Loading...
HomeMy WebLinkAbout20194551.tiff • PO#/OLA#:400001063/331001752 Routing#:18-HA4-XC-00039-ZM0001 IGA OPTION LETTER Date State Fiscal Year Option Letter No. 7/3/2019 2020 1 Project Code Original Contract# C 0853-111 (22470) 18HA4XC00039 Vendor Name: WELD COUNTY GOVERNMENT SUBJECT Option to unilaterally add phasing to include Design, Construction, Environmental, Utilities, ROW incidentals or Miscellaneous and to update encumbrance amount(s). REQUIRED PROVISIONS In accordance with the terms of the original Agreement 18HA4XC00039 between the State of Colorado,Department of Transportation and WELD COUNTY GOVERNMENT, the State hereby exercises the option to add a phase that will include Misc. and to encumber funds for the phase based on changes in funding availability and authorization. The total encumbrance is now Increased by$6,000,000.00. A new Exhibit C-1 is made part of the original Agreement and replaces Exhibit C. The total encumbrance as a result of this option and all previous options and/or amendments is now$6,000,000.00,as referenced in Exhibit C-1. The total budgeted funds to satisfy services/goods ordered under the Agreement remains the same:$6,000,000.00 as referenced in Exhibit C-1. The effective date of this option letter is upon approval of the State Controller or delegate. APPROVALS State of Colorado: J .Polis, or 4413Date: ?/V/9 y: Joshua Laipply,P.E.,Chief Engineer For: Shoshana M.Lew,Executive Director,Colorado Department of Transportation ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER CRS§24-30-202 requires the State Controller to approve all State Contracts.This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor is not authorized to begin performance until such time. If Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Contractor for such performance or for any goods and/or services provided hereunder. State Controller Robert Jaros,CPA,MBA,JD By: / Date: -7//V (9 Document Builder Generated 2019-4551 Rev. 12/09/2016 Cc%pW(mg),sac TCbCICI),) GinnrYvc.)n;Cat;0nS forts-/19 to/a3/ l9 E,G0o-15 EXHIBIT C-1 - FUNDING PROVISIONS C 0853-111 (22470) A. Cost of Work Estimate The Local Agency has estimated the total cost the Work to be$6,000,000.00,which is to be funded as follows: 1. BUDGETED FUNDS a. State Funds $6,000,000.00 (100.00%of Costs) b. Local Agency Matching Funds $0.00 (0.00%of Costs) TOTAL BUDGETED FUNDS $6,000,000.00 2. ESTIMATED PAYMENT TO LOCAL AGENCY a. State Funds Budgeted $6,000,000.00 TOTAL ESTIMATED PAYMENT TO LOCAL AGENCY $6,000,000.00 3. FOR CDOT ENCUMBRANCE PURPOSES a. Total Encumbrance Amount $6,000,000.00 b. Less ROW Acquisition 3111 and/or ROW Relocation 3109 $0.00 Net to be encumbered as follows: $6,000,000.00 Performance Period End Date WBS Element 22470.10.50 N/A/ N/A Misc. 3020 $6,000,000.00 B. The matching ratio for the federal participating funds for this Work is 100.00%State funds to 0.00%Local Agency funds, it being understood that such ratio applies only to the$6,000,000.00 total budgeted funds, it being further understood that all additional costs outside of the 100.00%/0.00%split are borne by the Local Agency at 100%.If the total cost of performance of the Work is less than$6,000,000.00,then the amounts of Local Agency and State funds will be decreased in accordance with the funding ratio described herein. C. The maximum amount payable to the Local Agency under this Contract shall be$6,000,000.00(for CDOT accounting purposes,the state funds of$6,000,000.00 and the Local Agency matching funds of$0.00 will be encumbered for a total encumbrance of$6,000,000.00),unless such amount is increased by an appropriate written modification to this Contract executed before any increased cost is incurred. It is understood and agreed by the Parties hereto that the total cost of the Work stated hereinbefore is the best estimate available, based on the design data as approved at the time of execution of this Contract,and that such cost is subject to revisions(in accord with the procedure in the previous sentence)agreeable to the Parties to bid and award. The maximum amount payable shall be reduced without amendment when the actual amount of the Local Agency's awarded contract is less than the budgeted total of the State funds and the Local Agency matching funds.The maximum amount payable shall be reduced through the execution of an Option Letter as described in Section 7.B.of this Contract. Exhibit C-1 -Page 1 of 1 STATE OF COLORADO DEPARTMENT OF TRANSPORTATION CDOT Engineering Contract .494. 2829 W. Howard Place, 3rd Floor Denver, Colorado 80202 (303) 757-9747 August 20, 2019 Mike Bedell Weld County Public Works PO Box 758 Greeley, CO 80632-0758 Re: Original Contract No.: 18-HA4-XC-00039 Contract Routing No.: 18-HA4-XC-0003 9-ZM0001 CDOT#: 400001063 Sub Account No.: 22470 Dear Mr. Bedell: Enclosed for your records on this project please find an original, fully executed and effective copy of the contract referenced above. Should you have any questions or require additional assistance regarding this contract document, please do not hesitate to contact Dale Zachary at (303) 757-9131 or Dale.Zachary@state.co.us. Should you have any questions regarding the Scope of Work or Notice to Proceed, if applicable, please contact the contract Project Manager. Thank you. Sincerely, &C't'41 Tracie Benton on behalf of Dale Zachary, Contract Administrator Enclosure Hello