Loading...
HomeMy WebLinkAbout20190422.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 52 BETWEEN COUNTY ROADS 63 AND 65 FOR APPROXIMATELY TWELVE (12) DAYS, FOR CULVERT REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 52, between County Roads 63 and 65, be temporarily closed, with said closure being effective February 4, 2019, for approximately twelve (12) days for a culvert replacement, and further, that standard official traffic control devices shal be erected at said closure giving notice of the restrictions. C,ci. , 2,s ,Z►s 'rcx1, c0 Sk.ote t oot 2/zo/tq 2019-0422 EG0024 TEMPORARY CLOSURE - COUNTY ROAD 52 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 28th day of January, A.D., 2019. BOARD OF COUNTY COMMISSIONERS WE,I D COUNTY, COLO'ADO ATTEST: dithio W ;11 Weld County Clerk to the Board BY' Q- eputy Clerk to the Board APP' : ' ED AS County Attorney Date of signature: (1'; to If l9 Mike Freeman, Pro -Tern arbara Kirkmeyer, ' hair . James .274 Steve Moreno 2019-0422 EG0024 MEMORANDUM TO: Clerk to the Board DATE: January 23, 2019 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 29 between WCR 84 and WCR 86 is closed from 2/4/2019 thru 2/8/2019 for a culvert replacement. $(. WCR 52 between WCR 63 and WCR 65 is closed from 2/4/2019 thru 2/15/2019 for a culvert replacement. See attached closure diagram(s). 2019-0422 YA eMZcf 41 WCR 380 Er Slf*"40 3 DETOUR. i tE WcR 63 EsEgg cc4y54g4O44OIP444*c4na#-IR SI IL ftf Iti ft it Itt It Et III tt2 It I$ It at It Iv It It ft m IC itf fF IL It It Lp ft It 1 - NA_\ am4t WCR 52 S,V.G:4'a . sr me, 4.4 Eta Et � t La. 2 2 radfigr 21/1 ROAD CLOSET, rCe.' LOCAL Ate rtTRAFFIC ONLY rAr Ar Akt \h w se_ till cr.& Et WCitt 65to to itAs It iJrsS fi! n 4 4 N. W �t ies IC In Et SIJ W Its It N! [II It It et ttl It IL kV 6V flit u ttt It ,N It tE It IL Project # AN -59 Road closure description WCR 52 between WCR 63 and WCR 65 closed 2/4/2019 thru 2/15/2019 for culvert replacement Notice to Public Road signs and barricaded during closure No Message boards to be used Detour Route WCR 63 between WCR 52 and WCR 380 .5 mile gravel WCR 380 between WCR 63 and WCR 65 1 mile gravel Notes ADT of WCR 52 is; 91/2018 Culvert replaced is irrigation: with new 96" CSPR Water to be used for dust control Culvert is .2 east of WCR 63 on WCR 52 Placement of signs not to scale Date 1/23/2019 Prepared by LEE STEPHEN Approved by county engineer CAMERON PARROTT Hello