Loading...
HomeMy WebLinkAbout20192738.tiffMEMORANDUM TO: Kim Ogle, Planning Services FROM: Evan Pinkham, Public Works DATE: May 1, 2019 SUBJECT: USR19-0026 Brahma The Weld County Department of Public Works has reviewed this proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS GENERAL PROJECT INFORMATION/LOCATION Project description: A Site Specific Development Plan and a Special Review Permit for Mineral Resource Development Facilities including Oil and Gas Support and Service including (Three (3) gas compressors and related equipment), up to five (5) temporary construction office trailers and ten (10) temporary conex for use during the construction of the facility in the A (Agricultural) Zone. (Brahma Compressor Station) This project is south of CR 136.5 and is west of CR 71. Parcel number 004333000002. Access is from CR 136.5. ACCESS Weld County Public Works has reviewed the application materials related to access, and does not have concern with the proposed access location. Per Chapter 12, Article 5, Section 12-5-30, an Access Permit is required for access to Weld County maintained roadways. We strongly encourage you to discuss your access with Public Works prior to laying out your site plan to ensure the approved accesses are compatible with your layout. Per Chapter 12, Article V, Section 12-5-30. F, when feasible, there shall be no net increase in the number of accesses to a public road. Minimum access spacing widths are shown in Weld County Code Appendix Table 12A-2. Please refer to Chapter 12 of the Weld County Code for more information regarding access. ROADS AND RIGHTS -OF -WAY County Road 136.5 is a gravel road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a local road, which requires 60 feet of right-of-way. The applicant shall delineate and label on the site map or plat the future and existing right-of-way (along with the documents creating the existing right-of-way) and the physical location of the road. If the right-of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article Ill, Section 23-3-50, the required setback is measured from the future right-of-way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. County Roads 134, 136, 65 & 67 are section line roads. Section line right-of-way does not exist in all sections in Weld County and should be verified before a decision to utilize it is made. Weld County commonly refers to these locations as "Non -Maintained Section Line Right -of -Way." The existence of a physical road does not imply public right-of-way and the road may be located on private property. All right- of-way should be verified and physical roads located in relationship to the public right-of-way to ensure trespassing does not occur. The applicant shall verify the existing right-of-way and the documents creating the right-of-way and this information shall be noted on the site plan or plat. The applicant shall delineate on the site map or plat the existing right-of-way and physical location of existing or proposed roads. If the right- of-way cannot be verified it shall be dedicated or an adequate easement between property owners shall be provided. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23- 3-50, the required setback is measured from the future right-of-way line. Be aware the physical roadway(s) may not be centered in the right-of-way. These roads are NOT maintained by Weld County. Per Chapter 12, Article 4, Section 12-4-30.B, a Weld County Right -of -Way Use Permit is required for any project that will be occupying, constructing or excavating facilities within, and/or encroaching upon, any County rights -of -way or easement. Right -of -Way Use Permit instructions and application can be found at https ://www.weldgov. com/d epartments/publicworks/perm its/. Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the County right-of-way. TRAFFIC No traffic counts are available in the area. The application stated the following in regard to traffic: 1-2 roundtrips in pickup trucks for operations staff, 3-4 round trips for Semi Trucks with water hauling trailers. Describe the expected travel routes for site traffic. Expected travel route is off WCR 136.5 onto an existing oil field road. TRACKING CONTROL Tracking control is required to prevent tracking from the site onto public roadways. For access to paved roads, tracking control devices can be double cattle guards with 100 ft. of asphalt or 300 ft of asphalt. For access to gravel roads, tracking control devices must be either double cattle guards with 100 ft. of road base, or road base on all driving surfaces. Temporary Tracking Control shall be used during construction unless permanent tracking control is installed ahead of construction activities. Recycled concrete is not allowed in County right-of-way. Tracking control for unmaintained public right-of-way is required just prior to entering publicly maintained roadways. A variance request for alternatives to the tracking control requirement can be submitted to Public Works for review and consideration. This site requires approved tracking control during construction. ROAD MAINTENANCE AGREEMENT Public Works is requiring Road Maintenance Agreement including, but is not limited to, dust control and damage repair to specified haul routes. Improvements/Road Maintenance Agreement: An example agreement is available at: https://www.weldgov.com/UserFiles/Servers/Server 6/File/Departments/Public%20Works/DevelopmentR eview/USR-SPR-Permits°/020Improvements°/020Agreement°/020Template.pdf. It will detail the approved haul route(s), outline when off -site improvements will be triggered, and include a maintenance agreement for the haul routes. Possible mitigations included in the road maintenance agreement may include but are not limited to: dust control, specified haul routes, damage repairs, and future improvement triggers. DRAINAGE REQUIREMENTS This area IS within a Non -Urbanizing Drainage Area: Non -Urbanizing Drainage Areas typically require detention of runoff from the 1 -hour, 100 -year, storm falling on the developed site and release of the detained water at the historic runoff rate of the 1 -hour, 10 -year storm falling on the undeveloped site for NON - URBANIZING areas. Detention Pond summarized in a Drainage Report: The applicant has submitted a preliminary drainage report. A final drainage report and detention pond design completed by a Colorado Licensed Professional Engineer is required prior to recording the USR map. The drainage report must include a certification of compliance stamped and signed by the PE. A Certification of Compliance form can be found on the Public Works Development Review website. General drainage report checklist is available on the engineering website. More complete checklists are available upon request. Historic Flows: The applicants will be required to maintain the historic drainage flows and run-off amounts that exist from the property. MS4 This site is not in a defined Municipal Separate Storm Sewer System (MS4) area which is a more urbanized area with state mandated, higher water quality requirements GRADING PERMIT A Weld County Grading Permit will be required if disturbing more than 1 acre. Grading Permit applications are accepted after the planning process is complete (plan recorded). An Early Release Request Form may be entertained only after the applicant, Public Works and Planning Department have reviewed the referral and surrounding property owner comments. The Early Release Request may or may not be granted depending on referral comments and surrounding property owner concerns. Contact an Engineering representative from the Public Works for more information. A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact: Colorado Department of Public Health and Environment, Water Quality Control Division, 303-692-3575. CONDITIONS OF APPROVAL A. A Road Maintenance Agreement is required at this location. Road maintenance includes, but is not limited to, dust control and damage repair to specified haul routes. (Department of Public Works) B. A Final Drainage Report and Certification of Compliance stamped and signed by a Professional Engineer registered in the State of Colorado is required. (Department of Public Works) C. The applicant shall submit a recorded copy of any agreement signed by all of the owners of the property crossed by the access. The access shall be for ingress, egress, utilities and shall be referenced on the USR map by the Weld County Clerk and Recorder's Reception number. (Department of Public Works) D. The plan shall be amended to delineate the following: 1. County Road 136.5 is a gravel road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall delineate and label on the site map or plat the future and existing right-of-way (along with the documents creating the existing right-of-way) and the physical location of the road. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) 2. Show and label the approved access locations, approved access width and the appropriate turning radii (60') on the site plan. The applicant must obtain an access permit in the approved location(s) prior to construction. (Department of Public Works) 3. Show and label the approved tracking control on the site plan. (Department of Public Works) 4. Show and label the entrance gate if applicable. An access approach that is gated shall be designed so that the longest vehicle (including trailers) using the access can completely clear the traveled way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled surface be less than 35 feet. (Department of Public Works) 5. Show and label a 30 -foot minimum access and utility easement to provide legal access to the parcel on the site plan. (Department of Public Works) 6. Show and label the accepted drainage features. Stormwater ponds should be labeled as "Stormwater Detention, No -Build or Storage Area" and shall include the calculated volume. (Department of Public Works) 7. Show and label the drainage flow arrows. (Department of Public Works) 8. Show and label the parking and traffic circulation flow arrows showing how the traffic moves around the property. (Department of Public Works) Prior to Construction: A. The approved access and tracking control shall be constructed prior to on -site construction. (Department of Public Works) B. If more than one (1) acre is to be disturbed, a Weld County Grading Permit will be required. (Department of Public Works) DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) 1. The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Department of Public Works) 2. The access to the site shall be maintained to mitigate any impacts to the public road, including damages and/or off -site tracking. (Department of Public Works) 3. There shall be no parking or staging of vehicles on public roads. On -site parking shall be utilized. (Department of Public Works) 4. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works) 5. The Property Owner shall comply with all requirements provided in the executed Road Maintenance Agreement. (Department of Public Works) 6. The Road Maintenance Agreement for this site may be reviewed on an annual basis, including a site visit and possible updates. (Department of Public Works) 7. Access will be along unmaintained County right-of-way and maintenance of the right-of-way will not be the responsibility of Weld County. (Department of Public Works) 8. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Public Works) 9. Weld County is not responsible for the maintenance of onsite drainage related features. (Department of Public Works) WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17th Avenue, Greeley, CO 80631 www,weldhealth,org Memorandum To: Kim Ogle From: Ben Frissell, Environmental Health Services Date: April 19, 2019 Re: USR79-0026 Summit Midstream Brahma Compressor Environmental Health Services has reviewed this proposal for a Site Specific Development Plan and a Special Review Permit for Mineral Resource Development Facilities including Oil and Gas Support and Service including (Three (3) gas compressors and related equipment), up to five (5) temporary construction office trailers and ten (10) temporary conex for use during the construction of the facility in the A (Agricultural) Zone. There will be no permanent employees on the site. Portable toilets and bottle water are proposed once construction has been completed, which is acceptable. Environmental Health has no objections to the proposal; however, we recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. The facility shall operate in accordance with Chapter 14, Article 1 of the Weld County Code. 4. Fugitive dust should attempt to be confined on the property. Uses on the property should comply with the Colorado Air Quality Commission's air quality regulations. 5. The applicant shall submit an Air Pollution Emission Notice (A.P.E.N.) and Health Administration Vital Records Icic: 9/0 304 6410 Fax: 9/0-304-6412 Public Health & Clinical Services Icic: 9:0 304 6420 Fax: 910-304-64 16 Environmental Health Communication, Services Education & Planning Tele: 970-304-6415 Tele:970-304-6470 Fux: 970-304-6411 Fax. 970-304-6452 Emergency Preparedness 8 Response Te le: 970-304-6470 Fax: 970-304-6462 Public Health Emissions Permit Application and obtain a permit from the Air Pollution Control Division, Colorado Department of Public Health and Environment, as applicable. 6. Adequate drinking, handwashing and toilet facilities shall be provided for employees and patrons of the facility, at all times. As employees or contractors are on site for less than 2 consecutive hours a day portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. Portable toilets shall be screened from existing adjacent residential properties. 7. All potentially hazardous chemicals must be handled in a safe manner in accordance with product labeling. All chemicals must be stored secure, on an impervious surface, and in accordance with manufacturer's recommendations. 8. Secondary containment shall be constructed around tanks to provide containment for the largest single tank and sufficient freeboard to contain precipitation. Secondary containment shall be sufficiently impervious to contain any spilled or released material. Secondary containment devices shall be inspected at regular intervals and maintained in good condition. All secondary containment will comply with the Colorado Oil and Gas Conservation (COGCC) Commission Rule 604 and/or the provisions of the State Underground and Above Ground Storage Tank Regulations. 9. The facility shall be constructed and operated to ensure that contamination of soil and groundwater does not occur. 10.Any contaminated soils on the facility shall be removed, treated or disposed of in accordance with all applicable rules and regulations. All spills will be reported to local, state and federal agencies in accordance with all state and federal regulations. 11.The facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in 25-12-103 C.R.S. 12.The applicant shall obtain a Colorado Discharge Permit System or CDPS permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division, if applicable. 13.A Spill Prevention, Control and Countermeasure Plan, prepared in accordance with the applicable provisions of 40 CFR, Part 112, shall be available on site or as applicable. 14.The facility shall notify the County of any revocation and/or suspension of any State issued permit. 15.The applicant shall notify the County upon receipt of any compliance advisory or other notice of non-compliance of a State issues permit, and of the outcome or disposition of any such compliance advisory or other notice of non-compliance. 16.The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. Hello