Loading...
HomeMy WebLinkAbout20195185.tiffDEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 December 20, 2019 To: Board of County Commissioners From: Toby Taylor Subject: HVAC Design Services Plaza West — Task Order Weld County awarded on -call design services to four different vendors. There is a need for design services for Air Handler 7 in Plaza West due to being inadequately sized for the planned remodel for two new courtrooms. Carin Design LLC has used the labor rates identified in their bid and quoted a lump sum of $7,280.00 to perform this design work. The attached amendment to the contract to accomplish this work requires BOCC approval. Therefore, Buildings & Grounds is recommending approving this task order. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director Co-nsoxtf Ai -€14- /.2-3n4014 B�CTT1 -`)) 2019-5185 j3Goo2i PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Date: December 19, 2019 Task Order Number: Cairn Design LLC —4-2019 Project Title: Weld County Courtroom HVAC Design Replace CU -7 & AHU-7- Architectural and Engineering Services Commencement Date: Completion Date: Design Compensation: $7,280.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional Task Order Work. In addition to that work described in section 2.1, the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will involve full architectural and engineering design and construction administration of the replacement of CU -7 & AHU-7 for the Weld County Courtrooms in the Centennial Building in Greeley, CO. 1. Architectural, structural, mechanical, electrical and plumbing design for the project as described in the attached Exhibit -Task Order 4-2019. Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. CONTRACTOR: Cairn Design LLC By: Ken Caudle Name: Title: Engineering Manager Date 12/19/2019 PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Weld ' ou ty Clerk to the = oard BY: Deputy C C k t • the APPROVED AS TO FUNDING: Controller APPROVED AS TO FORM: "IS County Attorney WELD COUNTY, COLORADO ^ es Mike Freeman, Pro -Tern DEC 3 0 2019 APPROVED AS TO SUBSTANCE: cted cial or Department Head ozo/9-c/��' CAI DESIG , LLC 64.9 kyki2,40kinafrictGalu,j item Exhibit -Task Order 4-2019 December 18, 2019 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County Courtroom HVAC Design Replace CU -7 and AHU-7- Architectural and Engineering Services In accordance with the fees identified in our bid, our not to exceed price for this on call work for this project is $7,280.00. Scope of Work: The project will involve full architectural and engineering design and construction administration of the replacement of CU -7 and AHU-7 for the Weld County Courtrooms in the Centennial Building in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural, structural, mechanical, electrical and plumbing design for the project. The project scope includes: • Complete design and construction administration for a new condensing unit CU -7 and AHU-7, and electrical as required for the new load as determined by the existing courtrooms mechanical engineer. The mechanical engineer for the courtrooms is responsible for providing all parameters necessary for the functionality of the system. Scope of Services: The scope of services included in this proposal are limited to the following: • Field verification of existing dimensions and systems as they relate to the project. • Coordination with the client as required to execute the scope of work. • Coordination with the building department as required for the permit. • Coordination and connection to existing duct work. • Submissions: Schematic Design, Design Development, Final Design,and For Construction. • Construction administration to include construction project meetings, RFIs, submittal and shop drawing review and approval, and final construction walk-through and punch list. Compensation: Total Design Fee - Not to exceed $7,280.00 1805 Shealy Drive Fort Collins, Colorado 80526 (9101286-1968 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service. Reimbursable expenses, +1- $200 (mileage and printing services) invoiced at cost + 10%. Exclusions: • Design of any system not listed above. • New or additional heating hot water generating systems. • Design changes, layout changes, or value engineering requested by client or owner after the final submission. Sincerely, Ken Caudle, PE Engineering Principal Approved and Accepted By: DEC 302019 Signature Date Mike Freeman, Pro—Tem Board of Weld County Commissioners Name Title ,2-0/9-, I��� Project: Courtrooms HVAC Additional Services - Replace AHU-7 and CU -7 Architecture/Structural Hours Principal PM Arch/Eng Drafter Assumptions Principal 0 Site Visit 0 Space Planning / Architectural 0 Structural Evaluation 5 1 4 Revisions 0 Code Forms 0 Permit Comments 0 Design Meetings 0 Construction Meetings 0 Total 5 hours 0 1 4 0 hours $175.00 $150.00 $125.00 $90.00 rates Architecture $0.00 $150.00 $500.00 $0.00 $650.00 Total Project Management Hours General Project Management 2 Design Meetings 1 Construction Meetings 1 4 hours Electrical Hours Principal 1 Site Visit 2 Design 4 Schedules 2 Revisions 0 Code Forms/Calculations 1 Permit Comments 0 Design Meetings 0 Construction Meetings 0 Principal PM Arch/Eng Drafter Assumptions 2 1 1 hour/ 1 mtg 1 0 4 0 0 hours $175.00 $150.00 $125.00 $90.00 rates Project Management $0.00 $600.00 $0.00 $0.00 $600.00 Total Principal PM Arch/Eng Drafter Assumptions 1 2 2 2 2 0 1 0 0 1 hour/ 1 mtg Total 10 hours 1 0 7 2 hours $175.00 $150.00 $125.00 $90.00 rates $1,230.00 Total Elec Mechanical Hours PM 3 Principal 1 Site Visit/As-Builts 4 Balance/Calcs/Evaluation 2 Design 15 Revisions 2 Code Forms/Schedules 2 Permit Comments 2 Design Meetings 2 Construction Meetings 2 Construction Admin 4 Total $175.00 $0.00 $875.00 $180.00 Electrical $1,230.00 Total Principal PM Arch/Eng Drafter Assumptions 3 1 4 2 5 10 2 2 2 2 2hours/ mtgs/1 mtgs 2 2hours / mtg / 1 mtgs 4 39 hours 3 5 21 10 hours $175.00 $150.00 $125.00 $90.00 rates $525.00 $750.00 $2,625.00 $900.00 Architectural/Structural A/E Project Management Electrical Mechanical/Plumbing $650.00 Total Architectural $600.00 Total PM Fee $1,230.00 Total EIec/PM Fee $4,800.00 Total M and P fee $7,280.00 Total NE fee Mechanical $4,800.00 Total Invoicing Schedule and Submissions 30% $2,184.00 SD 30% $2,184.00 DD 30% $2,184.00 CD 10% $728.00 Construction $7,280.00 Total Hello