Loading...
HomeMy WebLinkAbout20193047.tiffSubmit by Email Weld County Referral April 23, 2019 The Weld County Department of Planning Services has received the following item for review: Applicant: Public Service Company of Colorado Case Number: USR18-0100 Please Reply By: May 21, 2019 Planner: Chris Gathman Project: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A MAJOR FACILITY OF A PUBLIC UTILITY (ONE (1) 230kV TRANSMISSION LINE EXTENDING APPROXIMATELY 10.4 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPAAULT SUBSTATION) IN THE A(AGRICULTURAL) ZONE DISTRICT. THE APPLICANT IS AMENDING THE ORIGINAL APPLICATION THAT WAS ORIGINALLY SUBMITTED UNDER THE SAME CASE NUMBER. THE ORIGINAL REQUEST READ (ONE (1) 230 kV TRANSMISSION LINE EXTEND 21 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPA SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT. Location: The Transmission line runs from the WAPAAuIt Substation located south of County Road 86 and east of County Road 25 to the proposed Husky Substation (within the Town Limits of Ault). The Husky Substation will be located east of County Road 33 and south of County Road 86. Parcel Number: Multiple Parcels Legal: The Transmission line is to be located in Sections 2, 3, 4, 5, 6, 10, 15, 22, 26, 27 and 35, T7N, R66W of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. ■ We have reviewed the request and find that it does I does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. HDutrow 04/25/2019 Signature Date Agency Zoning Compliance Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax Submit by Email Weld County Referral April 23, 2019 The Weld County Department of Planning Services has received the following item for review: Applicant: Public Service Company of Colorado Case Number: USR18-0100 Please Reply By: May 21, 2019 Planner: Chris Gathman Project: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A MAJOR FACILITY OF A PUBLIC UTILITY (ONE (1) 230kV TRANSMISSION LINE EXTENDING APPROXIMATELY 10.4 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPAAULT SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT. THE APPLICANT IS AMENDING THE ORIGINAL APPLICATION THAT WAS ORIGINALLY SUBMITTED UNDER THE SAME CASE NUMBER. THE ORIGINAL REQUEST READ (ONE (1) 230 kV TRANSMISSION LINE EXTEND 21 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPA SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT. Location: The Transmission line runs from the WAPAAuIt Substation located south of County Road 86 and east of County Road 25 to the proposed Husky Substation (within the Town Limits of Ault). The Husky Substation will be located east of County Road 33 and south of County Road 86. Parcel Number: Multiple Parcels Legal: The Transmission line is to be located in Sections 2, 3, 4, 5, 6, 10, 15, 22, 26, 27 and 35, T7N, R66W of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services, We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. Signature Agency Date J tAPh Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (979) 400-6100 (970) 304-6498 fax Submit by Email Weld County Referral April 23, 2019 The Weld County Department of Planning Services has received the following item for review: Applicant: Public Service Company of Colorado Case Number: USR13-9100 Please Reply By: May 21, 2019 Planner: Chris Gathrnan Project: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A MAJOR FACILITY OF A PUBLIC UTILITY (ONE (1) 230kV TRANSMISSION LINE EXTENDING APPROXIMATELY 10.4 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPAAULT SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT. THE APPLICANT IS AMENDING THE ORIGINAL APPLICATION THAT WAS ORIGINALLY SUBMITTED UNDER THE SAME CASE NUMBER. THE ORIGINAL REQUEST READ (ONE (1) 230 kV TRANSMISSION LINE EXTEND 21 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPA SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT. Location: The Transmission line runs from the WAPAAult Substation located south of County Road 86 and east of County Road 25 to the proposed Husky Substation (within the Town Limits of Ault). The Husky Substation will be located east of County Road 33 and south of County Road 86. Parcel Number: Multiple Parcels Legal: The Transmission line is to be located in Sections 2, 3, 4, 5, 6, 10, 15, 22, 26, 27 and 35, T7N, R66W of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may beadded to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. Signature Tammy Waters Agency PDC Energy Date 4/30/19 Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax Submit by Email Weld County Referral April 23, 2019 The Weld County Department of Planning Services has received the following item for review: Applicant: Public Service Company of Colorado Case Number: USR18-0100 Please Reply By: May 21, 2019 Planner: Chris Gathman Project: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A MAJOR FACILITY OF A PUBLIC UTILITY (ONE (1) 230kV TRANSMISSION LINE EXTENDING APPROXIMATELY 10.4 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPAAULT SUBSTATION) IN THE A(AGRICULTURAL) ZONE DISTRICT. THE APPLICANT IS AMENDING THE ORIGINAL APPLICATION THAT WAS ORIGINALLY SUBMITTED UNDER THE SAME CASE NUMBER. THE ORIGINAL REQUEST READ (ONE (1) 230 kV TRANSMISSION LINE EXTEND 21 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPA SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT. Location: The Transmission line runs from the WAPAAuIt Substation located south of County Road 86 and east of County Road 25 to the proposed Husky Substation (within the Town Limits of Ault). The Husky Substation will be located east of County Road 33 and south of County Road 86. Parcel Number: Multiple Parcels Legal: The Transmission line is to be located in Sections 2, 3, 4, 5, 6, 10, 15, 22, 26, 27 and 35, T7N, R66W of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. ■ We have reviewed the request and find that it does I does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter. Signature Agency H. u • w skra-eLei Zoning Compliance Date 04/25/2019 Weld County Planning Dept. 1555 N 17th Ave, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax Submit by Email Weld County Referral April 23, 2019 The Weld County Department of Planning Services has received the following item for review: Applicant: Public Service Company of Colorado Case Number: USR18-0100 Please Reply By: May 21, 2019 Planner: Chris Gathman Project: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A MAJOR FACILITY OF A PUBLIC UTILITY (ONE (1) 230kV TRANSMISSION LINE EXTENDING APPROXIMATELY 10.4 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPAAULT SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT. THE APPLICANT IS AMENDING THE ORIGINAL APPLICATION THAT WAS ORIGINALLY SUBMITTED UNDER THE SAME CASE NUMBER. THE ORIGINAL REQUEST READ (ONE (1) 230 kV TRANSMISSION LINE EXTEND 21 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPA SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT Location: The Transmission line runs from the WAPA Ault Substation located south of County Road 86 and east of County Road 25 to the proposed Husky Substation (within the Town Limits of Ault). The Husky Substation will be located east of County Road 33 and south of County Road 86. Parcel Number: Multiple Parcels Legal: The Transmission line is to be located in Sections 2, 3, 4, 5, 6, 10, 15, 22, 26, 27 and 35, T7N, R66W of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter Agency Date Weld Re -9 School District May 7, 2019 Weld County Planning Dept. 1555 N 17th Ave, Greeley, Co. 80631 (970) 400-6100 (970) 304-6498 fax Submit by Email Weld County Referral April 23, 2019 The Weld County Department of Planning Services has received the following item for review: Applicant: Public Service Company of Colorado Case Number: USR18-0100 Please Reply By: May 21, 2019 Planner: Chris Gathnian Project: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A MAJOR FACILITY OF A PUBLIC UTILITY (ONE (1) 230kV TRANSMISSION LINE EXTENDING APPROXIMATELY 10.4 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPA AULT SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT, THE APPLICANT IS AMENDING THE ORIGINAL APPLICATION THAT WAS ORIGINALLY SUBMITTED UNDER THE SAME CASE NUMBER. THE ORIGINAL REQUEST READ (ONE (1) 230 kV TRANSMISSION LINE EXTEND 21 MILES, ONE (1) NEW SUBSTATION (GRAHAM CREEK) AND UPGRADES TO AN EXISTING SUBSTATION (WAPA SUBSTATION) IN THE A (AGRICULTURAL) ZONE DISTRICT Location: The Transmission line runs from the V APAAuIt Substation located south of County Road 86 and east of County Road 25 to the proposed Husky Substation (within the Town Limits of Ault). The Husky Substation will be located east of County Road 33 and south of County Road 86. Parcel Number: Multiple Parcels Legal: The Transmission line is to be located in Sections 2, 3, 4, 5, 6, 10, 15, 22, 26, 27 and 35, T7N, R86W of the 6th P.M., Weld County, Colorado. The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. We have reviewed the request and find Mat it does / does not comply with our Comprehensive Plan because: We have reviewed the request and find no conflicts with our interests. See attached letter Signature Agency Date Weld County Planning Dept. '1555 N 17th Aye, Greeley, CO. 80631 (970) 400-6100 (970) 304-6498 fax MAP 1 WtCINITY MAP NORTHERN COLORADO AREA PLAN i?najibti tampon* maPrewied CI Proposed 11te Route Substation Substation TransrnlsSft hatmary Raid cti *rag Douniarg and Nimbly ria CasprgratOink Drat Iit kg tbahes PriShiell Comp, al CAM Setts Inc VartDQma-ea 5=2 i0,t-fi7l•7fd9 clma u elms praaa Si. Sag 300 CASOa d-04 sem 41433 oponstanori Used si Yslt tom Pun. 201S) S.*s Opwlr DI carillke we obi 2fl1dj nowt NOW GO Da -LAtetaro (MA OLSOS? 3tb1,eilbek otbthtin.2il1d) ad Roo IPL•SI51 samr) yawncal - Weld COM* ctstita Soy RIO lige3.2014 -US PIMroHnld MP WWII Sting AIM } silo no - Mpr, x015) 9 € • �. ther Kai' Proposed Ealing Faatrm of acid ci ua Grub* Mai 14Mar Lake PIP Us ii Seaton rowanp-Rawt lPIr bait • Naixxr iril.sw iraataevs Iviwialloi I 0-1— Pafc Snow INC tMrsr Cems, Cobalt try Caton Sir; /rd Urid Mic &ENS 44s Kai ererr Mary liktwit-- Snit Sty *my Ca bean ShiSCIR 213 L'a41n Fai Ott Talitarr: Ent De DS Dsia Gana b eosin; tranuriaika - Pubic • Pave; *pt. 201e) 1 Fleets Raiaods • Furs ceii, Srakr.'i+rstip, forth as 004 • tam Pews.C�ltii�tta,WI) —U i Anil Jimmy frinullsa NE . s'-.arlUtar-zy CO ...-. - i �1 R ii -.H• . L .. ,- VMS Billii.I -'rii Ibfllair iiJ. pent al ir Ufir sr FIMPIAPIIIIMrinni .]brit Dm4IMil i ' lased Energy' Hello