Loading...
HomeMy WebLinkAbout20191460.tiffRESOLUTION RE: EXTENSION OF REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 29 BETWEEN COUNTY ROADS 88 AND 90 FOR AN ADDITIONAL ONE (1) MONTH, FOR UNANTICIPATED DELAYS DUE TO ADVERSE WEATHER CONDITIONS WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period nat to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 29, between County Roads 88 and 90, be extended, with said extended closure being effective April 29, 2019, for approximately an additional one (1) month through May 24, 2019, for unanticipated delays due to adverse weather conditions, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. ) 5k -c:' , -14, Ro 2019-1460 EG0024 TEMPORARY CLOSURE - COUNTY ROAD 29 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 15th day of April, A.D., 2019, nunc pro tunc Marcha i , 2019. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COL�RADO ATTEST: da44) o;4. Weld County Clerk to the Board BY: Deputy Clerk t DA ount £ ttorney Date of signature: 5-21-19 arbara Kirkmeyer,I;hair, Mike Freeman, Pro -Tern Conway c ----T James Steve Moreno 2019-1460 EG0024 MEMORANDUM TO: Clerk to the Board DATE: April 11, 2019 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 31 between WCR 76 and WCR 78 is closed from 4/23/2019 thru 4/26/2019 for a culvert replacement. .WCR 29 between WCR 88 and WCR 90 is closed from 4/29/2019 thru 5/24/2019 for a bridge replacement. See attached closure diagrams. 2.0161-114670 E GoO2y - I -- - -t1-fte. !La -f -L'- - t 7.7, -a -1-m-t- 4c174. / WCR 90 Alt 4- /!i Pt, e..cr Ind tO) N qt U r- aft^ 7,1 -"3-252- Sri -s`a n Er .car aliX rat 2 2 ['St AreArdift ROAD CLOSED LOCAL TRAFFIC ONLY WCR 88 �1 c cr tee= -is -.-Cr4I-edig- t- & in —ram- tit ett t3 -ru n- - m ad -� V eo i:Rftl‘,;I a.� MAIN STREET Miramet t-tx r t -ea II J r ti m PARK AV 2 co m MAIN AV 55 N S Bridge BR 29/88B current closure for BR 29/88A continues BR 29/88C will begin after completion of A & B Road will remain closed until all three bridges are complete Project # Br -134 Road closure description WCR 29 between WCR 88 and WCR 90 closed 4/29/2019 thru 5/24/2019 for bridge replacement Notice to Public Carroll Road signs and barricaded during closure Ln No Message boards to be used Detour Route WCR 88 between WCR 29 and WCR 31 WCR 31 between WCR 88 and WCR 90 WCR 90 between WCR 29 and WCR 31 1 mile gravel 1 mile gravel 1 mile paved V lu Notes ADT of WCR 29 is; 121/2015 Bridge 29/88A superstructure deck Water to be used for dust control Bridge is .3 north of WCR 88 on WCR 29 Placement of signs not to scale Date 4/1 0/20 19 Prepared by LEE STEPHEN Approved by county engineer CAMERON PARROTT Hello