HomeMy WebLinkAbout20190422.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 52 BETWEEN COUNTY ROADS 63 AND 65 FOR
APPROXIMATELY TWELVE (12) DAYS, FOR CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 52, between County Roads 63 and 65,
be temporarily closed, with said closure being effective February 4, 2019, for approximately
twelve (12) days for a culvert replacement, and further, that standard official traffic control devices
shal be erected at said closure giving notice of the restrictions.
C,ci. , 2,s ,Z►s 'rcx1,
c0 Sk.ote t oot
2/zo/tq
2019-0422
EG0024
TEMPORARY CLOSURE - COUNTY ROAD 52
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 28th day of January, A.D., 2019.
BOARD OF COUNTY COMMISSIONERS
WE,I D COUNTY, COLO'ADO
ATTEST: dithio W ;11
Weld County Clerk to the Board
BY' Q-
eputy Clerk to the Board
APP' : ' ED AS
County Attorney
Date of signature: (1'; to If l9
Mike Freeman, Pro -Tern
arbara Kirkmeyer, ' hair
. James
.274
Steve Moreno
2019-0422
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: January 23, 2019
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 29 between WCR 84 and WCR 86 is closed from 2/4/2019 thru 2/8/2019 for a culvert replacement.
$(. WCR 52 between WCR 63 and WCR 65 is closed from 2/4/2019 thru 2/15/2019 for a culvert replacement.
See attached closure diagram(s).
2019-0422
YA eMZcf
41
WCR 380
Er
Slf*"40
3
DETOUR.
i
tE
WcR 63
EsEgg cc4y54g4O44OIP444*c4na#-IR
SI
IL
ftf
Iti
ft
it
Itt
It
Et
III
tt2
It
I$
It
at
It
Iv
It
It
ft
m
IC
itf
fF
IL
It
It
Lp
ft
It
1 -
NA_\
am4t
WCR 52
S,V.G:4'a . sr me, 4.4 Eta Et � t La.
2 2
radfigr 21/1
ROAD CLOSET,
rCe.' LOCAL Ate
rtTRAFFIC ONLY
rAr Ar Akt
\h w
se_
till cr.&
Et
WCitt 65to
to
itAs
It
iJrsS fi! n 4 4 N.
W �t
ies
IC
In
Et
SIJ
W
Its
It
N!
[II
It
It
et
ttl
It
IL
kV
6V
flit
u
ttt
It
,N
It
tE
It
IL
Project # AN -59
Road closure description
WCR 52 between WCR 63 and WCR 65
closed 2/4/2019 thru 2/15/2019
for culvert replacement
Notice to Public
Road signs and barricaded during closure
No Message boards to be used
Detour Route
WCR 63 between WCR 52 and WCR 380 .5 mile gravel
WCR 380 between WCR 63 and WCR 65 1 mile gravel
Notes
ADT of WCR 52 is; 91/2018
Culvert replaced is irrigation: with new 96" CSPR
Water to be used for dust control
Culvert is .2 east of WCR 63 on WCR 52
Placement of signs not to scale
Date
1/23/2019
Prepared by
LEE STEPHEN
Approved by county engineer
CAMERON PARROTT
Hello