Loading...
HomeMy WebLinkAbout20191773.tiffHEARING CERTIFICATION DOCKET NO. 2019-51 RE: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT, USR19-0002, FOR A MINERAL RESOURCE DEVELOPMENT FACILITY, OIL AND GAS SUPPORT AND SERVICE FACILITY (CLASS II OILFIELD WASTE DISPOSAL FACILITY - SALT WATER INJECTION FACILITY) IN THE A (AGRICULTURAL) ZONE DISTRICT - ENGLISH FEEDLOT 2, LLC, CIO EXPEDITION WATER SOLUTIONS COLORADO, LLC A public hearing was conducted on May 15, 2019, at 10:00 a.m., with the following present: Commissioner Barbara Kirkmeyer, Chair Commissioner Mike Freeman, Pro -Tern Commissioner Sean P. Conway Commissioner Scott K. James Commissioner Steve Moreno Also present: Acting Clerk to the Board, Jessica Reid Assistant County Attorney, Bob Choate Planning Services Department representative, Angela Snyder Public Works Engineer representative, Mike McRoberts Health Department representative, Ben Frissell The following business was transacted: 2( I hereby certify that pursuant to a notice dated March 27, 2019, and duly published April 3, 2019, in the Greeley Tribune, a public hearing was conducted to consider the request of English Feedlot 2, LLC, c/o Expedition Water Solutions Colorado, LLC, for a Site Specific Development Plan and Use by Special Review Permit, USR19-0002, for a Mineral Resource Development Facility, Oil and Gas Support and Service Facility (Class II Oilfield Waste Disposal Facility — Salt Water Injection Facility) in the A (Agricultural) Zone District. Bob Choate, Assistant County Attorney, made this a matter of record. ' Angela Snyder, Department of Planning Services, presented a brief summary of the proposal and mentioned the site is on Lot B of Recorded Exemption, RECX18-0167. She indicated 13 referrals were sent out, eight (8) agencies responded, and the site is within the three (3) mile referral area of the Towns of Hudson and Lochbuie, and the City of Fort Lupton, and is located within the Fort Lupton Cooperative Planning Agreement (CPA) boundary. She stated the site would include a steel building to house an office and injection pumps, a concrete tank containment area, and a pipeline to deliver water to the site. She noted there will be ten (10) full-time employees over three (3) shifts, eight (8) parking stalls, and no screening or landscaping is proposed. She described surrounding uses, displayed images of site, and entered the favorable recommendation of the Planning Commission into the record as written. Mike McRoberts, Department of Public Works, provided a brief overview of the transportation plans and requirements, stated the access is on County Road (CR) 10, and provided traffic C.C:4LinSit&l, PW(Ynmi £t4LS ) aglHid 28161 2019-1773 PL1221 HEARING CERTIFICATION - ENGLISH FEEDLOT 2, LLC, C/O EXPEDITION WATER SOLUTIONS COLORADO, LLC (USR19-0002) PAGE 2 counts, average speed, and daily roundtrip information. He noted the site will have gravel or concrete on all drive surfaces, the Department of Public Works (PW) is requiring a Road Maintenance Agreement (RMA), and presented the drainage and grading requirements. 2 Ben Frissell, Department of Public Health and Environment, reviewed the water and sewer provisions and reiterated there will be up to ten (10) full-time employees. He stated water would be provided by a proposed commercial well, the applicant is proposing to install a commercial septic system, and noted floor drains will drain into the offload pad sump. He stated the Department of Public Health and Environment (EH) is requiring a Groundwater Monitoring Plan and an Offload Plan Design, and Development Standards (DS) #17-39 address EH items. In response to Commissioner Conway, Ms. Snyder reiterated the Town of Locubuie's concerns. 12 Eric Wernsman, with Wernsman Engineering and Land Development, represented the applicant and stated the owner of Expedition Water Solutions Colorado, LLC, Jim Goddard, responded to the Town of Lochbuie regarding their concerns. He described the noise mitigation measures, explained the site layout, mentioned there will be restrooms for employees and truck drivers, and stated the pipeline to the site should be completed around the same time as site construction. a No public testimony was offered concerning this matter. Chair Kirkmeyer suggested deleting Condition of Approval (COA) #1.F (Communication Plan), adding "including the Dark Sky Policy' to COA #1.G (Lighting Plan), changing "be limited to" to "no more than" in DS #4 (number of employees), deleting "and the Communication Plan" from DS #6 (Decommissioning Plan), adding a new DS #7 that reads "The applicant shall maintain compliance with the Lighting Plan", and changing the language in DS #22 (portable toilet screening) from "public vies/' to "public rights -of -way", and the Board agreed. El In response to Chair Kirkmeyer, Mr. Wernsman indicated he had reviewed, and agreed to abide by, the Conditions of Approval and Development Standards, as amended. la No public testimony was offered with regard to the changes to Conditions of Approval and Development Standards. IR Commissioner Moreno moved to approve the request of English Feedlot 2, LLC, c/o Expedition Water Solutions Colorado, LLC, for a Site Specific Development Plan and Use by Special Review Permit, USR19-0002, for a Mineral Resource Development Facility, Oil and Gas Support and Service Facility (Class II Oilfield Waste Disposal Facility — Salt Water Injection Facility) in the A (Agricultural) Zone District, based on the recommendations of Planning staff and the Planning Commission, with the Conditions of Approval and Development Standards, as amended. The motion was seconded by Commissioner Conway, and it carried unanimously. There being no further discussion, the hearing was completed at 11:36 a.ni. 2019-1773 PL1221 HEARING CERTIFICATION - ENGLISH FEEDLOT 2, LLC, C/O EXPEDITION WATER SOLUTIONS COLORADO, LLC (USR19-0002) PAGE 3 This Certification was approved on the 20th day of May, 2019. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, CO ORADO ATTEST: data) � Weld County Clerk to the Board BY: Deputy Cler AP ount orney Steve Moreno Date of signature: Cs III/Iq BarbbaraKirkmey- , Chair Mike Freeman, Pro -Tern XCUSED DATE OF APPROVAL an P/ onway 2019-1773 PL1221 ATTENDANCE LIST 0511 '201q In: NAME - PLEASE PRINT _ _ EGJEILY ADDRESS (CITY•, STATE_ZIP) EMAIL ; COUNTY OF ; :RESIDENCE SPEAKING - (WS)? Ailkettif I fu.; - 955c, E. -.-as Fps_ it)? W7 A --r,,.:, dent_ - C a� y 13. I/ Cw-cr.c rd. ,f \At.. ceery Z / c.D .z1 c—to�... c... - Luse( e N s_5`6G'.flk A/nII// Vt-c-o ft; b +, X53(, E. (-14 ccu.-loge_ a 1nit G.14- 1 ` C 16L OnD9 WIC Ir "L /) •/t (O Ved[rte,1r.Owscc,✓oinbigcsII€e,.co+- a w t" N. a 1-I0flra,) sr; f]$' SI. / L , (o tiiki 0,4. lo!(}ick5c,.'04 :J`10,.c.w Ornv`.i Nit* a Z0 TIM- 525}AO\ Sts LL10( DVS I MS 1G a is n � OA ►� & AAa—r NOV--17Y\50ty1 co4 8J L` to 04,104 ,4, CR./6s, L, ge `r)' Hello