HomeMy WebLinkAbout20192412.tiffEVIDENCE OF ADEQUATE WATER SUPPLY
There is no water source at the existing plant as it is currently an
unmanned facility. The expansion will require water for a toilet and hand
washing facilities for two to three full time operations employees at the
site and for the amine system. Aka will apply to the Colorado Division of
Water Resources for a water well permit to drill a well. Bottled water
will be provided during the construction phase of the project.
EVIDENCE OF ADEQUATE SEWAGE DISPOSAL
A new septic system is proposed. The existing Speer plant is an
unmanned facility and does not have a current sewer system. The plant
expansion will require a septic system for two to three full time
employees at the site. Aka will supply engineering designed septic
system plans and permit to the County. Portable toilets will be provided
during the construction phase of the project.
Hello