HomeMy WebLinkAbout20193939.tiffPlanner:
LAND USE APPLICATION
SUMMARY SHEET
Maxwell Nader
Case Number: USR19-0039
Applicant: Apryl L. and Manuel Gallegos -Herrera
Address: 25868 County Road 48 Kersey, CO 80644
Hearing Date: August 20, 2019
Request: A Site Specific Development Plan and Use by Special Review Permit for a Home
Business (transmission repair shop) and one (1) single-family dwelling unit per lot other
than those permitted under Section 23-3-20.A. (second single-family dwelling unit) in
the A (Agricultural) Zone District
Legal Lot B of Recorded Exemption RE -2820; being a part of the NE4 of Section 8, Township
Description: 4, Range 64 West of the 6th P.M., Weld County, Colorado
Location: South of and adjacent to County Road 48; approximately 500 feet west of County
Road 53
Size of Parcel: +1- 4.7 acres Parcel No. 1053-08-0-00-050
The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code.
The Department of Planning Services' staff has received referral responses with comments from the
following agencies:
Platte Valley Fire Protection District, referral dated May 15, 2019
▪ West Greeley Conservation District, referral dated June 10, 2019
▪ Weld County Department of Public Works, referral dated June 13, 2019
▪ Weld County Department of Public Health and Environment, referral dated June 12, 2019
The Department of Planning Services' staff has received referral responses without comments from the
following agencies:
Y Weld County Sherriff's Office, referral dated May 31, 2019
Y Central Weld County Water District, referral dated June 5, 2019
The Department of Planning Services' staff has not received responses from the following agencies:
Y Town of Kersey
Y Weld County Sheriff's Office
Y Weld County Zoning Compliance
Y Weld County School District RE -7
Y Colorado Division of Parks and Wildlife
Y Platteville-Gilcrest Fire Protection District
Y Weld County Department of Building Inspection
USR19-0039,
Apryl L. and Manuel Gallegos -Herrera,
Page 1 of 9
Planner:
SPECIAL REVIEW PERMIT
ADMINISTRATIVE REVIEW
Maxwell Nader
Case Number: USR19-0039
Applicant: Apryl L. and Manuel Gallegos -Herrera
Address: 25868 County Road 48 Kersey, CO 80644
Hearing Date: August 20, 2019
Request: A Site Specific Development Plan and Use by Special Review Permit for a Home
Business (transmission repair shop) and one (1) single-family dwelling unit per lot other
than those permitted under Section 23-3-20.A. (second single-family dwelling unit) in
the A (Agricultural) Zone District
Legal Lot B of Recorded Exemption RE -2820; being a part of the NE4 of Section 8, Township
Description: 4, Range 64 West of the 6th P.M., Weld County, Colorado
Location: South of and adjacent to County Road 48; approximately 500 feet west of County
Road 53
Size of Parcel: +/- 4.7 acres Parcel No. 1053-08-0-00-050
Case Summary:
The applicants are requesting a Site Specific Development Plan and Use by Special Review Permit for a
second residence and a Home Business on an approximately 4.7 acre parcel of land. There is currently a
residence on the property where the applicants live. The second residence on site is proposed for family,
caretaker or rental purposes. The Home Business will be operated by Manuel Herrera, the property owner.
The home business will be a transmission shop and consists of bringing in dry transmissions and fixing
them. Once the transmissions are repaired, they will be delivered back to the costumer. There will be no
costumers on site. Storage of any possible liquids related to the transmissions will be stored appropriately
and a third -party company will dispose of the liquids. All operations related to the business will be located
in a proposed shop, no outside storage is proposed for the business. The hours of operation are 8 am
through 5 pm, Monday through Friday and 8 am through 12 pm on Saturday. There will be four (4)
employees. No public access is proposed. No screening or landscaping is proposed. No fuel storage, signs,
equipment/vehicle washing, floor drains, are proposed.
The site currently has an Oil and Gas Support Service Facility Use By Special Review Permit (USR-1447)
recorded on June 16, 2004 Reception No. 3189430. Prior to recording of the plat USR-1447 will have to be
fully vacated with all components of the business removed.
DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE
APPROVED FOR THE FOLLOWING REASONS:
1. The submitted materials are in compliance with the application requirements of Section 23-2-260
of the Weld County Code.
2. It is the opinion of the Department of Planning Services' staff that the applicant has shown
compliance with Section 23-2-220 of the Weld County Code as follows:
A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other
applicable code provisions or ordinance in effect.
USR19-0039,
Apryl L. and Manuel Gallegos -Herrera,
Page 2 of 9
Section 22-2-20.F.2 - A.Policy 6.2. States, "Support opportunities, such as but not limited
to hobby farming and home businesses, to supplement family income and reduce living
expenses for farm families and others who prefer a rural lifestyle."
Section 22-2-20.G.-A.Policy 7.2. Conversion of agricultural land to nonurban residential,
commercial and industrial uses should be accommodated when the subject site is in an
area that can support such development, and should attempt to be compatible with the
region.
The business is compatible because the use will primarily be within the accessory structure
being the pole barn. The application materials state that this transmission shop will
primarily be for the surrounding farmers and neighbor's equipment in the area.
Section 22-2-20.H. - A.Goal 8. States, "Ensure that adequate services and facilities are
currently available or reasonably obtainable to accommodate the requested new land use
change for more intensive development."
There is currently water and septic service provided to the property. The house on the
property is currently served by Central Weld County Water District (CWCWD) via Tap #
1794. Water for the business and second home is available through Central Weld County
Water District via a letter from CWCWD dated April 25, 2019. A septic permit (SP -0100193)
sized for three (3) bedrooms was issued May 29, 2001 for the current home on the property.
A new on -Site Wastewater Treatment System (OWTS) will serve the business and the
second dwelling.
B. Section 23-2-220.A.2 -- The proposed use is consistent with the intent of the A
(Agricultural) Zone District.
Section 23-3-10. -- Intent, of the Weld County Code states, "The A (Agricultural) Zone
District is also intended to provide areas for the conduct of Uses by Special Review which
have been determined to be more intense or to have a potentially greater impact than Uses
Allowed by Right." This code section allows the applicant to apply for a USR (Use by
Special Review) Permit.
Section 23-3-40.M. -- Uses by special review, of the Weld County Code allows for "one (1)
single-family dwelling unit per lot other than those permitted under section 23-3-20.A.
(second single-family dwelling unit)" in the Agricultural (A) Zone District. This code section
allows the applicant to apply for the subject second home.
Section 23-3-40.P.-- Uses by special review, of the Weld County Code allows for a "home
business" in the Agricultural (A) Zone District. This code section allows the applicant to
apply for the home business.
C. Section 23-2-220.A.3 -- The uses which will be permitted will be compatible with the
existing surrounding land uses.
The subject property currently has an Oil and Gas Support Facility (USR-11447). This USR
will be fully vacated prior to recording of the new USR. There are several Use By Special
Review permits within one (1) mile of the subject property. Including one (1) accessory
structure, one (1) roping arena, one (1) airstrip, one (1) 400 head dairy, one (1) Oil and
Gas Support Service facility, two (2) in Ag related facilities, two (2) Mineral Resource
Facility and two (2) second single family residences.
The Weld County Department of Planning Services sent notice to ten (10) surrounding
property owners within five -hundred (500) feet. No correspondences were received back
from surrounding property owners regarding the proposed application. There were no
mails or phone calls received regarding the proposed application.
USR19-0039,
Apryl L. and Manuel Gallegos -Herrera,
Page 3 of 9
D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future
development of the surrounding area as permitted by the existing zoning and with the future
development as projected by Chapter 22 of the Weld County Code and any other
applicable code provisions or ordinances in effect, or the adopted Master Plans of affected
municipalities.
The site is located within the three (3) mile referral area of the Kersey. The Town of Kersey
did not return a referral. The site is also located within the Town of Kersey's Coordinated
Planning Agreement (CPA). The town indicated on the signed Notice of Inquiry form dated
May 14, 2019 that the property is not eligible for annexation and no further comments.
E. Section 23-2-220.A.5 -- The application complies with Chapter 23, Articles V and XI, of the
Weld County Code.
The property is not within the Geologic Hazard Overlay District, a Special Flood Hazard
Area, Airport Overlay District or the Municipal Separate Storm Sewer System (MS4) area.
Building Permits issued on the lot will be required to adhere to the fee structure of the
County -Wide Road Impact Fee, County Facility Fee and Drainage Impact Fee Programs.
F. Section 23-2-220.A.6 -- The applicant has demonstrated a diligent effort to conserve prime
agricultural land in the locational decision for the proposed use.
The soil designation for the site is "Irrigated (not prime) per the 1979 Soil Conservation
Service Important Farmlands of Weld County Map. The site is not being used for
agricultural production and the small lot size is not suitable for farming.
G. Section 23-2-220.A.7 —There is adequate provisions for the protection of the health, safety,
and welfare of the inhabitants of the neighborhood and County.
The Design Standards (Section 23-2-240, Weld County Code), Operation Standards
(Section 23-2-250, Weld County Code), Conditions of Approval and Development
Standards can ensure that there are adequate provisions for the protection of health,
safety, and welfare of the inhabitants of the neighborhood and County.
This recommendation is based, in part, upon a review of the application materials submitted by the
applicant, other relevant information regarding the request, and responses from referral entities.
The Department of Planning Services' staff recommendation for approval is conditional upon the following:
1. Prior to recording the map:
A. A final drainage report or qualifying narrative is required prior to recording the USR map.
(Department of Public Works)
B. USR-1447 shall be vacated prior to recording the USR map. (Department of Planning
Services)
C. The applicant shall attempt to address the requirements of the Platte Valley Fire Protection
District, as stated in the referral response dated May 15, 2019. Written evidence of such
shall be submitted to the Weld County Department of Planning Services. (Department of
Planning Services)
D. The plat shall be amended to delineate the following:
1. All sheets of the map shall be labeled USR19-0039 (Department of Planning Services)
USR19-0039,
Apryl L. and Manuel Gallegos -Herrera,
Page 4 of 9
2. The attached Development Standards. (Department of Planning Services)
3. The map shall be prepared in accordance with Section 23-2-260.D of the Weld County
Code. (Department of Planning Services)
4. All signs shall be shown on the map and shall adhere to Chapter 23, Article IV, Division
2 and Appendices 23-C, 23-D and 23-E of the Weld County Code. (Department of
Planning Services)
5. The map shall delineate the parking area for the employees. (Department of Planning
Services)
6. County Road 48 is a gravel road and is designated on the Weld County Functional
Classification Map as a local road which requires 60 feet of right-of-way at full buildout.
The applicant shall delineate and label on the site map or plat the future and existing
right-of-way (along with the documents creating the existing right-of-way) and the
physical location of the road. All setbacks shall be measured from the edge of right-
of-way. This road is maintained by Weld County. (Department of Public Works)
7. Show and label the approved access locations, approved access width and the
appropriate turning radii (60') on the site plan. The applicant must obtain an access
permit in the approved location(s) prior to construction. (Department of Public Works)
8. Show and label the entrance gate if applicable. An access approach that is gated shall
be designed so that the longest vehicle (including trailers) using the access can
completely clear the traveled way when the gate is closed. In no event, shall the
distance from the gate to the edge of the traveled surface be less than 35 feet.
(Department of Public Works)
9. Show and label the drainage flow arrows. (Department of Public Works)
10. Show and label the parking and traffic circulation flow arrows showing how the traffic
moves around the property. (Department of Public Works)
2. Upon completion of Condition of Approval #1 above, the applicant shall submit one (1) electronic
copy (.pdf) of the map for preliminary approval to the Weld County Department of Planning
Services. Upon approval of the map the applicant shall submit a Mylar map along with all other
documentation required as Conditions of Approval. The Mylar map shall be recorded in the office
of the Weld County Clerk and Recorder by the Department of Planning Services. The map shall
be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code.
The Mylar map and additional requirements shall be submitted within one hundred twenty (120)
days from the date of the Board of County Commissioners Resolution. The applicant shall be
responsible for paying the recording fee. (Department of Planning Services)
3. In accordance with Weld County Code Ordinance #2012-3, approved April 30, 2012, should the
plat not be recorded within the required one hundred twenty (120) days from the date of the Board
of County Commissioners Resolution, a $50.00 recording continuance charge shall added for each
additional three (3) month period. (Department of Planning Services)
5. Prior to Construction:
A. The approved access and tracking control shall be constructed prior to on -site construction.
(Department of Public Works)
USR19-0039,
Apryl L. and Manuel Gallegos -Herrera,
Page 5 of 9
7. Prior to the issuance of the Certificate of Occupancy:
A. An On -Site Wastewater Treatment System (OWTS) is required and shall be installed according
to the Weld County On -site Waste -water Treatment System Regulations. The OWTS is
required to be designed by a Colorado Registered Professional Engineer according to the Weld
County OWTS Regulations. (Department of Public Health and Environment)
8 The Use by Special Review Permit is not perfected until the Conditions of Approval are completed
and the map is recorded. Activity shall not occur, nor shall any building or electrical permits be
issued on the property, until the Use by Special Review plat is ready to be recorded in the office of
the Weld County Clerk and Recorder or the applicant has been approved for an early release
agreement (Department of Planning Services)
USR19-0039,
Apryl L. and Manuel Gallegos -Herrera,
Page 6 of 9
SITE SPECIFIC DEVELOPMENT PLAN
USE BY SPECIAL REVIEW PERMIT
DEVELOPMENT STANDARDS
Apryl L. and Manuel Gallegos -Herrera
USR19-0039
1. A Site Specific Development Plan and Use by Special Review Permit, USR19-0039, for a Home
Business (transmission repair shop) and one (1) single-family dwelling unit per lot other than those
permitted under Section 23-3-20.A. (second single-family dwelling unit) in the A (Agricultural) Zone
District, subject to the Development Standards stated hereon. (Department of Planning Services)
2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County
Code. (Department of Planning Services)
3. The hours of operation of the home business are 8:00 a.m. - 5:00 p.m. Monday — Friday and 8:00 a.m.
- 12:00 p.m. Saturday, as requested in the application materials. (Department of Planning Services)
4. The number of on -site employees shall be four (4). (Department of Planning Services)
5. The parking area on the site shall be maintained. (Department of Planning Services)
6. All signs shall adhere to Chapter 23, Article IV, Division 2 and Appendices 23-C, 23-D and 23-E of the
Weld County Code. (Department of Planning Services)
7. Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties where
such would cause a nuisance or interfere with the use on the adjacent properties in accordance with
the plan. Neither the direct, nor reflected, light from any light source may create a traffic hazard to
operators of motor vehicles on public or private streets. No colored lights may be used which may be
confused with, or construed as, traffic control devices. (Department of Planning Services)
8. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30 20 100.5,
C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and
groundwater contamination. (Department of Public Health and Environment)
9. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those
wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and
Facilities Act, 30-20-100.5, C.R.S. (Department of Public Health and Environment)
10. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive
particulate emissions, blowing debris, and other potential nuisance conditions. The applicant shall
operate in accordance with Chapter 14, Article 1 of the Weld County Code. (Department of Public
Health and Environment)
11. Fugitive dust should attempt to be confined on the property. Uses on the property should comply with
the Colorado Air Quality Commission's air quality regulations. (Department of Public Health and
Environment)
12. All potentially hazardous chemicals must be handled in a safe manner in accordance with product
labeling. and in a manner, that minimizes the release of hazardous air pollutants (HAPs) and volatile
organic compounds (VOCs). All chemicals must be stored securely, on an impervious surface, and in
accordance with manufacturers' recommendations. (Department of Public Health and Environment)
13. The facility shall adhere to the maximum permissible noise levels allowed in the Residential Zone as
delineated in 25-12-103 C.R.S. (Department of Public Health and Environment)
14. Adequate drinking, hand washing, and toilet facilities shall be provided for employees and patrons, at
all times. (Department of Public Health and Environment)
USR19-0039,
Apryl L. and Manuel Gallegos -Herrera,
Page 7 of 9
15. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. (Department
of Public Health and Environment)
16. Any septic system located on the property must comply with all provisions of the Weld County Code,
pertaining to On -site Wastewater Treatment Systems. (Department of Public Health and Environment)
17. The operation shall comply with all applicable rules and regulations of State and Federal agencies and
the Weld County Code. (Department of Public Health and Environment)
18. The operation shall comply with all applicable rules and regulations of State and Federal agencies and
the Weld County Code. (Department of Public Health and Environment)
19. The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant
to Chapter 15, Article I and II, of the Weld County Code. (Department of Public Works)
20. The access to the site shall be maintained to mitigate any impacts to the public road, including damages
and/or off -site tracking. (Department of Public Works)
21. There shall be no parking or staging of vehicles on public roads. On -site parking shall be utilized.
(Department of Public Works)
22. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire
an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works)
23. The historical flow patterns and runoff amounts on the site will be maintained. (Department of Public
Works)
24. Weld County is not responsible for the maintenance of onsite drainage related features. (Department
of Public Works)
25. Building permits may be required, per Section 29-3-10 of the Weld County Code. Currently, the
following have been adopted by Weld County: 2018 International Codes, 2006 International Energy
Code, and 2017 National Electrical Code. A Building Permit Application must be completed and two (2)
complete sets of engineered plans bearing the wet stamp of a Colorado registered architect or engineer
must be submitted for review. A Geotechnical Engineering Report performed by a Colorado registered
engineer shall be required or an Open Hole Inspection. (Department of Building Inspection)
26. The Use by Special Review area shall be limited to the plans shown hereon and governed by the
foregoing standards and all applicable Weld County regulations. Substantial changes from the plans
or Development Standards, as shown or stated, shall require the approval of an amendment of the
Permit by the Weld County Board of County Commissioners before such changes from the plans or
Development Standards are permitted. Any other changes shall be filed in the office of the Department
of Planning Services.
27. The property owner or operator shall be responsible for complying with all of the foregoing Development
Standards. Noncompliance with any of the foregoing Development Standards may be reason for
revocation of the Permit by the Board of County Commissioners.
28. RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT: Weld County has some of the most
abundant mineral resources, including, but not limited to, sand and gravel, oil, natural gas, and
coal. Under title 34 of the Colorado Revised Statutes, minerals are vital resources because (a) the
state's commercial mineral deposits are essential to the state's economy; (b) the populous counties of
the state face a critical shortage of such deposits; and (c) such deposits should be extracted according
to a rational plan, calculated to avoid waste of such deposits and cause the least practicable disruption
of the ecology and quality of life of the citizens of the populous counties of the state.
USR19-0039,
Apryl L. and Manuel Gallegos -Herrera,
Page 8 of 9
Mineral resource locations are widespread throughout the County and person moving into these areas
must recognize the various impacts associated with this development. Often times, mineral resource
sites are fixed to their geographical and geophysical locations. Moreover, these resources are
protected property rights and mineral owners should be afforded the opportunity to extract the mineral
resource.
29. WELD COUNTY'S RIGHT TO FARM STATEMENT: Weld County is one of the most productive
agricultural counties in the United States, typically ranking in the top ten counties in the country in total
market value of agricultural products sold. The rural areas of Weld County may be open and spacious,
but they are intensively used for agriculture. Persons moving into a rural area must recognize and
accept there are drawbacks, including conflicts with long-standing agricultural practices and a lower
level of services than in town. Along with the drawbacks come the incentives which attract urban
dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion,
and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban
dwellers to rural Weld County would quickly be gone forever.
Agricultural users of the land should not be expected to change their long-established agricultural
practices to accommodate the intrusions of urban users into a rural area. Well -run agricultural activities
will generate off -site impacts, including noise from tractors and equipment; slow -moving farm vehicles
on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal
confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; hunting and trapping
activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in
the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize
an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A
concentration of miscellaneous agricultural materials often produces a visual disparity between rural
and urban areas of the County. Section 35-3.5-102, C.R.S., provides that an agricultural operation
shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance
employs methods or practices that are commonly or reasonably associated with agricultural production.
Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to
assume that ditches and reservoirs may simply be moved "out of the way" of residential development.
When moving to the County, property owners and residents must realize they cannot take water from
irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water.
Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the
size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and
county roads outside of municipalities. The sheer magnitude of the area to be served stretches
available resources. Law enforcement is based on responses to complaints more than on patrols of
the County, and the distances which must be traveled may delay all emergency responses, including
law enforcement, ambulance, and fire. Fire protection is usually provided by volunteers who must leave
their jobs and families to respond to emergencies. County gravel roads, no matter how often they are
bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities
mean that roads from subdivisions to arterials may not be cleared for several days after a major
snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural
dwellers must, by necessity, be more self-sufficient than urban dwellers.
People are exposed to different hazards in the County than in an urban or suburban setting. Farm
equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center
pivot operations, high speed traffic, sandburs, puncture vines, territorial farm dogs and livestock, and
open burning present real threats. Controlling children's activities is important, not only for their safety,
but also for the protection of the farmer's livelihood.
USR19-0039,
Apryl L. and Manuel Gallegos -Herrera,
Page 9 of 9
July 15, 2019
DEPARTMENT OF PLANNING SERVICES
1555 N 17th AVE
GREELEY, CO 80631
WEBSITE: www.weldgov.com
E-MAIL: mnader@weldgov.com
PHONE: (970) 400-400-3527
FAX: (970) 304-6498
HERRERA MANUEL
25868 COUNTY ROAD 48
KERSEY, CO 806449030
Subject: USR19-0039 - A Site Specific Development Plan and Use by Special Review Permit for a Home
Business (transmission repair shop) and one (1) single-family dwelling unit per lot other than those
permitted under Section 23-3-20.A. (second single-family dwelling unit) in the A (Agricultural) Zone
District
On parcel(s) of land described as:
LOT B REC EXEMPT RE -2820, PART N2NE4 SECTION 8, T4N, R64W of the 6th P.M., Weld County,
Colorado.
Dear Applicants:
I have scheduled a meeting with the Weld County Planning Commission on August 20, 2019, at 12:30
p.m. A subsequent hearing with the Board of County Commissioners will be held on September 11,
2019 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration
Building, 1150 O Street, Greeley, Colorado. It is recommended that you and/or a representative be in
attendance to answer any questions the Planning Commission members or Board of County
Commissioners may have.
Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of
all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld
County Planning Department with written certification indicating the above requirement has been met.
A representative from the Department of Planning Services will be out to the property a minimum of ten
days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road
right-of-way which identifies the hearing time, date, and location. In the event the property is not
adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place
on the property and a second sign posted at the point at which the driveway (access drive) intersects a
publicly maintained road right-of-way.
The Department of Planning Services' staff will make a recommendation concerning this application to
the Weld County Planning Commission and will be included in the staff report one week prior to the
scheduled Planning Commission hearing. You may view the staff report at
www.weldcountyplanninqcases.orq
If you have any questions concerning this matter, please call.
Respectfully,
4
Maxwell Nader
Planner
May 15, 2019
DEPARTMENT OF PLANNING SERVICES
1555 N 17th AVE
GREELEY, CO 80631
WEBSITE: www.weldgov.com
E-MAIL: mnader@weldgov.com
PHONE: (970) 400-400-3527
FAX: (970) 304-6498
MANUEL HERRERA
25868 COUNTY ROAD 48
KERSEY, CO 80644-9030
Subject: USR19-0039 - A Site Specific Development Plan and Use by Special Review Permit for a Home
Business (transmission repair shop) and one (1) single-family dwelling unit per lot other than those
permitted under Section 23-3-20.A. (second single-family dwelling unit) in the A (Agricultural) Zone
District
On parcel(s) of land described as:
PT N2NE4 SECTION 8 T4N R64W LOT B REC EXEMPT RE -2820 (.32R) of the 6th P.M., Weld County,
Colorado.
Dear Applicants:
Your application and related materials for the request described above are complete and in order at this
time. I will schedule a meeting with you at the end of the review period to discuss the referral
comments received by our office.
It is the policy of Weld County to refer an application of this nature to any town or municipality lying
within three miles of the property in question or if the property under consideration is located within
the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a
copy of the submitted materials to the following Planning Departments for their review and
comments:
Kersey at Phone Number 970-353-1681
It is recommended that you contact the listed Planning Departments for information regarding their
process and to answer any questions that might arise with respect to your application.
If you have any questions concerning this matter, please call.
Respectfully,
Maxwell Nader
Planner
FIELD CHECK
Inspection date: August 8, 2019
CASE NUMBER:
APPLICANT:
LEGAL DESCRIPTION:
LOCATION:
USR19-0039
Apryl L. and Manuel Gallegos -Herrera
Lot B of Recorded Exemption RE -2820; being a part of the NE4
of Section 8, Township 4, Range 64 West of the 6th P.M., Weld
County, Colorado
South of and adjacent to County Road 48; approximately 500 feet
west of County Road 53
Zoning
Land Use
N
A (Agricultural)
N
Open space / Agriculture
E
A (Agricultural)
E
Agricultural / Rural Residential
S
A (Agricultural)
S
USR-1602 (4500 head)
W
A (Agricultural)
W
Agricultural / Farmland
COMMENTS:
The site is located south of CR 48 and approximately 500 feet west of CR 53. The site contains a singular
drive that has a gate. The site contains one existing residence and a pole barn and some out building
structures where it appears there were farm animals on site at one time.
Maxwell Nader, Planner I 08/08/2019