HomeMy WebLinkAbout20192405.tiffNOTICE
The Board of County Commissioners of Weld County, Colorado, on July 3, 2019,
conditionally approved a Site Specific Development Plan and Use by Special Review Permit,
1MJUSR19-14-0035, for the property and purpose described below. Conditional approval of this
plan creates a vested property right pursuant to Article 68 of Title 24, C.R.S., for a period of three
years.
DOCKET #: 2019-60
APPLICANT:
Aka Energy Group, LLC
125 Mercado St., Suite 201
Durango, CO 81301
LEGAL DESCRIPTION: Part of the W1/2 SW1/4 of Section 31, Township 4 North, Range 65
West of the 6th P.M., Weld County, Colorado
TYPE AND INTENSITY OF APPROVED USE: A Major Amendment, 1MJUSR19-14-0035, to a
Site Specific Development Plan and Use by Special Review Permit, USR14-0035, (natural gas
and condensate separator facility and compressor facility) to expand the boundaries and to add
an Amine System to treat gas and a Cryogenic Processing Plant including a 125 -foot Flare in the
A (Agricultural) Zone District
SIZE OF PARCEL: 80 acres, more or less
Failure to abide by the terms and conditions of approval will result in a forfeiture of the vested
property right.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
DATED: August 2, 2019
PUBLISHED: August 7, 2019, in the Greeley Tribune
Affidavit of Publication
NOTICE
The Board of County Commissioners of Weld County, Colorado,
on July 3, 2019, conditionally approved a Site Specific Develop-
ment Plan and Use by Special Review Permit, 1MJUSRI9-14•
-
0035, for the property and purpose described below. Conditional
approval of this plan creates a vested property right pursuant to
Article 68 of Title 24, C.R.S., for a period of three years.
DOCKET #: 2O19-60
APPLICANT:
Aka Energy Group, LLC
125 Mercado St., Suite 201
Durango, CO 81301
LEGAL DESCRIPTION: Part of the W1/2 SW1/4 of Section 31,
Township 4 North, Range 65 West of the 6th P.M., Weld County,
Colorado
TYPE AND INTENSITY OF APPROVED USE: A Major
Amendment, 1MJUSR19-14-0035, to a Site Specific Develop-
ment Plan and Use by Special Review Permit, USR14 0035,
(natural gas and condensate separator facility and compressor
facility) to expand the boundaries and to add an Amine System
to treat gas and a Cryogenic Processing Plant including a 125 -
foot Flare in the A (Agricultural) Zone District
SIZE OF PARCEL: 80' acres, more or less
Failure to abide by the terms and conditions of approval will re-
sult in a forfeiture of the vested property -right.
BOARD OF -COUNTY COMMISSIONERS
WELD COUNTY, COLORAD . .
DATED: August - 2019 Tribune
August 7, 2019
STATE OF COLORADO
County of Weld,
I Jennifer Usher
SS.
of said County of Weld, being duly sworn, say
that I am an advertising clerk of
THE GREELEY TRIBUNE,
that the same is a three days weekly plus Sunday
newspaper of general circulation and printed and
published in the City of Greeley in said county and
state; that the notice or advertisement, of which the
annexed is a true copy, has been published in said
daily newspaper for consecutive (days): that the
notice was published in the regular and entire issue
of every number of said newspaper during the
period and time of publication of said notice, and
in the newspaper proper and not in a supplement
thereof; that the first publication of said notice was
contained in the
Seventh day of August A.D. 2019 and the last
publication thereof: in the issue of said newspaper
bearing the date of the
Seventh day of August A.D. 2019 has been
published continuously and uninterruptedly during
the period of at least six months next prior to the
first issue thereof contained said notice or
advertisement above referred to; that said
newspaper has been admitted to the United States
mails as second-class matter under the provisions
of the Act of March 3,1879, or any amendments
thereof; and that said newspaper is a daily
newspaper duly qualified for publishing legal
notices and advertisements within the meaning of
the laws of the State of Colorado.
August 7, 2019
Total Charges: $9.97
7th day of August 2019
My Commission Expires 08/13/2022
Notary Public
VICI< G GARRETTS
NOTARY PUBLIC
STATE OF COLORADO
NOTARY ID ?_0144031754
MY COMMISSION EXPIRES AUGUST 13, 2?
Notice
Pursuant to the zoning laws of the State of Colorado and the Weld County Code, a public hearing
will be held before the Weld County Planning Commission and the Board of County Commissioners in the
Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado, at the times
specified below.
The complete case file may be examined by calling the Department of Planning Services at (970)
353-6100 to make arrangements with the case planner, or at the office of the Clerk to the Board of County
Commissioners, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631. E -Mail
messages sent to an individual Commissioner may not be included in the case file. To ensure inclusion of
your E -Mail correspondence into the case file prior to the Planning Commission hearing, please call
the Department of Planning Services to obtain the appropriate contact information. For inclusion of
any correspondence prior to the Board of Commissioners hearing E-mail egesick@co.weld.co.us.
If a court reporter is desired for either hearing, please advise the Department of Planning Services
or the Clerk to the Board's Office, in writing, at least five days prior to the hearing. The cost of engaging a
court reporter shall be borne by the requesting party. In accordance with the Americans with Disabilities
Act, if special accommodations are required in order for you to participate in this hearing, please contact
the Department of Planning Services at (970) 400-6100, or the Clerk to the Board's Office at (970) 336-
7215, Ext. 4226, prior to the day of the hearing. All cases scheduled before the Planning Commission or
Board of County Commissioners are subject to continuance, due to lack of quorum or otherwise. Contact
the Department of Planning Services or the Clerk to the Board's Office at the numbers above, for hearing
continuance information.
DOCKET #: 2019-60
PLANNING COMMISSION DATE: April 2, 2019
TIME: 12:30 p.m.
BOARD OF COMMISSIONERS DATE: April 24, 2019
TIME: 10:00 a.m.
CASE #: 1MJUSR19-14-0035
APPLICANT: AKA ENERGY GROUP LLC
PLANNER: CHRIS GATHMAN
REQUEST: A MAJOR AMENDMENT TO A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY
SPECIAL REVIEW PERMIT NO. USR14-0035 (NATURAL GAS & CONDENSATE SEPARATOR
FACILITY AND COMPRESSOR FACILITY) TO EXPAND THE BOUNDARIES AND TO ADD AN AMINE
SYSTEM TO TREAT GAS AND A CRYOGENIC PROCESSING PLANT INCLUDING A 125 -FOOT FLARE
IN THE A (AGRICULTURAL) ZONE DISTRICT.
LEGAL DESCRIPTION: W2SW4 SECTION 31, T4N, R65W OF THE 6TH P.M., WELD COUNTY,
COLORADO.
LOCATION: NORTH OF AND ADJACENT TO CR 38; 1 MILE EAST OF CR 35. (See Legal Description for
precise location.)
SIZE: 80 acres, more or less.
DATED: March 13, 2019
PUBLISHED: March 20, 2019, in the Greeley Tribune
ATTENTION: Proposed Conditions related to this Site Specific Development Plan and Use by Special
Review Permit request including, but not limited to, the number of allowable employees, hours of operation,
screening, and number of allowable vehicles and vehicle trips are subject to change or removal at both the
Planning Commission and Board of Commissioners hearings.
Affidavit of Publication
Notice •
Pursuant to thezoning laws of the State of Colorado and the
Weld'County Code, a public hearing will be held before the Weld
County Planning Commission and the Board of County Commis-
sioners in the Hearing Room, Weld County Administration Build-
ing,
1150.O Street, Greeley, Colorado, at the times specified be i2
low.
The complete case tile may be examined by calling the Depart-
ment of Planning Services at (970) 353.6100: to make arrange- '
merits with the case planner,or at the office of the Clerk to the
Board of. County Commissioners, Weld County Administration
Bui₹ding,: 1150 O Street, Greeley, Colorado 60631 E -Mail inca
sages sent to an individual Commissioner may not be included
in the case file. To ensure inclusion' of your E -Mail correspond-
ence into the case file prior to the Planning Commission '
hearing, please call the Dethartment of Planning Services to
obtain the appropriate contact information. For inclusion
of any correspondence prior to the Board ofConimission-
ers hearing E-mail egesick@co.weld.co.us,
If a court reporter is desired for either hearing, please advise the
Department of Planning Services or the Clerk to the 'Board's 0f
floe in writing, at least five days prior to the hearing. The cost of.
engaging a court reporter shalt be borne by the requesting party.
In accordance with the Americans: with Disabilities Act, if special
accommodations are required In order for you to participate in
this hearing please contact the Department of Planning Serv-
ices at (970) 4006100, or the Clerk to the Board's Office at
(370) 336-7215, Ext.4226, prior to the day o€ the hearing.; Alt
cases scheduled before the Planning Commission or Board of
County Commissioners are subject to continuance, due to lack
of quorum:or otherwise, Contact the Department of Planning
Services or the Clerk to the Board's Office at the numbers'
above, for hearing continuance information.
DOCKET 5:2019-60 .
PLANNING COMMISSION DATE: Apnl 2, 2019
TIME: 12:30 p.m.
BOARD OF. COMMISSIONERS DATE April 24, 2019. .
TIME: 10:00 a ra
CASE #: 1 MJUSR19-14 0035 '
• APPLICANT: AKA ENERGY GROUP LLC ..
• PLANNER: .CHRIS GATHMAN..
REQUEST: A MAJOR AMENDMENT TO A SITE SPECIFIC
DEVELOPMENT PLANAND USE BY SPECIAL REVIEW PER-
MIT NO.,USR14 0035 (NATURAL GAS & CONDENSATE SEP
ARATOR FACILITY' AND COMPRESSOR FACILITY TO : EX
PANDTHE;BOUNDARIESANDTO'ADDAN;AMINL�SYSTEM
TO TREAT. GAS AND A CRYOGENIC PROCESSING PLANT
INCLUDING A 125 FOOT FLARE IN THE A (AGRICULTURAL)
ZONE DISTRICT
LEGAL DESCRIPTION: ,W2S'IA/4 SECTION 31, TIN R6SW
OF-THE,6TH PM., WELD COUNTY, COLORADO
LOCATION: NORTH. OF ANDADJACENTTO CR 38 ,1 MILE
EAST OF CR 35. (See Legal Description for precciselocation.).'
;SIZE: 80 acres, more or fess,
DATED: March.13„2019
ATTENTION: Proposed Conditions related. tothis Site Specific
Development Pfen:and Use by Special Review'Permit request
inctudrngg; but not limited to, the number of allowable employees,
hours of operat₹on, screening, and number of allowable vehicles
and vehicle trips are subject to changeor at both the
Planning Commission and Board of Commissioners hearings.
° The Tribune
March 20,'2019[.
STATE OF COLORADO
County of Weld,
I Lucy Montoya
SS.
of said County of Weld, being duly sworn, say
that I am an advertising clerk of
THE GREELEY TRIBUNE,
that the same is a three days weekly plus Sunday
newspaper of general circulation and printed and
published in the City of Greeley in said county and
state; that the notice or advertisement, of which the
annexed is a true copy, has been published in said
daily newspaper for consecutive (days): that the
notice was published in the regular and entire issue
of every number of said newspaper during the
period and time of publication of said notice, and
in the newspaper proper and not in a supplement
thereof; that the first publication of said notice was
contained in the
Twentieth day of March A.D. 2019 and the last
publication thereof: in the issue of said newspaper
bearing the date of the
Twentieth day of March A.D. 2019 has been
published continuously and uninterruptedly during
the period of at least six months next prior to the
first issue thereof contained said notice or
advertisement above referred to; that said
newspaper has been admitted to the United States
mails as second-class matter under the provisions
of the Act of March 3,1879, or any amendments
thereof; and that said newspaper is a daily
newspaper duly qualified for publishing legal
notices and advertisements within the meaning of
the laws of the State of Colorado.
March 20, 2019
Total Charges: $20.85
20th day of March 2019
My Commission Expires 08/13/2022
Notary Public
VICKIE G GARRETI'S
NOTARY PUBLIC
STATE OF COLORADO
NOTARY ID 20144031754
MY COMMISSION EXPIRESAI.iGUST 13, 2022
•
PLANNING COMMISSION & BOARD OF COUNTY
COMMISSIONERS SIGN POSTING CERTIFICATE
THE LAST DAY TO POST THE SIGN IS May 11, 2019. THE SIGN SHALL BE POSTED
ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-
WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL
REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY,
THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST
PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT
AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY
MAINTAINED ROAD RIGHT-OF-WAY.
I, CHRIS GATHMAN, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE
SIGN WAS POSTED ON THE PROPERTY AT LEAST 10 DAYS BEFORE THE
PLANNING COMMISSION AND BOARD OF COMMISSIONERS HEARINGS FOR
1 MJUSR19-14-0035 IN THE AGRICULTURAL ZONE DISTRICT.
Chris Gathman
Name of Person Posting Sign
Signature of Person Posting Sign
STATE OF COLORADO )
) 55.
COUNTY OF WELD
The foregoing instrument was subscribed and sworn to me this • ' day of
• , 2019. WITNESS my hand and official seal.
Notary Public
My Commission Expires:
U
MY COM'u�1:;;fo:.� tX,;. E 5,
Poi'Nat Pe at ings concerning this prop wvdd be heard belbro .qtr
Coin Planning Corp aaxi
Board of County m z• S now
Roth hearing% will be bald al
WELD COUNTY A D PNP TRATt'GN BUILDING
11150 "'OP' Street •' Gre&ey, CO 80631
Pliinwiing Corn n lNslcn fl u Mriµ bet. rin*J an
1 *n.°°11
_
L14 I, - 1 i At4 MAD el air ,ti F fln cis
i t + 3,110 LIMN wi_.90a? 4 PatokriftitAl
c,:,' 4 t.l1$:lkfl1ftatitogina,rela r n,C*t Its
stio . ^a111. itrt.I' 7o •-A ",'-.
lift
iE9ri LILLISIORCLAinie AMU Sri Anti API a l •..
"nil-, M fin T Att A • cl.a 4440 ah ti41:O -1"
1 %Oita MIAS T kt id' -t it7511W4 A rAl..I•Y"ICI
I c A istaf •Ol er;Lrw�'Ai: r SCiNe
C.ONRA. s
Hello