Loading...
HomeMy WebLinkAbout20193485.tiffDistribution Box with speed levelers TYPICAL PLAN VIEW Observation Ports (2) 1 4' O 60 Infiltrator Std. Quick4® Chambers 60' (15 Chambers) 4" 0 Effluent Line from Septic Tank - Min. 1/8 -inch per foot fall Min, 18 -inch cover or insulated Min. Sail Treatmenr Area = 720 f' (60 Quick4® chambers) • ji;" co Slope TYPICAL CROSS-SECTION, A -A' 60 infiltrator® Std. Quick4t® Chambers with Dispersal Lines laid on infiltrative surface R CARVER LANDSCAPE COMPANY 39560 COUNTY ROAD 29 CTL I T PROJECT NO. WY0127&130 Establish Vegetative Cover f 13'j 12' (4 Chambers) N \- Random Backfill 12" to 24" 12" Soil Treatment Area F!GURE 3 INLET WITH PIPE LATERALS DETAIL HEADER 4 -INCH 0 ELBOW 4 -INCH 0 NON -PERFORATED/ ND CAP r.r4 QUICK4 STANDARD CHAMBERS J 1 4 -INCH 0 PERFORATED PIPE `HOLES ORIENTED WITHIN / 45' OF STRAIGHT DOWN OBSERVATION PIPE DETAILS Option A: CHAMBER RISER ABOVE GRADE QUICK4 STANDAR USE HOLE SAW TO CUT OUT PRE -MARKED CIRCLE ATTACH CAP OR THREADED CLEANOUT ASSEMBLY 4" PVC PIPE CUT TO FIT REST 4" PVC PIPE ON TOP OF INSPECTION PORT SEAT. SECURE IN PLACE WITH A DRYWALL SCREW Option B: INSTALLATION WITH VALVE BOX SMALL VALVE COVER BOX OR IRRIGATION VALVE BOX AT GRADE COMPACT SOIL BASE TO SUPPORT BOX USE HOLE SAW TO CUT OUT PRE -MARKED CIRCLE Adapted from drawings provided by Infiltratort Systems Inc. CARVER LANDSCAPE COMPANY 39560 COUNTY ROAD 29 CTL I T PROJECT NO. WY01279-130 ATTACH CAP OR THREADED CLEANOUT ASSEMBLY 4" PVC PIPE CUT TO FIT REST 4" PVC PIPE ON TOP OF INSPECTION PORT SEAT. SECURE IN PLACE WITH A DRYWALL SCREW Chamber Inlet and Observation Pipe Details FIGURE 4 Carver Landscape Company Inc. February 28, 2019 Department of Planning Services 1555 N. 17`'' Avenue Greeley, Colorado 80631 Dear Chris, Attached is the initial USR submittal for Carver Landscape Company, Inc. The application should be complete with the exception of the following items: • Updated cover sheet for the Certificate of Conveyances. Because it has been over two years the title company requires a new search. It will be done tomorrow and I'll try to submit that before closing. • List of surrounding property owners. Hopefully you can help update the original list Following are updates on items not necessarily required in the initial subm€ttal: • I have not applied for a building permit yet. An engineer from CTL/ Thompson is currently working on an evaluation and recommendation to bring existing building up to building code compliance. • A new septic field has been designed by CTL/ Thompson but has not been installed. I am considering oversizing it to have capacity for a future home on the site. Finally, I was hoping for your guidance in handling a community meeting. I know you are aware my neighbor is not happy with the current arrangement. Currently, we are in the middle of cleaning up the site and consolidating landscape materials to one area. As you will note on the USR map, I have proposed considerable landscaping in an effort to improve the curb appeal and additional screening. Any input you have regarding this would be appreciated. Hopefully everything you need is here. Thank You, Tim Carver Carver Landscape Company, Inc. 970-567-0344 P.O. Box 459, Windsor, CO 80550 • Phone; (970).834.1530 • Fax (970).834.1526 • Email; rcarver@frii_com WELD > ��_�;�• NORTH �.COUNTY WATER DISTRICT P.O. BOX 56 `• 3 _ 32825 CR 39 LUCERNE. CO 806.46 1C 1E: (973; 336-3C2i: FAX: (97C; 395-0997 • E-MA?L.water rwcwd,org ACCOUNT .ti LJVBER NAME AND SERVICE ADDRESS S L:itia PERIC7 1750001 CARVER LANDSCAPE COMPANY 39560 CR 29 AULT, CO 80610 12/18/2018-01/22/2019 20. Water Class Transferred Water Less YTD Usage Remaininc Water Allocation Plant Investment Class Less YTD Usage Remaining PI Allocation Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Previous Balance 01/22/2019 Standard - Full Current Amount Total Amount Due Prey. Read Curr. Read Usage Unit Amount 19.74 233 233 0 kgal 20.34 20.34 40.08 Hello