Date: September 30, 2019
To: Rob Turf, Purchasing Manager
From: Michael Bedell, Senior Engineer
RE: Bridge esi n Engineering Services (RFP #B1900113) Ir Bridge 54/13A P.eplace ge
Public Works has conducted a Best Value selection process to select a consultant to perform the Bridge
Design Engineering Services for the replacement of Bridge 54/13A. A selection committee comprised of
Don Dunker, Rob Turf, Matt Laporte, Michael Bedell, and Clay Kimmi reviewed and scored the three (3)
consultants that were previously short-listed after a review of their statements of qualifications. Attached
is a ranking summary which resulted from our review of submitted proposals.
A design fee amount of $502,772.00 has been submitted by J -u -B Engineers, Inc. (Fort Collins Office)
along with their scope of work. The primary aspect of this portion of the project is to perform bridge
design engineering services which will result in final bid documents to be used for construction.
It is Public Works Department recommendation to award a bridge designcontract to kil:LB..ticipstn,
inc. foy a total amount of S502,772.,00. This project is included as a line item in the 5 -year CIP, and it is
likely that the new bridge will be significantly wider than the existing bridge to account for anticipated
future traffic growvth.
OO( °Lti
EC,
1
5c4"'
. �N�M�n•R'=�a+ti�N�V1FtY� Y>J`�R-M UX?^iaSY`�3fAsi�5ee�iiz�x.aea�e�a
ate: 9/27/19
Bridges 19-46.5A, 5443A, and 64-39A
equest for Pr
sNs
Ri.nk il Jg Su
yr,
m
ry
UI
U
ridge 19=4
SA
Atkin)
MB
FEW
AJB
3
CK
3
2 1
1
C m m ittee Members
3
2
2
1
RT DD
2
2
1
I
ail Scoring
3
2
14
9
6
M
EM
RAN D
Date: September 30, 2019
To: Rob Turf, Purchasing Manager
From: Michael Bedell, Senior Engineer
RE: Bridge Design Engineering Services (RFP #81900113) for Bridge 19/46.5A Replacement
Public Works has conducted a Best Value selection process to select a consultant to perform the Bridge
Design Engineering Services for the replacement of Bridge 19/46.5A. A selection committee comprised
of Don Dunker, Rob Turf, Matt Laporte, Michael Bedell, and Clay Kimmi reviewed and scored the three
(3) consultants that were previously short-listed after a review of their statements of qualifications.
Attached is a ranking summary which resulted from our review of submitted proposals.
A design fee amount of $499,723.00 has been submitted by J -U -B Engineers, Inc. (Fort Collins Office)
along with their scope of work. The primary aspect of this portion of the project is to perform bridge
design engineering services which will result in final bid documents to be used for construction.
It is Public Works Department recommendation to award a bridge design contract to J -U -B Engineers,
Inca for a total amount of $499,72100. This project has a CDOT-administered grant in the amount of
$500,000.00 and the associated IGA was signed by the BOCC Chair on 6/24/2019.
MEMORAN DUM
Date: October 1, 2019
To: Rob Turf, Purchasing
From: Clay Kimmi, Project Manager, Public Works
ridge Design Engineering Services for BR64/39A, B1900I13
Public Works has conducted a Best Value selection process to select a consultant to perform the Bridge
Design Engineering Services for BR64/39A. A team comprised of Don Dunker, Rob Turf, Matt Laporte,
Mike Bedell, and Clay Kimmi reviewed and scored the three (3) consultants that were shortlisted after a
review of the Request for Proposals. See attached ranking summary.
A final fee amount of 5394,030.00 has been submitted by Felsburg, Molt, & Ullevig, along with their final
scope proposal. The primary aspect of this portion of the project is to perform bridge design engineering
services which will be incorporated into the final project drawings for the CR 64 and CR 41 Intersection
project.
The engineer's estimate for the bridge design was approximately 5400,000. The proposed cost of
$394,030.00 is within the estimated. budget.
It is our recommendation to award the bridge design contact for BR64/39A to Felsburg, bolt, and
Ul1evis. for a total amount of $394,030000. Weld County Public Works Department has worked
successfully with. this Consultant on past projects and believes the design contract amount is reasonable.
Bridge 64-39 Request for Proposals Ranking ummary
Date: 9/27/19
Bridge
64-39A
Committee
Members
Total
Scoring
la
Z
itt
MB
CK
ML
RT
DD
Atkins
3
3
3
3
0 3
15
In
,aka RYI�.wal
4..vah
k yY R i'
p{.
N �/�.T�V R�Nv.
�y1..
FH
1
1
1
2
1
6
D
(in
I
U
p
J;.
2
2
2
Low score is best
3
2
ridges 19-46.5A, 5443A„ and 4 Request for Proposals Ranking Summary
Date: 9/27/19
gaga
U,
U
ridge 19-46.5A
MB
CK
Atkins.
L
Ju0
3
2
1
3
1
Committee Members
M L
3
RI
Do
T
t Scoring
2
2
1
2
2
1
3
2
14
9
1 6
3
2
Low score is best
WELD COUNTY PURCHASING
1150 O Street, Room 107, Greeley, CO 80631
E -Mail: cmpeters(weldgov.com
E-mail: reverett(a weldgov.com
E-mail: rturf@weldgov.com
Phone: (970) 400-4223, 4222 or 4216
Fax: (970) 336-7226
DATE OF BID: AUGUST 7, 2019
REQUEST FOR: RFQ- ENGINEERING SERVICES FOR BRIDGES
DEPARTMENT: PUBLIC WORKS DEPT
BID NO: #B1900113
PRESENT DATE: AUGUST 12, 2019
APPROVAL DATE: TBD
VENDORS
BOHANNAN HUSTON
9785 MAROON CIRCLE, SUITE 140
ENGLEWOOD CO 80112
DREXELL, BARRELL & CO
1800 38TH STREET
BOULDER CO 80301
ALFRED BENESCH & COMPANY
7979 E. TUFTS AVENUE, SUITE 800
DENVER CO 80237
ATKINS NORTH AMERICA INC
7604 TECHNOLOGY WAY, SUITE 400
DENVER CO 80237
FELSBURG HOLT & ULLEVIG
6300 SOUTH SYRACUSE WAY, SUITE 600
CENTENNIAL CO 80111
J -U -B ENGINEERS INC
4745 BOARDWALK DR,
BLDG D, SUITE 200
FORT COLLINS CO 80525
THE DEPARTMENT OF PUBLIC WORKS IS REVIEWING THE BIDS AT THIS TIME.
2019-3638
6g -born,
Hello