HomeMy WebLinkAbout20194734.tiffWELD COUNTY
CODE ORDINANCE 2019-16
IN THE MATTER OF REPEALING AND REENACTING, WITH AMENDMENTS,
CHAPTER 5 REVENUE AN I FINANCE, OF THE WELD COUNTY CODE
BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF
WELD, STATE OF COLORADO:
WHEREAS, the Board of County Commissioners of the County of Weld, State of
Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with
the authority of administering the affairs of Weld County, Colorado, and
WHEREAS, the Board of County Commissioners, on December 28, 2000, adopted Weld
County Code Ordinance 2000-1, enacting a comprehensive Code for the County of Weld,
including the codification of all previously adopted ordinances of a general and permanent nature
enacted on or before said date of adoption, and
WHEREAS, the Weld County Code is in need of revision and clarification with regard to
procedures, terms, and requirements therein.
NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of the
County of Weld, State of Colorado, that certain existing Chapters of the Weld County Code be,
and hereby are, repealed and re-enacted, with amendments, and the various Chapters are
revised to read as follows.
CHAPTER 5
REVENUE AND FINANCE
Appendix 5-A Commercial Rental Schedule — NO CHANGE
Appendix 5-B Reserved
Appendix 5-C Missile Site Park Fees — NO CHANGE
Appendix 5-D Weld County Government Fees — ATT CHED
Appendix 5-E Rates for Clerk to the Board — NO CHANGE
Appendix 5-F GIS Fee Schedule — NO CHANGE
Appendix 5-H Fees for 3.2% Beer License or Liquor License — NO CHANGE
Appendix 5-I Clerk and Recorder Fees — ATTACHED
Appendix 5-J Land Use Application Fees — ATTACHED
Appendix 5-K Building Permit and Electrical Permit Application Fees — NO CHANGE
Appendix 5-L Required Bid Amount — NO CHANGE
Appendix 5-M Department of Public Works Permit Application Fees — ATTACHED
Appendix 5-N Development Impact Fees — NO CHANGE
Appendix 5-O Criminal Justice Records Retrieval — NO CHANGE
PAGE 1
2019-4734
ORD2019-16
BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is,
directed to arrange for Municode to supplement the Weld County Code with the amendments
contained herein, to coincide with chapters, articles, divisions, sections, and subsections as they
currently exist within said Code; and to resolve any inconsistencies regarding capitalization,
grammar, and numbering or placement of chapters, articles, divisions, sections, and subsections
in said Code.
BE IT FURTHER ORDAINED by the Board, if any section, subsection, paragraph,
sentence, clause, or phrase of this Ordinance is for any reason held or decided to be
unconstitutional, such decision shall not affect the validity of the remaining portions hereof. The
Board of County Commissioners hereby declares that it would have enacted this Ordinance in
each and every section, subsection, paragraph, sentence, clause, and phrase thereof irrespective
of the fact that any one or more sections, subsections, paragraphs, sentences, clauses, or
phrases might be declared to be unconstitutional or invalid.
The above and foregoing Ordinance Number 2019-16 was, on motion duly made and
seconded, adopted by the following vote on the 18th day of December, A.D., 2019.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST:
Barbara Kirkmeyer, Chair
Weld County Clerk to the Board
Mike Freeman, Pro-Tem
BY:
Deputy Clerk to the Board
Sean P. Conway
APPROVED AS TO FORM:
Scott K. James
County Attorney
Steve Moreno
Date of signature:
First Reading:
Publication:
November 6, 2019
November 13, 2019, in the Greeley Tribune
Second Reading: November 25, 2019
Publication: December 4, 2019, in the Greeley Tribune
Final Reading:
Publication:
December 18, 2019
December 27, 2019, in the Greeley Tribune
Effective: January 1, 2020
PAGE 2
2019-4734
ORD2019-16
APPENDIX 5-D - WELD COUNTY GOVERNMENT FEES
Service Provided
1. For the copying of public documents
where the fee for such copying is not
otherwise specified by statute
2. For the copying of public documents
via laser jet printer, if feasible, and where
the fee for such copying is not otherwise
specified by statute
3. Copy of the Home Rule Charter
4. For Weld County road maps
5. For For the taking of fingerprints by the
Weld County Sheriff's Office
6. For all research and retrieval of public
records requested pursuant to the
Colorado Open Records Act
.xw4Mv.M00,..v1.91.14w4vrpNWAVbmNW....w.
7. Weed spraying: truck and labor
Fee Established
$0.25 per copy, or actual cost
$0.25 per page, or actual cost
$5.00 + $3.00 postage if mailed
By size, as determined by Geographical
Information Services Department
$10.00 per person (I4-m4t of 2 cards)
at
The actual cost up to $30.00 per hour of time spent
by custodian's staff performing such research and
retrieval; however, first hour of time spent is free
and custodian must be paid the estimated cost
prior to custodian's staff commencing such
research and retrieval.
Fees to be set by Board Resolution to recover full
cost
8. District Attorney fee schedule (mailing fees may be added):
For all research and retrieval of public
records requested pursuant to the
Colorado Open Records Act and to the
Colorado Criminal Justice Records Act:
.x../..uNp✓iHmtwli�/wwvsiinM4/.
The actual cost up to $30.00 per hour of time spent
by custodian's staff performing such research and
retrieval; however, first hour of time spent is free
and custodian must be paid the estimated cost
prior to custodian's staff commencing such
research and retrieval.
PAGE 3
2019-4734
ORD2019-16
For the copying of public documents, if
feasible, and where the fee for such
copying is not otherwise specified by
statute:
$0.25 per page, or actual cost
9. Planning and building inspection Fee shall be actual cost of items plus handling and
materials
10. Assignment of oil and gas lease
11. Pretrial release supervision fee
12. Returned checks
13. Specia
14. Dri-ng rig permit fee
--F
postage when mailed
$100.00 per lease, per assignment
$20.00 per defendant
$20.00 per check
$2g.09-
1513. Motor vehicle identification number
inspections:
Certified inspections
Noncertified inspections
1511 ��. Special district service plan filing
fee (Section 32-1-202(3), C.R.S.)
$4700 .0-0 per move -
Amended special district service plan!
filing fee (Section 32-1-207, C.R.S.)
$20-0850.00
$12.00
X500.00
$250.00
X15. Copying audiotape of public safety
telephone and radio voice recordings
Fee of $45.00 per hour of recording time. If
recording time exceeds one hour, copies shall be
at a rate to fully recover the cost of the staff time
required and CD costs incurred to copy the CD as
determined by the department head.
Minimum fee $45.00
PAGE 4
2019-4734
ORD2019-15
1--816. Sheriff's fees copies of reports
and/or other documents maintained by
Criminal Justice Records:
VALE Surcharge
I
Report retrieval fee (to copy or to view)
Copy fee (first 2 pages free)
Mail request: (first 2 pages)
(additional pages)
From archived medium (NO CHARGE
TO VICTIMS)
Faxed copies
$10.00
$3.00
$0.25 per page, or actual cost
duseu
$3.50
$0.50 per page
$1.00 per page
Additional $1.00 per page
X917.Co- a for inmate medical services -1 $10.00 per clinic visit
py
2018. Requests for clearance or
immigration letters: letter will include
arrest records for all RIM contract
agencies:
In -person requests (self)
Mail requests
vir
Second party request or requests
requiring dispositions
r--
Second party request by mail or
requests requiring dispositions
r-2-1-1 9. Requests for broad computerized
searches by name or location:
w........... �.
.wMuw.ryw
$10.00 per prescription filled/refilled
$7.00
$7.50
$12.00
$12.50
$7.50 per 15 minutes of search time, so as not to
exceed $30.00 per hour
PAGE 5
2019-4734
ORD2019-16
Additional fee if programming is
required:
2220. Assessor/Treasurer items:
Aerial maps
Printouts (copies)
Reports
$60.00 minimum and $60.00 each subsequent
hour
$15.00 per map
$0.25 per page, or actual cost
Rebilling delinquent accounts
2321. Sheriff bond processing fee
2422. Mug shot photo processing fee
2-523. CCW application
$200.00 setup and $50.00 per hour
$5.00
$10.00 per bond
$10.00 per photo
$100.00 (includes $52.50 for fingerprinting charge
for CO and FBI clearance)
$38.00 for renewal (includes $13.00 CO insta-
check fee)
$15.00 late fee
$39.50 for CCW Name Change
$15.00 to replace lost or stolen CCW
:624. Notary service No fee shall be charged by County staff
225. Independent fee calculation study
administrative cost fee
2826. Civil processing
$500.00
Mileage charges reflected in separate Resolution,
which will be reviewed annually.
PAGE 6
wittoweioaur
2019-4734
OR®2019-16
MA WM*
a9-- em
issued by the
permit
Board of County
Comm iss ion s-
3327. Sex offender registration:
Annual Initial registration fee for
fingerprints+n-g and photo, per -Section
C.R.S. 16®22-108(6),,
stwenotedrat
Annual re -registration fee for
fingerprints and photo
3428. Committing and discharging
prisoners in County jail
$25.00
3-229. Justice Services work release fee
3330. Sheriffs documentation of
incarceration
34. S of4e -dar rb rati on -
Mileage zones were created to introduce a flat rate
and establish consistency in mileage rates from
year to year. The mileage zone is based on the
distance from the Weld County Sheriffs Office Law
Administration Building to the Post Office based on
Zip Code. The mileage fee will be charged based
on the Zip Code of the mailing address of the Civil
and will only be char
paperwork, ed once 9
regardless of how many attempts are made or the
miles actually driven.
PAGE 7
$100.00 per event
$20.0025.00 - -ua -
$30.00
$15.00 per day
$3.00 for one page
0.50 per additional page
$25,99 -to -register
�$�-25~00 to re -re
d.
2019-4734
OR02019-16
3€31. Copies of records (via burning of
CDs)
36. Reserved.
Copies shall be at a rate not to exceed $30.00 per
hour after the first hour, to recover the cost of the
staff time required and CD costs incurred to copy
the CD as determined by the department head.
The hourly rate shall be calculated on a full cost
for applicants recovery basis of the County's costs for the staff
3-732. Staff time app ca is or
positions involved in the assistance. The full cost
constituents that propose novel uses or
development that does not fit into
I recovery rate shall be determined by the Director of
established fee categories where staff will
Finance and Administration and shall include
4or salary, fringe benefits, support costs (services and
spend more hours of review,
oversight or assistance.
supplies) and indirect costs calculated in
accordance with the County -wide cost allocation
plan per Federal OMB -87 methodologies.
3-833. Coroner fee schedule:
Constituents shall deposit the estimated amount of
the costs prior to assistance. The County will draw I
upon it based on the standard hourly rate for each
staff providing the review, oversight or assistance.
Consistent with Colorado Open Records Act and
items #1, #2, and #6, of this Appendix D.
3934. Chapter 21 - 1041 Oil and Gas
WOGLA Permit
4035. Chapter 21 — 1041 Oil and Gas
WOGLA Permit (facility only, no wells)
4436. Location Assessment for Pipelines
(LAP)
Pipelines less than 25 miles in length
$10,000 per permit
Pipelines greater than 25 miles in
length
$2,500
$1,000.00
$1,500.00
Pipelines that require BOCC review
Additional $2,500.00
PAGE 8
2019-4734
ORD2019-16
APPENDIX 5-I - CLERK AND RECORDER FEES
Description
Fee
RECORDING DEPARTMENT FEES
GENERAL RECORDING
8'/2' X 11"-8W x 14"
First page
Each additional page
EXCEPTIONS:
$13.00
$5.00
Oversized pages (Larger than 8W x 14" Plats/Surveys)
First page
Each additional page
$13.00
$10.00
Documentary fee on all documents granting or conveying title to
real property per Section 39-13-102, C.R.S.
$0.01 per $100.00
consideration if
consideration is greater
than $500.00
OTHER GENERAL RECORDING FEES:
Federal tax liens and releases
$8.00
School bonds, first page
Each additional page
Military discharge
$13.00
$5.00
UCCs (real estate only):
PAGE 9
No charge
2019-4734
ORD2019-16
One or two pages
Three or more pages
$11.0013.00
$16.0018.00
All e -Recorded UCC statements
MARRIAGE/CIVIL UNION FEES:
$8.00
Marriage licenses/Civil unions (cash only) $30.00
Copy of marriage license
COPY FEES:
Per page (Smaller than 8.5" x 14")
$3.00
Oversized pages (larger than 81/2" x 14")
Certification per document
Certified school record
$0.25
I
I
$5.00
l
I
$1.00
$1.75
Military discharge
Postage fees 1 7 pages
Postage fees 8-60 pages
Postage fees 61+ pages
No charge
$1.00
$3.00
$5.00
To avoid paying a postage fee, please include a self-addressed
stamped envelope with your request. The envelope must be large
enough to accommodate the number of copies requested.
RETURNED CHECKS (per check)
$20.00
SPECIAL SERVICES
Share file (FTP per month)
$500.00
PAGE 10
2019-4734
ORD2019-16
Deed report subscription (per year)
Paper reports —per page
Certificate of magistracy
Each additional year
$200.00
$0.05
$2.00
$2.00
Document images on compact disc
Daily
Weekly
$10.00
Monthly
EAGLE WEB
$25.00
One month subscription (unlimited access)
Web copies without a subscription
First page
Each additional page
$100.00
$300.00
$0.50
$0.25
ELECTION DEPARTMENT FEES
Voter certification $1.00
Electronic voter list on compact disc or email (.csv or .txt format) $50.00
Voter list on paper (per page)
Locator (each)
Maps (each) colored copy
Copies (per page)
$0.25
$30.00
$15.00
$0.25
PAGE 11
2019-4734
ORD2019-16
Certified copies (per page)
loo
$1.25
Statement of votes cast:
Electronic copy $10.00
Paper copy (per page)
Mail -in ballot status subscription (.csv or .txt format) per
election cycle
Early voting list subscription (.csv or .txt format) per election
cycle
Voter address labels
Setup fee
Per label
PAGE 12
$0.25
$150.00
$150.00
$50.00
$0.02
2019-4734
ORD2019-16
APPENDIX -J - PLANNING FEE SCHEDULE
A
[Land Use Application
Use by Special Review (USR)
--- i- -family dwelling units (other than those --
permitted under Subsection 23-3-2-0.A.)-- Second
single-family dwelling
- Expansion of a- n-onconfarmi-ng u e-
!Fee
$1,200.00
$1,200.00
- Home business
- Animal boarding and/or trainin. facility, kennels
(more than the number of animals permitted in the Bulk
Requirements)as parr 0. B.1-0-
,$1,200.00
- Bed and breakfast facility
- Oil and gas storage facilities
- Accessory buildings with a gross floor area larger
than s -t- 4n Subsec ion- � �-permitted by
right in Article HI of Chapter 23
-- -o aposting=4FociIitie- --
C-o-n red -an icimal _ feoper 4oLivestock
Confinement Operation (LCO)
LCO: Less than or equal to 1,000 animal units 1-
LCO: Up to and including each additional 1,000
animal units 1
$1,200.00
$1,200.00
$1,200.00
x$1,200.00
$2,415.00
$500.00
Sa trite sewer -fad
mama. saw ...aa.a.al ConeVoonWA.anv,a.nwaraalaayartan
Wel
:$1-0,000.00
PAGE 13
2019-4734
ORD2019-16
I
•
I
- Mining permit
- Solid waste disposal site 2
$5,000.00 for the first 10 acres
plus $20.00 per acre or fraction
!thereof in excess of 10 acres
- Hazardous waste disposal site, excluding injection
wells
- Non -1041 major facility of a utility, other than
Sewage treatment facilities
- Sewage treatment facility
$20,000.00
$100,000.00
I
;$5,000.00
- 1041 facilities as defined in Chapter 21 of this Code
(except applications made pursuant to Chapter 21,
Article aV)
- All other use by specia-l--rev-i-ewUSR permits
- Minor us, spe a! re4ew-viewamendment
- Flood Hazard Development Permit (FHDP)
$500.00
23. Planned Unit Development (1-9 lots or fewer)
- Sketch plan
- Change of zone
PThnai plat
$180.00
Planned Unit Development (10 or more lots)
- Sketch plan
$2,100.00
$1,500.00 plus' $50.09-per—
buiLda -e-o
$1,500.00 plus $100.00 per
buildable lotw.3
PAGE 14
j$5,000.00
2019-4734
ORD2019-16
- Change of zone
- Final plat
34. Minor Subdivision (4-9 lots or fewer)
E-$3,000.00
buildable lot
- Sketch plan
- Change of zone
- Final plat
Major Subdivision (10 or more lots)
- Sketch plan
- Preliminary plan
$3,000.00 plus $100.00 per
buildable lot3
r$2,100.00
$1, 500.00 --per --$•5- :-00 per
buildable of
$1,500.00 plus $100.00 per
'buildable lot_3
$5,000.00
$2,100.00
- Change of zone
- Final plat
PAGE 15
$3,000.00 -plus $50.00 p -
buildable lot
$3,000.00 plus $100.00 per
buildable lot_3
2019-4734
ORD2019-16
45.
Resubdivision
- Lot line changes only
- Vacation of roads, streets or alleys only
- Redesign, additional lots or vacation of lots
r
Subdivision Exemptions
- Used with recorded exemptions
- Property line adjustment
$500.00
$500.00
$500.00 + $150.00
per additional
buildable lot
$180.00
$180.00
$180.00
- Financing
$180.00
- Temporary use
- Public and private utility
i
7,8,9,
10, 11,
13, 8.
Recorded Exemptions (2-, 3- and 4-lotRE)
- 2 lot RE
- 3 lot RE
$180.00
$400.00
$1,000.00
$1,300.00
- 4lot RE
$1,600.00
- Amendments
Zoning Permit
- Mobile homes, mManufactured homes, accessory
dwellings, temporary dwellingsother than temporary storage
$180.00
- Temporary storage (6 months) of a mobile home
PAGE 16
$300.00
$75.00
2019-4734
ORD2019-16
1
1
449.
wNu
15.10.
- Change of use (if mobil home is existing)
- Accessory Storage / Semi -Trailer (ZPAS)
- Commercial Vehicle (ZPCV)
•
- Zoning Permit for Ag (ZPAG)
- Zoning Permit for Ag (ZPAG) Minor Amendment
—even-it-far—Second Fa ily Dwelling
$75.00
$75.00
$75.00
-1:j$1,000.0O per
'$500.00
- Zoning Permit for Telecommunication Antenna Tower
DTrl
- Zoning Permit for Noncommercial Tower (ZPNCT)
- Zoning Permit for Home Occupation - Class II (ZPHB)
- Zoning Permit for Home Occupation - Class I (ZPHO)
- Zoning Permit for Wind Generator (ZPVV 1
Temporary Seasonal Use Permit (TSU)
Board of Adjustment
- Variance
- Appeal
16.11. Change of Zone
twwv
$599.00
• WOWSVAWeeffenNII
$500.00
$500.00
$300.00
$50.00
1$300.00
$75.00
l$710.00
$200.00
- Residential and agricultural s -Zoning districts 1R, E, and
$2,100.00 -plus
$1-a.
buildable lot -
PAGE
17
_.A
2019-4734
ORD2019-16
$5,500.00 plus
- Commercial/industrial zoning districts (C and I)
X12. !Site Plan Review
- Amendment
- Buildings <10,000 gross sq. ft.
a
- Buildings between 10,000-25,000 gross sq. ft.
- Building >25,000 gross sq. ft.
- Tenant fini-sh
Y.
x-13. Substantial Change Hearing
i1-9714.
$60-oo
Administrative Handling Fee - Special Request
{
20.15. ;Building Permit/Illegal Parcel
21.16.
;22.17.
I$150.00 per
buildable lot
$500.00
$1,300.00
$2,000.00
100.00
$250.00
Investigation Fee (for properties that have a zoning violation
case in process)
A fee will be charged by the County to future applicants when
County staff members are asked to assist professional
consultants in the preparation of land use applications. The fee
shall be an hourly rate charged in 15 -minute increments. The
hourly rate shall be calculated on a full cost recovery basis of
the County's costs for the staff positions involved in the
assistance. The full cost recovery rate shall be determined by
the Director of Finance and Administration and shall include
salary, fringe benefits, support costs (services and supplies)
and indirect costs calculated in accordance with the County-
wide cost allocation plan per Federal OMB -87 methodologies.
Preapplicants shall deposit an estimated amount of the costs
prior to the assistance. A final settlement of costs will be
determined by the DPS once all the work has been completed.
PAGE 18
i
I
'50% of the
established
application fee
2019-4734
ORD2019-16
r�
X3.13.
24.19.
25.20.
26,21.
f
2-7.22.
Incidental, Nontechnical Land Use Application Assistance
Amendment to Aany Regional Urbanization Area Map -and/or
the Comprehensive Plan
1
Creation of a Regional Urbanization Area
$50.00 per hour
AAIV
$1,500.00
minimum or
$700.00 per parcel,
whichever is
greater
'$25.00 per acre
Administrative Process
- Case continuance
- Hearing continuance
$150.00
$500.00
- Recording continuance
rateterr
Additional Fees May Be Assessed to Cover Publication Costs.
Outside Consultant for Professional Review. Necessity for
Review to Be Determined by the Director.
PAGE 19
;$50.00 per 3
months
Market rate
Professional rate
2019-4734
0RD2019-16
'29.24.
For those applications for uses identified to be of high
complexity or intensity where a determination is made that
County staff will be committing time and resources. The
applicant shall deposit an estimated amount of the costs prior to
assistance. The fee will be held and charged against by the
County based on the standard hourly rate for each department
administering or reviewing the permit. The departments shall
include, but not be limited to, the Department of Planning
Services, Health Department, Public Works and the County
Attorney's Office. The standard hourly rate shall be established
by the Finance Department for the actual time spent on the
p p
`review of the application. The rate shall be calculated on a full
cost recovery basis of the County's cost and shall include
salary, fringe benefits, support costs (services and supplies)
land indirect costs calculated in accordance with the County-
wide cost allocation plan per Federal OMB -87 methodologies
E
The applicant shall be provided copies of the billing 5 days prior
to the cost actually being billed. The applicant's sole remedy to
appeal any billing shall be to the Board of County
;Commissioners. The unused portion of the submitted
lapplication fee shall be returned to the applicant within 30 days
I of recording the Special Review plan map, within 30 days after
I denial of the application by the Board of County
Commissioners, or 30 days after the applicant submits a written
'request to withdraw the application.
pp
1 Animal units as defined in Section 23-1-90 of this Code.
PAGE 20
2019-4734
ORD2019-16
C
2 The fee to amend an application for a Special Review Permit for Solid Waste Disposal Sites
and Facilities shall not exceed $20,000.00. The full amount shall be submitted to the
Department of Planning Services at the time a complete application is submitted. The fee will be
held and charged against by the County based on the standard hourly rate for each department
administering or reviewing the permit. The departments shall include, but not be limited to, the
Department of Planning Services, Health Department, Public Works and the County Attorney's
Office. The standard hourly rate shall be established by the Weld County Finance Department
for the actual time spent on the review of the application and facility. The rate shall be calculated
on a full cost recovery basis of the County's cost and shall include salary, fringe benefits,
support costs (services and supplies) and indirect costs calculated in accordance with the
County -wide cost allocation plan per Federal OMB -87 methodologies. The applicant shall be
provided copies of the billing 5 days prior to the cost actually being billed. The applicant's sole
remedy to appeal any billing shall be to the Board of County Commissioners. The unused
portion of the submitted application fee shall be returned to the applicant within 30 days of
recording the amended Special Review plan map, within 30 days after denial of the application
by the Board of County Commissioners, or 30 days after the applicant submits a written request
to withdraw the application.
325% of this fee is due at the time of application, and the remaining 75% due at the time of
building permit issuance.
Development Impact Fees
r
1. Road Impact Fee
Kvmmn»ry
ordinance
MOMOMWAWAP
-By separate
2. County Facilities Impact PFee-Sthedule in Cha ter 20 of this--Code-B separate
pp Y
Fee ordinance
3. Drainage Impact Fee
Fee Schedule in
ordinance
ode.By separate
PAGE 21
2019-4734
ORD2019-16
APPENDIX 5-M - DEPARTMENT OF PUBLIC WORKS PERMIT APPLICATION FEES
root
Type
I. Development Can -traction FermitMS4 Reinspection
Fee
traea:E.Y4."6.Y.K4G' iSP'OXAC/i<YtSC A%S :6 til8'f.'l.K'dYAMZZ. =.50)..Weat "f GL: Afr' 'D'rn5 ,.ewwX&:�. O'9+:YiNi%Y'.+ taMontaltraq'C HteatC,.s>Nr•�'z v -c eirOrt,="11 idt
Dwelling units-
N-ndwellin-c-u i s
a-afsite Road -Afire -e e-nts/Haul Route Agreement
Review
Fee
$7 .00/lot
3. Flood Hazard Development Permit
42. tormwater Grading Permit (SWWP Review)
!Inspections
5. Geologic ward Permit
r
1, 6. Nonexclusive License Agreements
$50/hr
$1,..69.00/lot
$500.00
$180.00
$500.00
Fee TBD by State Geological Survey
:73. N-onexclusivNonmaintained Cross Road Signs
(Installation and Fabrication)
84. Access Permit Fees
$100.00
$150.00
aA) Field Access Permit (agricultural only) i Exempt
bB) Single residential afccessAccess Permit requiring
a variance
GC) Su-bdivision asses -Single residential
Commercial or ail -and gas access (up to 50-
ve-h4--ay)---
eD) Industrial or commercial access (more than 50
veh/day)
PAGE 22
-r
$75.00Subtotal x2
$150.00
$150300.00
2019-4734
ORD2019-16
#E) Temporary access (expires within 6 months)
gh) Inspection outside normal work hours
$7-5150.00
hG) Working prior to permit approval
4H) Public safety violation
95. Right -of -Way Use Permit Fees
A) Permit fee
Admin, review and inspection
*Admin, review and no inspection
Permit revision
Permit extension
Aver.w.. ...—
B) Annual permit
YVON
Admin, review and inspection
C) Road bore
Road bore with bore pit(s) located in R.O.W.
Road bore with bore pit(s) located outside
R.O.W.
PAGE 23
$50.00/hr
Subtotal x 2
$200500.00
$150.00
N/A
$75.00
$150.00
$300.00
Line outside diameter < 12" - $75.00
+ .30/LF
Line outside diameter 12" to 20" -
$100.00 + .30/LF
Line outside diameter > 20" - $125.00
+ .30/LF
Line outside diameter < 12" - $50.00
+ .30/LF
Line outside diameter 12" to 20" -
$75.00 + .30/LF
Line outside diameter > 20" o $100.00
+ .30/LF
2019-4734
ORD2019-10
Bore parallel in R.O.W. outside R.O.W.
D) Work within a hard surface roadway
Trench w/structural fill or flowable fill
Test hole/pot hole - 8" or less
E) Work within a gravel roadway
Trench w/structural fill
Test hole/pot hole - 8" or less
Line outside diameter < 12" - $25.00
+ .30/LF
Line outside diameter 12" to 20" -
$50.00 + .30/LF
Line outside diameter > 20" - $75.00
+ .30/LF
$2.50 per sq ft 5 years or older - min
$75.00
$5.00 per sq ft newer than 5 years -
min $100.00
Trench w/structural fill or flowfill treated gravel
Test hole/pothole treated gravel
F) Work in R.O.W. outside of roadway
Trenching/plow or cable puller
r Nirt
Test hole/pot hole - 8" or less
Occupation Fee
$50.00 per hole
$1.00 per sq ft $50.00 min
$25.00 per hole
$2.50 SF - $50.00 min
$50.00 per hole
Trench width up to 12" - $0.30/LF
Trench width 12" to 20" - $0.60/LF
Trench width > 20" - $0.90/LF
G) New appurtenance (meters, vaults, poles, etc.)
$10.00 per hole
$0.2SILF $50.00 min
3 sq. ft. or less $50.00
PAGE 24
2019-4734
ORD2019-16
Greater than 3 sq. ft.
00,0000.000/00000
H) Abandonment
$175.00
Abandonment/Retirement of line in R.O.W.
I) *Working prior to permit approval
Emergency repairs excluded
J) *Public safety violation
01,000,4/ _
K) Inspection outside normal work hours
6. Transport Fees
Singie Trip Permit
OS only
OW only
OS/OW
Special Permit
201 K -349K
350K+
Oil Rig Permit
0.0.0000
12"=<$75.00+0.50/LF
12" > $150.00 + 0.50/LF
Total of all fees * number days
Y
delinquent
$250.00
$75.00 per hour with a 2 -=hour min
$25.00
$50.00
$75.00
$350.00
j $500.00
Annual OS/OW Permit
Annual OS only Permit
Annual OW only Permit
$1,000.00 per move
(Note: Rig fee did not change due to
Resolution #2001-1923.)
$300.00
$250.00
$275.00
PAGE 25
2019-4734
ORD2019-16
Annual OW Divisible
r
97K
110K
* As determined by Public Works
260.00
$300.00
PAGE 26
2019-4734
ORD2019-16
Hello