Loading...
HomeMy WebLinkAbout20194734.tiffWELD COUNTY CODE ORDINANCE 2019-16 IN THE MATTER OF REPEALING AND REENACTING, WITH AMENDMENTS, CHAPTER 5 REVENUE AN I FINANCE, OF THE WELD COUNTY CODE BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF WELD, STATE OF COLORADO: WHEREAS, the Board of County Commissioners of the County of Weld, State of Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board of County Commissioners, on December 28, 2000, adopted Weld County Code Ordinance 2000-1, enacting a comprehensive Code for the County of Weld, including the codification of all previously adopted ordinances of a general and permanent nature enacted on or before said date of adoption, and WHEREAS, the Weld County Code is in need of revision and clarification with regard to procedures, terms, and requirements therein. NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of the County of Weld, State of Colorado, that certain existing Chapters of the Weld County Code be, and hereby are, repealed and re-enacted, with amendments, and the various Chapters are revised to read as follows. CHAPTER 5 REVENUE AND FINANCE Appendix 5-A Commercial Rental Schedule — NO CHANGE Appendix 5-B Reserved Appendix 5-C Missile Site Park Fees — NO CHANGE Appendix 5-D Weld County Government Fees — ATT CHED Appendix 5-E Rates for Clerk to the Board — NO CHANGE Appendix 5-F GIS Fee Schedule — NO CHANGE Appendix 5-H Fees for 3.2% Beer License or Liquor License — NO CHANGE Appendix 5-I Clerk and Recorder Fees — ATTACHED Appendix 5-J Land Use Application Fees — ATTACHED Appendix 5-K Building Permit and Electrical Permit Application Fees — NO CHANGE Appendix 5-L Required Bid Amount — NO CHANGE Appendix 5-M Department of Public Works Permit Application Fees — ATTACHED Appendix 5-N Development Impact Fees — NO CHANGE Appendix 5-O Criminal Justice Records Retrieval — NO CHANGE PAGE 1 2019-4734 ORD2019-16 BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is, directed to arrange for Municode to supplement the Weld County Code with the amendments contained herein, to coincide with chapters, articles, divisions, sections, and subsections as they currently exist within said Code; and to resolve any inconsistencies regarding capitalization, grammar, and numbering or placement of chapters, articles, divisions, sections, and subsections in said Code. BE IT FURTHER ORDAINED by the Board, if any section, subsection, paragraph, sentence, clause, or phrase of this Ordinance is for any reason held or decided to be unconstitutional, such decision shall not affect the validity of the remaining portions hereof. The Board of County Commissioners hereby declares that it would have enacted this Ordinance in each and every section, subsection, paragraph, sentence, clause, and phrase thereof irrespective of the fact that any one or more sections, subsections, paragraphs, sentences, clauses, or phrases might be declared to be unconstitutional or invalid. The above and foregoing Ordinance Number 2019-16 was, on motion duly made and seconded, adopted by the following vote on the 18th day of December, A.D., 2019. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: Barbara Kirkmeyer, Chair Weld County Clerk to the Board Mike Freeman, Pro-Tem BY: Deputy Clerk to the Board Sean P. Conway APPROVED AS TO FORM: Scott K. James County Attorney Steve Moreno Date of signature: First Reading: Publication: November 6, 2019 November 13, 2019, in the Greeley Tribune Second Reading: November 25, 2019 Publication: December 4, 2019, in the Greeley Tribune Final Reading: Publication: December 18, 2019 December 27, 2019, in the Greeley Tribune Effective: January 1, 2020 PAGE 2 2019-4734 ORD2019-16 APPENDIX 5-D - WELD COUNTY GOVERNMENT FEES Service Provided 1. For the copying of public documents where the fee for such copying is not otherwise specified by statute 2. For the copying of public documents via laser jet printer, if feasible, and where the fee for such copying is not otherwise specified by statute 3. Copy of the Home Rule Charter 4. For Weld County road maps 5. For For the taking of fingerprints by the Weld County Sheriff's Office 6. For all research and retrieval of public records requested pursuant to the Colorado Open Records Act .xw4Mv.M00,..v1.91.14w4vrpNWAVbmNW....w. 7. Weed spraying: truck and labor Fee Established $0.25 per copy, or actual cost $0.25 per page, or actual cost $5.00 + $3.00 postage if mailed By size, as determined by Geographical Information Services Department $10.00 per person (I4-m4t of 2 cards) at The actual cost up to $30.00 per hour of time spent by custodian's staff performing such research and retrieval; however, first hour of time spent is free and custodian must be paid the estimated cost prior to custodian's staff commencing such research and retrieval. Fees to be set by Board Resolution to recover full cost 8. District Attorney fee schedule (mailing fees may be added): For all research and retrieval of public records requested pursuant to the Colorado Open Records Act and to the Colorado Criminal Justice Records Act: .x../..uNp✓iHmtwli�/wwvsiinM4/. The actual cost up to $30.00 per hour of time spent by custodian's staff performing such research and retrieval; however, first hour of time spent is free and custodian must be paid the estimated cost prior to custodian's staff commencing such research and retrieval. PAGE 3 2019-4734 ORD2019-16 For the copying of public documents, if feasible, and where the fee for such copying is not otherwise specified by statute: $0.25 per page, or actual cost 9. Planning and building inspection Fee shall be actual cost of items plus handling and materials 10. Assignment of oil and gas lease 11. Pretrial release supervision fee 12. Returned checks 13. Specia 14. Dri-ng rig permit fee --F postage when mailed $100.00 per lease, per assignment $20.00 per defendant $20.00 per check $2g.09- 1513. Motor vehicle identification number inspections: Certified inspections Noncertified inspections 1511 ��. Special district service plan filing fee (Section 32-1-202(3), C.R.S.) $4700 .0-0 per move - Amended special district service plan! filing fee (Section 32-1-207, C.R.S.) $20-0850.00 $12.00 X500.00 $250.00 X15. Copying audiotape of public safety telephone and radio voice recordings Fee of $45.00 per hour of recording time. If recording time exceeds one hour, copies shall be at a rate to fully recover the cost of the staff time required and CD costs incurred to copy the CD as determined by the department head. Minimum fee $45.00 PAGE 4 2019-4734 ORD2019-15 1--816. Sheriff's fees copies of reports and/or other documents maintained by Criminal Justice Records: VALE Surcharge I Report retrieval fee (to copy or to view) Copy fee (first 2 pages free) Mail request: (first 2 pages) (additional pages) From archived medium (NO CHARGE TO VICTIMS) Faxed copies $10.00 $3.00 $0.25 per page, or actual cost duseu $3.50 $0.50 per page $1.00 per page Additional $1.00 per page X917.Co- a for inmate medical services -1 $10.00 per clinic visit py 2018. Requests for clearance or immigration letters: letter will include arrest records for all RIM contract agencies: In -person requests (self) Mail requests vir Second party request or requests requiring dispositions r-- Second party request by mail or requests requiring dispositions r-2-1-1 9. Requests for broad computerized searches by name or location: w........... �. .wMuw.ryw $10.00 per prescription filled/refilled $7.00 $7.50 $12.00 $12.50 $7.50 per 15 minutes of search time, so as not to exceed $30.00 per hour PAGE 5 2019-4734 ORD2019-16 Additional fee if programming is required: 2220. Assessor/Treasurer items: Aerial maps Printouts (copies) Reports $60.00 minimum and $60.00 each subsequent hour $15.00 per map $0.25 per page, or actual cost Rebilling delinquent accounts 2321. Sheriff bond processing fee 2422. Mug shot photo processing fee 2-523. CCW application $200.00 setup and $50.00 per hour $5.00 $10.00 per bond $10.00 per photo $100.00 (includes $52.50 for fingerprinting charge for CO and FBI clearance) $38.00 for renewal (includes $13.00 CO insta- check fee) $15.00 late fee $39.50 for CCW Name Change $15.00 to replace lost or stolen CCW :624. Notary service No fee shall be charged by County staff 225. Independent fee calculation study administrative cost fee 2826. Civil processing $500.00 Mileage charges reflected in separate Resolution, which will be reviewed annually. PAGE 6 wittoweioaur 2019-4734 OR®2019-16 MA WM* a9-- em issued by the permit Board of County Comm iss ion s- 3327. Sex offender registration: Annual Initial registration fee for fingerprints+n-g and photo, per -Section C.R.S. 16®22-108(6),, stwenotedrat Annual re -registration fee for fingerprints and photo 3428. Committing and discharging prisoners in County jail $25.00 3-229. Justice Services work release fee 3330. Sheriffs documentation of incarceration 34. S of4e -dar rb rati on - Mileage zones were created to introduce a flat rate and establish consistency in mileage rates from year to year. The mileage zone is based on the distance from the Weld County Sheriffs Office Law Administration Building to the Post Office based on Zip Code. The mileage fee will be charged based on the Zip Code of the mailing address of the Civil and will only be char paperwork, ed once 9 regardless of how many attempts are made or the miles actually driven. PAGE 7 $100.00 per event $20.0025.00 - -ua - $30.00 $15.00 per day $3.00 for one page 0.50 per additional page $25,99 -to -register �$�-25~00 to re -re d. 2019-4734 OR02019-16 3€31. Copies of records (via burning of CDs) 36. Reserved. Copies shall be at a rate not to exceed $30.00 per hour after the first hour, to recover the cost of the staff time required and CD costs incurred to copy the CD as determined by the department head. The hourly rate shall be calculated on a full cost for applicants recovery basis of the County's costs for the staff 3-732. Staff time app ca is or positions involved in the assistance. The full cost constituents that propose novel uses or development that does not fit into I recovery rate shall be determined by the Director of established fee categories where staff will Finance and Administration and shall include 4or salary, fringe benefits, support costs (services and spend more hours of review, oversight or assistance. supplies) and indirect costs calculated in accordance with the County -wide cost allocation plan per Federal OMB -87 methodologies. 3-833. Coroner fee schedule: Constituents shall deposit the estimated amount of the costs prior to assistance. The County will draw I upon it based on the standard hourly rate for each staff providing the review, oversight or assistance. Consistent with Colorado Open Records Act and items #1, #2, and #6, of this Appendix D. 3934. Chapter 21 - 1041 Oil and Gas WOGLA Permit 4035. Chapter 21 — 1041 Oil and Gas WOGLA Permit (facility only, no wells) 4436. Location Assessment for Pipelines (LAP) Pipelines less than 25 miles in length $10,000 per permit Pipelines greater than 25 miles in length $2,500 $1,000.00 $1,500.00 Pipelines that require BOCC review Additional $2,500.00 PAGE 8 2019-4734 ORD2019-16 APPENDIX 5-I - CLERK AND RECORDER FEES Description Fee RECORDING DEPARTMENT FEES GENERAL RECORDING 8'/2' X 11"-8W x 14" First page Each additional page EXCEPTIONS: $13.00 $5.00 Oversized pages (Larger than 8W x 14" Plats/Surveys) First page Each additional page $13.00 $10.00 Documentary fee on all documents granting or conveying title to real property per Section 39-13-102, C.R.S. $0.01 per $100.00 consideration if consideration is greater than $500.00 OTHER GENERAL RECORDING FEES: Federal tax liens and releases $8.00 School bonds, first page Each additional page Military discharge $13.00 $5.00 UCCs (real estate only): PAGE 9 No charge 2019-4734 ORD2019-16 One or two pages Three or more pages $11.0013.00 $16.0018.00 All e -Recorded UCC statements MARRIAGE/CIVIL UNION FEES: $8.00 Marriage licenses/Civil unions (cash only) $30.00 Copy of marriage license COPY FEES: Per page (Smaller than 8.5" x 14") $3.00 Oversized pages (larger than 81/2" x 14") Certification per document Certified school record $0.25 I I $5.00 l I $1.00 $1.75 Military discharge Postage fees 1 7 pages Postage fees 8-60 pages Postage fees 61+ pages No charge $1.00 $3.00 $5.00 To avoid paying a postage fee, please include a self-addressed stamped envelope with your request. The envelope must be large enough to accommodate the number of copies requested. RETURNED CHECKS (per check) $20.00 SPECIAL SERVICES Share file (FTP per month) $500.00 PAGE 10 2019-4734 ORD2019-16 Deed report subscription (per year) Paper reports —per page Certificate of magistracy Each additional year $200.00 $0.05 $2.00 $2.00 Document images on compact disc Daily Weekly $10.00 Monthly EAGLE WEB $25.00 One month subscription (unlimited access) Web copies without a subscription First page Each additional page $100.00 $300.00 $0.50 $0.25 ELECTION DEPARTMENT FEES Voter certification $1.00 Electronic voter list on compact disc or email (.csv or .txt format) $50.00 Voter list on paper (per page) Locator (each) Maps (each) colored copy Copies (per page) $0.25 $30.00 $15.00 $0.25 PAGE 11 2019-4734 ORD2019-16 Certified copies (per page) loo $1.25 Statement of votes cast: Electronic copy $10.00 Paper copy (per page) Mail -in ballot status subscription (.csv or .txt format) per election cycle Early voting list subscription (.csv or .txt format) per election cycle Voter address labels Setup fee Per label PAGE 12 $0.25 $150.00 $150.00 $50.00 $0.02 2019-4734 ORD2019-16 APPENDIX -J - PLANNING FEE SCHEDULE A [Land Use Application Use by Special Review (USR) --- i- -family dwelling units (other than those -- permitted under Subsection 23-3-2-0.A.)-- Second single-family dwelling - Expansion of a- n-onconfarmi-ng u e- !Fee $1,200.00 $1,200.00 - Home business - Animal boarding and/or trainin. facility, kennels (more than the number of animals permitted in the Bulk Requirements)as parr 0. B.1-0- ,$1,200.00 - Bed and breakfast facility - Oil and gas storage facilities - Accessory buildings with a gross floor area larger than s -t- 4n Subsec ion- � �-permitted by right in Article HI of Chapter 23 -- -o aposting=4FociIitie- -- C-o-n red -an icimal _ feoper 4oLivestock Confinement Operation (LCO) LCO: Less than or equal to 1,000 animal units 1- LCO: Up to and including each additional 1,000 animal units 1 $1,200.00 $1,200.00 $1,200.00 x$1,200.00 $2,415.00 $500.00 Sa trite sewer -fad mama. saw ...aa.a.al ConeVoonWA.anv,a.nwaraalaayartan Wel :$1-0,000.00 PAGE 13 2019-4734 ORD2019-16 I • I - Mining permit - Solid waste disposal site 2 $5,000.00 for the first 10 acres plus $20.00 per acre or fraction !thereof in excess of 10 acres - Hazardous waste disposal site, excluding injection wells - Non -1041 major facility of a utility, other than Sewage treatment facilities - Sewage treatment facility $20,000.00 $100,000.00 I ;$5,000.00 - 1041 facilities as defined in Chapter 21 of this Code (except applications made pursuant to Chapter 21, Article aV) - All other use by specia-l--rev-i-ewUSR permits - Minor us, spe a! re4ew-viewamendment - Flood Hazard Development Permit (FHDP) $500.00 23. Planned Unit Development (1-9 lots or fewer) - Sketch plan - Change of zone PThnai plat $180.00 Planned Unit Development (10 or more lots) - Sketch plan $2,100.00 $1,500.00 plus' $50.09-per— buiLda -e-o $1,500.00 plus $100.00 per buildable lotw.3 PAGE 14 j$5,000.00 2019-4734 ORD2019-16 - Change of zone - Final plat 34. Minor Subdivision (4-9 lots or fewer) E-$3,000.00 buildable lot - Sketch plan - Change of zone - Final plat Major Subdivision (10 or more lots) - Sketch plan - Preliminary plan $3,000.00 plus $100.00 per buildable lot3 r$2,100.00 $1, 500.00 --per --$•5- :-00 per buildable of $1,500.00 plus $100.00 per 'buildable lot_3 $5,000.00 $2,100.00 - Change of zone - Final plat PAGE 15 $3,000.00 -plus $50.00 p - buildable lot $3,000.00 plus $100.00 per buildable lot_3 2019-4734 ORD2019-16 45. Resubdivision - Lot line changes only - Vacation of roads, streets or alleys only - Redesign, additional lots or vacation of lots r Subdivision Exemptions - Used with recorded exemptions - Property line adjustment $500.00 $500.00 $500.00 + $150.00 per additional buildable lot $180.00 $180.00 $180.00 - Financing $180.00 - Temporary use - Public and private utility i 7,8,9, 10, 11, 13, 8. Recorded Exemptions (2-, 3- and 4-lotRE) - 2 lot RE - 3 lot RE $180.00 $400.00 $1,000.00 $1,300.00 - 4lot RE $1,600.00 - Amendments Zoning Permit - Mobile homes, mManufactured homes, accessory dwellings, temporary dwellingsother than temporary storage $180.00 - Temporary storage (6 months) of a mobile home PAGE 16 $300.00 $75.00 2019-4734 ORD2019-16 1 1 449. wNu 15.10. - Change of use (if mobil home is existing) - Accessory Storage / Semi -Trailer (ZPAS) - Commercial Vehicle (ZPCV) • - Zoning Permit for Ag (ZPAG) - Zoning Permit for Ag (ZPAG) Minor Amendment —even-it-far—Second Fa ily Dwelling $75.00 $75.00 $75.00 -1:j$1,000.0O per '$500.00 - Zoning Permit for Telecommunication Antenna Tower DTrl - Zoning Permit for Noncommercial Tower (ZPNCT) - Zoning Permit for Home Occupation - Class II (ZPHB) - Zoning Permit for Home Occupation - Class I (ZPHO) - Zoning Permit for Wind Generator (ZPVV 1 Temporary Seasonal Use Permit (TSU) Board of Adjustment - Variance - Appeal 16.11. Change of Zone twwv $599.00 • WOWSVAWeeffenNII $500.00 $500.00 $300.00 $50.00 1$300.00 $75.00 l$710.00 $200.00 - Residential and agricultural s -Zoning districts 1R, E, and $2,100.00 -plus $1-a. buildable lot - PAGE 17 _.A 2019-4734 ORD2019-16 $5,500.00 plus - Commercial/industrial zoning districts (C and I) X12. !Site Plan Review - Amendment - Buildings <10,000 gross sq. ft. a - Buildings between 10,000-25,000 gross sq. ft. - Building >25,000 gross sq. ft. - Tenant fini-sh Y. x-13. Substantial Change Hearing i1-9714. $60-oo Administrative Handling Fee - Special Request { 20.15. ;Building Permit/Illegal Parcel 21.16. ;22.17. I$150.00 per buildable lot $500.00 $1,300.00 $2,000.00 100.00 $250.00 Investigation Fee (for properties that have a zoning violation case in process) A fee will be charged by the County to future applicants when County staff members are asked to assist professional consultants in the preparation of land use applications. The fee shall be an hourly rate charged in 15 -minute increments. The hourly rate shall be calculated on a full cost recovery basis of the County's costs for the staff positions involved in the assistance. The full cost recovery rate shall be determined by the Director of Finance and Administration and shall include salary, fringe benefits, support costs (services and supplies) and indirect costs calculated in accordance with the County- wide cost allocation plan per Federal OMB -87 methodologies. Preapplicants shall deposit an estimated amount of the costs prior to the assistance. A final settlement of costs will be determined by the DPS once all the work has been completed. PAGE 18 i I '50% of the established application fee 2019-4734 ORD2019-16 r� X3.13. 24.19. 25.20. 26,21. f 2-7.22. Incidental, Nontechnical Land Use Application Assistance Amendment to Aany Regional Urbanization Area Map -and/or the Comprehensive Plan 1 Creation of a Regional Urbanization Area $50.00 per hour AAIV $1,500.00 minimum or $700.00 per parcel, whichever is greater '$25.00 per acre Administrative Process - Case continuance - Hearing continuance $150.00 $500.00 - Recording continuance rateterr Additional Fees May Be Assessed to Cover Publication Costs. Outside Consultant for Professional Review. Necessity for Review to Be Determined by the Director. PAGE 19 ;$50.00 per 3 months Market rate Professional rate 2019-4734 0RD2019-16 '29.24. For those applications for uses identified to be of high complexity or intensity where a determination is made that County staff will be committing time and resources. The applicant shall deposit an estimated amount of the costs prior to assistance. The fee will be held and charged against by the County based on the standard hourly rate for each department administering or reviewing the permit. The departments shall include, but not be limited to, the Department of Planning Services, Health Department, Public Works and the County Attorney's Office. The standard hourly rate shall be established by the Finance Department for the actual time spent on the p p `review of the application. The rate shall be calculated on a full cost recovery basis of the County's cost and shall include salary, fringe benefits, support costs (services and supplies) land indirect costs calculated in accordance with the County- wide cost allocation plan per Federal OMB -87 methodologies E The applicant shall be provided copies of the billing 5 days prior to the cost actually being billed. The applicant's sole remedy to appeal any billing shall be to the Board of County ;Commissioners. The unused portion of the submitted lapplication fee shall be returned to the applicant within 30 days I of recording the Special Review plan map, within 30 days after I denial of the application by the Board of County Commissioners, or 30 days after the applicant submits a written 'request to withdraw the application. pp 1 Animal units as defined in Section 23-1-90 of this Code. PAGE 20 2019-4734 ORD2019-16 C 2 The fee to amend an application for a Special Review Permit for Solid Waste Disposal Sites and Facilities shall not exceed $20,000.00. The full amount shall be submitted to the Department of Planning Services at the time a complete application is submitted. The fee will be held and charged against by the County based on the standard hourly rate for each department administering or reviewing the permit. The departments shall include, but not be limited to, the Department of Planning Services, Health Department, Public Works and the County Attorney's Office. The standard hourly rate shall be established by the Weld County Finance Department for the actual time spent on the review of the application and facility. The rate shall be calculated on a full cost recovery basis of the County's cost and shall include salary, fringe benefits, support costs (services and supplies) and indirect costs calculated in accordance with the County -wide cost allocation plan per Federal OMB -87 methodologies. The applicant shall be provided copies of the billing 5 days prior to the cost actually being billed. The applicant's sole remedy to appeal any billing shall be to the Board of County Commissioners. The unused portion of the submitted application fee shall be returned to the applicant within 30 days of recording the amended Special Review plan map, within 30 days after denial of the application by the Board of County Commissioners, or 30 days after the applicant submits a written request to withdraw the application. 325% of this fee is due at the time of application, and the remaining 75% due at the time of building permit issuance. Development Impact Fees r 1. Road Impact Fee Kvmmn»ry ordinance MOMOMWAWAP -By separate 2. County Facilities Impact PFee-Sthedule in Cha ter 20 of this--Code-B separate pp Y Fee ordinance 3. Drainage Impact Fee Fee Schedule in ordinance ode.By separate PAGE 21 2019-4734 ORD2019-16 APPENDIX 5-M - DEPARTMENT OF PUBLIC WORKS PERMIT APPLICATION FEES root Type I. Development Can -traction FermitMS4 Reinspection Fee traea:E.Y4."6.Y.K4G' iSP'OXAC/i<YtSC A%S :6 til8'f.'l.K'dYAMZZ. =.50)..Weat "f GL: Afr' 'D'rn5 ,.ewwX&:�. O'9+:YiNi%Y'.+ taMontaltraq'C HteatC,.s>Nr•�'z v -c eirOrt,="11 idt Dwelling units- N-ndwellin-c-u i s a-afsite Road -Afire -e e-nts/Haul Route Agreement Review Fee $7 .00/lot 3. Flood Hazard Development Permit 42. tormwater Grading Permit (SWWP Review) !Inspections 5. Geologic ward Permit r 1, 6. Nonexclusive License Agreements $50/hr $1,..69.00/lot $500.00 $180.00 $500.00 Fee TBD by State Geological Survey :73. N-onexclusivNonmaintained Cross Road Signs (Installation and Fabrication) 84. Access Permit Fees $100.00 $150.00 aA) Field Access Permit (agricultural only) i Exempt bB) Single residential afccessAccess Permit requiring a variance GC) Su-bdivision asses -Single residential Commercial or ail -and gas access (up to 50- ve-h4--ay)--- eD) Industrial or commercial access (more than 50 veh/day) PAGE 22 -r $75.00Subtotal x2 $150.00 $150300.00 2019-4734 ORD2019-16 #E) Temporary access (expires within 6 months) gh) Inspection outside normal work hours $7-5150.00 hG) Working prior to permit approval 4H) Public safety violation 95. Right -of -Way Use Permit Fees A) Permit fee Admin, review and inspection *Admin, review and no inspection Permit revision Permit extension Aver.w.. ...— B) Annual permit YVON Admin, review and inspection C) Road bore Road bore with bore pit(s) located in R.O.W. Road bore with bore pit(s) located outside R.O.W. PAGE 23 $50.00/hr Subtotal x 2 $200500.00 $150.00 N/A $75.00 $150.00 $300.00 Line outside diameter < 12" - $75.00 + .30/LF Line outside diameter 12" to 20" - $100.00 + .30/LF Line outside diameter > 20" - $125.00 + .30/LF Line outside diameter < 12" - $50.00 + .30/LF Line outside diameter 12" to 20" - $75.00 + .30/LF Line outside diameter > 20" o $100.00 + .30/LF 2019-4734 ORD2019-10 Bore parallel in R.O.W. outside R.O.W. D) Work within a hard surface roadway Trench w/structural fill or flowable fill Test hole/pot hole - 8" or less E) Work within a gravel roadway Trench w/structural fill Test hole/pot hole - 8" or less Line outside diameter < 12" - $25.00 + .30/LF Line outside diameter 12" to 20" - $50.00 + .30/LF Line outside diameter > 20" - $75.00 + .30/LF $2.50 per sq ft 5 years or older - min $75.00 $5.00 per sq ft newer than 5 years - min $100.00 Trench w/structural fill or flowfill treated gravel Test hole/pothole treated gravel F) Work in R.O.W. outside of roadway Trenching/plow or cable puller r Nirt Test hole/pot hole - 8" or less Occupation Fee $50.00 per hole $1.00 per sq ft $50.00 min $25.00 per hole $2.50 SF - $50.00 min $50.00 per hole Trench width up to 12" - $0.30/LF Trench width 12" to 20" - $0.60/LF Trench width > 20" - $0.90/LF G) New appurtenance (meters, vaults, poles, etc.) $10.00 per hole $0.2SILF $50.00 min 3 sq. ft. or less $50.00 PAGE 24 2019-4734 ORD2019-16 Greater than 3 sq. ft. 00,0000.000/00000 H) Abandonment $175.00 Abandonment/Retirement of line in R.O.W. I) *Working prior to permit approval Emergency repairs excluded J) *Public safety violation 01,000,4/ _ K) Inspection outside normal work hours 6. Transport Fees Singie Trip Permit OS only OW only OS/OW Special Permit 201 K -349K 350K+ Oil Rig Permit 0.0.0000 12"=<$75.00+0.50/LF 12" > $150.00 + 0.50/LF Total of all fees * number days Y delinquent $250.00 $75.00 per hour with a 2 -=hour min $25.00 $50.00 $75.00 $350.00 j $500.00 Annual OS/OW Permit Annual OS only Permit Annual OW only Permit $1,000.00 per move (Note: Rig fee did not change due to Resolution #2001-1923.) $300.00 $250.00 $275.00 PAGE 25 2019-4734 ORD2019-16 Annual OW Divisible r 97K 110K * As determined by Public Works 260.00 $300.00 PAGE 26 2019-4734 ORD2019-16 Hello