HomeMy WebLinkAbout20193485.tiffDistribution Box with speed levelers
TYPICAL PLAN VIEW
Observation Ports (2)
1
4'
O
60 Infiltrator Std. Quick4® Chambers
60' (15 Chambers)
4" 0 Effluent Line from Septic Tank
- Min. 1/8 -inch per foot fall
Min, 18 -inch cover or insulated
Min. Sail Treatmenr Area = 720 f'
(60 Quick4® chambers)
•
ji;"
co
Slope
TYPICAL CROSS-SECTION, A -A'
60 infiltrator® Std. Quick4t® Chambers with
Dispersal Lines laid on infiltrative surface
R
CARVER LANDSCAPE COMPANY
39560 COUNTY ROAD 29
CTL I T PROJECT NO. WY0127&130
Establish Vegetative Cover
f
13'j
12' (4 Chambers)
N
\- Random Backfill
12" to 24"
12"
Soil Treatment Area
F!GURE 3
INLET WITH PIPE LATERALS DETAIL
HEADER
4 -INCH 0
ELBOW
4 -INCH 0 NON -PERFORATED/
ND CAP
r.r4
QUICK4 STANDARD
CHAMBERS
J 1
4 -INCH 0 PERFORATED PIPE
`HOLES ORIENTED WITHIN
/ 45' OF STRAIGHT DOWN
OBSERVATION PIPE DETAILS
Option A: CHAMBER RISER ABOVE GRADE
QUICK4 STANDAR
USE HOLE SAW
TO CUT OUT
PRE -MARKED CIRCLE
ATTACH CAP OR THREADED
CLEANOUT ASSEMBLY
4" PVC PIPE CUT TO FIT
REST 4" PVC PIPE ON TOP OF
INSPECTION PORT SEAT.
SECURE IN PLACE WITH A
DRYWALL SCREW
Option B: INSTALLATION WITH VALVE BOX
SMALL VALVE COVER BOX OR
IRRIGATION VALVE BOX AT GRADE
COMPACT SOIL BASE
TO SUPPORT BOX
USE HOLE SAW
TO CUT OUT
PRE -MARKED CIRCLE
Adapted from drawings provided by
Infiltratort Systems Inc.
CARVER LANDSCAPE COMPANY
39560 COUNTY ROAD 29
CTL I T PROJECT NO. WY01279-130
ATTACH CAP OR THREADED
CLEANOUT ASSEMBLY
4" PVC PIPE CUT TO FIT
REST 4" PVC PIPE ON TOP OF
INSPECTION PORT SEAT.
SECURE IN PLACE WITH A
DRYWALL SCREW
Chamber Inlet and Observation
Pipe Details
FIGURE 4
Carver
Landscape
Company Inc.
February 28, 2019
Department of Planning Services
1555 N. 17`'' Avenue
Greeley, Colorado 80631
Dear Chris,
Attached is the initial USR submittal for Carver Landscape Company, Inc. The application should be
complete with the exception of the following items:
• Updated cover sheet for the Certificate of Conveyances. Because it has been over two years the
title company requires a new search. It will be done tomorrow and I'll try to submit that before
closing.
• List of surrounding property owners. Hopefully you can help update the original list
Following are updates on items not necessarily required in the initial subm€ttal:
• I have not applied for a building permit yet. An engineer from CTL/ Thompson is currently
working on an evaluation and recommendation to bring existing building up to building code
compliance.
• A new septic field has been designed by CTL/ Thompson but has not been installed. I am
considering oversizing it to have capacity for a future home on the site.
Finally, I was hoping for your guidance in handling a community meeting. I know you are aware my
neighbor is not happy with the current arrangement. Currently, we are in the middle of cleaning up the
site and consolidating landscape materials to one area. As you will note on the USR map, I have
proposed considerable landscaping in an effort to improve the curb appeal and additional screening.
Any input you have regarding this would be appreciated.
Hopefully everything you need is here.
Thank You,
Tim Carver
Carver Landscape Company, Inc.
970-567-0344
P.O. Box 459, Windsor, CO 80550 • Phone; (970).834.1530 • Fax (970).834.1526 • Email; rcarver@frii_com
WELD
> ��_�;�• NORTH �.COUNTY WATER DISTRICT
P.O. BOX 56
`• 3 _ 32825 CR 39
LUCERNE. CO 806.46
1C 1E: (973; 336-3C2i: FAX: (97C; 395-0997 • E-MA?L.water rwcwd,org
ACCOUNT .ti LJVBER NAME AND SERVICE ADDRESS
S L:itia PERIC7
1750001
CARVER LANDSCAPE COMPANY
39560 CR 29
AULT, CO 80610
12/18/2018-01/22/2019
20.
Water Class
Transferred Water
Less YTD Usage
Remaininc Water Allocation
Plant Investment Class
Less YTD Usage
Remaining PI Allocation
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
Previous Balance
01/22/2019 Standard - Full
Current Amount
Total Amount Due
Prey. Read Curr. Read Usage Unit Amount
19.74
233 233 0 kgal 20.34
20.34
40.08