan and has no objection to approval of the 16 -lot PUD Sketch Plan. Weld County Sheriffs office, referral dated 4/4/18 The Weld County Sheriffs Office reviewed the Sketch Plan and found no conflicts with their interests. 8. Weld County Zoning Compliance, referral dated 3/16/18 The Weld County Zoning Compliance reviewed the Sketch Plan and found no conflicts with their interests. 9. West Greeley Conservation District, referral dated 4/9/18 The West Greeley Conservation District reviewed the Sketch Plan and found no conflicts with their interests. 10. Colorado Division of Water Resources, referral dated 4/4/18 The Colorado Division of Water Resources reviewed the Sketch Plan and considers the North Weld County Water District to be a reliable water source and the project will not cause material injury to decreed water rights. Ongoing coordination with Greeley #2 Ditch Company (per the above) and stormwater agreement will also satisfy any concerns with historical release rates. 11. Colorado Department of Transportation, referral dated 3/22/18 CDOT reviewed the Sketch Plan and commented on potential impacts on the WCR 27/5,1392 intersection and associated traffic volumes. If traffic volumes are increased by more than 20%, a new access permit would be required and auxiliary lane construction be considered. Sean Kellar, the traffic engineer for the project, provided analysis for potential impacts at WCR27/5H392 via email correspondence dated 7/11/18 with Gloria Hice-Idler of Rocksol Consulting. He concluded the proposed development would cause less than a 2% increase to traffic volumes and would not warrant auxiliary lanes at WCR7/SH32. The additional 75' for future ROW at SH392 has also been accounted for and incorporated into the design. 12. Weld County Department of Public Works, referral dated 4/13/18 Weld County Department of Public Works reviewed the Sketch Plan and commented on the following items: • North Access - Concerns with spacing criteria and alignment with existing access on west side of CR27. The north access to the project aligns with the northern most existing driveway on the west side of CR27. The intersection spacing from 5H392 to north access is approximately 681', exceeding the required 135' for local road per 2017 Functional Classification Map and Technical Design Criteria. Email correspondence dated 7/17/18 between Evan Pinkham kha m and Aaron Olson verifying access location compliance included with Change of Zone submittal. • South Access Meets safety spacing criteria ONLY if the closure of oil and gas horse shoe adjacent to the location is closed and reclaimed. All oil and gas operations on project site have expired and all wells have been plugged and abandoned. All areas of previous activity have been restored (regraded and reseeded). • Northern Oil and Gas Access Point — Adjacent to HWY 392 will need to be closed and reclaimed as well and any oil and gas traffic will have to be routed through the subdivision. All oil and gas operations on project site have expired and all wells have been plugged and abandoned. All areas of previous activity have been restored (regraded and reseeded). • All future and existing Right of Way and physical location of existing and proposed roads to be delineated on Site Map or Plat. Existing Right of Way documentation and delineation has been found and represented on the Zoning Flap. The Site Plan and Final Plat will contain reception numbers and verified locations of all Right of Way. • Tracking Control Policy, Improvements and Road Maintenance Agreement) and Drainage Requirements. Temporary tracking control will be maintained throughout construction and is shown on the submitted erosion control plan. The applicant acknowledges Improvements/Maintenance Agreement associated with the development. Ongoing coordination efforts and correspondence with Dale Trowbridge are included with the Change of Zone submittal. The preliminary drainage report will be further developed at Final Plat. Roads — Vehicular Circulation System design will be required at Change of Zone. A Site Plan sheet has been added to the submittal, outlining cross sections, pavement information, type of surface, layout of roadway, and profile. • Construction Schedule, Utility Map, and Grading Permit The applicant acknowledges a Construction schedule will be provided at Final Plat. The applicant acknowledges a Utility Map will be provided at Final Plat. The applicant acknowledges a Grading Permit and Construction Stormwater Permit will be required. • Conditions of Approval .r Improvements and Road Maintenance Agreement — Applicant acknowledges improvements and agreements associated with development. o Final Drainage Report and Certification of Compliance - Applicant acknowledges requirement. o County Road 25.75 to be delineated as 60' ROW and maintained by Weld County - Site Plan updated to reflect ROW. o County Road 27 section line is shown to have 60' of unmaintained section line ROW per CIS ROW map. Delineate existing ROW, all setbacks to be measured from edge of ROW,, future ROW is 140' in this location — Existing ROW documentation and delineation has been found and represented on the Zoning Map. The site plan and Plat will contain reception numbers and verified location of all ROW. o Show and label approved access locations and appropriate radii (25') on site plan. Applicant must obtain access permit in approved locations prior to construction — Access locations shown on Site Plan, access permit was applied for with Change of Zone submittal. o Show and label entrance gate if applicable — Nat applicable. o Show and label section line ROW as CR27 Section Line ROW, not County Maintained —The site plan and Nat will contain reception numbers and verified location of all ROW. Applicant shall show and label accepted drainage features and drainage flow arrows. Storm water ponds should be labeled as "`Stormwater Detention, No - wild or Storage Area" and shall include the calculated volume — All applicable information shown on Conceptual Drainage Plan. o Applicant shall show drainage flow arrows — Flow arrows shown on Conceptual Drainage Plan. c� The applicant shall show on -site parking areas — Not applicable. • Development Standards (Notes on the Site Plan) o Property Owner shall control noxious weeds on the site, access on site shall be maintained to mitigate any impacts to the public road including damages and/or off -site tracking, any work that may occupy and or encroach upon any County ROW or easement shall acquire an approved ROW Use Permit prior to commencement, historical flow patterns and runoff amounts on the site will be maintained, Weld County is not responsible for the maintenance of onsite drainage related features, Weld County is not responsible for the maintenance on on -site subdivision roads. — Notes will be added to Final Plat. 13. Windsor -Severance Fire Protection District, referral dated 3/21/18 Windsor -Severance Fire Protection District reviewed the Sketch Plan and found it acceptable upon the following conditions: Fire hydrants no greater than 600' apart and no structure greater than 300' from hydrant, fire lane signage required depending on road width, and street names must be verified in the Larimer County Street standards. Hydrants and signage will be spaced per WSFPD specifications and shown on plans. Street names are pending and will be verified with Sandra Friedrichsen prior to including on Final Plat. 14. Weld County Department of Public Health and Environment, referral dated 4/12/18 Weld County Department of Public Health and Environment reviewed the Sketch Plan and concluded the applicant had satisfied both water service and septic treatment. Notes will be added to covenants outlining areas of prohibited activities (such as planting and construction) within designated absorption sites. Initial impact plan submitted with► Sketch Plan did not adequately address all environmental impacts - A Specific Development Guide was submitted with Change of Zone. Component one of this document outlines specific environmental impacts associated with the development. un GROUP landsoapearchitecture I planning I illustration Jul 31, 2018 Weld County Planning and Building Department 1555 N 17th Ave PO Box 1229 Greeley, CO 80631 SPECIFIC DEVELOPMENT GUIDE LONESTAR ESTATES (PUD) CHANGE OF ZONE INTRODUCTION The subject property is approximately 59.19 acres and located in the E1/2 of the E11.2 Section 19, Township 6 North, Range 66 West of the 6th Principal Meridian, Weld County, Colorado, Lot B of Recorded Exemption No. 0805-19-1-RE2143. Lonestar Estates PUD proposes (16) residential estate lots through the Planned Unit Development process, ranging from 2.14 acres to 4.27 acres in lot size. The property is currently zoned AG (Agriculture) and is mostly dryland pasture. The site is bordered to the west by County Road 27, to the north by HWY 392, to the east by Greeley No. 2 Canal, and to the south by Greeley No. 2 Canal. Proposed land uses are single-family residential as described in the E (Estate) zone district. Compatibility with neighboring subdivisions is proposed through similar lot sizes and architectural styles. A Homeowner's Association (HOA) will oversee additional guidelines found in the HOA covenants to maintain a rural character. COMPONENT ONE — ENVIRONMENTAL IMPACTS 1. Noise and Vibration Rural, single-family residential uses are proposed on the subject property. Noise or vibrations will be typical of rural estate uses and will comply with proper levels accepted in the E (Estate) residential land use district. 2. Smoke, Dust and Odors The internal road will be paved and the development is not expected to generate additional smoke, dust, or odors. 3. Heat, Light and Glare No allowable activities are expected to generate excessive amount of heat, light, or glare. The HOA covenants will outline acceptable light fixtures and cut-off shields to minimize light pollution and preserve the dark sky and rural character. 444 Mountain Aw, loud,C0 80513 TEL 970, 5325891 891 war TBGroup.us 4. Visual/Aesthetic Impacts Lot sizes are compatible with neighboring subdivisions and similar land uses. The HOA covenants will outline architectural features and styles to maintain a rural character and aesthetic. 5. Electrical Interference N o activities that would generate electrical interference are anticipated within the project. 6. Water Pollution Historic drainage flows and run-off amounts will be maintained by onsite detention as stated in the drainage report. The subject property is not within a floodplain. 7. Wastewater Disposal On -Site Wastewater Treatment Systems (OWTS) will be designed and installed by each homeowner. 8. Wetland Removal N o existing wetlands are located on subject property. 9. Erosion and Sedimentation Best Management Practices (BMP) will be executed to control erosion throughout the construction of roadways, single-family residences, and associated outbuildings. 10. Excavating, Filing, and Grading Best Management Practices (BMP) will be executed throughout construction to mitigate impacts of excavation, filing, and grading. Roadway borrow ditches and grading areas will be seeded with native grasses. 11. Drilling, Ditching, and Dredging N o drilling, ditching, or dredging is anticipated for this project. 12. Air Pollution Best Management Practices (BMP) will be executed throughout construction to mitigate any potential impacts on air quality. Estate lot sizes are not anticipated to have any long- term impact on air quality. 13. Solid Waste Local trash services will contract with each homeowner to remove solid waste via trash can or dumpster pster pick-up. Homeowners will also be responsible for periodic septic system clean out. Lonestar Estates PUGS - Change of Zone - 7.31.18 Page 2 14. Wildlife Removal The property does not contain wildlife habitat that would support significant wildlife species. It is anticipated that no wildlife will need to be removed. 15. Natural Vegetation Removal The project site natural vegetation is dryland pasture. Disturbed areas of construction will be seeded with native grasses to preserve rural character. 16. Radiation/Radioactive Material There no known radioactive materials on the project site. Activities containing radioactive materials will be prohibited. 17. Drinking Water Sources North Weld County Water District will provide service to the property. An existing 8" water main is located in County Road 27 and an existing 12" water main is located in HWY 392. A proposed 6" water main is to be looped within the project per the schematic plans provided by NWCWD and attached with Change of Zone submittal. 18. Traffic Impacts Given the small increase in traffic flow to the proposed subdivision, there will be negligible impact to the surrounding roadways and intersections. The County Road 27 and HWY 392 intersection will not have in increase in traffic load past the 20%, which will satisfy any CDOT concerns for the intersection. Refer to Traffic Impact Study for further information. COMPONENT TWO — SERVICE PROVISION IMPACTS 1. Schools The impact on RE4-Windsor School District is potentially (16) new single-family homes. The district Assistant Superintendent provided Sketch Plan comments per letter dated 3/16/18. Recommendations for bus stop and turn around location will be coordinated with the District and designed at Final Plat. 2. Law Enforcement The subject property is located within the Weld County Sherriff's Department service area. 3. Fire Protection The subject property is located within the Windsor -Severance Fire Protection District service area. 4. Ambulance The subject property is located with the Windsor -Severance Fire Protection District service area. Lonestar Estates PUD - Change of Zone - 7.31.18 Page 3 5. Transportation County Road 27 will serve access to the subject property. Coordination with Weld County Public Works determined northern and southern accesses to be compliant with Weld County design standards and intersection spacing. An Access Permit Application is attached with Change of Zone submittal. 6. Traffic Given the small increase in traffic flow to the proposed subdivision, there will be negligible impact to the surrounding roadways and intersections. The County Road 27 and HWY 392 intersection will not have in increase in traffic load past the 20%, which will satisfy any CDOT concerns for the intersection. Refer to Traffic Impact Study for further information. 7. Storm Drainage Historic drainage flows and run-off amounts will be maintained by onsite detention as stated in the Preliminary Drainage Report. Ongoing efforts and correspondence between Ditch Company and owner, stormwater release agreement will be included at Final Plat. 8. Utility Provisions The utility services areas for subject property are as follows: Water: North Weld County Water District Gas: Xcel Energy Electric: Poudre Valley REA Phone/Internet: +enturylink 9. Water Provisions North Weld County Water District will provide service to the property. An existing 8" water main is located in County Road 27 and an existing 12" water main is located in HWY 392. A proposed 6" water main is to be looped within the project per the schematic plans provided by NWCWD and attached with Change of Zone submittal. 10. Sewage Disposal Provisions On -Site Wastewater Treatment Systems (OWTS) will be designed and installed by each homeowner. 11. Structural Road improvement Plan Two new access drives are proposed from County Road 27 to enter subject property. Paved, internal roads per Weld County Rural Local Street Section standards will be constructed to access each proposed lot. Lonestar Estates PUD - Change of Zone - 7.31.18 Page 4 COMPONENT THREE — LANDSCAPING ELEMENTS Entry landscape and sign will be optional and may be incorporated at time of Final Plat. Detention areas will be seeded with native grass to maintain rural character existing conditions. Each lot and homeowner will be responsible for individual landscape treatments. It is anticipated that each lot will be mostly dryland pasture to retain compatibility with neighboring subdivisions. COMPONENT FOUR — SITE DESIGN '1. Unique Features The project site is almost entirely dryland pasture, used for grazing livestock in the past. It is anticipated that each lot will retain this aesthetic, and the lot sizes are catered to equine enthusiasts and owners. A► contiguous open space perimeter tract, located around the southern half of the project site, will offer riding and walking for Lonestar Estates residents. 2. Consistency► with Chapter 22 Lonestar Estates is in conformance with the Comprehensive Plan, Chapter 22 of the Weld County code as follows: Section 22-2-120 — Residential Goals and Policies A. R. Goal 1. Ensure that adequate services and facilities are currently available or reasonably obtainable to serve the residential development of district. B. R. Goal 2. Promote cost-effective delivery of facilities and services to residential development C. R. Goal 3. Consider the compatibility with surrounding land uses, natural site features, nearby municipalities' comprehensive plans and general residential growth trends when evaluating new residential development proposals. D. R. Goal 4. Residential development should support agriculture, and be in supported agricultural areas. E. R. Goal 7. Encourage urban Residential uses when the subject site is located inside an approved intergovernmental Agreement urban growth area, County Urban Growth Boundary Area, Regional Urbanization Areas, Urban Development Nodes or where adequate infrastructure and services are currently available or reasonably obtainable. F. R. Goal 8. Urban Residential development patterns, design features, infrastructure, amenities, and other development elements should conform to urban design standards. G. R. Goal 9. Promote the development of affordable, quality housing for County residents. Lonestar Estates is within the Greeley Long Range Expected Growth Area. The project site is adjacent to Sierra Acres PUD, and is designed with compatible lot sizes in mind. The anticipated housing for this project will reflect the rural character of this area and neighboring communities. Existing infrastructure supports obtainable services with minimal impact to the respective districts. Lonestar Estates PUD - Change of Zone - 7.31.18 Page 5 3. Zone District Compatibility The proposed design is compatible with the intent of the E (Estate) Zone District and surrounding residential and agricultural land uses per the following code excerpt: Section 23-3-400 — Intent of the E (Estate) Zone District The E (Estate) Zone District is intended to provide the present and future residents of the county with areas in which to locate and establish residential land uses and land uses that are compatible with residential areas. The E (Estate) Zone District is intended to be located, designed, and developed in a manner that is compatible with Chapter 22 of the code and the adopted master plans of affected municipalities. Lonestar Estates PUD proposes the E (Estate) Zoning District, including the limitations animal units and standard building setbacks. 4. Flood Hazard, Geologic Hazard or Airport Overlay District The property is not located within a floodplain, n, geologic hazard, or airport overlay district. COMPONENT FIVE — COMMON OPEN SPACE USAGE Lonestar Estates meets the 15% required open space with a total of 9.99 acres, or 17%. Per the Sketch Plan review comments, Weld County Planning Department requested the open space areas be contiguous to better balance the site. The design has been revised to allow for connected, usable open space areas where feasible. These spaces will offer common areas for horseback riding or walking and preserve the rural character of the area. COMPONENT SIX PROPOSED SIGNAGE Entry signage is under consideration by owner. Ongoing coordination and design may be incorporated at time of Final Plat. Entry sign will be located in an outlot and will comply with all sign code and permit requirements. COMPONENT SEVEN — RUA Impacts The project site is not located within a Regional Urbanizing Area as defined by the Weld County► Code. COMPONENT EIGHT— Intergovernmental Agreement Impacts The project site is within the Greeley Long Range Expected Growth Area and referral comments were received at Sketch Plan. The City of Greeley does not warrant annexation at this time. Coordination between City of Greeley and North Weld County Water District occurred prior to Sketch Plan which established letter of intent to serve by NWCWD and services being unavailable from the City of Greeley. Lonestar Estates PUD - Change of Zone - 7.31.18 Page 6 un GROUP landsoapearchitecture I planning I illustration Jul 31, 2018 Weld County Planning and Building Department 1555 N 17th Ave PO Box 1229 Greeley, CO 80631 RE: Lonestar esta r Estates — Waiver Request The following is a waiver request for the minimum 2.5 acre lot size within the E (Estate) Zone Distict use and requirement. We are requesting a minimum of 2.0 acre lot size for (6) of the (16) lots being proposed in the development. The justification for this waiver includes the following: 1. Compatibility with adjoining PUD developments: Sierra Acres PUD is located on the east side of CR27 where (7) of the (9) lots are less than 2.5 acres in size. 2. Average lot size is 2.73 acres in size. 3. Additional, contiguous open space incorporated into site plan. 444 Mountain Awr loud, CO 80513 TEI- 070, 25 01 WEB TBGroup.us Weld County Treasurer Statement of Taxes Due +'enutii %linker. "Z804717.3 3 Nivel 080519100021 Legal Description PT E rlE, 19 6 66 LOT : `ti faux EXEMPT RECX I , -0015 SIB Address 32550 COUNTY ROAD 27 Account: R8947473 STRICKLIN LORI J 32550 COM4TY ROAD 27 GRE13LEY, CO 80631=935S i it 1 MIS MI MI if it ® GI ® i! IC ® i®® MB® r® i NU ka7 G®®® G8 ®® id i .G i s i i G a i G G l i a ai G i Mt II a i i i i i G IN G G G i a a G a Year Tax Charge. Interest Fees Payments Balance 53.294.10i 50.00 50.110 ($3-494.10) $0.00 Taal Tax Charge $0.00 Grand Total Due as of 07/31/2018 $0.00 Tax Billie at D17. Rates for Tnx Area 0430 - 0430 Authority WELD COUNTY ,SCHOOL D1 ST Rti N NORRTIFITAN COLORADO WATER. (NC WINDSOR-SEVEi r(CE FIRE WINDSOR -SEVERANCE FIRE 1 i3ON AIMS RThillOR COLLEGE CLLARVIEW LIBRARY WEST GR.EELEY CONSERVATION Taxes Billed 201: * Credit Levy Mill Levy 15.snoaoo0* 4Q1900000 0 I ,0000000 71940000 940000 0.5050000 63 170000 3.57(I000Q 0.4 140000 Amount $619.67 S1.929.24 I:,2,.1 $247.76 .S 141,1-11 S16.24 83.9000000 ¶329410 Values AG.rLoor ERR R,1 i rATCD LAND AG -WASTE LAND FARM/RANCH RESIDENCE -HOPS OTHER BLDGBLEIGS,- AGRICULTURAL Actual Assessed S I 1.677 $3,300 sit) sio $447.919 $32,250 $12317 53:5 70 Total $471.932 39220 ALL TAX LIES! SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEEL, CHANGES MAY OCCUR. AND THE TREASURERS OFFICE WILL NEED TO RE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY, REAL PROPERTY, AND MOBILE HOMES -AUGUST 1. TAX LIEN SALE REDEMPTUON AMOUNTS MUST BE PAID BY CASH OR CASHIER'S CHECK POSTMARKS ARE NOT ACCEPTED ON TAX LIEN SALE REDEMPTION PAYMENTS, PAYMENTS MUST BE IN OUR OFFICE AND PROCESSED BY THE LAST BUSINESS DAY OF THE MONTH. Weld County Treasurer R.O. !B,ox 458, Greeley, CO 80632 . 1400 N. 17th Ave, G eeieyr, CO 80631 ( 70) 353,3845 Ext. 3290 Weld County Treasurer Statement of Taxes Due comic 1 Over It8947474 I' in cE 08051910007 Lvgui1 Description T' T- [ 19 6 66 LOT B REC EXEMPT RECX I i-0035 SStua Address Account: R8947474 STRICKLIN LORI J 32550 COM4TY ROAD 27 GRE13LEY, CO 80631=935S i it 1 MIS MI MI if it ® GI ® i! IC ® i®® MB® r® i NU ka7 G®®® G8 ®® id i .G i s i i G a i G G l i a ai G i Mt II a i i i i i G IN G G G i a a G a Year Tax Charge. interest Fees Payments Balance Si A9 5 .0 S44.85 S5.00 S1,344, 7) $1.1:M Taal Tax Charge $0.00 Grand Total Due as of 07/31/2018 50100 Tax Billed at 20 I 7 Kato for Tim Arca 0430 - 0430 Authority WELD COUNTY ,SCHOOL iNST . NORTHERN COLORADO WATER WINDSOR -SEVERANCE FIRE WINDSOR -SEVERANCE FIRE ISON AIMS .111ThillOR COLLEGE CLEARVIEW LIBRARY WEST GREELEY CONSERVATION Taxes R lied 2017 * Credit Levy Miai Is.Rooa000* 4Q1900000 I ,.O1IOOQQO 7.1940000 O_500O01Q 63 [70000 70000 3.5700000 4 140000 53.9900000 Amount 52.81.24 $17.00 51.28,[1;.x: 5S.99 $112,44 $63,55 $7..37 Sl,495.02 Values. AG. LOOD IRRRMA TED LAND AG W A.STE LAND Actual Assessed $61.3-17 $ 791i Total $61.368 $17{361 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT ARRANT FEES CHANGES MAY OCCUR. AND THE TREASURERS OFFICE WILL NEED TO RE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY, REAL PROPERTY, AND MOBILE HOMES -AUGUST 1. TAX LIEN SALE REDEMPTION AMOUNTS MUST BE PAID BY CASH OR CASHIER'S CHECK POSTMARKS ARE NOT ACCEPTED ON TAX LIEN SALE REDEMPTION PAYMENTS, PAYMENTS MUST BE IN OUR OFFICE AND PROCESSED BY THE LAST BUSINESS DAY OF THE MONTH. Weld County Treasurer P.O. !B,ox 458, Greeley, CO 80632 . 1400 N. 17th Ave, G eeieyr, CO 80631 (70) 353,3845 Ext. 3290 From: To: Cc: Subject: Date: aaron@tbaroup.us "Evan Pinkham" tcampbell@coffey-engineering.com; Dawn Anderson RE: Lone Star Estates - Access Alignment Tuesday, July 17, 2018 9:07:00 PM Evan, Yes, the other access is located further south on CR27 with adequate intersection spacing south of Bravo Point. Thank you for verifying, we will proceed with current layout. Aaron Olson Partner TB I Group landscape architecture I planning 444 Mountain Avenue Berthoud, Colorado 80513 970.532.5891 Aaron@TBGroup.us www.TBGroup.us From: Evan Pinkham [mailto:epinkham@weldgov.com] Sent: Tuesday, July 17, 2018 2:28 PM To: aaron@tbgroup.us Cc: team pbe ll @coffey-engi neering.com; Dawn Anderson cd ra nde rson@weld gov.com> Subject: RE: Lone Star Estates - Access Alignment Aaron, This access location appears to meet our spacing requirements. This would be the second access to this PUD. D . Correct? Thanks, Evan Evan Pinkham Development Review Planner Weld County Public Works 1111 H Street, P.D. Box 758 Greeley, CO 80632 (970)400-5727 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: aarontbgroup.us {mailto:aarontbgroup.us] Sent: Tuesday, July 17, 2018 12:52 PM To: Evan Pin kham <epi n kham weldgov.com> Subject: FW: Lone Star Estates - Access Alignment Aaron Olson Partner TB I Group landscape architecture I planning 444 Mountain Avenue Berthoud, Colorado 80513 970.532.5891 Aaron@TBGroup.us www.TBGroup.us From: aaron ntbgrou p.us Sent: Tuesday, July 17, 2018 12:49 PM To: 'dranderson@weldgov.com' <dranderson@weldgov.com>; 'ephinkham @weldgov.com' <ephinkham @weldgov.com> Cc: 'Hayley Balzano' <hbalzano@co.weld.co.us>; 'Troy Campbell' <tcampbell@coffey- engineering.com> Subject: FW: Lone Star Estates - Access Alignment Dawn and Evan, Please see below email I just sent Hayley for clarification on a comment she made for Lone Star Estates PUD Sketch Plan regarding our north access alignment and spacing. In her absence, can you please provide feedback and the concern with the design as proposed? Thanks, Aaron Olson Partner TB I Group landscape architecture I planning 444 Mountain Avenue Berthoud, Colorado 80513 970.532.5891 Aaron()a.TBGroup.us www.TBGroup.us From: aarontbgroup.us Sent: Tuesday, July 17, 2018 12:42 PM To: 'Hayley Balzano' <hbalzano co.weld.co.us> Cc: 'Troy Campbell' <tcampbell Coffey-engineering.com> Subject: Lone Star Estates - Access Alignment Hayley, Following up with one of the comments we received for the Lone Star Estates Sketch Plan with regard to the north access alignment and adjacent driveway. We have designed the north access to align with the north driveway across the street on CR27 (CR25.75) — see attached image with red line illustrating location. Can you please provide clarification to the nature of your comment for both spacing criteria and alignment? The 2017 Functional Classification Map shows the existing CR 27 (CR25.75) as a gravel local, which would require 135' intersection spacing (per Table 1.04.2 Technical Design Criteria). We are currently providing 681' from HWY 392, exceeding both minor and major collector classifications (330'/660'). Thanks, Aaron Olson Partner TB I Group landscape architecture I planning 444 Mountain Avenue Berthoud, Colorado 80513 970.532.5891 Aaron dTBGroup.us www.TBGroup.us Weld County Public Works Dept. 1111 H Street P.O. Box 758 Greeley, CO 80632 Phone: (970)304-6496 Fax: (970)304-6497 Applicant Name Aaron Olson Company ny TB Group Address 444 Mountain Ave City Berthoud State CO Zip 80513 Business Phone 970-532-5891 Fax F- mail aaron@tbgroup.us Parcel Location & Sketch The access is on WCR 27 Nearest intersection: WCR 27 & WCR 68 (HWY 392) Distance from Intersection N. ACCESS 681'1 S. ACCESS 1,674' Parcel Number 080519100022 Section/Township/Range 19/6 / 66 Is there an existing access to the property? Number of Existing Accesses 0 Road Surface T ►� & Con�structior information Asphalt X Gravel Treated Other Culvert Size & Type TBD Materials used to construct Access TEED Construction Start Date TED Finish Date TBD Proposed Use j Temporary (Tracking Pad Required)/ $75 Small Commercial or Oil & Gas/$75 o Field (Agriculture Only)/Exempt ACCESS PERMIT APPLICATION FORM Property Owner (If different than Applicant) Name Joe Stricklin Address 32550 County Road 27 City Greeley _ state CO Zip 80631 Phone 970-222-7993 Fax Email joe.stcicklinl©grnaikcom A = Existing Access = Proposed Access t re - U Single Residential/$75 Large Commercial/ 150 WCR 68 (HWY 392) PARCEL•0805191000n VV( 66 CD cC V Industrial/$150 Subdivision/$150 Is this access associated with a Planning Process? No USR RE � i PUD Other Required Attacf ed Documents TraffiPlan-Cerfificat , ,nsurance - Access Pictures (From the heft, Right, & into the access) By accepting this permit, the undersigned Applicant, under penalty of perjury, verifies that they have received all pages of the permit application; they have read and understand ail of the permit requirements and provisions set forth on all pages; that they have the authority to sign for and bind the Applicant, if the Applicant is a corporation or other entity; and that by virtue of their signature the Applicant is bound by and agrees to comply with all said permit requirements and provisions, aft Weld County ordinances, and state laws regarding facilities construction. Signature Printed Name Date Approval or Denial will be issued in minimum of 5 days. Aoproved ► V 60H/10 Lone Star Estates P U D Sketch Plan Access Permit Pictures CR27 CR68 (HWY392) View East CR27 - Proposed North Access View North CR27 - Proposed South Access View East (Sierra Acres PUD Bravo Point Intersection) View West View South View North View North View Northeast CONCEPTUAL DRAINAGE REPORT LONE STAR ESTATES RECORDED EXEMPTION No. 0805-19-O1 REC X 16-0O35, LOTB WELD COUNTY, CO 80631 Prepared For: Joe Stricklin 32550 County Road 27 Weld County, CO 80631 Prepared By Coffey Engineering & Surveying, LLC 4045 St. Cloud Drive, Suite 180 Loveland, CO 80538 970-622-2095 COFFE ENGINEERING & SURVEYING Project No. 2258.00 July 30, 2018 COFFEY ENGINEERING & SURVEYING July 30, 2018 Hayley Balzano Weld County Engineering Department 1555 N 17th Ave Greeley, CO 80631 Re: Lone Star Estates Recorded Exemption No. 0805-19-01 Rec X 16-0035, LOTS Weld County, CO 80631 2258.00 Dear Ms. Balzano: Coffey Engineering and Surveying is pleased to present this Drainage Report for the Lone Star Estates project for your review and approval. The project is south of Highway 392 and east of County Road 27. This report has been prepared in accordance with the Weld County Engineering and Construction Criteria and the Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual. We look forward to your favorable review of this project and report. Please do not hesitate to contact our office at 970.622.2095 if you have any questions or need additional information. Sincerely, COFFEY ENGINEERING ANDSURVEYING, LLC Troy Campbell, PE Project Manager ENGINEER'S CERTIFICATION I hereby certify that this report for the drainage design of Lone Star Estates was prepared by me (or under my direct supervision) in accordance with the provisions of the Urban and Flood Control District Storm Drainage Criteria and supplemental Weld County requirements for the owner thereof. Registered Professional Engineer State of Colorado No. 41159 (Seal) PAGE 1 I. Table of Contents I. GENERAL LOCATION AND DESCRIPTION A. Site Location M.,.M,MM - oMr MEM.MM MsMMMM•M.M.ID* M3M3M*6 MMM •••••• •••••• 3!3MMM M6MMMM* ■ B. Site Description 11M4.M..M. . M.M...M.i...M.M....MM.•..M.......t..MM.M..MMM...M.M.........M.M....MM....M4M4i.i...M.M.. 4 Proposed Project Description .9M9F....... ■ II. IV. V. DRAINAGE BASINS AND �Y TE11rI........+............................................... A. B. Major or Basin Description .e ...............M........... Sub -Basin Description ...........;....... • 5 DRAINAGE RITERI ►.....................................*.........................:....:...m.... A. Regulations ......MM no . - se en.. 5 B. Development Criteria Reference andConstraints................ M . ..................................5 C. Hydrological Criteria ria ..M........ .................e0MM.......****M.e.MMMF....... 5 D. Hydraulic Criteria .M.....M.9.9MMy.}.M.M.F*OM ...M.M...MMM...?MME...M..}..MM►.►M31M.}•MMM.F.MMM...M.M• E. IVIodifications ofCriteria -.....eM.M?.?M.Me...s..*.MMM.i?.M.....M..}9s.sei4MMMe.. MMM?.?M.Meee.s.••••••.i?MMM.♦ 6 CONCLUSIONS.............0.0.0000.00.••••••••••••••••••••••••••••............00.00.•••••••00.7 A. Compliance with Standards rM...... B. Drainage Concept .................. 050 • • • ***• • • et* • • • ..l... l . . ... r. r... .r .....r.r..... REFERENCES iiiiiiiiiiii•i�riiii�riiii#iiiliiliiiiiiiiiAiiiiiiiiiiiiiiiyliiiiiiAii�riiiiil�lii4ilii�liiii�liiAiiiii 7 PAGE . VI. APPENDICES A. Hydrologic Computations Vicinity Map 4EMA. Firm Panel 0812301510E US GS Soil Map Greeley Intensity Duration FrequencyCurve Figure 3-1 Greeley Extended Duration Intensity Frequency Tabulation Table 3-3 Table 6-5 Runoff Coefficients Table 6-3 Recommended Percentage Imperviousness Values Rational Method CalculatedComposite C Tables Rational Method Calculated Imperviousness Rational Method Calculated Flows B. Hydraulic Computations Modified FAA Method Basin 1 Modified FAA Method Basin 2 C. Map Pocket Drainage Exhibit I. GENERAL LOCATION AND DESCRIPTION PAGE3 A. Site Location The project site is located within the Northeast 1/4 of Section 19, Township 6 North, Range 66 West of the 6th P.M., County of Weld, State of Colorado. More specifically, the site is located on the east side of Weld County Road 27 between Highway 392 and Weld County Road 66. Please refer to the Vicinity Map located in Appendix A. The area surrounding the project site is sparsely developed. The site is surrounded by residential/agricultural properties. The Greeley #2 Ditch, managed by the New Cache Ditch Company, runs along the south and east sides of the site, and will be the receiving water for site runoff. B. Site Description The Lone Star Estates site is approximately 59.2 acres and has historically been used for agricultural purposes. Existing ground cover primarily includes native vegetation. The northern portion of the site, approximately 43.5 acres, drains to the east at a slope of approximately 1-3 percent. The remaining 15.7 acres drains south at a slope of approximately 1-3 percent. According to the NRCS soils map survey, the native soils consist of Kim Loam, which is a Type "A" soil. These soils have a moderate to high infiltration rate (low runoff potential) when thoroughly wet. C. Proposed Project Description The site will consist of the future development of approximately sixteen (16) residential lots with a minimum area of two (2) acres. Primary construction will include the construction of a residential access road and the construction of two on -site detention ponds. II. DRAINAGE BASINS AND SYSTEM A. Major Basin Description The proposed site is not located within any major drainage basin according to The Weld County Master Drainage Plan and does not identify any major drainage improvements for this area. The Lone Star Estates site is not located in any floodways or flood prone areas. The site is located in FEMA FIRM Map Panels 08123 1510E and 081230 1502E. There is no FIRM PAGE 4 Map for 0 123C1502E because there are no flood hazard areas within its limit. The property is located entirely within Flood Hazard Zone X indicating an area of minimal flooding. A copy of the FEMA FIRM Map is included within the appendix. B. Sub -Basin Description The developed site is delineated into two sub -basins. Sub -basin Pi, (43.5 acres), is comprised of the northern portion of the site. The basin consists of residential lots, a portion of the access road, landscaping, and a detention pond. Runoff will generally follow historic drainage patterns and flow east into a proposed detention pond. The proposed detention pond will require roughly 117,000 cubic feet (2.76 ac -ft) of volume to accommodate the developed runoff of 37.1 cfs. The pond will release at the 10 -year historic rate of 1.92 cfs. Sub -basin P2, (15.7 acres), is comprised of the southern portion of the site. The basin consists of residential lots, a portion of the access road, landscaping, and a detention pond. Runoff will generally follow historic drainage patterns and flow south into a proposed detention pond. The proposed detention pond will require roughly 43,500 cubic feet (1.00 ac -ft) of volume to accommodate the developed runoff of 19.35 cfs. The pond will release at the 10 -year historic rate of 0.81 cfs. III. DRAINAGE CRITERIA A. Regulations Drainage design criteria specified in the Weld County Drainage Criteria found in the Weld County Engineering and Construction Criteria, the Urban Storm Drainage Criteria Manual, Volume 3 by the Urban Drainage and Flood Control District (UDFCD), and Design Criterial and Construction Specifications Storm Drainage Volume II have been referenced in the preparation of this study. B. Development Criteria Reference and Constraints The criteria used as the basis for analysis and design of stormwater management improvements for this site are those found in the references cited. To the knowledge of the author, there are no other capital drainage improvements planned for this portion of the site; aside from those referred to above, that would constrain or otherwise influence the design of the stormwater improvements for this site. C. Hydrological Criteria PAGE 5 Stormwater runoff from the respective sub -basin of the site is analyzed for storms with 10 - year and 100 -year return frequencies. Due to the relatively small aggregate area of the tributary drainage sub -basin (under 90 acres), the Rational Method was chosen for use in the design of the stormwater management improvements. The Rational Method provides that: Q CIA, where: = Design flow in cubic feet per second (cfs) C = Coefficient of runoff for the area under consideration I = Rainfall intensity for the design storm duration (in/br) A = Area of the drainage sub -basin under consideration (ac) Peak flows were calculated using the Rational Method for the 10 -year and 100 -year storm events. This software uses the local 1 -hour rainfall depth and Intensity -Duration -Frequency Curves Figure 3-1 and Extended Duration -Intensity -Frequency Tabulation Table 3-3 to calculate rainfall intensities as a function of the time of concentration. These values were obtained by the City of Greeley Design Criteria and Construction Specifications Storm Drainage Volume II, and can be found in the Appendix. The "C" values were taken from Table 6-5 Runoff coefficients. Percent imperviousness values were taken from Table 6-3, Recommended Percentage Imperviousness Values, USDCM (See Appendix). Soils of hydrologic soil type "A" dominate the site. The hydrologic basin parameters and runoff rates are included in the Appendices. The USDFCD software UD-BMP v3.03 and the Modified FAA Method, was used to calculate the size for the proposed detention pond. The proposed ponds were sized to detain the 100 -year storm and release at the 10 -year historic rate. Any flows greater than a 100 - year event will flow through a spillway/weir. The ultimate outfall for the detention ponds is the Greeley #2 Ditch. D. Hydraulic Criteria Within this development, all runoff will be conveyed on the surface, initially as sheet flow and subsequently as concentrated flow in swales. The assessment of required capacity and the sizing of the respective components of the drainage system are based on the anticipated runoff from the 100 -year storm event. E. Modifications of Criteria PAGE 6 There are no modifications or variances requested in connection with the design of the stormwater management for the Lone Star Estates site development. IV. CONCLUSIONS A. Compliance with Standards The drainage design for the Lone Star Estates site is in general compliance with the requirements of the Weld County Drainage Criteria. The criteria and recommendations of the Urban Storm Drainage Criteria Manual are also reflected in the design of the drainage system, as appropriate. B. Drainage Concept The drainage design for the Lone Star Estates site should be adequate to safely convey onsite flows through the development. Development of the site, as proposed, will have a beneficial impact on flood damage and water quality in downstream drainage facilities and drainage ways by delaying the initial discharge of runoff from the site such that sediments and other potential pollutants typically carried by this first flush are removed from the flow. The proposed drainage improvements cause no adverse impact to adjacent properties. V. REFERENCES "Weld County Engineering and Construction Criteria", Weld County, April 2012 "Urban Storm Drainage Criteria Manual, Volumes 1, 2, and 3", Urban Drainage and Flood Control District, January 2016 "Design Criterial and Construction Specifications Storm Drainage Volume II", Greely CO, March 2007 Natural Resources Conservation Service Web Soil Survey at websoi1survey.nres.usda.govlapp PAGE 7 1 k7 I S rfl y Road SCALE: 1 IN = 2,000 FT 1000' 2000' I INA 14' sristi U .J T Yies feal e: am • if MIA L'5iJ T/ COFFEY ENGINEERING & SURVEYING 4045 St. Cloud Drive. Suite 180 Loveland, CO 80538 [P] 970-622-2095 [F] 970-461-4469 Bra ewcII Rog.41 10 W 0 Sri SITE Z rt P try .ad - VICINITY MAP LONE STAR ESTATES RECORDED EXEMPTION NO. OSO5-19-01 REC X 16-0035, LOTB LOCATED IN TIIE F,4 OF SECTION 19, T6N, RO6W, 6111 P.M., COUNTY OF WELD. STATE €IF COLORADO Project: 2258.00 Drawing: VNMP Drafted By: CJD Date: 09/25/17 Revised: 11/29/17 Checked By: TWC C I It< lit? Ft " Sheet: 2 4 a I) i. �a (F+•)y {2j 0 0 C 7 0 U) CV co z ia 2 O LL z 4 2 MAP LEGEND were mapped at C E 0 73 > ciSt- vco .orb 0 C 13 CO '3 C UCI 0 613 f.2 0 Clew kli -01-5c Ms E 03 c 0 ilia.ec C 00 ria) > r 0 O (L) c 0 >t cn E c' 03 -the ;3O C W c ec 8 co Very Stony Spot ten a C "ex t Map Unit Lines Special Line Features Water Features Transportation Resources Conservation Service 3 J co ZDE o t c 0 crc� V J 1 o Web Mercator (EP :3857) CD Q r CU mint Irmr it2 7:3 to L = .c.; cz U) c� > 0 .0 -a c) -a (I) r. co C e 2 0 n C CZ GO 03 > G " a L c st 0 C, • a . 5 GO CO t( Q Cr) -0 " a 0 ow 0c° te 0 co D ism Ne' al co 20a)a)a2 L a_.,ea a ea 5% n co) US Routes Major Roads Local Roads 1.12 nee or area C — •3 0 - a) L 4 = D aa � a + it)U C' i7 0- >. O �i > > '0 a; O ai 0 �5T. c > CO O) •3 01 on 0 0 0 0 -J a. ■ eat 1 / x 0 al CO CO 0 V t N O CO CU 0 0 0 o a o ea ( Et w co 6 CO ill tU § C. co ▪ a) 0 0 0 tit) •V •- 0 0 Ca CO en co 2 cn •, • C co co er .� = 'c rh o = a a< a_ > 3 ,, Ct$ CL e ' E co ac :C , 'v 3 a I— 0 CO (J) CO a L O O Marsh or swamp Mine or Quarry aneous Water tiu L C c 0 to Rock Outcrop ii 0 L 2 images were photographed: V) 0 Cti le; ga I r lines were n which the soi -C3 C CJ E a} E0c •1- 2 P2 • CO o a3 2 L Cr-n -C -F� 0 t155 ta) iC ring a 15 co a Imoo ._ cn a- 415 I IC 70 p 0 C, 04 esl CSC} 0) CO CO CL CD Resources Ct z Conservation Service 711 5 Soil Map —Weld County, Colorado, Southern Part Map Unit Legend Weld County, Colorado, Southern Part (CO618) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 4 Aquolls and Aquepts, flooded 0.5 0.9% 32 Kim loam, slopes 1 to 3 percent 45.9 81.8% 33 Kim loam, slopes 3 to 5 percent 9.7 17.2% Totals for Area of Interest 56.1 100.0% USDA Natural Resources Web Soil Survey a Conservation Service National Cooperative Soil Survey 8/18/2017 Page 3 of 3 LID TO E a ANDERSON, INC. I994 (BASED ON NOAA ATLAS, 1973 PRECIPITATIONHNCHES PER HOUR 8 7 6 5 4 3 2 I -E■■s■uMNlnn■.M■■■Mi•ssf 1. iusfl■Nna ■i!■mssimm ■■s■Nn-fEm Sib min ■.�,�� UHUOHNIMMEEEms IRs*NIM..MNrsil■MNu■IfAN■s■Riiil �r■J ■E■ N NW ■.i rrr ■u. ■ Mi . f■ ME■ ■ Mi ■ ice flu ■ a MUM S IM MUM MUM flu f at REM al■ • 0 ■ u■ ■ � Mi! ■ M1 i MI MUM flu !a i IM ENEsaM■■MMENM■asf■■lad■l■NallsfliuN■■fllllf Nlal Lr■tlaass■IMilaflMsll a■N■l■MMM■f■IUMIUMflfl■l■l■■■Nfl■ME iin.11■rffr■f ssinf fflMiisrisisnnl■!!■iiill■MNfluN■■N■■N■Nl f # irlisfaRNMEMM.■iflflflll■ll■IIINI■isf lflauulllM■■lff■flf !Mil ■Nlnufln.Mall!■Nall■i■■Mf■■flMNlMf■iiilhllS■■NIMNII■Ml■NINMfl ■a■i minmi■■nuu■■MM■■its■IMISMIIINNIfiufiluuulullllafi■lfli ■M■Mfai'il MEMMEii■■Nwl■■■fsi■NhI■■ ■■Ns■IN■■l■NSISNNNIMMN■sisi ■MOM NaWMfa■MMMiii■Nh1I1UMNMNhh■1MMNf 1MN■s■lifsfNu1MNMN■llf li ■ila.filt nnff■ililull■MIMMMIMuiuuu■lfl■llillifllllllfl■f li #■wlssfM■MM■NN..Nllfann■f l■■sfllluMnNffififf■frlllllllllunfi liullsf i1MNrlwflnlll'laillll■■llllrflllfluIlf ss■llfl■■s,l■llMI f■■MNIMINN 1l.nails■lsif■sluMff■■■■■■iiflsill■fil■■slflN.■Mi f ■MuUNlflul'llfl■■ME■NENUN■Nflffis■s■NMOM NflfssuIMINam■all f ■nNlalsalll.M■nNif■■I■iiil11■■fs■InnullMuuuluMMMlluuulMn.11 M ■NMNNnI.M l■■■f■si■■NNM■■ls■■fili■fllflMMNININfsimNlrf■lfl slaNlNlumummimNIMNIff■l■fa■l■l■ll■llf llslllllllllsllflsl■fll ■MM■iiisllllfiminiflhllrill■lil■ mimosas ■sfi■lli■sslf■■lillfl mums s isawafVEMlflifl■MN■ MEN ■M■■■N■Mss■iiM■fl■■■IMII■■MNMIIM ■fiiliitsilifluNlflfl■f I■NINNNN■NM■MR■■ . i■issifl■l■■■illi■lf ifs■NNIN■Nf■Nk1NNIfINIIf l■Iiit■I■■Iflf■SMNMUUM■ll■INl■■MOMIII Nfwasmla■■Mililh.NIMflsaiuIN■■I■lf uUf f f f■■nNssuMMlflfls.Illf it■NMNI■NNf► NNL1N■I■■■f■NNUt■a■aIr■NNfNNMi1■flwifl■■it■MMM■Mr mum ■l■f'f lIl■M■■■lift■!salUN■NU■■■■INNNIss■Iilll■NflI■s! INo■i NNE■NMIMMU■NNEEVEM■MMl■■NiilMfM■■iM■MMfsiMMIN!■■lMMEM . flfll■ :iif flf■MllflWaUs1■■MIN ■N Nslsl1M1NflMMiillili■l■MM■■N■1UMNss MIN. INNiiamn iirf■M■■f if llMss■lfllif lillfl■ii�lilURlflill■f■ IMSML■■MN■SMIMuLWUUrfl I� l■ilflUUUMIININIUof M■i■slff■MSNUMI■ Iiannionniu■■■sMN■llflrfl■f lffliflflllff Mfl■lrlMfll■■llfff■f■ N■anNNlflssfrfsuUMk'IIMI■■fllfl■RIIRiURR■■MUNIU■INNMfs■fir■Ni■ NauusfsMii ■■ ■■■EEINNE Maul■! ■l■■ M■■ al l fl of lmmfli■■lll■Rwf■ ENE illsa■L1fauMN■MMMI■■fN■I■I■a■M■ ERN ■IM■fnnu■■frllluuu■Mm■f MN■l Nnuiffl!■ rllrrf►lf■WM■il■uMifMllllflill■Mfili■■■Il■lflslssi ■■il■mum ■NM■■NEomsm f ■s■NUNNalfIhMINir■Mwf UNUM■UNflMwlo■fr aNisi■NWENNnfl■ltfilff;ll.UUIll■fillMIIf l■fi■NEE ■fshIflsaf f N■ ssu■alai!■s■INlaluN#s■ll■f Nsf MMMaissimmoINMNMMfi■NMU■N■frfs■ ■aMEEREM►1af■i #MMfNW IMIMiiIIMMINSIMiIMIfNNiMMMffllllillwwNM■ ii■IM1'MiillaNNNNEEE■AINISMs1Mu1■hNMfihf■MINNNs1I■Ih!■■NNNMM■ NaaalnlimmM ssruN■INUIfM■■OM■■■IiUNI■if N■IilUNMfl■lUMMNI■rss■ mum ■kI■raiN■s■■1■asllif s■lii■llfllll■lslif lllMwll■lllallilr as■■sNI'l■a►a.NnM■■■■nIEMMMf Ufl?EVERMNI:NNMUINfM■l■iiMMMIM■■ as■u.MNNMflI■■MINIfNff■la■flONL *t'INLiL sMxa■lINNMIIIIMIMINIsMi ls■■Nfa 'Manna . ■i■sill■!iiiusOMMEMMuRMN■NINM■UM■■■MEMMMORISE ■luNNSlrINUNpl■INNURM■■IMII•INguMMEMErlallff N■IIMEMO f M■!Misr iilsi.NIL'aff f.IMMNINII1■■■aNM■■M`Msli■Mllafu1N■■i■ssl■afwwlf■ alaiNMaMN#I■Mnnlluu■M■■S■■■sbl■a■InINUMafiRSllfflUNNNMNNriNI■ ■M■IINMMINISEM ►as■lIlf ■aMM#MflRMflflI■rNNli■UUN■■lhIllarllll ■ENOMlN■■lOI■M■l#■lfuuusl■s■lMIMSINmU■f■llll■IS■flUiuIIU■■■■ ■ iNMIM.UNI■ tMMSNf l■sluIllif■lif lINU■!LU■MUUIMNNf ■■sNMENwf ■M■ ils.fls■■.NNeamsIOf ■uulfaau■■■■MSIM■IflwuuIUNRRSM■fl1fsSIIal ■MNfnsM■■alsfl■RI■► alf ■awsNMMfaMlilas■sl'fll■■MM■■■■■l■■NNMSS ■MENS 1s■■nIMSO INEMOONUNsll■rsllf■USIsr■f lflfiff UMf f IIuNIalM ■ENEM u■■f f MNUONIRNIIUNII■INUMINUI■s f lMUNIISPIls■IMIIRIUMNMM■ NEMMMlNf MMArsfa OMNsa■NIIN■N■a■NNMNOP -NWAIf NNENCYM■■slsfrfNass ■a■■fuaiNanu■Ni■oinauuhnpn.M iiul1mlvU •w 1.ah3iUNffsflflfiwfMMra ii■Isfu►1Munnuu■■rgllrrfl. f MUNINMlUfliflNI■Irr5IUUSI`SIMUMMIMMf ■lNMIiMMI!■■sMfNlN`N■MfNwsaNaMMIM■Na■■■■fMNMNSf■■i■M:Ma■ME ENNIO■I■NEMf!!f ■■MNI1iiMNN`ZNM *IMIMMI:NN■■IMMMIr EMMaMSEMMI■ i moNN■iwssf ■■■■I■sMOlrlMfMMM_ nit0AUMfl■■sssri ctimmirrf.n■ ■Nnuuaf MsuhirlNNNlfs■■fflN■MNaZMI Nf ■■■■■ IEEE ■■fs■I■lfiUUNlf■ O MsMIsMNIOa■■MRaaaMMNNeI■■■MMImMfsIMNMENaIf■fa Ms■aNIsEMill f■s■rfa■uuaa`i■Mf■■■IINSNflUNIflIIfIIUaaf ■ ■allLl ■ ■■ ■■M�I�r�s■N Mi■ll■ ■�l■N �. E�r■as■s •.MM MEENfM1■allM■ss■■IMl■Mi MMEMMEMErfllrlMOsMR f au.lssari■ssmisg f Mal■l■IssNshff Ifl■MUS UluMa■NiMMMIUMMuI■NU ■NNEREENisilll■fbsisMMIMMMiI■MMNM■■l■NasimlMrs■aflffalNar■■ EN ■l a. n. s NNNE ME RE gll ■I INM N U MRINM IGIU ■ ■1f IN I II MMI I■ UMM ■ ■ l M ■ M ■aalslauu■■nNauaNMIMMI■flNiflhIIfl■Sw IMNM u.Mcnlaafiuil■Ma ■■Ilif EEEMMEMM MEMMILTAIMMEEMEFFM0aWill i ri SERM is■Mf ISLINNssulsm I■MuttonssafMNaNNiMIM■fwlaMENCINAtuallm IISMMruRNNNNMas: !■ iiawf rlslr■lif ■MI■I■NMMf ■f Ialif■M■l1RNNSEMOMENSZ5MS■EMMl■lafs ■NM Ei■MSMMN■MMaM■Ml■ssMMNsaOOMMaMMf■■■Mf#MNMfwI MEMMiMINMM Rfrl■i■■l#■MflllflN■l■■s■I■l■#■1s**UU■l■lflafls■■If■NNSMM -al ia■■Mf■sfaal■aMli■■■■IRMMNMsMMIiINUNWANNINNI■NM■i■N■sMMNM a NM IIMN■N■■MMNINiMM■NiN■ll■ININf IMINg WI�,.NMOIsMfN■■■N■N■il■■M■ ■ii■ffMMENIM■<N■I■mIM■■■MailUifOZWINAM■■Smsrammu ■NfNNNl m !i■■nNN■■.M..M■I■M■■■■ail■f■■■N■NNMNNfrf ■NsNUMlllltM9AME SN Ml■inn.■■E MNMIINISMM■■ININ■ANN■IlssNf■Nilia■lNlisNMrf ■rS M= MiN■Na■■■ EMI ■ENE NNIN■llur■s■!aN■saffil■lslil■lMN■ilil■l!N■lu ■i■lilllslfl■Mwf■IIINM IEEE i■■ NNE lilllNlfl■l.#ll.lfll■INMNsf ENNINMI■■MMM■lNlUUIIII■■■■isi■MMI■■IIISNIO■f■la#lslialN■NNSN ■ssii■flmuNUfllllf l■■■liifiial■slf lrlslRrflfllllllf f lflhlaf ■■slivasis■w■ NNE ■N■■■■l■Nls■■■INEME ls■■■NU■llI■■lhIUNUN■UM ■N■■.Nflf f ■rrl■iflsfM■lf IMMMOOMMENEMuENNsaafNlfliuuulffalMfl ■■■NEENNEluu■l■■■l■I■■■l■lufirl■■a■l■■flUN■lll■l■■llf MMMIlfI Nl■N.N■flliMNN■si■sillaflusfl■■■lsiflwMOMMERmf■l■Mfll■fll■ll rllrslifal■■EMMN■NNINsuis■ ONO is■■NIIMNfsflNllsNlmNll■MM■MMEN !lMENOM■NaiflsrinMasnIaflfMEMNON•EMSEEMN!■lRflflffUUIU ■fr■$ Cmofeermer Greeley' Great. From the Ground Up. 10 20 30 TIME IN MINUTES 40 50 60 INTENSITY -DURATION -FREQUENCY CURVES PUBLIC WORKS DEPARTMENT STORMWATER MANAGEMENT DIVISION um HINDI AVENUE GREEI.EY■ COLORADO 80631 FIGURE 3-1 SCALE: NTS REVISED AUG 1996 STORM DURATION STORM FREQUENCY 2 -YEAR (IN/HR) 5 -YEAR (IN/HR) 10 -YEAR (IN/HR) 25 -YEAR (IN/HR) 50 -YEAR (IN/HR) 100 -YEAR (IN/HR 5 MIN 3.62 5.19 6.12 7.31 8.73 9.67 10 2.81 4.02 4.75 5.67 6.78 7.51 15 2.37 3.40 4.01 4.79 5.72 6.34 20 2.00 2.86 3.38 4.03 4.81 5.34 25 1.77 2.54 3.00 3.58 4.28 4.74 30 1.64 2.35 2.78 3.22 3.97 4.39 40 1.34 1.92 2.27 2.70 3.23 3.59 50 1.16 1.66 1.96 2.34 2.80 3.10 60 (1HR) R) 1.04 1.49 1.76 2.10 2.51 2.78 80 0.80 1.14 1.47 1.61 1.91 2.16 100 0.67 0.94 1.20 1.30 1.58 1.79 120 (2HR) R) 0.58 0.80 0.96 1.14 1.30 1.50 150 0.49 0.66 0.78 0.93 1.10 1.23 180 (3HR) R) 0.42 0.56 0.67 0.80 0.92 1.05 4 HR 0.33 0.44 0.53 0.62 0.72 0.81 5 0.27 0.36 0.43 0.50 0.57 0.66 6 0.23 0.30 0.37 0.43 0.49 0.57 8 0.20 0.24 0.29 0.34 0.39 0.44 10 0.15 0.20 0.24 0.29 0.32 0.36 12 0.13 0.17 0.20 0.25 0.28 0.31 14 0.11 0.15 0.18 0.23 0.24 0.27 16 0.10 0.13 0.16 0.20 0.22 0.24 18 0.09 0.12 0.14 0.18 0.19 0.21 20 0.08 0.11 0.13 0.17 0.18 0.19 22 0.07 0.10 0.12 0.16 0.16 0.17 24 0.07 0.09 0.11 0.14 0.15 0.16 EXTENDED DURATION -INTENSITY -FREQUENCY TABULATION GREELEY, CO TABLE 3-3 Greeley Great. From the Ground Up. Great. . Up. PUBLIC WORKS DEPARTMENT STORMWATER MANAGEMENT DIVISION 1001 NINTH AVENUE GREELEY4 COLORADO 80631 SCALE: NTS REVISED MARCH 2007 Runoff Chapter 6 Table 6-5. Runoff coefficients, c NRCS Hydrologic Soil Group A Total or Effective % Imperviousness 2-yr 5-yr 10-yr 25-yr 50-r 100-yr 2% 0.02 0.02 0.02 0.02 0.02 0.17 5% 0.04 0.05 0.05 0.05 0.05 0.19 10% 0.09 0.09 0.09 0.09 0.1 0.23 15% 0.13 0A4 0.14 0.14 0.14 0.28 20% 0.18 0.19 0.19 0.19 0.19 0.32 25% 0.22 0.23 0.24 0.24 0.24 0.36 30% 0.27 0.28 0.28 0.28 0.29 0.4 35% 0.31 0.33 0.33 0.33 0.33 0.44 40% 0.36 0.37 0.38 0.38 0.38 0.48 45% 0.4 0.42 0.42 0.42 0.43 0.52 50% 0.45 0.47 0.47 0.47 0.48 0.56 55% 0.49 0.51 0.52 0.52 0.52 0.6 60% 0.53 0.56 0.56 0.57 0.57 0.64 65% 0.58 0.6 0.61 0.61 0.62 0.68 70% 0}. 62 0.65 0.66 0.66 0.67 0.72 75% 0.67 0.7 0.71 0.71 0.71 0.76 80% 0.71 0.74 0.75 0.76 0.76 0.8 85% 0.76 0.79 0.8 0.8 0.81 0.84 90% 0.8 0.84 0.85 0.85 0.86 0.88 95% 0.85 0.88 0.89 0.9 0.9 0.92 100% 0.89 0.93 0.94 0.94 0.95 0.96 NRCS Hydrologic Soil Group B Total or Effective % Imperviousness 2% 0.02 0.02 0.14 0.24 0.38 0.46 5% 0.04 0.05 0.17 0.27 0.39 0.48 10% 0.09 0.09 0.21 0.3 0.42 0.5 15% 0.13 0.14 0.25 0.34 0.45 0.53 20% 0.18 01.19 0.29 0.37 0.48 0.55 25% 0.22 0.23 0.33 0.41 0.51 0.58 30% 0.27 0.28 0.37 0.44 034 0.6 35% 0.31 0.33 0.41 0.48 0.57 0.63 40% 0.36 0.37 O.45 0.51 0.6 0.65 45% 0.4 0.42 0.49 0.55 0.63 0.67 50% 0.45 0.47 0.53 0.58 0.66 0.7 55% 0.49 0.51 0.57 0.62 0.69 0.72 60% 0.53 0.56 0.61 0.65 0.72 0.75 65% 0.58 0.6 0.65 0.69 0.75 0.77 70% 0.62 0.65 0.69 0.72 0.78 0.8 75% 0.67 0.7 0.73 0.76 0.81 0.82 80% 0.71 0.74 0.77 0.79 0.84 0.85 85% 0.76 0.79 0.81 0.83 0.87 0.87 90% 0.8 0.84 0.85 0.86 0.89 0.9 95% 0.85 0.88 0.89 0.9 0.92 0.92 100% 0.89 0.93 0.94 0.94 0.95 0.94 6-10 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 1 January 2O16 9 Runoff Chapter 6 Table 6-3. Recommended percentage imperviousness values Surface Land Characteristics Use or Percentage Imperviousness (%) Business: Downtown Areas 95 Suburban Areas 75 Residential: Single-family 2.5 acres or larger 12 0.7 2.5 acres 20 — 0.25 — 0.75 acres 30 0.25 acres or less 45 Apartments 75 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 10 Playgrounds 25 Schools 55 Railroad yard areas 50 U n d e ve to p e d Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off -site defined) flow analysis (;when land use not 45 Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil Lawns, clayey soil 2 6-8 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 1 January 2016 osite C Values E O LI Lone Star Estates c-1 r -I r4 rNQ ,■-. cc ■- 0 ›i .'I H O C t cc ,rte, O 6 O d T --I 6 rei 6 cc ,I,..., 4, i N -c c y- w I- Ct w U 43.4500 NI 0 'b- N tar; ri 43.4500 IN 0 ,t rm- if; ri gia RS 43 I- CU CL C SEE IMPERVIOUSNESS (220 - AGRICULTURAL - TABLE 5-3 WCE&CC) SEE IMPERVIOUSNESS (20 - AGRICULTURAL - TABLE 5-3 WCE&CC) -O 0- SEE IMPERVIOUSNESS (15,40 - SINGLE FAMILY RES. > 2.5 ACRES -TABLE 6-3 UDFCD) SEE IMPERVIOUSNESS (15,40 - SINGLE FAMILY RES_ > 2.5 ACRES -TABLE 6-3 UDFCD) CI3 ill U U) in I- t( c (13 rci ft -pip J f/; a' etI mei 0. 4• Ira et 4.61 CU *,..r CU L w 4:3 Lel CU el >s. 0 LU SIP■,. �r1 W L i.l al 4 al 4-4 U U O t a) L U eI.r al a) 4 Cu c co} I; C r4 rl Cu to ,ice c . o o. C I bib r -I 0 (NI Ll ri 0 ry 0 41 Cl O z L 4- - E 0 1 CU C 0 In a) VD U a .0 SOU U t O cc NRCS Hvdro(SSEc Soil Croup A r, rn•. aa-o I f'J . f'�I ti�.r r v" fel 0 t ....,!. '1- C.? Ifi, zr }-I -..• '!ri . '.:1 'Cr ar~. 'r *! � 'y; l7'_. Q0 tirq '20 r °t >tit 4,i I V �I O C '° .. C, r- 6 el C! el 0 r!`, 6 r°-, 0 I -f- 0 tt 0' ; }r^, 0 V% 6 Z U' ,4 ,__. r�-. CD r--_ CD CC CD xc, C3 �_: ImP . lyn a CD Ai -r• r q 1 -r irI C ' j. C it 4 . ::C: ' - f til I ao rl g rf in cl c rte, C: r -.t C 1 r• ^T C' . ; r l lan 0 I r- wt', CP — CI a • v °C r ' ' • r-- C "t Ire .2c. C' . = -t CD l ri 0 • wi 0 •• c7 0- •.t' a •- .1. Cl •i4. DD n.l en n*l OD r1 r [ 71-ur P - ,P4 P4 y o }r1 — c ° ✓ r-4,, rr. r -- V% x ,A. ,r' -4 r. r� 'r, r�-.r — ,:: ici ,... O ,., 0 O rJ- r 0 0‘0‘r+7 r o ri op elrei 0 ro-•4 0 r"- rya 0. r.r-1, - 0. r - ?I7 0 • : -• V% 1 0 Lip 14% 0 ° vm C 0 C i' w 0 0",• w• G' DS "L- .D •0 'In 0', 'C I-* :I r-4CP r-1 74,,•"'". . wr P c.. 4, CD / rr, - C nc• - 0 r --1 r i a CP rte- r•l 0 — r rs, i,;• C' r^i 0" --4. .+,a 4ri ' ,. CD Gam, ' ;CD H.' ,r, 0 3G 'n a CCDC r4 LC.. w r- — r At C' r-- Q ,+la, I-- 'Iar}. cc �a -D C °r , C Total or Effective % Imoenlousncss i '. T =`• N a. #:,,::: - in . '.:y e - 0 ,—,, L..T 1Ye�-,. Y. .—, lii -.. r•.c h t.- i r el . .C •- L` I;71' N a '- V% rr; I S e� J 14'7 r 1��� V} J� a•t V' ICI • T C}-- I! i 1l T 4* C T �4} 1 a • '.y .-1. . I'- -lm.: .4?.. Isri ry ,...7 a "•_ O - - .q0 1.1. T J xG ..P d- C 5 .,,P S, IY } , pie: c 00 0 c -I N x tli 0- N r..• ,3 CJ r6 O LL C) 01.1 4-1 in QE Rationa enviousness E Lone Star Estates V) 0 CO C £2 'el�y CI. tU (-.4& <N.* Tat s-i l I E Cu al L L G OOSVEP 15.7402 43.4500 IN O ,c. LA 1%4 O 415 Cr; in •M a ..-.. LI i ri u *CD � a n; Image UNDEVELOPED (AGRICULTURAL SEE TABLE 6-3 BELOW) UNDEVELOPED (AGRICULTURAL SEE TABLE 6-3 BELOW) RESIDENTIAL (SINGLE FAMILY - > 2.5 ACRES, SEE TABLE 6-3 BELOW) RESIDENTIAL (SINGLE FAMILY - > 2.5 ACRES, SEE TABLE 6-3 BELOW) i In cu a. 1 as CI O CZ 7 C) L u a) II O inn ill L 03 •ter cu 1 ....• ti ru rO V Tti ii L iti eti o o ill" ei 1t II co f a ih ia ru CO rl eC rsi m re' GL NI tL Total Site C c L`'rti in 1 Q a. an LA cu O i _ j t cc pri Ws r ~ - ar -rd i�•- � i«: — v,. V-. 1 4 _' P1 rY 7 g g g g ri Fi l 1 b 1 ,4 Y 3 c m c 9iC t ii f a — Ire - — v-' r — �. — i ; P z- .l 6 r,. 1 17. I ., ..„ C 2 lie:' - :i — „. a. I . '�9 _ a, ra C •(U 0 C L r 2 LO Ci CU F— i) a N iB U' O L E Strickl i n QE Rationa O_ 401 0 i 4.3 co O I-i C m Lone Star Estates 29.27 I I LENT 6 b- I Developed f': rel m +T, ri '1" �r cap LA iii— aa. ut 0 LL co co 0 Q ri 0 CI1 41 OU flnri r ki) Lid tY . 'C C a+ ;4.1: us C CD C %' 0 C1i m 4.25 •st 4: O M! gars d tr} 4 L N- N 2.57 N., S..1 Lf7 N 2.57 237 ( � C C LL 35.15 Tel Lin ri rn ..tiMil Cri co esi 36.04 30.41 OD O en C E ..r1 owT I— V fQ I H L C I MI 14a N DO rfl w O 40 m r l lD C1' Ln Ni 44 l4 M rn r4 Cfl E I CD ..— E ow r -I N L.6 O a 6 O or O 5.5556 L) in in Lid Lin v-► in LA ;46I iJG Q rrn e -I CD ri CVI ri 4 r -I � sr' � ri 41 ti Ii:D GW GW C. .... t10 0 CO 0 O 0 3-1 C? C- rl 0 0 ri C? 0 ri 4 0 ri 0 _„ U' w 500 0 0 500 0 iti0 J i .N 47 1- C 2834 ri Ln m m Ni 't `n 03 sNI CA icu E r I= io Cli •1.,, els vgi 2 � LIE L —I ID l'nrii w O cis ,r/�.I W M Cl�+� IC LO ILn V rl m N. ark 6 L = a2 Q. v tfl 0 c ..i 0 ri 2/0 0 r-i Jo t'y 2,00 'id r,. w 0 01:1"J 424 kti cr c.0 1 al Pia L yj . � 0 ' Lis0 'lam N IN RN iu .71 aC a La E= a V t"+) 0 O {y O O fV O O el O ri O e-1 O {LI C) icttL Ste} t6 in '�' [Y9 Ct 0 N. LP5 ri ZOGT'6S 43.4500 0 us; ri ZOGI'65 Ih Sega sa tO 03 ri el ri {y i 4,0 . C CL 011 ri D2 Entire Site riis f d Entire Site Equation RO-3 IC awns, BE = Nearly bare ground, GW = Grassed Waterway, PA = Paved Areas 0 -C ▪ Ct /C Y .471 cC C) s L t } ▪ 4] C) 3 0 - C C6 1 4J -r• ot rc 1'- C 4.4 9) t� CTs c E II UCn LI Cl - 1" d SLR CIA C15 N rr3 H I II � s-. - � 3 CiC E ro 0) 0 K- 7^- Se 1.0 • 1 • m _ 4 II ▪ C.) C _ > .C V LL_ 0 r act in_QE Rational S Li eC DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Lone Start Estates Basin ID: P1 (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Determination of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness la a 12.00 percent Catchment Drainage Imperviousness 12.00 percent Catchment Drainage Area A a 43.450 acres Catchment Drainage Area A a 43.450 acres Predevelopment NRCS Soil Group Type = A A, B, C, or D Predevelopment NRCS Soil Group Type az A A, B, C, or D Return Period for Detention Control T sa 5 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control In 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Td a 32 minutes Time of Concentration of Watershed Tc a 32 minutes Allowable Unit Release Rate q - 0.05 cfsracre Allowable Unit Release Rate q - 0.05 cfs?acre One -hour Precipitation P, a 1.49 inches One -hour Precipitation P, = 2.78 inches Design Rainfall IDF Formula i - C1` P,r(C2+TJ' C2 Design Rainfall IDF Formula i = C14 P1t(C2+TjAC, Coefficient One C- - 28.50 Coefficient One C- - 28 50 Coefficient Two C2 - 10 Coefficient Two C2 - 10 coefficient Three C:-) - 0.789 Coefficient Three C3 - 0/89 Determination at Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C - 0,08 Runoff Coefficient C - 0.29 Inflow Peak Runoff Op -inn 7.73 cfs Inflow Peak Runoff Op -in - 52.30 cfs Allowable Peak Outflow Rate Op -out = 1.98 cfs Allowable Peak Outflow Rate Op -out - 1.98 cfs Mod. FAA Minor Storage Volume = 13,1149 cubic feet Mod. FAA Major Storage Volume = 120,377 cubic feet Mod. FAA Major Storage Volume = 2.763 acre -ft Mod. FAA Minor Storage Volume = 0.302 acre -ft 1 c- Enter Rainfall Duration Incremental Increase Value Here {e.g. 5 for 5 -Minutes) Rainfall Duration minutes (input) Rainfall Intensity inches r' hr (output) Inflow Volume acre-feet (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) Rainfall Duration minutes (input) Rainfall Intensity inches r' hr {output) Inflow Volume acre-feet {output) Adjustment Factor "M" (output) Average Outflow cfs (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) 0 0.00 0.000 0.00 0.00 0.000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000 1 6.40 _ 0,031 1.00 1.98 0.003 0.028 1 11.95 0.207 1.00 1.98 0.003 0.205 2 5.98 0.057 1.00 1.98 0.005 0.052 2 11.15 0.387 1.00 1.98 0.005 0.382 3 5.61 0.081 1.00 1.98 0.008 0.072 3 10.47 0.545 1.00 1.98 0.008 0.537 4 5.29 0,101 1.00 1.98 0.011 0.090 4 9.88 0.686 1.00 1.98 0.011 0.675 5 5.01 0.120 1.00 1.98 0.014 0.108 5 9.35 0.812 1,00 1.98 0.014 0.798 8 4.76 0.137 1.00 1.98 0.016 0.121 6 8.89 0.926 1.00 1.98 0.016 0.809 7 4.54 0.152 1.00 1.98 0.019 0.133 7 8.47 1.029 1.00 1.98 0.019 1.010 8 4,34 0.196 1.00 1.98 0.022 0.145 6 8.10 1.125 1.00 1.98 0.022 1.103 9 4.16 0.179 1.00 1.98 0.025 0.155 9 7.76 1.212 1.00 1.98 0.025 1.188 10 7.45 1.294 1.00 1.98 0.027 1.266 10 4.00 0.191 1.00 1.98 0.027 _ 0.164 11 3.134 0.202 1.00 1.98 0.030 0.173 11 7.17 1.369 1.00 1.98 0.030 1.339 12 6.91 1.440 1.00 1.98 0.033 1.407 12 3.71 0.213 1.00 1.98 0.033 0.180 13 3.58 0.223 1.00 1.98 0.035 0.187 13 6.68 1.506 1.00 1.98 0.035 1.471 14 346 0.232 1.00 1.98 0.038 0.194 14 6.46 1.568 1,00 1.98 0.039 1.530 15 3.35 0.241 1.00 1.98 0.041 0.200 15 6.25 1.627 1.00 1.98 0.041 1.586 16 3.25 0.249 1.00 1.98 0.044 0.205 16 8.06 1.683 1.00 1.98 0.044 1.639 17 3.15 0.257 1.00 1.98 0.046 0.210 17 5.88 1/36 1.00 1.98 0.046 1.669 18 3.06 0.264 1.00 1.98 0.049 0.215 18 5.72 1.786 1,00 1.98 0.049 1.737 19 2.98 0.271 1.00 1.98 0.052 0.219 19 5.56 1.833 1.00 1.98 0.052 1.782 20 2.90 0.278 1.00 1.96 0.054 0.223 20 5.41 1.879 1.00 1.98 0.054 1.825 21 2.83 0.284 1.00 1.98 0.057 0.227 21 527 1.923 1.00 1.98 0.057 1.865 22 2.76 0.290 1.00 1.98 0.060 0.231 22 5.14 1.964 1.00 1.98 0.060 1.904 23 2.69 0.296 1.00 1.98 0.083 0.234 23 5.02 2.004 1.00 1.98 0.063 1.942 24 2.63 0.302 1.00 1.98 0.065 0.237 24 4.90 2.043 1,00 1.98 0.065 1.977 25 2.57 0.307 1.00 1.98 0.068 0.239 25 4.79 2.080 1.00 1.98 0 06 2.012 26 2.51 0.313 1.00 1.98 0.071 0.242 26 4.69 2.115 1.00 1.98 r 0.071 2.045 27 2.48 0.318 1.00 1.98 0.074 0.244 27 4.59 2.150 1.00 1.98 0.074 2.076 28 2.4.1 0.323 1.00 1.98 0.076 0.247 28 4.49 2.183 1.00 1.98 0.076 2.107 29 2.36 0.328 1.00 1.98 0.079 0.249 29 4.40 2.215 1.00 1.918 0.079 2.136 30 2.31 0.332 1.00 1.98 0.082 0.250 30 4.31 2.246 1.00 1.98 0.082 2.164 31 2.27 0.337 1.00 1.98 0.084 0.252 31 4.23 2.276 1.00 L98 0.084 2.192 32 222 0.341 1.00 1.98 0.087 0.254 32 4.15 2.305 1.00 1.98 0.087 2.218 33 2.18 0.345 0.98 1.95 0.089 0.257 33 4.07 2.334 0.98 1.95 0.089 2.245 34 2.14 0.349 0.97 1.92 0.090 0.259 34 4.00 2.361 0.97 1.92 0.090 2.271 35 2.11 0.353 0.96 1.139 0.091 0.262 35 3.93 2.388 0.96 1.89 0.091 2.297 36 2.07 0.357 0.94 1.87 0.093 0.284 36 3.86 2.414 0.94 1.87 0.093 2.321 37 2.04 0.361 0.93 1.84 0 094 0.267 37 3.80 2.439 0.93 1.84 0.094 2.345 38 2.00 0.364 0.92 1.82 0.095 0.269 38 3.74 2.464 0.92 1.82 0.095 2.369 39 1.97 0.368 0.91 1.80 0.097 0.271 39 3.68 2.488 0.91 1.80 0.097 2.391 40 1.94 0.371 0.90 1,.78 0.098 0.273 40 3.62 2.511 0.90 1.78 0.098 2.413 41 1.91 0:375 0.89 1.76 0.099 0.275 41 3.56 2.534 0.89 1.76 0.099 2.435 42 1.88 0.378 0.88 1.74 0.101 0.277 42 3.51 2.557 0.88 1.74 0.101 2.456 43 1.85 0.381 0.87 1.72 0.102 0.279 43 245 2.576 0.87 1.72 0.102 2.476 44 1.82 0.384 0.86 1.71 0.103 0.281 44 340 2.600 0.86 1,71 0.103 2496 45 1.80 0.387 0.86 1.69 0.105 0.283 45 326 2.621 0.86 1.69 0.105 2.516 46 1.77 0.390 0.85 1.68 0.106 0.284 46 3.31 2.641 0.85 1.68 0.108 2.535 47 1.75 0.393 0.84 1.86 0.108 0.286 47 3.26 2.661 0.84 1.66 0.108 2553 48 1.72 0.396 0.83 1.65 0.109 0287 48 3.22 2.681 0.83 1.65 0.109 2572 49 1.70 _ 0.399 0.83 1.63 0.110 0.289 49 3.17 2.700 0.83 1.63 0.110 2.590 50 1.68 0.402 0.82 1.82 0.112 0.290 50 3.13 2.719 0.82 1.62 0.112 2.607 51 1.66 0.405 0.81 1.61 0.113 0.292 51 3.09 2.737 0.81 1.61 0.113 2.624 52 1.64 0.407 0.81 1.60 0.114 0.293 52 3.05 2.755 0.81 1.60 0.114 2.641 53 1.62 0.410 0.80 1.59 0.116 0.294 53 3.01 2.773 0.80 1.59 0.116 2,657 54 2.98 2.790 0.80 1.57 0.117 2.673 54 1.60 0.413 0.80 1.57 0.117 0.295 55 1.56 0.415 0.79 1.56 0.118 0.297 55 2.94 2.807 0.79 1.56 0.118 2.689 56 1.56 0.418 0.79 155 0.120 0,298 58 2.91 2.824 0.79 1.55 0.120 2.704 57 2.87 2.841 0.78 1.54 0.121 2.720 57 1.54 0.420 0.78 1.54 0.121 0.299 58 1.52 0.422 0.78 1.53 0.123 0.300 58 2.84 2857 0.78 1.53 0.123 2.735 59 1.50 0.425 0.77 1.52 0.124 0.301 59 2.81 2.873 0.77 1.52 0 124 2.749 60 2.77 2.889 0.77 1.52 0.125 2.763 60 1.49 0.427 0.77 1.52 0.125 0.302 Mod. FAA Minor Storage Volume (cubic ft.) = 13,149 Mod. FAA Major Storage Volume (cubic ft.) = Mod. FAA Minor Storage Volume (acre -ft.) = 0.3019 Mod. FAA Major Storage Volume (acre -ft.) = UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 235, Released January 2015 120,377 2.7635 Stricklin Ponds B1 and B3 Combination Detention.xls, Modified FAA 713112018, 9:20 AM DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Lone Start Estates Basin ID: P1 Inflow and Outflow Volumes vs. Rainfall Duration Volume (acre-feet) 3.5 3 2.5 2 1.5 1 0.5 0 0 ••s �i i • 0 • OIDGOOOOOOOOO = n T . Y 10 20 30 40 Duration (Minutes) 50 60 moo— Minor Storm In Sow Volume—orCut lime Volu me ci Minor Sturm Sorage Volume —a Molar Storm Inflow Volume a. Maier Storm Outflow 4blumo ■ Mahr Bonn Storage Volume 70 UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 Stricklin Ponds B1 and B3 Combination Detention.xls, Modified FAA 713102018, 9:20 AM 14 Project: Lone Star Estates Basin ID: P2 (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Determination of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method Design Information (Input): la = A = Type = T = Tc = q = P, = ^C; Cl = C2 = O3 = percent acres A, B, C, or D yeas (2, 5, 10, 25, 50,. or 100) minutes cfsiacre inches Design Information (Input): I9 = A = Type = T = Tc = q = P1 = C, = C2 = C3 = 12.00 percent acres A, B, C, or 0 years (2, 5, 10, 25, 50, or 100) mirutes cfs/acre inches Catchment Drainage Imperviousness Catchment Drainage Area Predevelopment NRCS Soil Group Return Period for Detention Control Time of Concentration of Watershed Allowable Unit Release Rate One-hou- Precipitation Design Rainfall IDF Formula i = Ciw Pi?(C2+T)j Coefficient One Coefficient Two Coefficient Three 12.00 Catchment Drainage Imperviousness Catchment Drainage Area Predevelopment NRCS Soil Group Return Period for Detention Control Time of Concentration of Watershed Allowable Unit Release Rate One -hour Precipitation Design Rainfall IDF Formula i = C1' Pi?(Cf+Te)"C3 Coefficient One Coefficient Two Coefficient Three 15.740 15.740 A A 5 100 25 25 0.05 0.05 1.49- 2.78 28.50 28.50 10 10 0.789 0.789 Determination of' Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Aunaff Coefficient Inflow Peas. Runoff Alowable Peak C = Op -in = Outflow Pate Op -out = Mod. FAA Minor Storage Volume = Mod. FAA Minor Storage Volume = c- Enter Rainfall Duration Incremental Increase Name 0.08 cfs cfs cubic feet acre -ft for 5 -Minutes) Runoff Coefficient C = Inflow Peak Runoff Op -in = Allowable Peak Outflow Rate Op -out = Mod. FAA Major Storage Volume = Mod. FAA Major Storage Volume = 0.29 cfs efs cubic feet acre -ft 3.26 22.07 0.81 0.81 4,684 43,528 0.108 0.999 1 Here (e.g. 5 Rainfall Duration minutes (irput) Rainfall Intensity inches / hr (output) Inflow VolJrne acre-feet {output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Votme acre-feet (output) Storage Volume acre-feet (output) Rainfall Duration minutes (input) Rainfal Intensity inches 1 hr (output) Inflow Volume acre-feet (output) Adjstrent Factor "m" (output) Average Outflow cfs {output) Outflow Volume acre-feet (output! Storage Volunne acre-feet (output) 0 0.00 0.000 0.00 0.00 0.000 D.000 0 0.00 D.000 0.00 0.00 D.000 0.000 1 6.4D 0.011 1.00 0.81 0.001 0.010 1 11.95 0.075 1.00 0.81 _ 0.001 0.074 2 5.98 0.021 1.00 0.81 0.002 0.019 2 11.15 0.140 1.00 0.81 0.002 0.138 3 5.61 0.029 1.00 0.81 0.003 D.026 3 10.47 0.198 1.00 D.81 0.003 0.194 4 5 5.29 5.01 0.037 0.043 1.00 1.00 0.81 0.81 0.004 0.006 0.032 4 9.88 D.248 1.00 0.81 0.004 0.244 0.038 5 9.35 0.294 1.00 0.81 0.006 0288 6 4.76 0.050 1.00 0.81 0.007 0.043 6 8.89 0.335 1.00 0.81 0.007 0.329 7 4.54 0.055 1.00 0.81 0.008 0.047 7 8.47 0.373 1.00 0..81 0.008 0.365 8 4.34 0.060 1.00 0.81 0.009 0.051 8 8.10 0.407 1.00 081 0.009 0.398 9 4.16 0.065 1.00 0.81 0.010 0.055 9 7.76 0.439 1.00 0.81 0.010 0.429 10 4.00 0.069 11.00 0.81 0.011 0.058 10 7.45 0.469 1.00 0.81 0.011 0.457 11 3.84 0.073 1.00 0.81 0.012 0061 11 7.17 0.496 1.00 O81 0.012 0.484 12 3.71 0.077 11.00 D.81 0.013 0.064 12 6.91 0.522 1.00 0.81 0,013 0.508 13 3.58 0.081 1.00 0.81 0.015 0.066 13 6.68 0.546 1.00 0.81 _ 0.015 0.531 14 3.46 0.084 1.00 0.81 0.016 0.068 14 6.46 0.568 1.00 0.81 0.016 0.553 15 3.35 0.087 1.00 0.81 0.017 0.070 15 6 25 0.589 1.00 0.81 0.017 0.573 116 3.25 0.090 1.00 0.81 0.018 0.072 16 6.06 _ 0.61D 1.00 0.81 0.018 0.592 17 3.15 0.093 1:00 0.81 0.019 O074 17 5.88 0.629 1.00 0.81 0.019 0.610 18 3.06 0.096 1.00 0.81 0.02D 0.076 18 5.72 0.647 1.00 0.81 0.020 0.627 19 2.98 0.098 1.00 0.81 0.021 0.077 19 5.56 0..664 1.00 0.81 0.021 0'.643 20 2.90 0.101 1.00 0.81 0.022 0.078 20 5.41 0.681 1.00 0.81 0.022 0.658 21 2.83 0.103 1.00 0.81 0.023 0.080 21 5.27 0.696 1.00 0.81 0.023 0.673 22 2.76 0.105 1.00 0.81 0.025 0.081 22 5.14 0.712 1.00 0.81 0.025 0.687 23 2.69 0.107 1.00 0.81 0.026 0.082 23 5.02 0.726 1.00 0.81 0.026 0.700 24 2.63 0.109 1.00 0.81 0.027 0.083 24 4.9D 0.740 1.00 0.81 0.027 0.713 25 2.57 0.111 0.99 0.80 0.028 0.084 25 4.79 0.753 0.99 0.80 0.028 0.726 26 2.51 0.113 0.97 0.79 0.028 0.085 26 4.69 0.766 0.9'7 0.79 0.028 0.738 27 2.46 0.115 0.96 0.77 0.029 0.086 27 4.59 0.779 0.96 0.77 0.029 0.750 28 2.41 0.117 0.94 0.76 0.029 0.088 28 4.49 0.791 0.94 0.76 0.029 0.761 29 2.36 0.119 0.92 0.75 0.030 0.089 29 4.40 0.802 0.92 035 0.030 0.773 30 2.31 0.120 0,91 0.74 0.030 0.090 30 4.31 0.814 0.91 0.74 0.030 0.783 31 2.27 0.122 0.90 0.73 0.031 0.091 31 4.23 0.825 0.90 0.73 0.031 0..794 32 2.22 0.123. 0.88 0.72 0.032 0.092 32 4,15 !0.835 0.88 0.72 0.032 0.804 33 2.18 0.125 0.87 0.71 0.032 0.093 33 4.07 0.845 0.87 0.71 0.032 0.813 34 2.14 0.126 0..86 0.70 0.033 0.094 34 4.00 0.855 0.86 0.70 0.033 0.823 35 2.11 0.1.28 0.85 0.69 0.033 0.095 35 3.93 0.865 0.85 0.69 0.033 0.832 36 2.07 0.129 0..84 0.68 0.034 0.095 36 3.86 0.874 0.84 0.68 0.034 0.841 37 2.04 0.131 0.83 0.67 0.034 0.096 37 3.80 0.884 0.83 0.67 0.034 0.849 38 2.00 0.132 0.82 0.67 0.035 0.097 38 174 0.893 0.82 0.67 0.035 0858 39 1.97 0.133 0.82 0.66 0.035 0.098 39 3.68 0.901 0.82 0.66 0.035 0.866 40 1.94 0.135 D.81 0.65 0.036 0.098 40 3.62 0.910 0.81 D.65 0.036 0.874 41 1.91 0.138 0.80 0.85 0.037 0.099 41 3.56 0.918 0.80 0.65 0=037 0.881 42 1.88 0.137 0.79 0.64 0.037 0.100 42 3.51 0.926 0.79 D.64 0.037 0.889 43 44 1.85 182 0.138 0.139 0.79 0.78 0.64 0.63 0.038 0.10D 43 3.45 0.934 0.79 D.64 0.038 0.89E 0.038 0.101 44 3.40 0.942 0.78 0.63 0.038 0.904 45 1.80 0.140 0.77 0.63 0.039 0.102 45 3.36 0.949 0.77 0.63 0.039 0.911 46 1.77 0.141 0.77 0.62 0.039 0.102 46 3.31 0.957 0.77 0.62 0.039 0.917 47 1.75 0.143 0.76 0.62 0.040 0.103 47 3.26 0.964 0.76 0.62 0.040 0.924 48 1.72 0.144 0.76 0.61 0.041 0.103 48 3.22 0.971 0.76 0.61 0.041 0.931 49 1.70 0.145 0.75 0.61 0.041 0.104 49 an 0.978 0.75 0.61 0.041 0.937 50 1.68 0.146 0.75 0.60 0.042 0.104 50 3.13 O985 0.75 0.600 0.042 0.943 51 1.66 0.147 0.74 0.60 0.042 0.,104 51 3.09 0.992 D.74 0.60 0.042 0.949 52 53 1.64 1.62 0.148 0.149 0.74 0.73 0.60 0.59 0.043 0.043 0.105 52 3.05 0.998 0.74 0.60 0.043 0.955 0.105 53 3.01 1.005 0.73 0.59 0.043 0.961 54 1.60 0.149 0.73 0.59 0.044 O106 54 2.98 1.011 0.73 0.59 0.044 0.967 55 1.58 0.150 0.72 0.59 0.044 0.106 55 2.94 1.017 0.72 0.59 0.044 0.973 66 1.56 0.151 0.72 0.58 0.045 0.106 56 2.91 1.023 0.72 0.58 0,045 0.978. 57 1.54 0.152 0.72 0.58 0.046 0.107 57 2.87 1.029 0.72 0.58 0.046 0.984 58 1.52 0.153 0.71 0.58 0.046 0.107 58 2.84 1.035 0.71 0.58 0.046 0.989 59 1.50 0.154 0.71 0.57 0..047 0107 59 2.81 1.041 0.71 0.,57 0.047 0.994 60 1.49 0.155 0.71 0.57 0.047 0.108 60 2.77 1.046 0.71 0.57 0.047 0.999 Mod. FAA Minor Storage Volume (cubic ft.) = 4,684 Mod. FM Major Storage Volume (cubic ft) Mod. FAA Minor Storage Volume (acre -it.) = 0.1075 Mod. FM Major Storage Volume (acre -ft) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2O15 43,528 0.9993 Stricktin Pond B2 Detention:As, Modified FAA 11/29/2017, 11:47 AM *IWIW llama It WE'CZmM OltSl {NaadA'.'aaa7fliV rrtorto yt flat IN OMNI',h ►rc4M Ihtt71T IWX III Q t L itMIS - rFt7NRt data• LEI re .faE peam Al ac m Iodhla -o-iq (6-7aK-o%.e1.aaaR') D.11 —a13 — all 111 1 trE I 11 1 I MI I BIB I BM I .* r 0 y) — r r (Tim C"7 r 0 ..e...............e...„ �1 l YIl?'---, _1 In A nJ 1 I CO -3•1 .G- - a:. .ii. a CU) t L m ta N, jos II a r 0. O =1•C.r'�ws,�.►_ice—�_• :;i • -�c-+..��ti..�,� m• I In I_}71_tt I • ism r - O 0trot MO 1 —..�...— I Tdl feat =OM= 'mI NI t tat 4 rid tl Les as r F.r4 CO (st I Co > 1'- C? Lr' S E- rn L7-13 r 4 r 0 3 N l� f - r ! tI h b�4•l v I;t i ^�I r �:I,. I IJI ;14I t i r:. 7 L1.1 F \\1 7 • Y-, Yrl r O --I .r 77 JO 13 rn- c Ai m O ----- ~ ~-�~"_ ace - lie m I r ;sat Ns ate ' MN l !' I ar I aar I aw l M mil ' =I I NMI I MI' I MN 000 -a trio W pro Ulmfri VI SI 0 4 0 T004 0rn „z -13 -Sc, 4 cp I 1•J'17 r 2 Fl Z7 � J q 6� t7 CP 9 L.4 3 4 4 L VIII I :III I I 11111 I I I Q c 1; r •n A Wa co ee y FR ag g E 5341113OO6 LN3NrY3 MUM my vm•4 N -$$N$ :888r 8 7,8 a a m j C r't O 2 OFFEY ENGINEERING & SURVEYING 4045 St. Cloud aim. Suite 180 Loveland. 0080536 CO] 970-622.2095 H 307-742-7403 EXHIBIT FOR LONE STAR ESTATES CONCEPTUAL DRAINAGE PLAN )..) tA..M;'f:QT NO. 'P.'.: 19111 {-.C:X Iett ...or.3 Cr ti'•(:1•'C)\ 19. I'M,.:{H W. eq..; .'.31.. (Y?!.\ 11 D. 14 t:.:}.ti 1'`' r t (F. co:.CE{:`")U PROJECT: DATE: nrsicmirn: DRAFTER: CHECKED 1W: APPROVED 1W: 224 S.Ci► Q7/3I:IS RJP CJn T •C TWC DRAINAGE REPORT REVIEW CHECKLIST Project Name: Stricklin PUD Lone Star Estates PUDKI8-0002 The purpose of this checklist is to provide the applicant's Engineer a basic list of items that County Staff will review in regards to a drainage report. The drainage design shall meet the requirements of the Weld County Code and commonly accepted engineering practices and methodologies. A detention pond design (or other stormwater mitigation design) is appropriate for projects which have a potential to adversely affect downstream neighbors and public rights -of -way from changes in stormwater runoff as a result of the development project. The design engineer's role is to ensure adjacent property owners are not adversely affected by stormwater runoff created by development of the applicant's property. REPORT (2 = complete, ❑ = required) ❑Stamped by PE, scanned electronic PDF acceptable ❑ Certification of Compliance ❑Variance request, if applicable Description/Scope of Work ® Number of acres for the site Methodologies used for drainage report & analysis Design Parameters Design storm Release rate xl ■ ■ ■ xl xl El URBANIZING or NON -URBANIZING Overall post construction site imperviousness Soils types xl xl Discuss how the offsite drainage is being routed Conclusion statement must also include the following: ❑ Indicate that the historical flow patterns and run-off amounts will be maintained in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off for the 100 -year storm. ❑ How the project impacts are mitigated. Construction Drawings ❑ Drawings stamped by PE, (scanned electronic PDF preferred) Drainage facilities ❑ Outlet details ❑ Spillway Maintenance Plan ❑ Frequency of onsite inspections ❑ Repairs, if needed ❑ Cleaning of sediment and debris from drainage facilities ❑ Vegetation maintenance ❑ Include manufacturer maintenance specifications, if applicable Comments: New Cache La Poudre needs to sign off on accept of releases Time of Concentration/Intensity Calculations are required Outlet calculations and details are required 4/27/2016 Weld County Department of Planning Services I Development Review 1555 N. 17th Avenue, Greeley, CO 80631 I P h : 970-353-6100 I Fax: 970-304-6498 www.co.weld .co .us/Departments/Plan ni ngZon i ng aaron@tbgroup.us To: Cc: Subject: Diana/ Diana A4ungst Troy Campbell FW: Lone Star Estates Please see below email for proof of ongoing coordination with the Ditch Company as the owner and Dale Trowbridge work through the drainage agreement. I've also attached a PDF of the email for the submittal document records. Please let me know if you need anything else. Thanks, Aaron Olson Partner TB I Group landscape architecture I planning 444 Mountain Avenue Berthoud, Colorado 80513 970.532.5891 AaronTBGroup.us www.TBGroup.us From: Dale Trowbridge <DTrowbridge@newcache.com> Sent: Tuesday, September 4, 201$ 2 A7 PM To: Christopher Holmes <cholmes@coffeyeengineeri ng.co m> Subject: RE: Lone Star Estates Christopher, Attached is a draft drainage agreement for Lone Star. There are several highlighted areas in the document. These are areas that need to be filled in (yellow) and areas that direction is needed (blue). I won't go into more detail at this point. Dale Trowbridge General Manager New Cache La Poudre Irrigating Company From: Christopher Holmes ccholmescoffey-engineering.com> Sent: Tuesday, August 14/ 2018 9:33 AM To: Dale Trowbridge <DTrowbridge@newcache.com> Subject: Lone Star Estates Hi Dale, 1 I'm just touching base with you on the storm water agreement for Lone Star Estates. Please let me know where you are on getting a draft for an agreement back to me at your convenience. Have a great day, Christopher Holmes, El Engineering Technician COFFEY ENGINEERiNGes SURVEYING 4045 St. Cloud Drive, Suite 180, Loveland, CO 80538 Office: 970-622-2095 Cell: 605-691-3365 www.coffey-engineering.com Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast Ltd Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast Ltd 2 COFFEY ENGINEERING & ZORN/EYING July 31, 2018 Diana Aungst, AICP, CFM Weld County Department of Planning Services 1555 N. 17th Avenue Greeley, Colorado 80631 RE: Lone Star Estates PUD Zoning Submittal Corner of WCR 27 and HWY 392, Weld County CO Project No. 2258.00 Dear Diana Aungst, The purpose of this memo is to address the change in the standard scale for the zoning plat, state the location and availability of right-of-way and easement reception numbers, and to bring attention to the emails included in this submission addressed to the New Cache La Poudre Irrigating Co.. • The zoning plat is scaled 1"=200' to keep the plat to a single sheet. At a 1"=100' scale the plat would take up several sheets. • All existing easements and right-of-way contiguous with the proposed PUD are shown in the zoning plat with reception numbers. If any additional information on easements and right-of-way associated with the property is needed they will be supplied upon request. • Included with this submittal are two emails to Dale Trowbridge at the New Cache La Poudre Irrigating Co.. A call and email were sent out on July 18, 2018 as well as a follow up email on July 30, 2018. Continued correspondence will continue until an easement agreement and stormwater agreement are finalized. If you have any questions or require additional information, please call Coffey Engineering at (970) 622-2095. Sincerely, COFFEY EN INEERIN G, LLC Christopher Holmes Engineering Designer COFFEY ENGINEERING, LLC (970) 622-2095 4045 ST CLOUD DRIVE, SUITE 180 LOVELAND, COLORADO Christopher Holmes From: Sent: To: Subject: Hi Dale, Christopher Holmes Wednesday, July 18, 2018 9:37 AM 'da l e@newcaehe.com' Storm Water Agreement for Lone Star Estates I am a civil engineer working on a zoning change for a property in Weld County. The property will be called Lone Star Estates and is located off of WCR 25.75 and south of 392. They will need to enter into a storm water agreement with the New Cache La Poudre Irrigating Company. I was hoping that you could send me an example in PDF form of the storm water contract so that I could forward that to the owner. Thanks for your time and have a great day, Christopher Holmes, El Engineering Technician COFFEY Et Gl NEERING.3 SURVEYING 4045 St. Cloud Drive, Suite 180, Loveland, CO 80538 Office: 970-622-2095 Cell: 605-691-3365 www.coffey-engineering.com 1 Christopher Holmes From: Sent: To: Subject: Hi Dale, Christopher Holmes Monday, July 30, 2018 8:29 AM 'dale@newcache.com' Lone Star Estates I am currently working on a rezone for a property located within the service area of the New Cache La Poudre irrigation channel. The proposed residential development will be dedicating easements for the ditch and will be releasing storm flows into it as well. I currently have the example easement agreement to give to the owner but am also looking for a storm water agreement. If you could provide me with the necessary paperwork for a storm water agreement with New Cache La Poudre Irrigation, that would be great. Have a great day, Christopher Holmes, El Engineering Technician ef COFFEY E t GI N E ER IN G ,. SURVEYING 4045 St. Cloud Drive, Suite 180, Loveland, CO 80538 Office: 970-622-2095 Cell: 605-691-3365 www.coffey-engineering.com 1 Christopher Holmes From: Sent: To: Subject: Christop her, Dale Trowbridge <DTrow'bridge@newcache.com> Wednesday, August 1, 2018 11:43 AM Christopher Holmes RE: Lone Star Estates I will get that document to you after my next board meeting...which is the 8t". Has any of the particulars in the development or the engineering changed. The engineering report I have is dated 11/30/17. Dale From: Christopher Holmes <chol mes@Coffey-e ngineering.com> Sent: Monday, July 30, 2018 8:29 AM To: Dale Trowbridge <DTrowbridge@newcache.com> Subject: Lone Star Estates Hi Dale, I amcurrently working on a rezone for a property located within the service area of the New Cache La Poudre irrigation channel. The proposed residential development will be dedicating easements for the ditch and will be releasing storm flows into it as well. I currently have the example easement agreement to give to the owner but am also looking for a storm water agreement. If you could provide me with the necessary paperwork for a storm water agreement with New Cache La Poudre Irrigation, that would be great. Have a great day, Christopher Holmes, El Engineering Technician COFFEY Et ► I NE ER lisisKi URA)]NG 4045 St. Cloud Drive, Suite 180, Loveland, CO 80538 Office: 970-622-2095 Cell: 605-691-3365 www.coffey-engineering. corn Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast Ltd 1 From: To: Cc: Subject: Date: Attachments: Troy Campbell Joe Stricklin asron@tbgroup.us FW: PUDK18-0OO2 - Lone Star Estates Wednesday, July 11, 2018 4:03:23 PM image001.png image002.png 09-26-2017 Lone Star Estates TIS.PDF Joe/Aaron, Please see below — the traffic engineer spoke with CDOT — the comments regarding auxiliary lanes on Hwy 392 should be addressed and no further action required. Thanks, Tray 970-622-2095 [O] 970-217-9148 [M] TCampbell@Coffev-Engineering.com From: Sean Kellar <skellar@kellarengineering.com> Sent: Wednesday, July 11, 2018 3:59 PM To: Troy Campbell<tcampbell@coffey-engineering.com> Subject: FW: PU DK1S-0002 - Lone Star Estates Respectfully, Sean Kellar, PE, PTOE 970.219.1602 skellar@kellarengineering.com CONFIDENTIALITY NOTICE: The information contained in this e-mail message may be privileged, confidential and protected from disclosure. If you are not the intended recipient, any dissemination, distribution, or copying is strictly prohibited. If you think that you have received this e-mail message in error, please contact the sender and delete the original message immediately. Kellar Engineering LLC From: Sean Kellar[mailto:skellar@kellarengineering.com] Sent: Wednesday, July 11, 2018 3:58 PM To: gloria.hice-idler@state.co.us Subject: PUDK18-0002 - Lone Star Estates Hi Gloria, Good talking with you. The proposed project's contributing traffic is much less than 20% to WCR 27/ SH 392. It's actually less than a 2% impact. Also, the development's site generated traffic does not warrant auxiliary lanes at MICR 27/SH 392. Based upon this information this project's site generated traffic does not trigger the need to address 1CR 27/H 392. Please feel free to let me know if you need anything further. Thanks! Respectfully, Sean Kellar, PE, PTOE 970.219.1602 skellar@ kellarengineering.com Figure 5: Site Generated Peak Hour Traffic S.H 392 VILE, r r esir 1 Site Access 1 Project Sitp a Site Access Legend Amipm Lone Estateisi T1S Page i0 Diana Aunyst ROM Sent To: Cc: Subject Diana, Hi -idler -CDOT, Gloria <gior .hive -idler@ te. ews Thursday, March 22, 201811:29 AM Diane Aungst Bilobran, Timothy PUDKIB- 2 - Lone Star Estates J'vo rovioitivod this pre sal and. offer the following: T. The drainage report has been forwarded to our hydrau.li c s engineers for review. As soon as I receive comments from them L will forward to you. 4 Though no fPvaW access is be requested,. COOT is interested in knowing the impacts of the developmenton the WCR 21759 392. intersection. If traffic volumes a ro increased by more than 20 E a new access permit would be required.. if the traffic vu lures atthat intersection, specific to this drovcilopment wore to warrant auxiliary ry lanes, CDOT would request that the County r._ , ui re the developer to look into their construction. 3. It appears that future ROW has already boon planned for (75' either side of the highway centerline). If you have any questions. please. let me know. Gloria like -Idler Roc kso i Consulting (970) 381-8629 COLORADO Uaep.n 1 m PMM ai Transportation 1iO601 "+,fir 1Wth Street:, Greeley, CO 8061A gioria.hice-idtergstate.co.us fwww.codotagov I www.cotrip.org CON FI DENTIALI Y NO ICE: 1 he information contained in this e-mail message may be privileged, confidential and protected from disclosure. If you are not the intended recipient, any dissemination, distribution, or copying is strictly prohibited. If you think that you have received this e-mail message in error, please contact the sender and delete the original message immediately. Kellar Engineering LLC Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast Ltd Hello