HomeMy WebLinkAbout20190490.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 33 BETWEEN COUNTY ROADS 36 AND 38 FOR
APPROXIMATELY FIVE (5) DAYS, FOR PUBLIC SERVICE COMPANY TO PERFORM
FEDERALLY MANDATED UPGRADES AND MAINTENANCE TO CHALK BLUFF'S
NATURAL GAS PIPELINE SYSTEM
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 33, between County Roads 36 and 38,
be temporarily closed, with said closure being effective February 4, 2019, for approximately
five (5) days for Public Service Company to preform federally mandated upgrades and
maintenance to Chalk Bluff's natural gas pipeline system, and further, that standard official traffic
control devices shall be erected at said closure giving notice of the restrictions.
CC: so(v4pspo.}dn,
CO sfiate. `PoNlot
ZIZ2/t 4
2019-0490
EG0024
TEMPORARY CLOSURE - COUNTY ROAD 33
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 30th day of January, A.D., 2019.
BOARD OF COUNTY COMMISSIONERS
W,LD COUNTY, Cs ORADO
ATTEST: datAg� J je f#40 or.
Weld County Clerk to the Board
Deputy
VEDA
ttorney
Date of signature: 7-IZ- ('
arbara Kirkmeyer Chair
Steve Moreno
2019-0490
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: January 28, 2019
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Public Service Company is requesting permission to close CR 33 between CR 36 and CR 38
from 2/4/19 through 2/8/19 to perform federally mandated upgrades and maintenance to the 8"
Chalk Bluffs natural gas pipeline system.
See attached closure diagram(s).
2019-0490
CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC
Contractor: XCEL ENERGY MHT 2a -163815
Project: 8" CHALK BLUFFS - SOUTHBOUND CR 33 - WELD COUNTY
Method of Handling Traffic: ROAD CLOSED WITH A DETOUR ON A
PREPARED BY: TWO LANE RURAL ROAD
„� ��r. e _,�.P� 0i/.23/15
ATSSA TCS NAME DATE
PHONE: 970-242-0669 41
CERTIFICATION # 24558./
ISSUE DATE: 06/16/20
EXPIRATION DATE: 06/01/2021
DETOUR
NOTES:
1. CONTRACTOR WILL NEED ROAD CLOSED WITH DETOUR ON A TWO LANE RURAL ROAD AT OR
NEAR AN INTERSECTION DURING ALLOWABLE WORKING HOURS ONLY. CONTRACTOR WILL
PROVIDE ACCESS TO LOCAL RESIDENTS.
2. AT NIGHT, HAZARDS WILL BE BARRICADED WITH DRUMS AND FLASHING LIGHTS.
3. REFER TO MUTCD 2009 EDITION FIGURE 6H-20 FOR TYPICAL APPLICATION.
5. ALL TRAFFIC CONTROL DEVICES AND SETUP SHALL ADHERE TO STANDARDS OF THE 2009 MUTCD.
ANY EXISTING SIGNS THAT CONVEY MISLEADING INFORMATION WILL BE COVERED.
6. TWO TYPE III BARRICADES WILL BE USED TO CLOSE EACH SIDE OF THE ROAD CLOSURE.
n
W
I-
DETOUR
4 -
TILT
WORK
AHEAD
DETOUR
Cr38
ROAD CLOSED
TO
THRU TRAFFIC
DETOUR
ROAD
CLOSED
X23MA
500'
DETOUR
AHEAD
ROAD
CLOSED
AHEAD
ROAD CLOSED
TO
THRU TRAFFIC
DETOUR
500'
500'
500'
ROAD
CLOSED
AHEAD
500'
500' 500'
DETOUR
AHEAD
ROAD
CLOSED
AHEAD
UTILIT
WORK
AHEAD
DETOUR
DETOUR(I.
Em"
SIGNS & DEVICES:
4 - UTILITY WORK AHEAD
4 - ROAD CLOSED AHEAD
6 - DETOUR AHEAD
1- ROAD CLOSED TO THRU TRAFFIC
2 - ROAD CLOSED
2 - DETOUR ARROW (2D)
8 - DETOUR MARKER (4R/RL)
4 - TYPE III BARRICADES
CONES/ DRUMS / LIGHTS / SIGN COVERS
n
AJ
W
Ui
X18-XCED-020-02a
N