Loading...
HomeMy WebLinkAbout20193638.tiffto/ Date: September 30, 2019 To: Rob Turf, Purchasing Manager From: Michael Bedell, Senior Engineer RE: Bridge esi n Engineering Services (RFP #B1900113) Ir Bridge 54/13A P.eplace ge Public Works has conducted a Best Value selection process to select a consultant to perform the Bridge Design Engineering Services for the replacement of Bridge 54/13A. A selection committee comprised of Don Dunker, Rob Turf, Matt Laporte, Michael Bedell, and Clay Kimmi reviewed and scored the three (3) consultants that were previously short-listed after a review of their statements of qualifications. Attached is a ranking summary which resulted from our review of submitted proposals. A design fee amount of $502,772.00 has been submitted by J -u -B Engineers, Inc. (Fort Collins Office) along with their scope of work. The primary aspect of this portion of the project is to perform bridge design engineering services which will result in final bid documents to be used for construction. It is Public Works Department recommendation to award a bridge designcontract to kil:LB..ticipstn, inc. foy a total amount of S502,772.,00. This project is included as a line item in the 5 -year CIP, and it is likely that the new bridge will be significantly wider than the existing bridge to account for anticipated future traffic growvth. OO( °Lti EC, 1 5c4"' . �N�M�n•R'=�a+ti�N�V1FtY� Y>J`�R-M UX?^iaSY`�3fAsi�5ee�iiz�x.aea�e�a ate: 9/27/19 Bridges 19-46.5A, 5443A, and 64-39A equest for Pr sNs Ri.nk il Jg Su yr, m ry UI U ridge 19=4 SA Atkin) MB FEW AJB 3 CK 3 2 1 1 C m m ittee Members 3 2 2 1 RT DD 2 2 1 I ail Scoring 3 2 14 9 6 M EM RAN D Date: September 30, 2019 To: Rob Turf, Purchasing Manager From: Michael Bedell, Senior Engineer RE: Bridge Design Engineering Services (RFP #81900113) for Bridge 19/46.5A Replacement Public Works has conducted a Best Value selection process to select a consultant to perform the Bridge Design Engineering Services for the replacement of Bridge 19/46.5A. A selection committee comprised of Don Dunker, Rob Turf, Matt Laporte, Michael Bedell, and Clay Kimmi reviewed and scored the three (3) consultants that were previously short-listed after a review of their statements of qualifications. Attached is a ranking summary which resulted from our review of submitted proposals. A design fee amount of $499,723.00 has been submitted by J -U -B Engineers, Inc. (Fort Collins Office) along with their scope of work. The primary aspect of this portion of the project is to perform bridge design engineering services which will result in final bid documents to be used for construction. It is Public Works Department recommendation to award a bridge design contract to J -U -B Engineers, Inca for a total amount of $499,72100. This project has a CDOT-administered grant in the amount of $500,000.00 and the associated IGA was signed by the BOCC Chair on 6/24/2019. MEMORAN DUM Date: October 1, 2019 To: Rob Turf, Purchasing From: Clay Kimmi, Project Manager, Public Works ridge Design Engineering Services for BR64/39A, B1900I13 Public Works has conducted a Best Value selection process to select a consultant to perform the Bridge Design Engineering Services for BR64/39A. A team comprised of Don Dunker, Rob Turf, Matt Laporte, Mike Bedell, and Clay Kimmi reviewed and scored the three (3) consultants that were shortlisted after a review of the Request for Proposals. See attached ranking summary. A final fee amount of 5394,030.00 has been submitted by Felsburg, Molt, & Ullevig, along with their final scope proposal. The primary aspect of this portion of the project is to perform bridge design engineering services which will be incorporated into the final project drawings for the CR 64 and CR 41 Intersection project. The engineer's estimate for the bridge design was approximately 5400,000. The proposed cost of $394,030.00 is within the estimated. budget. It is our recommendation to award the bridge design contact for BR64/39A to Felsburg, bolt, and Ul1evis. for a total amount of $394,030000. Weld County Public Works Department has worked successfully with. this Consultant on past projects and believes the design contract amount is reasonable. Bridge 64-39 Request for Proposals Ranking ummary Date: 9/27/19 Bridge 64-39A Committee Members Total Scoring la Z itt MB CK ML RT DD Atkins 3 3 3 3 0 3 15 In ,aka RYI�.wal 4..vah k yY R i' p{. N �/�.T�V R�Nv. �y1.. FH 1 1 1 2 1 6 D (in I U p J;. 2 2 2 Low score is best 3 2 ridges 19-46.5A, 5443A„ and 4 Request for Proposals Ranking Summary Date: 9/27/19 gaga U, U ridge 19-46.5A MB CK Atkins. L Ju0 3 2 1 3 1 Committee Members M L 3 RI Do T t Scoring 2 2 1 2 2 1 3 2 14 9 1 6 3 2 Low score is best WELD COUNTY PURCHASING 1150 O Street, Room 107, Greeley, CO 80631 E -Mail: cmpeters(weldgov.com E-mail: reverett(a weldgov.com E-mail: rturf@weldgov.com Phone: (970) 400-4223, 4222 or 4216 Fax: (970) 336-7226 DATE OF BID: AUGUST 7, 2019 REQUEST FOR: RFQ- ENGINEERING SERVICES FOR BRIDGES DEPARTMENT: PUBLIC WORKS DEPT BID NO: #B1900113 PRESENT DATE: AUGUST 12, 2019 APPROVAL DATE: TBD VENDORS BOHANNAN HUSTON 9785 MAROON CIRCLE, SUITE 140 ENGLEWOOD CO 80112 DREXELL, BARRELL & CO 1800 38TH STREET BOULDER CO 80301 ALFRED BENESCH & COMPANY 7979 E. TUFTS AVENUE, SUITE 800 DENVER CO 80237 ATKINS NORTH AMERICA INC 7604 TECHNOLOGY WAY, SUITE 400 DENVER CO 80237 FELSBURG HOLT & ULLEVIG 6300 SOUTH SYRACUSE WAY, SUITE 600 CENTENNIAL CO 80111 J -U -B ENGINEERS INC 4745 BOARDWALK DR, BLDG D, SUITE 200 FORT COLLINS CO 80525 THE DEPARTMENT OF PUBLIC WORKS IS REVIEWING THE BIDS AT THIS TIME. 2019-3638 6g -born, Hello