Loading...
HomeMy WebLinkAbout20192412.tiffEVIDENCE OF ADEQUATE WATER SUPPLY There is no water source at the existing plant as it is currently an unmanned facility. The expansion will require water for a toilet and hand washing facilities for two to three full time operations employees at the site and for the amine system. Aka will apply to the Colorado Division of Water Resources for a water well permit to drill a well. Bottled water will be provided during the construction phase of the project. EVIDENCE OF ADEQUATE SEWAGE DISPOSAL A new septic system is proposed. The existing Speer plant is an unmanned facility and does not have a current sewer system. The plant expansion will require a septic system for two to three full time employees at the site. Aka will supply engineering designed septic system plans and permit to the County. Portable toilets will be provided during the construction phase of the project. Hello