Loading...
HomeMy WebLinkAbout20191987.tiffRESOLUTION RE: ACTION OF BOARD CONCERNING USE BY SPECIAL REVIEW PERMIT, USR19-0014, FOR A 1041 MAJOR FACILITY OF A PUBLIC UTILITY (A WIND ENERGY FACILITY FOR UP TO 380 MEGAWATTS (MW), ALONG WITH ONE (1) 230 KILOVOLT (KV) TRANSMISSION LINE APPROXIMATELY ELEVEN (11) MILES IN LENGTH AND ONE (1) 115 KV TRANSMISSION LINE APPROXIMATELY FIFTEEN (15) MILES IN LENGTH, TWO (2) ELECTRICAL SUBSTATIONS, TWO (2) TEMPORARY LAYDOWN YARDS AND TWO (2) CONCRETE BATCH PLANTS ALONG WITH UP TO SEVEN (7) TEMPORARY CONSTRUCTION TRAILERS TO BE UTILIZED DURING THE CONSTRUCTION OF THE FACILITIES AND SIX (6) METEOROLOGICAL TOWERS) IN THE A (AGRICULTURAL) ZONE DISTRICT - LEEWARD RENEWABLE ENERGY DEVELOPMENT, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board of County Commissioners held a public hearing on the 22nd day of May, 2019, at the hour of 10:00 a.m., in the Chambers of the Board for the purpose of hearing the application of Leeward Renewable Energy Development, LLC, 6688 N. Central Expressway, Suite 500, Dallas, Texas 75206, for a Site Specific Development Plan and Use by Special Review Permit, USR19-0014, for a 1041 Major Facility of a Public Utility (a wind energy facility for up to 380 megawatts (MW), along with one (1) 230 kilovolt (kV) transmission line approximately eleven (11) miles in length and one (1) 115 kV transmission line approximately fifteen (15) miles in length, two (2) electrical substations, two (2) temporary laydown yards and two (2) concrete batch plants along with up to seven (7) temporary construction trailers to be utilized during the construction of the facilities and six (6) meteorological towers) in the A (Agricultural) Zone District on the following described real estate, to -wit: The proposed facility is located in Sections 6, 7, and 8, Township 10 North, Range 58 West; Section 1, Township 10 North, Range 59 West; Sections 2 and 3, Township 10 North, Range 60 West; Sections 1, 3, 4, 5, 6, 7, 9, 10, 19, 30, and 31, Township 11 North, Range 58 West; Sections 1, 2, 3, 4, 5, 7, 8, 9, 10, 11, 12, 15, 17, 18, 19, 20, 22, 23, 24, 25, 29, and 36, Township 11 North, Range 59 West; Sections 13, 14, 23, 24, 25, 26, and 35, Township 11 North, Range 60 West; Sections 19, 20, 21, 25, 26, 27, 29, 32, 33, 34, 35, and 36, Township 12 North, Range 58 West; Sections 19, 20, 21, 22, 24, 26, 27, 28, 29, 30, 31, 32, 34, 35, and 36, Township 12 North, Range 59 West; and Sections 22, 23, 24, 25, 26, and 27, Township 12 North, Range 60 West of the 6th P.M., Weld County, Colorado cc/.Pc_CcC..,(TP),PwCmm1, EKcL-(-L Ca(6C), C..PPL REP Oco/al/t9 2019-1987 PL2672 RE: CONTINUANCE (USR19-0014) - LEEWARD RENEWABLE ENERGY DEVELOPMENT, LLC PAGE 2 WHEREAS, the Board heard all of the testimony and statements of those present and reviewed the request of the applicant and, having been fully informed, finds that this request be approved and the matter should be continued to June 10, 2019, at 9:00 a.m., to allow adequate time for proper notice and public testimony. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the abovementioned matter be, and hereby is, continued to June 10, 2019, at 9:00 a.m. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 22nd Day of May, A.D., 2019. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: 4tifmvs,) X:44 Weld County Clerk to the Board BY puty Clerk to the Boar APPR• .: D AS ttorney Date of signature: ()(oII00(19 Barbara Kirkmeyer, ChaJir Mike Freeman, Pro-Tem ConwaV' _ Y v tt K. James 77 — Steve Moreno 2019-1987 PL2672 Hello