Loading...
HomeMy WebLinkAbout20190696.tiffMEMORANDUM TO: Diana Aungst, Planning Services FROM: Hayley Balzano, Public Works DATE: October 16, 2018 SUBJECT: USR18-0087 EWS #9 The Weld County Department of Public Works has reviewed this proposal. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS GENERAL PROJECT INFORMATION/LOCATION Project description: Salt Water Injection Well Facility This project is north of and adjacent to CR 132 and is west of and adjacent to CR 71. Parcel number 020902000002. Access is from CR 132. ACCESS Weld County Public Works has reviewed the application materials related to access. The applicant is proposing accessing the site off of County Road 132, approximately 660 feet west of County Road 71. This meets the safety spacing criteria. Per Chapter 12, Article 5, Section 12-5-30, an Access Permit is required for access to Weld County maintained roadways. We strongly encourage you to discuss your access with Public Works prior to laying out your site plan to ensure the approved accesses are compatible with your layout. Per Chapter 12, Article V, Section 12-5-30. F, when feasible, there shall be no net increase in the number of accesses to a public road. Minimum access spacing widths are shown in Weld County Code Appendix Table 12A-2. Please refer to Chapter 12 of the Weld County Code for more information regarding access. ROADS AND RIGHTS -OF -WAY County Road 132 is a gravel road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way. The applicant shall delineate on the site map or plat the future and existing right-of-way and the physical location of the road. If the right-of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of-way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. County Road 71 is a gravel road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a(n) local road, which requires 60 feet of right-of-way. The applicant shall delineate on the site map or plat the future and existing right-of-way and the physical location of the road. If the right- of-way cannot be verified it shall be dedicated. Pursuant to the definition of setback in the Weld County Code, Chapter 23, Article III, Section 23-3-50, the required setback is measured from the future right-of- way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. Per Chapter 12, Article 4, Section 12-4-30.B, a Weld County Right -of -Way Use Permit is required for any project that will be occupying, constructing or excavating facilities within, and/or encroaching upon, any County rights -of -way or easement. Right -of -Way Use Permit instructions and application can be found at https://www.weldgov.com/departments/publicworks/permits/. Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the County right-of-way. TRAFFIC Latest ADT on CR 132 counted 32 vpd with 42% trucks. The traffic information submitted with the application materials indicated that there will be approximately 80 daily semi roundtrips and 10 daily passenger vehicle round trips. TRACKING CONTROL POLICY Per Chapter 12, Appendix 12A.10.1, traffic volumes to the proposed facility require the installation of a tracking control device and a minimum of 300 feet of compacted recycled asphalt or aggregate road base. Tracking control is required to prevent tracking from the site onto public roadways. Temporary Tracking Control shall be used during construction unless permanent tracking control is installed ahead of construction activities. Recycled concrete is not allowed in County right-of-way. Tracking control devices can be double cattle guards or rip rap (6" washed rock). Tracking control for unmaintained public right-of- way is required just prior to entering publicly maintained roadways. A variance request for alternatives to the tracking control requirement can be submitted to Public Works for review and consideration. IMPROVEMENTS AND ROAD MAINTENANCE AGREEMENT Public Works is requiring an Improvements Agreement with triggers for auxiliary lanes and dust control. The triggers for auxiliary lanes are: • 10 VPH turning left into the facility triggers a left turn deceleration lane • 25 VPH turning right into the facility triggers a right turn deceleration lane • 50 VPH turning right out of the facility triggers a right turn acceleration lane • Safety Hazards related to turning left out of the facility triggers a left turn acceleration lane The triggers for dust control are: • 200 VPD triggers magnesium chloride dust abatement • 300 VPD triggers alternative pavement • 400 VPD triggers pavement The submitted traffic study indicates that the site will have 80 semi truck round trips per day and 10 passenger vehicle round trips per day. In addition to the existing 32 vehicles per day on County Road 132, this triggers the requirement for magnesium chloride dust abatement. An Improvements Agreement is required for sites with required off -site improvements per Chapter 12, Article 5, Section 12-5-60. Collateral is required to ensure the improvements are completed, and maintained. Improvements/Road Maintenance Agreement: An example agreement is available at: https://www.weldgov.com/UserFiles/Servers/Server 6/File/Departments/Public%20Works/DevelopmentR eview/sprusr.pdf. It will detail the approved haul route(s), outline when off -site improvements will be triggered, and include a maintenance agreement for the haul routes. Possible mitigations included in the road maintenance agreement may include but are not limited to: dust control, specified haul routes, damage repairs, and future improvement triggers. DRAINAGE REQUIREMENTS This area IS within a Non -Urbanizing Drainage Area: Non -Urbanizing Drainage Areas typically require detention of runoff from the 1 -hour, 100 -year, storm falling on the developed site and release of the detained water at the historic runoff rate of the 1 -hour, 10 -year storm falling on the undeveloped site for NON - URBANIZING areas. Detention Pond summarized in a Drainage Report: The applicant has submitted a preliminary drainage report. A final drainage report and detention pond design shall be completed by a Colorado Licensed Professional Engineer and adhere to the drainage related sections of the Weld County Code. The drainage report must include a certification of compliance stamped and signed by the PE which can be found on the engineering website. General drainage report checklist is available on the engineering website. More complete checklists are available upon request. GRADING PERMIT A Weld County Grading Permit will be required if disturbing more than 1 acre. Grading Permit applications are accepted after the planning process is complete (plan recorded). An Early Release Request Form may be entertained only after the applicant, Public Works and Planning Department have reviewed the referral and surrounding property owner comments. The Early Release Request may or may not be granted depending on referral comments and surrounding property owner concerns. Contact an Engineering representative from the Public Works for more information. A Construction Stormwater Permit is also required with the State for disturbing more than 1 acre. Contact: Colorado Department of Public Health and Environment, Water Quality Control Division, 303-692-3575. CONDITIONS OF APPROVAL A. An Improvements and Road Maintenance Agreement is required for off -site improvements at this location. Road maintenance includes, but is not limited to, dust control and damage repair to specified haul routes. The Agreement shall include provisions addressing engineering requirements, submission of collateral, and testing and approval of completed improvements. (Department of Public Works) B. A Final Drainage Report and Certification of Compliance stamped and signed by a Professional Engineer registered in the State of Colorado is required. (Department of Public Works) C. The plan shall be amended to delineate the following: 1. County Road 132 is a gravel road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) 2. County Road 71 is a gravel road and is designated on the Weld County Functional Classification Map as a local road which requires 60 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Department of Public Works) 3. Show and label the approved access locations, approved access width and the appropriate turning radii (60') on the site plan. The applicant must obtain an access permit in the approved location(s) prior to construction. (Department of Public Works) 4. Show and label the approved tracking control on the site plan. (Department of Public Works) 5. Show and label the entrance gate if applicable. An access approach that is gated shall be designed so that the longest vehicle (including trailers) using the access can completely clear the traveled way when the gate is closed. In no event, shall the distance from the gate to the edge of the traveled surface be less than 35 feet. (Department of Public Works) 6. The applicant shall show and label the accepted drainage features and drainage flow arrows. Stormwater ponds should be labeled as "Stormwater Detention, No -Build or Storage Area" and shall include the calculated volume. (Department of Public Works) 7. Show and label the parking and traffic circulation flow arrows showing how the traffic moves around the property. (Department of Public Works) Prior to Construction: A. The approved access and tracking control shall be constructed prior to on -site construction. This site requires a tracking control device and a minimum of 300 feet of recycled asphalt or road base. (Department of Public Works) B. If more than one (1) acre is to be disturbed, a Weld County Grading Permit will be required. (Department of Public Works) Prior to Operation: A. Accepted construction drawings and construction of the off -site roadway improvements are required prior to operation. (Department of Public Works) DEVELOPMENT STANDARDS (NOTES ON THE SITE PLAN) 1. The property owner shall control noxious weeds on the site. (Department of Public Works) 2. The access on the site shall be maintained to mitigate any impacts to the public road including damages and/or off -site tracking. (Department of Public Works) 3. There shall be no parking or staging of vehicles on public roads. On -site parking shall be utilized. (Department of Public Works) 4. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works) 5. The Property Owner shall comply with all requirements provided in the executed Improvements Agreement. (Department of Public Works) 6. The Improvements Agreement for this site shall be reviewed on an annual basis, including possible updates. (Department of Public Works) 7. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Public Works) 8. Weld County is not responsible for the maintenance of onsite drainage related features. (Department of Public Works) WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org Memorandum To: Diana Aungst From: Ben Frissell, Environmental Health Services Date: October 12, 2018 Re: USR18-0087 Class II Injection Well EWS Environmental Health Services has reviewed this proposal for a Site Specific Development Plan and Special Review Permit for Mineral Resource Development Facilities, Oil and Gas Support and Service (Class II Oilfield Waste Disposal Facility - Saltwater Injection Facility) in the A (Agricultural) Zone District There will be up to 10 full time employees that utilize the site with some additional third - party truck drivers and/or contractors. Water will be provided by a proposed commercial well and the site will be serviced by a proposed engineered on -site wastewater treatment system. No recycling operations will occur onsite. We recommend that the following requirements be incorporated into the permit as conditions that must be met prior to the acceptance of waste: 1 The facility shall submit a Groundwater Monitoring Plan for review and approval to the Weld County Department of Public Health and Environment. 2. The facility shall submit design plans of the offload pad area which should incorporate a sub -sump monitoring point and synthetic liner for review and approval to the Weld County Department of Public Health and Environment. Environmental Health has no objections to the proposal; however, we recommend that the following requirements be incorporated into the permit as development standards: 1. No disposal of waste, other than Class II, as currently defined by the Environmental Protection Agency, is permitted. Any changes from the approved Class II use will require an amendment to this Use by Special Review Permit. 2. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. Health Administration Vito/ Records Icic: 9/U 304 6410 Fax: 9/U -3U1-6112 Public Health & Clinical Services Icic: 9/0 304 6420 Fax: 9 /0-304-6416 Environmental Health Services Tele: 970-304-6415. Fax. 970-304-6411 Communication, Education & Planning Tele: 970-304-5470 Fax: 970-304-6452 Emergency Preparedness & Response Tele: 970-304-6470 Fax: 970-3O4-6452 Public Health 3. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. 4. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. The facility shall operate in accordance with Chapter 14, Article 1 of the Weld County Code. 5. Fugitive dust should attempt to be confined on the property. Uses on the property should comply with the Colorado Air Quality Commission's air quality regulations. 6. The applicant shall submit an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit Application and obtain a permit from the Air Pollution Control Division, Colorado Department of Public Health and Environment, as applicable. 7. Adequate drinking, handwashing and toilet facilities shall be provided for employees and patrons of the facility, at all times. As employees or contractors are on site for less than 2 consecutive hours a day portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County and shall contain hand sanitizers. 8. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to On -site Wastewater Treatment Systems. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. 9. All potentially hazardous chemicals on -site must be handled in a safe manner in accordance with product labeling. All chemicals must be stored secure, on an impervious surface, and in accordance with manufacturer's recommendations. 10. Secondary containment shall be constructed around tanks to provide containment for the largest single tank and sufficient freeboard to contain precipitation. Secondary containment shall be sufficiently impervious to contain any spilled or released material. Secondary containment devices shall be inspected at regular intervals and maintained in good condition. All secondary containment will comply with the Colorado Oil and Gas Conservation (COGCC) Commission Rules and/or the provisions of the State Underground and Above Ground Storage Tank Regulations. 11.A leak detection system shall be designed and installed beneath concrete unloading pad(s), piping, and sump(s). The unloading pad shall be kept in good condition. 12.As applicable, a Spill Prevention, Control and Countermeasure Plan, prepared in accordance with the applicable provisions of 40 CFR, Part 112, shall be available. 13. The facility shall be constructed and operated to ensure that contamination of soil and groundwater does not occur. 14.The facility shall comply with the accepted Groundwater Monitoring Plan. 15. Analytical waste data and environmental monitoring data shall be made available to Weld County Department of Health and Environment upon request. The Weld County Department of Health and Environment reserves the right to require additional monitoring. 16. Any contaminated soils on the facility shall be removed, treated or disposed of in accordance with all applicable rules and regulations. All spills will be reported to local, state and federal agencies in accordance with all state and federal regulations. 17. All stormwater, which has come into contact with waste materials on the site, shall be confined on the site. In the event the storm water is not adequately controlled on the site, upon written notification from the WCDPHE or CDPHE, a comprehensive site -wide Stormwater Plan shall be developed and implemented. The plan must be approved, in writing by the WCDPHE or CDPHE, prior to implementation. 18.The applicant shall obtain a Colorado Discharge Permit System or CDPS permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division, as applicable. 19. The facility shall adhere to the maximum permissible noise levels allowed in the Residential Zone as set forth in Section 25-12-103, C.R.S. 20. WCDPHE will be notified prior to the closure of the facility. Upon site closure, the facility will remove all wastes from the site and decontaminate all equipment, tanks, and secondary containment. All wastes removed from the site during closure activities will be disposed of off -site, in accordance with all state and federal rules and regulations and with Weld County Code. Documentation of closure activities will be provided to WCDPHE. 21. The facility shall notify the County of any revocation and/or suspension of any State issued permit. 22.The applicant shall notify the County upon receipt of any compliance advisory or other notice of non-compliance of a State issues permit, and of the outcome or disposition of any such compliance advisory or other notice of non-compliance. 23. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. Hello