HomeMy WebLinkAbout20193499.tiffPlease note: values have been redacted as pricing is confidential CENTRAL WELD COUNTY WATER DISTRICT December 19, 2018 T3 Land & Investment PO Box 367 Springfield, NE 68059 RE: Timmerman First Subdivision Dear Mr. Timmerman, This letter is in response to your request for four 1,5" taps and one 3/4" tap to provide water service to the Timmerman First Subdivision on property described as follows: PT SE4 13 4 65 LOT B REC EXEMPT RECX15-i0109 Parcel 105513400012 Submitted herewith is the cost for the necessary booster pump and four 1.5" taps for domestic service and one 3!4" tap to feed a tank or pond to be used for fire protection. Booster pump for domestic service only, Customer is responsible for designing, installing and maintaining fire system, Option #1- purchase taps Four 1.5"Tap Fees @$ ea S 1,140,000 gal annual allotment each Surcharge: $3 per thousand gallons for usage over allotment %" tap fees — 1 @ al ea 342,000 gal annual allotment Surcharge: $3 per thousand gallons for usage over allotment 16" 860' Line extension under CR 49 w/24" steel casing bore, 12" 380' line in subdivision, booster pump Total Due Option #1 S Option #2 — dedicate water Transfer 21 shares CBI to District S OR pay L ca sh m lieu SEM per share to dedicate water to project. 16" 860' Line extension under CR 49 w'24" steel casing bore, 12" 380' line in subdivision, booster pump Total Due Option #2 **District is willing to consider allowing shares to be used at tap 804 on a temporary basis until first tap in development is sold. Upon receipt of the above "Total Due" and the appropriate documentation being signed in the District's office by all deed holders, the District will prepare a work order for the installation of the line extension. The cost estimate and availability of service is good for 30 days. Please tote that its your roponsibility to contact Northern Colorado Water Conservancy District at 800-369-7246 for netilionink confirmation into the Northern Colorado Water Conservancy District Central Weld cannot issue a to until all regu#r nzents are sails ed. This is in accordance with the Rules and Regulations 9Mo:them Colorado Water Conservancy District Sincerely, CENTRAL WELD COUNTY WATER hATER DISTRICT Stan' Linker, iistrict. Manager SLlkn 2235 2nd Avenue • Greeley, Colorado 80631 * Phone (970) 352-1284 • Fax (970) 353-5865 From: Sent: To: Subject: Chris Gathman <cgathman@weldgov.com> Wednesday, January 16, 2019 1:11 PM Kelsey Bruxvoort Water Supply for T3 is adequate to proceed with PUDZ Kelsey, The water supply question has been addressed. You can proceed with submittal of the PUD change of zone application. Thanks, Chris Gothmar, Planner III Weld County Department of Planning Services 1555 N. 17th Avenue tel:. 970-400-3537 fax: 970-400-4098 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. 1 Kelse Bruxvoort From: Sent: To: Cc: Subject: Attachments: Chris, Kathy Naibauer <kathy@cwcwd.com> Thursday, June 28, 2018 9:41 AM 'Chris Gathman' Williams - DNR, Joanna; Kelsey Bruxvoort CWCWD referral response update PU D 18-0003 cwcwd water supply 062618.pdf I am responding to concerns communicated by the Division of Water Resources in their April 24, 2018 referral response for PUDK18-0003. Attached is an updated water supply report including data for the 2017-2018 water year. The portion of the report that DNR received in 2012 titled {`System Analysis" has not been revised since that time but is scheduled to be revised later this year. It should be noted that the 2012 report indicated the District's share of the NISP project was 3,300 acre feet. Our current share of the project is 3,500 acre feet. The District has not yet received the necessary study fees or documents from the applicant to complete a study, but we have received communication that the necessary information is being gathered. As stated in our referral response dated May 7, 2018, "specific fire flow requirements from the servicing fire department must be submitted to the District along with appropriate fees" for a water study to be conducted. In this case the District has not dedicated water from our "District Availability" of CBT, which is currently estimated at 1941 acre feet and shown on the attachment, for use at this specific project as projected water demands are unclear. Once a study is completed the applicant can secure dedicated water through the purchase of a line extension and taps. Study results may also provide options for securing dedicated water through a transfer of CBT shares or a cash -in -lieu payment. Additional information can be provided as it becomes available. Thanks, Kathy Naibauer Central Weld County Water District 2235 2nd Ave Greeley, CO 80631 Phone 970 352 1284 1 CBT WATER OWNERSHIP CCD Balance at Beg. of Water Year Water Purchased/Transferred in Ownership Greece /Loveland ilrr, CWOIND Qwnershil Balance 2010-11 5,347 23 1 A.F.ALLOTMENT BY NCWCD: A.F. Beg. Water Year Water Rented/Transferred District Balance to be Used 5;370 80% 4,296 2,924 7.220 2011-12 5,431 108 11 100% 5,539 2,089 7,628 2012-13 5,577 115 0.3 5,692 60% 3,415 3,945 7,360 2013-14 5,632 31 0.3 5.663 60% 3,398 �� 3.606 7,004 2014-15 ►,663 0 0.3 70% 3,964 2,896 6,860 2015.16 5,719 2016=17 5,7'19 28 0,3 2017-18 5,832 0 0.3 5,832 DISTRICT USAGE -3,909 -3,1181 -4,670 -4,297 4,240 4,003 3,181 7,164 4,924 4,598 2,914 4 854 80%, 4,666 2,607 7,273 -5,332 DISTRICT AVAILABILITY 3,312 2,690 2,707 x.620 2261 2,658 1,941 3,747 estimated for the water year CBT WATER OWNERSHIP 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 CWCWD Water Greele Balance Purchased/Transferred /Loveland at Beg. of Water Year in Ownership Irr. 5,347 23 1 5,431 108 11 5,577 115 03 8,832 31 0.3 5,663 0 0.3 5,663 56 0.3 5,719 28 0.3 5,832 0 0.3 C CWD Owrrershl Balance 5,370 8,539 5,692 5,663 5,663 5,719 8,747 5,832 A.F/ALLOTMENT BY NCWCD: 80% 100% 60% 60% 70% 70% 80% 80% A.F. Beg. Water Year Water Rented/Transferred 4,296 2,924 5,539 2,089 3,415 3,945 3,398 3,606 3,964 2,806 4,003 3,181 4,598 2,914 4,666 2,607 , District Balance to be Used 7,220 7,628 7,360 7,004 6,860 7,184 7,511 7,273 DISTRICT USAGE -3,909 -3,881 -4,670 4,297 4,240 -4,924 -4,854 -5,332 DISTRICT AVAILABILITY 3,312 I 3,747 1 2,690 1 2,707 I 2,620 1 2,261 J 2,658 1 1,941 1 * estimated for the water year From: Chris Gathman To: Frank Haug Cc: Tom Parka Jr. Subject: RE: T3 Land & Investment PUDZ -.. Water Supply Date: Thursday/ January 10, 2019 2:34:49 PM I agree. Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue teF: 970-400-3537 fox: 970-400-4098 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Frank Haug Sent: Friday, January 04, 2019 1:23 PM To: Chris Gathman <cgathman@weldgov.com>; Tom Parko Jr. <tparko@weldgov.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply I guess at this point, it seems okay to me to move forward. What do you all think? From: Kathy Naibauer <kathy@cwcwd.com> Sent: Friday, January 4, 2019 9:26 AM To: Frank Haug <fhaug weldgov.com>; Kelsey Bruxvoort <Kbruxvoort FLagpros.com> Chris Gathman <cgath man (E'weldgov.com> Cc: Tim Naylor <tnaylor@agpros.com>; Bob Moser <BMoser@agpros.com>; DBTimmer49hotmail.com Subject: RE: T3 Land & Investment PUDZ - Water Supply Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Frank, Our office manager, Roxanne Garcia, had some correspondence with Joanna Williams from CDWR in October about their stated concerns from their April 24, 2018 referral response for this project. At the conclusion of the correspondence Joanna indicated that their comments were "addressed for now". If Joanna has additional concerns we are unaware what they are but will be able to address them once they are made clear. Although the costs established in the December 19 water study are only good for 30 days, and CW's requirements must be met in order to receive service, a can serve letter was generated for this parcel on Mach 14, 2018 which was good for a year. I have attached a copy of it to this email for reference. The can serve letter should be considered an indication that service is available if requirements are met and an additional one can be obtained if the project is delayed past March 14, 2019. The District is not concerned about a lack of availability of service as long as the applicant meets our requirements and is willing to enhance the infrastructure necessary to serve the property. Please feel free to reach out via phone or email if you would like to discuss further. Thanks, Kathy Naibauer Central Weld County Water District 2235 2nd Ave Greeley, CO 80631 Phone 970 352 1284 From: Frank Haug cfhaug@weldgov.com> Sent: Thursday, January 3, 2019 4:33 PM To: Kelsey Bruxvoort <KbruxvoortWagpros.com>; Chris Gathman <cgathman@weldgov.com> Cc: Tim Naylor ctnaylor agpros.com>; Bob Moser BMoserPagpros.com> DBTimmer49@hotmail.com; Kathy Naibauer ckathyPcwcwd.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply The original issue that we had with this I believe was based off of this letter from the state engineer, basically saying that they didn't have enough information to determine whether there was sufficient water supply. Some of that is because the water supply provided by CWCWD that is attached only goes through 2018. I'd say we'd all like to get a more finalized answer to the issue, and at the end of the day we are just trying to determine the sufficiency of the water supply. So far what I see is that we have 1) a letter from the state engineer saying that they don't have enough information from April of this year, 2) a water supply chart that doesn't have information for 2019 and the following years, and then 3) the letter stating that you can purchase the five taps. I think we are close to having all that we need to go back to the state engineer and get an updated letter. However, the sticking point to me seems to be that the water projections haven't been updated for 2019. Isn't that sort of what the state engineer was talking about? Specifically the language below. Until we get an answer to that question, aren't we just going to end up in the same position with another letter from the state engineer saying the same thing? Maybe I am missing something, and if so, I am certainly happy to discuss other alternatives. Thanks. "Since the District's water supply report was last updated with this office on June 30, 2012, we request that the District provide an updated water supply report prior to further evaluation of the subdivision water supply plan. As outlined in the statutes, Section .30-28-1.36(1)(h)(ll), CR.S., a municipality or quasi - municipality is required to file a report with the county and the State Engineer documenting the amount of water which can be supplied to the proposed development without causing injury to existing water rights." From: Kelsey Bruxvoort <Kbruxvoortr.Dagpros.com> Sent: Wednesday, January 2, 2019 10:11 AM To: Frank Haug cfhaug@weldgov.com>; Chris Gathman <cgathman@weldgov.com Cc: Tim Naylor tnaylor@agpros.com>; Bob Moser <BMoser@agpros.com>; DBTimmer49@hotmail.com; Kathy Naibau.er <kathy@cwcwd.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Frank, please see the attached referral response from Central Weld in regards to their water supply plan and the concerns communicated by the Division of Water Resources in their April 24, 2018 referral response for PUDK18-0003. My understanding of Central Weld's policy is that the rates expressed in a commitment letter or water study is valid for 30 -days, after which the rates are subject to change. We do not expect a waiver from their policy would be approved. We are aware that their board recently approved a tap fee increase that takes effect 2/1/2019. Please confirm whether the PUD Change of Zone application can be submitted with this information. Thank you, Kelsey Bruxvoort Land Planner AGPROfessionals 3050 67th Avenue Greeley, CO 80634 Office: 970-535-9318 Mobile: 970-744-0068 Fax: 97O-535-9854 www.agpros.com 1P.'fessionals 1 EV1 1.OI'5:1RS. 0,11 _\(p t1CL..L1 URE From: Frank Haug <fhaugweldgov.com> Sent: Wednesday, January 02, 2019 9:39 AM To: Kelsey Bruxvoort <Kbruxvoort@agpros.com>; Chris Gathman <cgath man C weld ov.co m> Cc: Tim Naylor <tnaylorPagpros.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply Thanks, it appears from this that there is water available. I think that we need to get a copy of the water supply plan letter under CRS 29-20-304(3). Do you have a copy of that? Also, this says it is good for 30 days, can you get them to extend the offer, if not the price, for a year? I think that when we get the water supply plan we will be good to go. From: Kelsey Bruxvoort <Kbruxvoort@agpros.com> Sent: Friday, December 28, 2O18 11:35 AM To: Frank Haug <fhaugweldgov.com>; Chris Gathman <cgathman weldgov.com> Cc: Tim Naylor <tnaylor@agpros.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Frank, please find attached the results of the Central Weld County Water District water study for the T3 Land & Investment, LLC PUDZ application. This is in response to your email below. Water can be supplied to the development through two different options as outlined in the water study results. Please confirm whether the attached water study results are adequate for the submittal of the PUD Change of Zone application. Thank you, Kelsey Bruxvoort Land Planner AGPROfessionals 3050 67th Avenue Greeley, CO 80634 Office: 970-535-9318 Mobile: 970-744-0068 Fax: 970-535-9854 www.agpros.com A'P'''fessiotzals DEVELOPERS `ELOPERS OF AGRICULTURE From: Frank Haug <fhaugRDweldgov.com> Sent: Thursday, August 16, 2018 3:23 PM To: Kelsey Bruxvoort <Kbruxvoort agpros.com>; Chris Gathman <cgathman@weldgov.com> Cc: Tim Naylor <tnayloragpros.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply See attached highlighted language. My concern is that some of the referrals can't be done until the water is resolved, like the fire district referral, the division of water resources, etc. So if we send it out to some, that starts the 28 day clock. If the water district and fire district don't get back within the 28 days, or get back and say that they request denial because of the lack of water plan, then we are creating an issue. Aside from that, the highlighted language in the code appears to me to require that the submittal include the source of water, and that the planning staff not deem it complete until that issue is resolved. Again, maybe I am missing something or misinterpreting this, but I don't see how we can ask for some agency referrals, hold off on some, and deem it a complete application without the water matter being resolved. I just don't know how to reconcile the fact that sending it out for referral without the water matter locked down will be futile since that information is required for some of the referral agencies. Anyway, let me know if you have other thoughts on it or a different suggestion, thanks. From: Kelsey Bruxvoort <KbruxvoortPagpros.com> Sent: Thursday, August 16, 2018 1:51 PM To: Frank Haug cfhaug@weldgov.com>; Chris Gathman <cgathman@weldgov.com> Cc: Tim Naylor <tnaylor agpros.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply Hi Frank, the water study is currently in progress. We needed to provide CWCWD with fire flow requirements and the fee both of which have been submitted. The water study is likely to take 60 days to complete. We expect it by October 4th. We're requesting that the PUD Change of Zone application be allowed to be accepted by the Planning Department so it can be issued for the 28 -day referral process. We understand that we may not be able to be scheduled for the Hearings until the water study is complete. However, if we wait till the beginning of October to submit the PUD Change of Zone application, our estimated date for Public Hearings is December 2018 or January 2019. Please let me know your thoughts, Thanks, Kelsey Bruxvoort Land Planner AGPROfessionals 3050 67th Avenue Greeley, CO 80634 Office: 970-535-9318 Mobile: 970-744-0068 Fax: 970-535-9854 www.agpros.com AGPROfessionals DEVELOP L.tS OF AGRICULTURE From: Frank Haug <-rhaugC weldgov.com> Sent: Thursday, August 16, 2018 1:41 PM To: Kelsey Bruxvoort <KbruxvoortWagpros.com>; Chris Gathman <cgathman@weldgov.com> Cc: Tim Naylor <tnaylor agpros.com Subject: RE: T3 Land & Investment PUDZ - Water Supply Kelsey, maybe I am misunderstanding but isn't this the same information that we had before? I am not seeing any updated information relating to whether the water is available and secured. From what I can gather, the water district has not received the fees or the information they need to perform the study to determine whether they can provide sufficient water for the project. For purposes of processing the application, I think we can get everything ready to go, but we will need some sort of solid determination that there is enough water available. My understanding of the process at this point is that once we have it all completed, we can send out referrals and schedule the planning commission hearing. However, until this water issue is resolved, I don't think we can move forward with a hearing. What suggestions do you have as to procedurally how we move this forward without the water part in place? What timing are you looking for in terms of getting that water issue resolved, or in the meantime, accomplishing while we wait for it to get resolved? Anyway, just trying to make sure I am understanding the issues. Thanks. Frank N. Haug Assistant Weld County Attorney 1150 O Street Mailing Address: P.O. Box 758, Greeley, CO 80632 tel: (970) 400-4394 fax: (970) 352-0242 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Kelsey Bruxvoort <KbruxvoortPagpros.com> Sent: Wednesday, August 15, 2018 8:37 AM To: Chris Gathman <cgathman@weldgov.com> Cc: Tim Naylor <tnaylor agpros.com>; Frank Haug <fhaug weldgov.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply Hi Chris, following up regarding the T3 Land PUD water supply. Please let me know the determination regarding the water supply. Thanks, Kelsey Bruxvoort Land Planner AGPROfess orals 3050 67th Avenue Greeley, Co 80634 Office: 970-535-9318 Mobile: 970-744-0O68 Fax: 970-535-9854 www.agpros.com AGPRO fessionals DEVELOPERS OF AGRICULTURE From: Kelsey Bruxvoort Sent: Friday, August 10, 2018 2:07 PM To: 'Chris Gathmani <cgathman Pweldgovecom> Cc: Tim Naylor <tnaylor agpros.com>; Frank Haug cfhaugweldgov.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply Hi Chris, Central Weld County Weld District provided an updated Water Supply Plan as a response to the concerns communicated by the Division of Water Resources in their April 24, 2018 referral response for PUDK18-OOO3. Please see the attached June 28, 2O18 email from Kathy Naibauer. Please forward this information to the County Attorney to verify whether this satisfies the water requirements for the submittal of the PUD Change of Zone application. A CWCWD water study is currently in progress but it may be 1-2 months before it is complete. To avoid delay, we would request that the PUD Change of Zone application be allowed to be processed as CWCWD and DWR will both have a chance to respond during the 28 -day referral period. Please let me know the determination regarding water supply, Thanks, Kelsey Bruxvoort Land Planner AGPROfessionals 3050 67th Avenue Greeley/ CO 80634 Office: 970-535-9318 Mobile: 970-744-0068 Fax: 970-535-9854 www.agpros.com AGPR fession ash DEVELOPERS OF AGRICULTURE From: Chris Gathman ccgathman @weldgov.com> Sent: Wednesday, June 27, 2018 2:23 PM To: Kelsey Bruxvoort cKbruxvoortagpros.com> Cc: Tim Naylor <tnaylor@agpros.com>; Frank Haug cfhaug@weldgov.com> Subject: RE: T3 Land & Investment PUDZ - Water Supply Dear Kelsey, I received a determination from our Attorneys. An updated water supply plan needs to be submitted by Central Weld Water to the Division of Water Resources (for their review and approval). Once this is addressed, the Attorneys can then evaluate/review the can serve letter to determine if it is adequate to proceed with submittal of the PUD change of zone application. Regards, Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue to l: 970-400-3537 fax:970-400-4098 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. if you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Kelsey Bruxvoort [mai lto : Kbruxvoort@agpros.com] Sent: Thursday, June 21, 2018 4:01 PM To: Chris Gathman <cgathman@weldgov.com> Cc: Tim Naylor <tnaylorC agpros.com> Subject: T3 Land & Investment PUDZ - Water Supply Hi Chris, as discussed today at our pre -application meeting for the T3 Land & Investment 4 -Lot PUD Change of Zone application, we would like to determine whether our current Can Serve Letter is sufficient for submittal of the PUDZ application. Please see the attached Central Weld County Water District (CWCWD) Can Serve letter. Our understanding through discussions with CWCWD are as follows: • CWCWD will supply the required information to the Colorado Division of Water Resources (CDWR) regarding their water supply plan. See the attached referral letter from CDWR. • Our development will likely require a water study with CWCWD prior to issuance of any line extension agreements, tap service agreements, etc. This water study will be predicated on fire flow requirements and will take a minimum of 30-45 days to complete. • A waterline extension is likely required for our development. The above mentioned water study will provide guidance regarding this extension. It is our understanding that proof of adequate water supply will be required before the PUDF can be finalized and that this information can be supplied with the PUD Final Plat application. Please forward this information to the County Attorney to verify whether the attached Can Serve letter is adequate for the PUD Change of Zone application. Thank you, Kelsey Bruxvoort Land Planner AGPROfessionals 3050 67th Avenue Greeley, CO 80634 Office: 970-535-9318 Mobile: 970-744-0068 Fax: 970-535-9854 www.agpros.com GPROfessionals Di. . hi 1 ....� I n 1 R L.1 IN 1.• l •• Hello