Loading...
HomeMy WebLinkAbout20191585.tiffUSE BY SPECIAL REVIEW (USR) APPLICATION DEPARTMENT OF PLANNING SERVICES * 1555 N. 17TH AVENUE * GREELEY, CO 80631 www.weldgov.com * 970-400-6100 * FAX 970-304-6498 FOR PLANNING DEPARTMENT USE: AMOUNT $ 2.500 APPLICATION RECEIVED BY MH DATE RECEIVED: 12/4/2018 CASE # ASSIGNED: USR18-0124 PLANNER ASSIGNED: MH Parcel Number': 1 0 5 9- 3 4- 3- 0 0- 0 4 7 Address of site: 9239 CR 38, Platteville, CO 80651 ('A 12 digit number on Tax I.D. information, obtainable at www weldgov.com). Legal Description: PT SW4 34-4-67 Lying in the E2SW4 Section: 34 Township: 4 N Range: 67 W Zone District: Ag Acreage: 40 +/- Floodplain: 142)VQGeological Hazard: YQV ® Airport Overlay: you ® FEE OWNER(S) OF THE PROPERTY: Name: Silbaugh, Veronica and Cameron Company: Phone #: Street Address: 9239 CR 38 Email: City/State/Zip Code: Platteville, CO 80651 Name: Company: Phone #: Street Address: City/State/Zip Code: Name: Email: Company: Phone #: Street Address: City/State/Zip Code: Email: APPLICANT OR AUTHORIZED AGENT: (See below: Authorization must accompany all applications signed by Authorized Agents) Name: Kelsey Bruxvoort Company: AGPROfessionals Phone #: (970) 535-9318 Email: kbruxvoort@agpros.com Street Address: 3050 67th Ave City/State/Zip Code: Greeley, CO 80634 PROPOSED USE: Outdoor venue for uo to 200 people operated on approximately 5 -acres of a 40 -acre parcel. The venue will offer rentable outdoor space for private gatherings. Weddings are anticipated to be the primary use for the venue, but it may be used for Quinceaneras, retirement parties, rotary clubs, etc. Existing Use By Right activites associated with the property will continue. I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner. notarized evidence must be included indicating that the signatory has to legal authority to sign for the corporation. last Siana Signs re: Owner or Authorized Agent Date Signature: Owner or Authorized Agent Date Print Name Print Name Rev 412016 DocuSign Envelope ID: 556C51O8-8825-4B11-9FA1-A47A3E254674 AGPROfessionals DE El OPERS OF AGRICULTURE August 8, 2018 To Whom It May Concern: Veronica and Cameron Silbaugh are contracted with AGPROfessionals to process work related to Weld County land use and permit work. AGPROfessionals is authorized to represent and request the release of all records necessary on the behalf of Veronica Silbaugh and Cameron Silbaugh. We respectfully request that all correspondence be directed to AGPROfessionals. Sincerely, DocuSigned by: Eve Si(ka4 9/10/2018 6:29:56 AM PDT ittiftirSilbaugh Date DocuSigned by: Lam Ca* int& S 004 9/10/2018 6:28:55 AM PDT �4lbaugh Date ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 67th Avenue, Suite 200 0 Greeley, CO 80634 970.535.9318 /office 0 970.535.9854 / fax 0 www.agpros.com AGPROfessionals DEVELUPLRS Ulr AGRICUL1 URE USE BY SPECIAL REVIEW (USR) QUESTIONNAIRE Prepared for Veronica and Cameron Silbaugh St. Vrain River Ranch Planning Questions: 1. Explain, in detail, the proposed use of the property. Veronica and Cameron Silbaugh are requesting a Use By Special Review (USR) permit for an outdoor venue for up to 200 people located in the Southwest Quarter of Section 34. Township 4 North, Range 67 West of the 6t" P. M. Vrain River Ranch. The outdoor venue will be operated on approximately 5 -acres of the 40 - acre parcel nestled near the Saint Vrain River. The venue will offer a cost-effective rentable outdoor space for private gatherings. Weddings are anticipated to be the primary use for the venue. however the facility may be used for quinceaneras, company picnics. retirement parties. rotary clubs, etc. The facility will take advantage of the rustic rural charm of the site. The proposed name of the facility is the St. The anticipated users of the facility are the current residents. event attendees. wedding planners. maintenance workers. The proposed venue will be constructed and utilized in two phases. The use of the venue during phase one will be seasonal and will consist of outdoor use. 6:00 A.M. to 12:00 A.M., 7 -days a week, April 1;t through September 30th. No new structures are proposed with phase one. gatherings. At full build out. the facility will be operational 6:00 A.M. to 12:00 A.M.. 7 -days a week. year-round. The primary hours of operation for both phases are expected to be 10 00 A.M. to 11:00 P.M.. weekends. Friday through Sunday with the heaviest use anticipated to occur during summer months. The hours of use will vary event to event depending on patron needs. wedding officiants. musicians. caterers/food truck vendors. and contract Phase two includes the construction of a barn for indoor The existing residence associated outbuildings, residential uses and agricultural uses will continue to be operated as a Use By Right in the A (Agricultural) Zone District separate from the venue activities. A facility entrance sign is proposed. as shown on the site plan. applicable Weld County code requirements. mounted lights. low profile garden walkway lights and string -lights. proposed. T character of the site. Facility sign(s) will adhere to Outdoor lighting is anticipated to include wall - Pole lights are not he existing vegetation will be retained as much as possible to preserve the rural Parking will occur in an improved gravel area as shown on the site plan. 2. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 22 of the Comprehensive Plan. This USR application has been prepared utilizing the process outlined in the Weld County Code and Procedural Guides. The Guiding Principles of the Comprehensive Plan found in Section 22-1-120 states. "Land use changes must afford flexibility based on the specific ENGINEERING, PLAN\I\(;, ('ONSt I.TI\G & REAL ES"I'I 3050 67'h Avenue, Suite 200 0 Greeley, CO 80634 970.535.9318 i office 0 970.535.9854 fax 0 www.agpros.com Page 2 of 9 location and the particular circumstances encountered within the locality. It is also important to weigh the cumulative impacts that specific land use changes will have. This proposal is respectful of surrounding uses. There are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and county. Section 22-2-10. F. states.Land use policies should support a high -quality rural character which respects the agricultural heritage and traditional agricultural land uses of the County. as agricultural lands are converted to other uses (excluding urban development). Rural character in the County includes those uses which provide rural lifestyles, rural -based economies and opportunities to both live and work in rural areas. The natural landscape and vegetation predominate over the built environment. Agricultural land uses and development provide the visual landscapes traditionally found in rural areas and communities. - Section 22-2-20.B.3 A.Policy 2.3 states. -Encourage development of agriculture and agriculturally related businesses and industries in underdeveloped areas where existing resources can support a higher level of economic activity. Agricultural businesses and industries include those related to ranch. confined animal production. farming, greenhouse industries. landscape production and agri-tainment or agri-tourism uses. The site is located in an area that can support this type of use. This facility will retain and enhance the rural character of the site with respect for the agricultural tradition of Weld County The facility aims to be a cost effective agri-tourism. agri-tainment event venue. 3. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 23 (Zoning) and the zone district in which it is located. The proposal is consistent with the intent of the A (Agricultural) Zone District. This proposal is allowed in the A Zone as a Use By Special Review as called in Chapter 23. 23-3-40. 23-3-40-S. Any use permitted as a Use By Right, an accessory use. or a Use by Special Review in the commercial or industrial zone districts. provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions. PUD development proposals shall not be permitted to use the special review permit process to develop. 23-3-40-W. Uses similar to the uses listed above as Uses by Special Review as long as the use complies with the general intent of the A (Agricultural) Zone District. The Design Standards (Section 23-2-240. Weld County Code), Operation Standards (Section 23-2-250. Weld County Code). Conditions of Approval and Development Standards can ensure that there are adequate provisions for the protection of health. safety, and welfare of the inhabitants of the neighborhood and county. 4. Describe what type of land uses surround the site. Explain how the proposed use is consistent and compatible with surrounding land uses. The surrounding area is primarily crop farming. rural residential and undeveloped riparian woodland. Page 3 of 9 The property is located near the confluence of the Saint Vrain and South Platte Rivers. Large undeveloped parcels near and/or containing the rivers owned by Public Service Company of Colorado are east of the subject property. Public Service Company of Colorado also owns the parcel along the northwestern boundary which was historically railroad right-of-way and is currently proposed as a rails -to -trails parcel for recreational use. The St. Vrain River Ranch will be compatible with the surrounding land uses and will take advantage of the rural rustic charm of the site. 5. What are the hours and days of operation? (e.g. Monday thru Friday 8:00 a.m. to 5:00 p.m.) The proposed venue will be constructed and utilized in two phases. The use of the venue during phase one will be seasonal and will consist of outdoor use. 6:00 A.M. to 12-00 A.M.. 7 -days a week. April 1st through September 30th. No new structures are proposed with phase one. Phase two includes the construction of a barn for indoor gatherings. At full build out. the facility will be operational 6:00 A.M. to 12:00 A.M.. 7 -days a week. year-round. The primary hours of operation for both phases are expected to be 1O00 A.M. to 11:00 P.M.. weekends, Friday through Sunday with the heaviest use anticipated to occur during summer months. The hours of use will vary event to event depending on patron needs. 6. List the number of full time and/or part time employees proposed to work at this site. The property owners will be managing the outdoor venue operations. Landscape and maintenance work will be hired as needed. Outside vendors may be engaged for events depending on patron needs. 7. If shift work is proposed include the number of employees per shift. Shift work is not proposed. 8. List the number of people who will use this site. Include contractors, truck drivers, customers, volunteers, etc. This is a USR request to allow up to 200 people to use the proposed outdoor venue. The residents will continue to use the property as they have historically. The anticipated users of the facility are the current residents, event attendees, wedding planners. wedding officiants. musicians. caterers/food truck vendors. and contract maintenance workers. 9. If this is a dairy, livestock confinement operation, kennel. etc.. list the number and type of animals. This site is not a CAFO. however owners personal animals and livestock may be on -site. 10. Describe the type of lot surface and the square footage of each type. (e.g. asphalt, gravel. landscaping, dirt. grass, buildings) Lot surfaces will be rangeland grass and riparian woodland with improved gravel surfaces in roadways and parking areas. The existing vegetation will be retained as much as possible to preserve the rural character of the site. Page 4 of 9 11. How many parking spaces are proposed? How many handicapped (ADA) parking spaces are proposed? An improved gravel surface parking area is proposed. Sixty-eight (68) standard spaces for attendees and two (2) handicapped (ADA) parking spaces are proposed. A parking area for vendors/food trucks is also proposed, as shown on the site plan. 12. Explain the existing and proposed landscaping for the site. The existing vegetation and landscaping will be retained as much as possible to preserve the rustic/rural charm of the site. The property owners may contract additional landscape improvements in the future separate from this USR request. The venue is significantly set back from the public right-of-way and existing landowners. sufficient vegetative screening. Existing trees and shrubs provide 13. Describe the type of fence proposed for the site. (e.g. 6 -foot chain link with earth tone slats) Rod and rail fencing is proposed. specifically along the riverbanks for safety. Additional fencing may be built in the future between the residence and the outdoor venue area. 14. Describe the proposed screening for all parking and outdoor storage areas. If the site is located in a floodplain outdoor storage is restricted. See planning question no. 12 above. The subject property is located in a 100 Year Zone A floodplain. No outdoor storage is proposed Tables. chairscanvas tents. etc. will be stored in the existing outbuildings. 15. Explain any proposed reclamation procedures when termination of the Use by Special Review activity occurs. If venue operations cease to occur the subject property will continue to be used as a single- family residential site. 16. Who will provide fire protection to the site? The Platteville-Gilcrest Fire Protection District will provide fire protection to the site. 17. List all proposed on -site and off -site improvements associated with the use (e.g. landscaping, fencing, buildings, drainage, turn lanes, etc.) and a timeline of when you will have each one of the improvements completed. No off -site improvements are proposed. Existing on -site improvements include a single- family residence and associated out -buildings. improved gravel surfaces. landscaping and fencing. A barn is proposed for phase two for indoor gatherings as shown on the site plan. The existing gravel drive will be widened to allow for two-way traffic and a parking area with improved gravel surfaces is proposed. Page 5 of 9 Engineering Questions: 1. Describe how many roundtrips/day are expected for each vehicle type: Passenger Cars/Pickups, Tandem Trucks, Semi-Truck/Trailer/RV (Roundtrip = 1 trip in and 1 trip out of site) Typical vehicles accessing the site include personal vehicles as well as vendor trucks. Arrivals and departures will be staggered throughout the duration of each event and car- pooling by attendees is anticipated. Traffic volumes will vary significantly as volumes are dependent on the type of event and number of attendees. Anticipated traffic volumes for a typical event are shown below. Pickups and cars: Vendor vehicles: 40 trips/day for personal vehicles up to 3 vehicles, one round-trip per day each 2. Describe the expected travel routes for site traffic. Traffic to the site will come from WCR 38 to the west and from WCR 19 1/2 to the south. 3. Describe the travel distribution along the routes (e.g. 50% of traffic will come from the north, 20% from the south, 30% from the east, etc.) It is anticipated that 40% of traffic will travel along WCR 38 from the west and 60% will travel along WCR 19 1/2 from the south. 4. Describe the time of day that you expect the highest traffic volumes from above. The highest traffic volumes are expected during morning hours between 10.00 AM to 12:00 PM and during evening hours between 6:00 P.M. to 8:00 P.M. 5. Describe where the access to the site is planned. The facility access features two ingress/egress points on WCR 38 and WCR 19 1/2. The site access is historical to the property and allows vehicles to safely navigate the curve where WCR 38 and WCR 19 1/2 join. The access provides users with adequate sight lines down both WCR 38 and WCR 19 1/2 and functions as acceleration/deceleration lanes outside the public right-of-way. No change to the existing access point is proposed. 6. Drainage Design: Detention pond summarized in a drainage report is required unless the project falls under an exception to storm water detention requirements per code section 23-12-30 F.1. A. Does your site qualify for an exception to storm water detention? If so, describe in a drainage narrative the following: 1. Which exception is being applied for and include supporting documentation. 2. Where the water originates if it flows onto the property from an offsite source 3. Where it flows to as it leaves the property 4. The direction of flow across the property 5. If there have been previous drainage problems with the property Page 6of9 The subject property is currently a non -urbanizing agricultural property with an existing residence and outbuildings. The parcel has an unobstructed flow path and is immediately adjacent to a Federal Emergency Management Administration (FEMA) regulatory floodplain channel and. therefore. is exempt from stormwater detention per Article XII. Storm Drainage Criteria, Section 23-12-30 Drainage Policy. F. Exceptions. 1. Exceptions to stormwater detention shall not jeopardize the public health. safety, and welfare of public and private property and shall be limited to the following: a. No stormwater detention will be required for sites that meet any of the following conditions. Requirements of the Municipal Separate Storm Sewer System (MS4) areas remain applicable. 12. Individual parcel with an unobstructed flow path and no other parcel(s) between the Federal Emergency Management Administration (FEMA) regulatory floodplain channel and the project. A Drainage Narrative has been prepared for this USR request and is included in the application materials. a. Does your site require a storm water detention pond? If so, the following applies: i. A drainage report summarizing the detention pond design with construction drawings and maintenance plan shall be completed by a Colorado Licensed Professional Engineer and adhere to the drainage related sections of the Weld County Code. ii. The drainage report must include a certification of compliance stamped and signed by the PE which can be found on the engineering website. iii. A general drainage report guidance checklist is available on the engineering website. More complete checklists are available upon request. As determined by a Colorado Licensed Professional Engineer. the site is exempt from storm water detention. A Drainage Narrative is included in the application materials. Environmental Health Questions: 1. What is the drinking water source on the property? If utilizing a drinking water well include either the well permit or well permit application that was submitted to the State -Division of Water Resources. If utilizing a public water tap include a letter from the Water District. a tap or meter number, or a copy of the water bill. The existing residence is served by the Little Thompson Water District. A copy of a current water bill is included in the application materials. Bottled water is proposed for event attendees during phase one. the seasonal use of the venue. Page 7 of 9 The construction of the barn for phase two will allow year-round use. A new tap is proposed for phase two. 2. What type of sewage disposal system is on the property? If utilizing an existing septic system provide the septic permit number. If there is no septic permit due to the age of the existing septic system, apply for a septic permit through the Department of Public Health and Environment prior to submitting this application. If a new septic system will be installed, please state "a new septic system is proposed". Only propose portable toilets if the use is consistent with the Department of Public Health and Environment's portable toilet policy. The existing residence is served by a septic system. permitted under SE -0200074. A copy of the septic permit is included in the application materials. During phase one, the seasonal use of the venue, portable restroom trailers are proposed. The operator will utilize an appropriate sanitary services provider to manage the toilets and remove and dispose of contents as needed in accordance with applicable requirements. The construction of the barn for phase two will allow year-round use. A septic system is proposed for phase two 3. If storage or warehousing is proposed, what type of items will be stored? Storage and warehousing are not a part of this proposal. 4. Describe where and how storage and/or stockpile of wastes, chemicals, and/or petroleum will occur on this site. No storage and/or stockpile of wastes, chemicals. and/or petroleum is proposed. 5. If there will be fuel storage on site indicate the gallons and the secondary containment. State the number of tanks and gallons per tank. No on -site fuel storage is proposed. 6. If there will be washing of vehicles or equipment on site indicate how the wash water will be contained. No vehicle washing is proposed on -site. 7. If there will be floor drains indicate how the fluids will be contained. No floor drains are proposed. 8. Indicate if there will be any air emissions. (e.g. painting, oil storage, etc.) No regulated air emissions are anticipated from this site. 9. Provide a design and operations plan if applicable. (e.g. composting, landfills, etc.) N/A Page 8 of 9 10. Provide a nuisance management plan if applicable. (e.g. dairies, feedlots, etc.) The facility will adhere to the maximum permissible noise levels allowed in the Commercial Zone District. Sources of light will be shielded so that light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent properties. Neither the direct. nor reflected. light from any light source will create a traffic hazard to operators of motor vehicles on public or private streets. No colored light will be used which may be confused with. or construed as. traffic control devices. The property owner or operator will be responsible for controlling noxious weeds on the site. Trash will be collected in a covered. confined trash dumpster and removed at least weekly by an appropriate trash removal company as described in the Nuisance Management Plan. The operation is not expected to generate disproportionate amounts of fugitive dust. Lot surfaces will be rangeland grass and riparian woodland with improved gravel surfaces in roadways and parking areas. Parking will be internal to the site. The site is located within the forested riparian environment of the Saint Vrain and South Platte Rivers. Watering of surfaces will occur as necessary to suppress dust. The venue is significantly set back from the public right-of-way and existing landowners. Existing trees and shrubs provide sufficient vegetative screening and sound absorption. A Written Nuisance Management Plan has been prepared for this request and is included with the Use By Special Review application 11. Additional information may be requested depending on type of land use requested. N/A Building Questions: 1. List the type, size (square footage), and number of existing and proposed structures. Show and label all existing and proposed structures on the USR drawing. Label the use of the building and the square footage. There is an existing single-family residence. equipment buildings and utility sheds. These will be used by the residents and are not a part of the outdoor venue. A new barn is proposed for the venue. although it may not be built for several years. Construction of the barn. provisions for a year-round water source and installation of the proposed septic system will commence phase two. allowing year-round use of the facility. The barn structure will meet applicable Code requirements for the proposed use_ Canvas tents will be available for patrons upon request. Portable restroom trailers are proposed for seasonal and outdoor uses. Page 9 of 9 v 2. Explain how the existing structures will be used for this USR? The existing structures will continue to be used by the residents and are not a part of the outdoor venue 3. List the proposed use(s) of each structure. See building question no. 1 above. AGPROfessjonals Dl-111.OPERS OF AGRICULTURE November 28, 2018 Mr. Michael Hall Weld County Department of Planning Services 1555 17th Avenue Greeley, CO 80631 Subject: St. Vrain River Ranch USR (PRE 18-0214) Veronica J. and Cameron P. Silbaugh AGPRO Project #: 2759-01 Dear Michael, Thank you for your feedback on the St. Vrain River Ranch USR application. A copy of the Weld County Completeness Review Comments is enclosed for reference. Please see our responses below: Planning, Comment No. 1. Community Meeting - No Neighborhood Meeting was held for this request per Sec. 23-3-210.B.4. of the Weld County Code. Environmental Health, Comment 2.A. Noise Mitigation — Enclosed are the revised USR Questionnaire and the Nuisance and Waste Management Plan which have been revised to address noise mitigation in greater detail. The property owner or operator will attempt to minimize noise generated during operation and maintain compliance with Weld County Noise Requirements. The facility will adhere to the maximum permissible noise levels allowed in the Commercial Zone District. The surrounding area is primarily crop farming, rural residential and undeveloped riparian woodland. The property is located near the confluence of the Saint Vrain and South Platte Rivers. Large undeveloped parcels near and/or containing the rivers owned by Public Service Company of Colorado are east of the subject property. Public Service Company of Colorado also owns the parcel along the northwestern boundary which was historically railroad right-of- way and is currently proposed as a rails -to -trails parcel for recreational use. The St. Vrain River Ranch will be compatible with the surrounding land uses. The existing vegetation and landscaping will be retained as much as possible to preserve the rustic rural charm of the site. The venue is significantly set back from the public right-of-way and existing landowners. Existing trees and shrubs provide sound absorption and screening. ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 67th Avenue • Greeley, CO 80634 970.535.9318 /office • 970.535.9854 / fax • www.agpros.com Page 2 of 2 Environmental Health, Comment 3. Portable Toilets — Enclosed is the revised Water and Sewage Disposal Plan to clarify the two proposed phases of development and use of the site. The proposed venue will be constructed and utilized in two phases. The use of the venue during phase one will be seasonal and will consist of outdoor use, 6:00 A.M. to 12:00 A.M., 7 -days a week, April 1'` through September 30th• No new structures are proposed with phase one. Phase two includes the construction of a barn for indoor gatherings. At full build out, the facility will be operational 6:00 A.M. to 12:00 A.M., 7 -days a week, year-round. The primary hours of operation for both phases are expected to be 10:00 A.M. to 11:00 P.M., weekends, Friday through Sunday with the heaviest use anticipated to occur during summer months. The hours of use will vary event to event depending on patron needs. During phase one, the seasonal use of the venue, bottled water and portable restroom trailers will be provided. The operator will utilize an appropriate sanitary services provider to manage toilets and remove and dispose of contents as needed in accordance with applicable requirements. The construction of the barn for phase two will allow for year-round use. A septic system and new tap are proposed for phase two of the venue operations. Public Works, Comment 4. Traffic Impact Study — A Traffic Impact Study has been prepared for this proposal and is included with this response letter. Please contact me at (970) 535-9318 if you have any questions. Thank you, Kelsey Bruxvoort Land Planner Encl. 1. Weld County Completeness Review Comments 2. Revised USR Questionnaire 3. Revised Nuisance Management Plan 4. Revised Water and Sewage Disposal Plan 5. Traffic Impact Study L DEVELOPERS ON AGRICULFURI- AGPROfessionals Notices of Inquiry Prepared for Veronica and Cameron Silbaugh Use By Special Review (USR) St. Vrain River Ranch Notices of Inquiry were issued for the proposed St. Vrain River Ranch USR on Friday, August 10, 2018 to the Towns of Milliken and Platteville. No responses have been received to date. A copy of the correspondence sent to Milliken and Platteville is included in the application materials. ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 67th Avenue, Suite 200 0 Greeley, CO 80634 970.535.9318 /office 0 970.535.9854 / fax 0 www.agpros.com Kelsey Bruxvoort From: Sent: To: Cc: Subject: Attachments: Hi Pepper, Kelsey Bruxvoort Friday, August 10, 2018 1:33 PM 'PMcclenahan@MillikenCO.gov' 'CRinebarger@MillikenCO.gov'; Tim Naylor; Shannon Toomey; 'vsilbaugh@aol.com' Milliken Notice of Inquiry for St. Vrain River Ranch - Weld County USR Pre -Application Request.pdf; Pre -Application Questionnaire.pdf; ST-1_07.17.18.pdf; MILLIKEN NOI.pdf AGPROfessionals is in the process of submitting a Weld County Use By Special Review application on behalf of Veronica and Cameron Silbaugh. Our site is located within the Weld County-Millliken IGA. Weld County Planning Staff has advised us to notify the Town of Milliken prior to the submittal of our application. Please see the attached Weld County Pre - Application Request for project details. Property information is shown below: Parcel: 105934300047 Legal: PT SW4 34-4-67 Lying in the E2SW4 Address: 9239 CR 38, Platteville, CO 80651 Owners: Silbaugh, Veronica & Cameron Please confirm that you've received this request and please provide comments on the attached Notice of Inquiry Form. The required time period for Notice of Inquiries is 21 -days. If you have no comments, it would help us greatly if you would respond to that effect. We appreciate your help, Thank you, Kelsey Bruxvoort Land Planner AGPROfessionals 3050 67th Avenue Greeley, CO 80634 Office: 970-535-9318 Mobile: 970-744-0068 Fax: 970-535-9854 www.agpros.com AG PRO fessionals 1)1L:VI. LOI't.RS of \(.RIUL l I 1 Notice of Inquiry Development within a Coordinated Planning Agreement or Intergovernmental Agreement (CPA or IGA) Boundary Date of Inquiry 8/2/2018 Municipality with CPA or IGA Milliken CPA Name of Person Inquiring Veronica J. & Cameron P. Silbaugh c/o Kelsey Bruxvoort (Agpro) Property Owner Veronica J. & Cameron P. Silbaugh Planner Michael Hall mhall@weldgov.com Legal Description Portion of SW4 34-4-67 lying SE of the abandoned UPRR row Parcel Number 105934300047 Nearest Intersection CR 38 & CR 19.5 Type of Inquiry USR The above person inquired about developing a property inside your designated CPA or IGA boundary. This person has been referred to community by Weld County Planning to discuss development options on this site. Visit Chapter 19 of the Weld County Code for specifics on your agreement. Weld County Comments OUTDOOR EVENT VENUE FOR UP TO 100 PEOPLE (WEDDINGS, PARTIES, COMPANY PICNICS, ETC.) TO BE LOCATED ON APPROXIMATELY 5 ACRES OF THE 40 ACRE PARCEL Annexation Interest? Name/Title of Municipality Representative Municipality Comments Signature of Weld County Planner Signature of Municipality Representative Plase return the signed form to: Weld County Planning Department 1555 N 17th Avenue, Greeley, CO 80631 (970) 353-6100 x3540 " (970)304-6498 fax Kelsey Bruxvoort From: Sent: To: Cc: Subject: Attachments: Hi Melissa, Kelsey Bruxvoort Friday, August 10, 2018 1:33 PM 'mkconsultinginc@aol.com' Tim Naylor; Shannon Toomey; 'vsilbaugh@aol.com' Patteville Notice of Inquiry for St. Vrain River Ranch - Weld County USR Pre -Application Request.pdf; Pre -Application Questionnaire.pdf; ST-1_07.17.18.pdf; PLATTEVILLE NOI.pdf AGPROfessionals is in the process of submitting a Weld County Use By Special Review application on behalf of Veronica and Cameron Silbaugh. Our site is located within the Weld County -Platteville IGA. Weld County Planning Staff has advised us to notify the Town of Platteville prior to the submittal of our application. Please see the attached Weld County Pre -Application Request for project details. Property information is shown below: Parcel: 105934300047 Legal: PT SW4 34-4-67 Lying in the E2SW4 Address: 9239 CR 38, Platteville, CO 80651 Owners: Silbaugh, Veronica & Cameron Please confirm that you've received this request and please provide comments on the attached Notice of Inquiry Form. The required time period for Notice of Inquiries is 21 -days. If you have no comments, it would help us greatly if you would respond to that effect. We appreciate your help, Thank you, Kelsey Bruxvoort Land Planner AGPROfessionals 3050 67th Avenue Greeley, CO 80634 Office: 970-535-9318 Mobile: 970-744-0068 Fax: 970-535-9854 www.agpros.com AG PRO I,! 1. I i WHO C.)} .X{.KID C 1.1 l'4I fessionals 1 Notice of Inquiry Development within a Coordinated Planning Agreement or Intergovernmental Agreement (CPA or IGA) Boundary Date of Inquiry 8/2/2018 Municipality with CPA or IGA Platteville CPA Name of Person Inquiring Veronica J. & Cameron P. Silbaugh do Kelsey Bruxvoort (Agpro) Property Owner Veronica J. & Cameron P. Silbaugh Planner Michael Hall mhall@weldgov.com Legal Description Portion of SW4 34-4-67 lying SE of the abandoned UPRR row Parcel Number 105934300047 Nearest Intersection CR 38 & CR 19.5 Type of Inquiry USR The above person inquired about developing a property inside your designated CPA or IGA boundary. This person has been referred to community by Weld County Planning to discuss development options on this site. Visit Chapter 19 of the Weld County Code for specifics on your agreement. Weld County Comments OUTDOOR EVENT VENUE FOR UP TO 100 PEOPLE (WEDDINGS, PARTIES, COMPANY PICNICS, ETC.) TO BE LOCATED ON APPROXIMATELY 5 ACRES OF THE 40 ACRE PARCEL Annexation Interest? Name/Title of Municipality Representative Municipality Comments Signature of Weld County Planner Signature of Municipality Representative Plase return the signed form to: Weld County Planning Department 1555 N 17'h Avenue, Greeley, CO 80631 (970) 353-6100 x3540 (970)304-6498 fax Drainage Narrative For St. Vrain River Ranch USR Part of The SW 1/4 of Section 34, Township 4N, Range 67 W of the 6th P.M. AGPROfessionals DEVELOPERS OF AGRICULTURE AGPROfessionals 3050 67th Avenue Greeley, CO 80634 (970) 535-9318 8/17/2018 St. Vrain River Ranch USR Table of Contents Certifications 3 Summary 4 Introduction 5 1. Location 5 2. Property Description 5 Historic Drainage 5 I. Overall Basin Description 5 2. Drainage Patterns Through Property 5 3. Off -site Drainage Flow Patterns 6 Conclusions 6 List of References 7 Appendices ii St. Vrain River Ranch USR Certifications I hereby certify that this drainage narrative for the proposed St. Vrain River Ranch USR was prepared under my direct supervision in accordance with the provisions of the Weld County storm drainage criteria for the owners thereof. Chad TeVelde, P.E. AGPROfessionals 8/17/2018 Drainage Narrative Page 3 of 7 AGPROfessionals, 3050 67'" Avenue, Greeley CO 80634 • 970-535-9318 * www.agnros.com St Vrain River Ranch USR Summary The project site for the proposed USR is currently a non -urbanizing, agricultural property with an existing residence and outbuildings. The applicant is proposing an outdoor venue on approximately five acres of the 42.03 -acre parcel. The parcel has an unobstructed flow path and is immediately adjacent to a Federal Emergency Management Administration (FEMA) regulatory floodplain channel and, therefore, is exempt from stormwater detention per Article XII, Storm Drainage Criteria, Section 23-12-30 Drainage Policy. F. Exceptions. 1. Exceptions to stormwater detention shall not jeopardize the public health, safety, and welfare of public and private property and shall be limited to the following: a. No stormwater detention will be required for sites that meet any of the following conditions. Requirements of the Municipal Separate Storm Sewer System (MS4) areas remain applicable. 12) Individual parcel with an unobstructed flow path and no other parcel(s) between the Federal Emergency Management Administration (FEMA) regulatory floodplain channel and the project. 8/17/2018 Drainage Narrative Page 4 of 7 AGPROfessionals, 3050 67' Avenue, Greeley CO 80634 + 970-535-9318 • www agpros,conl St, Vrain River Ranch USR Introduction 1. Location The proposed site is located in part of the southwest '/4 of Section 34, T4N, R67W, , 6th PM. This site is located north of Highway 66 and northwest of the Town of Platteville, CO. The properties surrounding the site are undeveloped, agricultural farm land. The property is partially bordered along the south side by Weld County Road (WCR) 38. The nearest road to the west is WCR 19, to the north is WCR 42 and to the east is WCR 23. A vicinity map is shown in Appendix A. 2. Property Description The applicant is proposing an outdoor venue on approximately five acres of the 42.03 - acre property. The proposed site is currently a non -urbanizing, agricultural property with an existing residence and outbuildings. There are five types of soil: Bankard sandy loam (0% to 3% slopes), Haverson loam (0% to 1% slopes), Kim loam (1% to 3% slopes), Nelson fine sandy loam (3% to 9% slopes), and Tassel fine sandy loam (5% to 20% slopes). The majority of the soil is somewhat excessively drained, hydrologic soil group A (see USDA-NRCS soil report in Appendix B). The Saint Vrain Creek runs along the eastern edge of the property, where stormwater from the site currently discharges. Historic Drainage 1. Overall Basin Description The site has a relatively flat topography with slopes ranging from approximately zero to nine percent predominately towards the southeastern corner of the property. A topographic map was downloaded from the United States Geological Survey (USGS) website and is shown in Appendix C. Historically, there have been no previous drainage issues with the property. A Federal Emergency Management Administration (FEMA) map of the project area is included in Appendix D. The property is located on panel 08123C1695E and is currently located within a 100 -year tloodplain, zone A. 2. Drainage Patterns Through Property The site is located in rural Weld County and is surrounded by undeveloped, agricultural land. A Master Plan for the site area is not currently available. The site is mostly southeast sloping and has a generally flat topography. Historically, the basin drainage flows towards the southeast into the Saint Vrain Creek. 8/17/2018 Drainage Narrative Page 5 of 7 AGPROfessionals, 3050 67th Avenue, Greeley CO 80634 • 970-535-9318 * www.agpros coat St Vrain River Ranch USR 3. Off -site Drainage Flow Patterns Offsite flows from the north and west are intercepted by railroad tracks. Offsite flows from the south and the east are intercepted by the Saint Vrain Creek. Therefore, an increase in runoff is not expected. Conclusions This drainage narrative is consistent with the Weld County Engineering and Construction Guidelines. An increased risk of damage from storm runoff is not expected since the site has an unobstructed flow path and is immediately adjacent to a FEMA floodplain channel. We recommend that the site is exempt from stormwater detention per Article XII, Storm Drainage Criteria, Section 23-12-30 Drainage Policy. 8/17/2018 Drainage Narrative Page 6 of 7 AGPROfcssionals, 3050 67th Avenue, Greeley CO 80634 • 970-535-9318 • \rim agpros.corrt St Vrain River Ranch (JSR List of References Federal Emergency Management Agency. "FEMA Flood Map Service Center." FEMA Flood Map Service Center. FEMA, 20 Jan. 2016. Web. 16 Aug. 2018. <https://msc.fema.gov/portal>. United States Department of Agriculture - Natural Resources Conservation Service. "Web Soil Survey." Web Soil Survey. USDA - NRCS, 2006. Web. 16 Aug. 2018. <http://websoilsurvey.sc.egov.usda.gov/App/WebSoiISurvey.aspx>. United States Geological Survey. "Maps." Overview - Maps, United States Geological Survey. USGS, 2016. Web. 16 Aug. 2018. <www.usgs.gov/products/maps/topo-maps>. Weld County. "Property Portal - Map Search." Property Portal - Map Search. Weld County, 19 Dec. 2017. Web. 16 Aug. 2018. <https://www.co.weld.co.us/maps/propertyportaU?accr-R6779991>. Weld County. "Weld County Engineering and Construction Criteria Guidelines." Weld County Engineering, July 2017. Web. 16 Aug. 2018. <www.weldgov.com/UserFiles/Servers/Server_6/F ile/Departments/Public%20Works/En gineering/WCECG%20-%208-3-17.pdf.> 8/17t2018 Drainage Narrative Pagc 7 of 7 AGPROfessionals, 3050 67th Avenue, Greeley CO 80634 * 970-535-9318 * w«,. agoros.curn Ths map manner generated static output from an Internet maopng site and ,s Ior reference only Data layets that appear on the map may a may not be accurate, current or otherwise'eliade HIS MAP IS NOT TO BE USED OR NAVIGATION USDA United States Department of Agriculture \CS Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Weld County, Colorado, Southern Part August 16, 2018 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreationwaste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface 2 How Soil Surveys Are Made 5 Soil Map 8 Soil Map 9 Legend10 Map Unit Legend 11 Map Unit Descriptions 11 Weld County, Colorado Southern Part 13 10—Bankard sandy loam, 0 to 3 percent slopes, frequently flooded.. .. 13 25—Haverson loam, 0 to 1 percent slopes 14 32 —Kim loam, 1 to 3 percent slopes .. 16 38 —Nelson fine sandy loam, 3 to 9 percent slopes ........ ...... ..... 17 61 —Tassel fine sandy loam, 5 to 20 percent slopes ...................... 18 85 —Water 19 References 20 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness. length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil -vegetation -landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil -landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil -landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field -observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources. such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and 6 Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers all of which help in locating boundaries accurately. Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 Custom Soil Resource Report MAP LEGEND Area of Interest (AOI) Area of Interest (AO') Soils Sod Map Unit Polygons N Sal Map Unit Lines Sod Map Unit Points Special Point Features V Ed O A. a O O V • 0 0 Blowout Borrow Pit C ay Spot Closed Depression Gravel Pit Gravelly Spot Lane I Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severey Eroded Spot S+nkhole Slide or Shp Sock Spot • Spoil Area Stony Spot Very Stony Spot Wet Soot Other Special L ne Features Water Features Streams and Canals Transportation i-1-• Rails ay Interstate Highways ti US Routes Major Roads Local Roads Background . Aenal Photography 10 MAP INFORMATION The soil surveys that comprise your AOl were mapped at 1 24,000 Warning Sod Map may not be valid at this scale Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement The raps do not show the small areas of contrasting soils that could have been shown at a more detailed scale Pease rely on the bar scale on each map sheet for map measurements Source of Map Natural Resources Conservation Service Web Soil Survey URL Coordinate System Web Mercator (EPSG 3857) Maps from the Web Sod Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area A protection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required This product is generated from the USDA-NRCS certified data as of the version date(s) listed below Soil Survey Area: Weld County, Colorado, Southern Part Survey Area Data Version 16. Oct 10, 2017 Soil map units are labeled (as space allows) for map scales 1 50,000 or larger Date(s) aerial images were photographedSep 20, 2015 —Oct 15, 2016 The orthophoto or other base map on which the soil Ines were compiled and digitized probably differs from the background imagery displayed on these maps As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres In AOI Percent of ACM 10 25 Bankard sandy loam, 0 to 3 percent slopes, frequently flooded Haverson loam, 0 to 1 percent slopes 32 Kim loam, 1 to 3 percent slopes 38 Nelson fine sandy loam, 3 to 9 percent slopes 61 Tassel fine sandy loam, 5 to 20 percent slopes 85 Water Totals for Area of Interest 28.7 0.0 66.6% 0.0% Map Unit Descriptions 5.1 5.0 0.0 4.3 11.9% 11.5% 0.1% 9.9% 43.1 100.0% The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it 11 Custom Soil Resource Report was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion. and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas, Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar Alpha -Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Weld County, Colorado, Southern Part 10 Bankard sandy loam, 0 to 3 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 2s51 n Elevation: 4,090 to 5,410 feet Mean annual precipitation: 12 to 17 inches Mean annual air temperature. 48 to 52 degrees F Frost -free period: 130 to 160 days Farmland classification: Prime farmland if irrigated and the product of I (soil erodibility) x C (climate factor) does not exceed 60 Map Unit Composition Bankard, frequently flooded, and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Bankard, Frequently Flooded Setting Landform: Flood plains, ephemeral streams Down -slope shape: Linear Across -slope shape: Linear Parent material: Sandy alluvium Typical profile A - 0 to 2 inches: sandy loam AC - 2 to 9 inches: sandy loam CI - 9 to 17 inches: loamy sand C2 - 17 to 80 inches: sand Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat excessively drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): High (2.00 to 6.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: Frequent Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Salinity, maximum in profile: Nonsaline (0.0 to 1.9 mmhos/cm) Available water storage in profile: Low (about 3.5 inches) Interpretive groups Land capability classification (irrigated): 6s Land capability classification (nonirrigated): 6s Hydrologic Soil Group: A Ecological site: Sandy Bottomland (R067BY031 CO) Hydric soil rating: No 13 Custom Soil Resource Report Minor Components Glenberg, rarely flooded Percent of map unit: 8 percent Landform: Flood -plain steps, ephemeral streams Down -slope shape: Linear Across -slope shape: Linear Ecological site: Sandy Bottomland (R067BY031 CO) Hydric soil rating: No Kitcarson, frequently flooded Percent of map unit: 5 percent Landform: Flood plains, ephemeral streams Down -slope shape: Linear Across -slope shape: Linear, concave Ecological site: Wet Meadow (R067BY038CO) Hydric soil rating: No Alda, frequently flooded Percent of map unit: 5 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Concave Ecological site: Salt Meadow (R067BY035CO) Hydric soil rating: No Las animas, frequently flooded Percent of map unit: 2 percent Landform: Flood plains, ephemeral streams Down -slope shape: Linear Across -slope shape: Linear, concave Ecological site: Salt Meadow (R067BY035CO) Hydric soil rating: No 25—Haverson loam, 0 to 1 percent slopes Map Unit Setting National map unit symbol: 3622 Elevation: 4,500 to 4,800 feet Mean annual precipitation: 12 to 17 inches Mean annual air temperature: 46 to 54 degrees F Frost -free period: 125 to 180 days Farmland classification: Prime farmland if irrigated Map Unit Composition Haverson and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. 14 Custom Soil Resource Report Description of Haverson Setting Landform. Flood plains, stream terraces Down -slope shape: Linear Across -slope shape: Linear Parent material: Stratified, calcareous alluvium Typical profile H1 - 0 to 4 inches: loam H2 - 4 to 60 inches: stratified loamy sand to loam to clay loam Properties and qualities Slope: 0 to 1 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Gypsum, maximum in profile: 1 percent Salinity, maximum in profile: Nonsaline to moderately saline (0.0 to 8.0 mmhos/cm) Available water storage in profile: High (about 9.6 inches) Interpretive groups Land capability classification (irrigated): 3w Hydrologic Soil Group: B Ecological site: Loamy Plains (R067BY002CO) Hydric soil rating: No Minor Components Vona Percent of map unit: 8 percent Hydric soil rating: No Fluvaquentic haplustolls Percent of map unit: 4 percent Landform: Terraces Hydric soil rating. Yes Other soils Percent of map unit: 3 percent Hydric soil rating: No Custom Soil Resource Report 32 Kim loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: 362b Elevation: 4,900 to 5,250 feet Mean annual precipitation: 13 to 17 inches Mean annual air temperature: 46 to 52 degrees F Frost -free period: 125 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Kim and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Kim Setting Landform: Alluvial fans, plains Down -slope shape: Linear Across -slope shape: Linear Parent material: Mixed eolian deposits derived from sedimentary rock Typical profile H1 - 0 to 12 inches: loam H2 - 12 to 40 inches: loam H3 - 40 to 60 inches: fine sandy loam Properties and qualities Slope: 1 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Available water storage in profile: Moderate (about 9.0 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 4e Hydrologic Soil Group: A Ecological site: Loamy Plains (R067BY002CO) Hydric soil rating: No Custom Soil Resource Report Minor Components Otero Percent of map unit: 10 percent Hydric soil rating: No 38 Nelson fine sandy loam, 3 to 9 percent slopes Map Unit Setting National map unit symbol. 362j Elevation: 4,800 to 5,050 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 57 degrees F Frost -free period: 145 to 190 days Farmland classification: Farmland of local importance Map Unit Composition Nelson and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nelson Setting Landform: Plains Down -slope shape: Linear Across -slope shape: Linear Parent material: Residuum weathered from sandstone Typical profile H1 - 0 to 9 inches: fine sandy loam H2 - 9 to 30 inches: fine sandy loam H3 - 30 to 34 inches: weathered bedrock Properties and qualities Slope: 3 to 9 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to high (0.06 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Low (about 3.7 inches) 17 Custom Soil Resource Report Interpretive groups Land capability classification (irrigated): 4e Land capability classification (nonirrigated): 6e Hydrologic Soil Group: B Ecological site: Sandy Plains (R067BY024C0) Hydric soil rating. No Minor Components Thedalund Percent of map unit: 10 percent Hydric soil rating: No Terry Percent of map unit: 5 percent Hydric soil rating: No 61 —Tassel fine sandy loam, 5 to 20 percent slopes Map Unit Setting National map unit symbol: 363c Elevation: 4,850 to 5,200 feet Mean annual precipitation: 12 to 19 inches Mean annual air temperature: 46 to 52 degrees F Frost -free period: 110 to 165 days Farmland classification: Not prime farmland Map Unit Composition Tassel and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tassel Setting Landform: Breaks Down -slope shape: Linear Across -slope shape: Linear Parent material: Residuum weathered from sandstone Typical profile H1 - 0 to 11 inches: fine sandy loam H2 - 11 to 15 inches: very fine sandy loam H3 - 15 to 20 inches: weathered bedrock Properties and qualities Slope: 5 to 20 percent Depth to restrictive feature: 10 to 20 inches to paralithic bedrock Natural drainage class: Well drained Runoff class: Medium 18 Custom Soil Resource Report Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Available water storage in profile: Very low (about 2.0 inches) Interpretive groups Land capability classification (irrigated): 6e Land capability classification (nonirrigated): 6e Hydrologic Soil Group: D Ecological site: Sandstone Breaks (R067BY056CO) Hydric soil rating: No Minor Components Otero Percent of map unit 8 percent Hydric soil rating: No Terry Percent of map unit: 7 percent Hydric soil rating: No 85 —Water Map Unit Composition Water 95 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Minor Components Aquolls Percent of map unit: 5 percent Landform: Marshes Hydric soil rating: Yes References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep -water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nres/detail/national/soils/?cid=nres 142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www. nres. usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// wwwnres. usda.gov/wps/portal/nres/detail/national/soils/?cid=nres 142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres usda.gov/wps/portal/nres/detail/soils/ home/'acid=nres 142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 20 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430 -VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda. gov/wps/portal/nres/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf 21 U IPSO •11I VI t W VELAND I-• V.S. DEPARTMENT or THE INTERIOR U.S GEOLOGICAL SURYlY i vs _..Tamer or■ ' _ Kaki.. V v 11 I -,I • as • .us. N I lI 1 Maul ..•• 1 • a I JOHNSTONT 1; M••. •-' Ws CIWWIy US Topo p w a IiiEi2i" —A, a1 4 • I l ..V.• a w SSW la •.I, MAna M W Ward f•a•• OS•Y«tl WS/ a• Spas as • ma Slat es Ise abennia= gas SUSS ••• I aae as as II. ss "s ros•pa es a SS IS Car•. IPla1. *SS I.11•. MPS ..a..•••• San.. 4'•.•.. •.. la.aa• •.y1..7 Salsa awe •.... M.. a =-- "•I•. W_ M IMI �. •• in• Yl•, al. .S •.. MI M 11yM. r.e Ss •Ida: Seas Ssw . •..r•• was.., •••ass•••a w area IM as as .a a1. Duds V , 1•.« • ;In trasetemor CIO a•••.11 a Y..•. • a IPS I • II . M SCAT[ 1:24 000 fr 1 1 1 I Nam I I i 1 N •.y y a 1•a V ? • + • • 1 $ I ✓ a •P i •an .a.•4 • r la soh 1,...t e. T P. IN - Un i, IP T !• a1. 4111a•.ail •et CS Stet aSVe •a •••••••=====0 =SSD tae SSAea••••.•a. Sams♦la •sea N. m IS ~MS Sm toa a•. M • I i I • I a I • r1� • I • speal piss ISSIP INS laSS Sala JOHNSTOWN QUADRANGLE LC101040 ••TAUT[ we t t I. .nay a- a U' IlN- 1 4.a I.. a. F • • I • 1 S ti • M 5 Se v ste //47/7=C_____411 warm _ y r •IA• • liras SO 4a1/I(aa0• _ I dams revert dams w .. JOHNSTOWN, CO I•H Man WM WPM VSOO X 2222222 National Flood Hazard Layer FI RMette 43' !O 4 6 ti N 1 6,000 AO't5']720-s 250 500 a FEMA Legend Sgt f1ing/oAt root DCTAUD UGERV AND WOO SAP Mil Mlle MNt% (ArouW SPECIAL FLOOD HAZARD AREAS OTHER AREAS OF FLOOD HAZARD '#1 OTHER AREAS ;NNW Base Flood Devotion (BEE) tiro vin With SFr et Depth ;.re AI 40 Ar .t r Regutriton, Floodway 0 2% Annual Chance Flood Hazard. Areas of 1% annual chance flood with average depth less than one foot or with dratrage areas of less than one square mile lone . % Fuu,re Conditions 1% Annual Chance Flood Hazard :One I Ares with Reduced Flood Rack dire to Levee See Notes. ex-. I Area with Flood Risk due to Lena/ore o NNOSCREE4 Arse of Minimal Flood Hazard Effective LOMRs Area of Undetermined Flood Hazard ton 9 GENERAL -—-- Channel. Culvert. or Storm Sewer STRUCTURES worn Levee. Cake, or Floodwall OTHER FEATURES MAP PANELS x Cross Sections with 1% Annual Chance fv.s Water Surface Elevation Coastal Trensect __KJ__ __ Base Flood Elevation Line (BEE) Urn it of Study Jurisdiction Boundary Coastal Transact Baseline Neat Baseline Hydrographic Feature Digits; Data Available No Digital Data Available Lnmapped The pin dispteyce on the map is an appro.-mate point setetted by the user and noes not represent an authoritative property location This rasp complies with FEMA's stareards for the use of digital flood maps if it is not void as described below. The basemap shown comp les with FEMA's basernap accuracy Standards The flood hazard information is denied directly from the aulhodtative NFHL web services provided by FEMA. This map was exported on 8/16/2018 at 1-11'.3k PM and does not reflect changes or amendments subi*quont to this date and time. The NFHL and effective Information may change or become superseded by new data over time This map image is void tf the one or more of the 'ollowing map elements do not appear basemap Imagery, flood zone labets. legend, scale bar, map creation date, community identifiers, F1RM panel number, and FIRM e'fective date. Map images for unmapped and unmoeernized areas cannot be used for regulstory purposes AGPRO fessionals DEVELOPERS OF AGRIC:ULI'URE Traffic Narrative Prepared for Veronica and Cameron Silbaugh St. Vrain River Ranch Use By Special Review (USR) Application Traffic Narrative The subject property is located on Weld County Road (WCR) 38 northeast of the bend where WCR 38 joins with WCR 191/2. The proposed St. Vrain River Ranch outdoor venue will allow up to 200 people on -site for private gatherings. Weddings are anticipated to be the primary use for the venue, however the facility may be used for quinceaneras, company picnics, retirement parties, rotary clubs, etc. The existing residence, associated outbuildings. residential uses and agricultural uses will continue to be operated as a Use By Right separate of the venue activities. The anticipated users of the facility are the current residents, event attendees, wedding planners, wedding officiants. musicians, caterers/food truck vendors, and contract maintenance workers. The facility will be operational 6:00 A.M. to 12:00 A.M., 7 -days a week. The primary hours of operation will be 10:00 A.M. to 11:00 P.M., weekends, Friday through Sunday. The hours of use will vary event to event depending on patron needs. Traffic to the site will come from WCR 38 to the west and from WCR 19/2 to the south. It is anticipated that 50% of traffic will come from the west and 50% will come from the south. The facility access features two ingress/egress points on WCR 38 and WCR 19'/2. Enclosed is an exhibit of the existing access. The site access is historical to the property and allows vehicles to safely navigate the curve where WCR 38 and WCR 191/2 join. The access provides users with adequate sight lines down both WCR 38 and WCR 19%2 and functions as acceleration/deceleration lanes outside the public right-of-way. No change to the existing access point is proposed. Typical vehicles accessing the site include personal vehicles as well as vendor trucks. Arrivals and departures will be staggered throughout the duration of each event and car-pooling by attendees is anticipated. Traffic volumes will vary significantly as volumes are dependent on the type of event and number of attendees. Anticipated traffic volumes for a typical event are shown below: Pickups and cars: Vendor vehicles: 40 trips/day for personal vehicles up to 3 vehicles, one round-trip per day each The highest traffic volumes are expected during morning hours between 10:00 AM to 12:00 PM and during evening hours between 6:00 P.M. to 8:00 P.M. ENGINEERING, PLANNING, CONSULTING & REAL ESTATE 3050 67'h Avenue, Suite 200 0 Greeley, CO 80634 970.535.9318 / office O 970.535.9854 / fax 0 www.agpros.com rWELD COUNTY t',NI INF M/4 MMNt. Traffic Narrative - Access Exhibit St. Vrain River Ranch USR18-XXXX —1111110 r .:: . Private residential drive Ij . 1 Venue access road a: 0 "Facilit Access 222.3b i WGS 1984 Web Mercator_Auxiliary Sphere c Weld County Colorado 444.1 Feet Tar. K a user c)eneraleo ctdrrc output trout ar. Irner.x•: mapping site Inc r< • Ne:erce only Data layers ma: appear o•i this rrap may or may no. De 3CCar., Curer : a )117.-1 wise! f?l Zt ee ERIS MAP IS NOT TO BE USID FOR NAVIGATION rr";.lir• r. H,,oldr Denver Legend Parcels Highway County Boundary Venue location Silbaugh property boundary Notes St. Vrain River Ranch USR WCR38and WCR191/2 Traffic Impact Study KE Job #2018-069 Prepared for: AGPROfessionals 3050 67th Avenue, Suite 200 Greeley, CO 80634 Prepared by: KELLAR ENGINEERING www.kellarengineering.com 970.219 1602 phone November 28, 2018 Sean K. Kellar, PE, PTOE This document together with the concepts and recommendations presented nerein as an instrument of service is intended only for the specific purpose and client for which it was prepared Reuse of and improper reliance on this document without written authorization from Kellar Engineering LLC shall be without liability to Kellar Engineering LLC TABLE OF CONTENTS 1.0 Introduction 2.0 Existing Conditions and Roadway Network 2.1 Recent Traffic Volumes 3.0 Pedestrian/Bicycle Facilities 4.0 Proposed Development 4.1 Trip Generation 4.2 Trip Distribution 4.3 Traffic Assignment 4.4 Short Range Total Peak Hour Traffic 5.0 Traffic Operation Analysis 5.1 Analysis Methodology 5.2 Intersection Operational Analysis 5.3 Auxiliary Lane Analysis 6.0 Findings List of Figures: Figure 1: Figure 2: Figure 2b: Figure 3: Figure 4: Figure 5: Figure 6: Figure 7: Vicinity Map Site Plan Site Plan (aerial) Recent Peak Hour Traffic 2020 Background Peak Hour Traffic Trip Distribution Site Generated Peak Hour Traffic 2020 Short Range Total Peak Hour Traffic Page 3 3 3 7 7 7 8 8 8 9 9 9 9 18 Page 4 5 6 11 12 13 14 15 St. Vrain River Ranch Traffic Impact Study Page 1 TABLE OF CONTENTS (continued) List of Tables: Table 1: Table 2: Table 3: Table 4: Appendices: Appendix A: Trip Generation Recent Peak Hour Operations 2020 Background Peak Hour Operations 2020 Short Range Total Peak Hour Operations Traffic Counts Appendix B: Level of Service (LOS) Tables Appendix C: Aerial Image and Street View Appendix D: Weld County Functional Classification Map Appendix E: HCM Calculations (Synchro) Page 10 16 16 17 Page 20 22 23 25 26 St. Vrain River Ranch Traffic Impact Study Page 2 1.0 Introduction The purpose of this Traffic Impact Study (TIS) is to identify project traffic generation characteristics, to identify potential traffic related impacts on the adjacent street system. and to develop mitigation measures required for identified traffic impacts. This TIS is for the proposed St. Vrain River Ranch project located at WCR 38 and WCR 19 '/2. Weld County. CO in Weld County. CO. See Figure 1: Vicinity Map. Kellar Engineering LLC (KE) has prepared the TIS to document the results of the projects anticipated traffic conditions in accordance with Weld County's requirements and to identify projected impacts to the local and regional traffic system. 2.0 Existing Conditions and Roadway Network The project site is located north where Weld County Road 38 (WCR 38) and Weld County Road 19 1/2 (WCR 19 1/2) intersect in Weld County. CO. WCR 38 has one thru lane in each direction and a posted speed of 55 mph. WCR 19 1/2 has one thru lane in each direction and a posted speed of 55 mph adjacent to the project site. WCR 38 and WCR 1/2 are both classified as collector roadways on the Weld County Functional Classification Map. WCR 38 and WCR 19 '/2 intersect at a curve with a 20 mph advisory posting. The proposed project has access via two existing ingress/egress points on WCR 38 and WCR 19 1/2. See Figure 2 and Figure 2b. 2.1 Recent Traffic Volumes Recent peak hour traffic volume counts were conducted using data collection video cameras. The traffic counts were conducted in 15 -minute intervals on Saturday. 11/10/18 from 4:00 PM to 6.00 PM. the anticipated peak hours for the proposed use. The traffic counts are shown in Figure 3 with the count sheets provided in Appendix A. St. Vrain River Ranch Traffic Impact Study Page 3 Figure 1: Vicinity Map .. '"� r ele — a • : l S •'+ NW _� ew 2 CR 34 •• /'Wskscat PROJECT LOCATION :( "• .;'" t' `\ CR365 - S it��. ' 4`s3 T 3 > ti awe) `4 • ! — - 'sal • �^ 1 '. ` u ` • .. . . . _ �t e • •. • ... ssrra. „ i.• .a VICINITY MAP SCALE 1•=2000' St. Vrain River Ranch Traffic Impact Study Page 4 Figure 2: Site Plan SILBAUGH OUTDOOR VENUE USE BY SPECIAL REVIEW USR18-XXXX IN THE SW1/4 OF SECTION M, TOWNSHIP 4 NORTH, RANGE 6? WEST OF THE 6TH P M., WELD COUNTY. CO 1 MOMS 1100.0a1 • f ' t•1 S l 4 COMM AND n[wow n 11o.1m ninaI Ilan 00 SliCICIN Cr nta Y(/ &Uri I MO MI WEN 10 It /1‘01(D W NIOSIA1V. M1ole0 i/1Ma M.W*CJ USR18-XXXX - SITE PLAN Y-- e.Y -p- trifflil ' 11U1' 1t1I M4 "?_,T ....- at ... \.; r... —..... Slow 1 7 1 I- 1' I I 4 1 4 I 4 4 1 c 1 • • • t z re s se U 00 gg • USR-2 St. Vrain River Ranch Traffic Impact Study Page 5 Figure 2b: Site Plan (aerial) WELD COUNTY sirr 1NLINL MArrLN(, Private residential drive Venue access road • WGS_1984 Web_Mercator Au.dlery_Sphera C Weld County Colorado Traffic Narrative - Access Exhibit St. Vrain River Ranch USR18-XXXX Facility Access MX 0, 0 ..tt ge:remrc SL ^rrrra:: c>> .:,Ira -3#t s r.;p Venue location Silbaugh property boundary Page 6 St. Vrain River Ranch Traffic Impact Study 3.0 Pedestrian/Bicycle Facilities Currently there are no existing sidewalks or bicycle facilities adjacent to the project site. Additionally. the project is not anticipated to generate additional pedestrian or bicycle trips Any additional pedestrian or bicycle traffic from this project. if any, would be negligible. 4.0 Proposed Development The proposed St. Vrain River Ranch project consists of a special event venue development. Vehicular access to the project site is from two existing ingress/egress points on WCR 38 and WCR 19 '/z. This site access is historical to the property to navigate the curve where WCR 38 and WCR 19 % join. See Table 1: Trip Generation and Figure 2b: Site Plan (aerial). 4.1 Trip Generation Site generated traffic estimates are determined through a process known as trip generation. Rates and equations are applied to the proposed land use to estimate traffic generated by the development during a specific time interval. The acknowledged source for trip generation rates is the Trip Generation Report published by the Institute of Transportation Engineers (ITE) The Institute of Transportation Engineers. (ITE) Trip Generation Manual. 9th Edition does not provide detailed data on the specific uses associated with the project. As such. KE was able to estimate the peak hour trip generation based upon correspondence with the client and project team. Based upon information provided by the client, the proposed St. Vrain River Ranch outdoor venue will allow up to 200 people on -site for private gatherings. Weddings are anticipated to be the primary use for the venue. however the facility may be used for birthday parties. company picnics. retirement parties. rotary clubs. etc. The anticipated users of the facility are the current residents. event attendees. wedding planners. wedding officiants. musicians. caterers/food truck vendors. and contract maintenance workers. The primary peak use of the facility will be on weekends. Typical vehicles accessing the site include personal vehicles as well as vendor trucks. Arrivals and departures will be staggered throughout the duration of each event and car- pooling by attendees is anticipated. Traffic volumes will vary on the type of event and number of attendees. Anticipated traffic volumes for a typical weekend event are below: St. Vrain River Ranch Traffic Impact Study Page 7 Pickups and cars: Vendor vehicles 40 trips/day for personal vehicles up to 3 vehicles. one -round trip per day each Therefore. a typical event at the St. Vrain River Ranch is projected to generate approximately 46 weekend (Saturday) daily trips. and 35 total weekend (Saturday) peak hour trips. See Table 1: Trip Generation. 4.2 Trip Distribution Distribution of site traffic on the street system was based on the area street system characteristics. existing traffic patterns and volumes. anticipated surrounding development areas. and the proposed access system for the project. The directional distribution of traffic is a means to quantify the percentage of site generated traffic that approaches the site from a given direction and departs the site back to the original source. Figure 5 illustrates the trip distribution used for the projects analysis. 4.3 Traffic Assignment Traffic assignment was obtained by applying the trip distributions to the estimated trip generation of the development. Figure 6 shows the site generated peak hour traffic assignment. 4.4 Short Range Total Peak Hour Traffic Site generated peak hour traffic volumes were added to the background traffic volumes to represent the estimated traffic conditions for the short range 2020 horizon. These background (2020) and short range (2020) total traffic volumes are shown in Figure 4 and Figure 7 respectively. The short range analysis year 2020 includes the proposed development for the project plus an increase in background traffic per the growth rates from the NFRMPO (North Front Range Metropolitan Planning Organization). St. Vrain River Ranch Traffic Impact Study Kw 8 5.0 Traffic Operation Analysis KE's analysis of traffic operations in the site vicinity was conducted to determine the capacity at the identified intersection. The acknowledged source for determining overall capacity is the Highway Capacity Manual. 5.1 Analysis Methodology Capacity analysis results are listed in terms of level of service (LOS) LOS is a qualitative term describing operating conditions a driver will experience while traveling on a particular street or highway during a specific time interval LOS ranges from an A (very little delay) to an F (long delays). A description of the level of service (LOS) for signalized and unsignalized intersections from the Highway Capacity Manual are provided in Appendix B 5.2 Intersection Operational Analysis Operational analysis was performed for the short range 2020 horizon. The calculations for this analysis are provided in Appendix E Using the short range total traffic volumes shown in Figure 7, the projects intersections are projected to operate acceptably. See Table 4 for the 2020 Short Range Total Peak Hour Operation. 5.3 Auxiliary Lane Analysis The auxiliary lane analysis for the study intersections were conducted using CDOT State Highway Access Code (SHAC). Based upon the SHAC. a left -turn deceleration lane is required at an intersection with a projected peak hour ingress turning volume greater than 10 vph. Additionally. a right -turn deceleration lane is required at an intersection with a projected peak hour ingress turning volume greater than 25 vph. and a right -turn acceleration lane is required at an intersection with a projected peak egress turning volume greater than 50 vph. Based upon the projected traffic of the development and the State Highway Access Code (SHAC). auxiliary lanes are not projected to be required. St. Vrain River Ranch Traffic Impact Study ('dgc Table 1: Trip Generation ITE Code Land Use Size Weekend Daily Trips Saturday Peak Hour Rate Total Rate In Rate Out Total * I Events varies 46 * 23 * 12 35 The Institute of Transportation Engineers' (ITE) Trip Generation Manual. 9'h Edition does not provide detailed data for this particular use. As such, KE was able to estimate the peak hour trip generation based upon correspondence with the client and project team. See Section 4.1 St. Vrain River Ranch Traffic Impact Study Page 10 Figure 3: Recent Peak Hour Traffic N WCR 38 16 ----Do- lead Saturday Peak Hour f-- 0 NTS St. Vrain River Ranch Traffic Impact Study Page 11 Figure 4: 2020 Background Traffic N WCR 38 17 -► Legend Saturday Peak Hour NTS St. Vrain River Ranch Traffic Impact Study Page 12 Figure 5: Trip Distribution N NTS St. Vrain River Ranch Traffic Impact Study Page 13 Figure 6: Site Generated Traffic N WCR 38 f-- 5 9 -► Legend Saturday Peak Hour NTS St. Vrain River Ranch Traffic Impact Study Page 14 Figure 7: 2020 Short Range Total Traffic WCR 38 44- 33 26 -► Legend Saturday Peak Hour �-- 5 N NTS St. Vrain River Ranch Traffic Impact Study Page 15 Table 2: Recent Peak Hour Operations Intersection Movement Level of Service (LOS) Weekend Peak LOS WCR 38/WCR 19.5 EB Left/Thru A EB Approach A WB Thru/Right A WB Approach A SB Left/Right A SB Approach A Overall A Table 3: 2020 Background Peak Hour Operations Intersection Movement Level of Service (LOS) Weekend Peak LOS WCR 38/WCR 19.5 EB Left/Thru A EB Approach A WB Thru/Right A WB Approach A SB Left/Right A SB Approach A Overall A St. Vrain River Ranch Traffic Impact Study Page 16 Table 4: 2020 Short Range Total Peak Hour Operations Intersection Movement Level of Service (LOS) Weekend Peak LOS WCR 38/WCR 19 5 EB Left/Thru A EB Approach A WB Thru/Right A WB Approach A SB Left/Right A SB Approach A Overall A St. Vrain River Ranch Traffic Impact Study Page 17 6.0 Findings Based upon the analysis presented in this TIS. the proposed St. Vrain River Ranch project located at WCR 38 and WCR 191/2. Weld County. CO will be able to be successfully meet Weld County's requirements. All intersections are projected to operate acceptably upon development of the St. Vrain River Ranch project. See Appendix E for Synchro HCM outputs. The findings of the TIS are summarized below • The proposed project is anticipated to generate approximately 46 weekend (Saturday) daily trips and 35 total weekend (Saturday) peak hour trips. • The study intersection (WCR 38 and WCR 19 1/2) is projected to operate acceptably with the development of the project and background traffic in the 2020 Short Range Total future. • The existing street improvements are sufficient to accommodate the proposed project's traffic • The site access to the property is safe and appropriate from a traffic engineering perspective based upon the projected traffic volumes_ The existing site access to the property provides adequate sight distance to WCR 38 and WCR 19 '/2. The locations of the two ingress/egress points are tangent to the curve where WCR 38 and WCR 19 1/2 join. The geometry of these access points provides the ability for vehicles to enter and exit the property in a safe manner • Based upon the projected traffic of the project and the State Highway Access Code (SHAC). auxiliary lanes are not projected to be required. • Manual traffic control by police officers (wearing proper PPE) or by certified traffic control technicians is recommended to direct large event traffic at the WCR 38 and WCR 19 1/2 intersection during peak hours. St. Vrain River Ranch Traffic Impact Study Page 18 Appendix A: Traffic Counts (3O3) 216-2439 www.aNtrafficdata_net Peak Hour - All Vehicles I) 0 000 0 (t) (44) 27 •.. Location: 1 WCR 38/WCR 19.5 & WCR 38 PM Date and Start Time: Saturday, November 1O, 2O18 Peak Hour. O4:3O PM - O5 -3O PM Peak 15 -Minutes: 05.15 PM - O5:3O PM 1 MICR SRC" se 5 J l LL, osLo 0.68 W 013 E r '6 s 16 r0 ... s °n el 1irco —1 c.c.' or re, SKR . 1 1 0 0 toe 0 0 a S 44) 27 001 16 Mole Total study counts contained in paten ,s Traffic Counts WCR 38 Interval Eathound Start Tn WCR 38 Westbound Peak Hour - Pedestrians/Bicycles on Crosswalk a0 0a 10 N to o VW�E CODo -HOF 1 1 WCR 38/WCR 19.5 Northbound Southland WCR 38MMCR 19.5 Raing Pedestran Crossngs 11 -Turn Left Tlw Riga U -Tun Left Dim Right U -Tr Left TFw Rght U -Tun Lei Trim R,ght Total Hoot West Ears South No* 4-00 PM 0 0 3 0 0 0 8 0 0 0 0 0 0 0 0 0 11 39 0 0 0 0 4 15P 0 0 4 0 0 0 3 0 0 0 0 0 0 0 0 0 7 37 0 0 0 0 0 0 2 0 i 0 0 0 0 0 0 4h40PY 0 0 S 0 0 0 6 0 0 0 0 WPM 0 0 2 0 0 0 7 0 0 0 0 0 a 0 01 43 0 0 •i i 0 0 0 11 42 0 0 0 0 a 0 0 9 _36 0 0 0 0 5.30 PM 0 1 4 0 0 0 4 0 0 0 0 0 0 0 0 0 9 0 0 0 0 545 PM 0 0 3 0 0 0 2 0 0 0 0 0 0 0 0 0 5 0 0 0 0 Cant Total 0 1 30 0 0 0 44 0 0 0 0 0 0 0 0 0 75 0 0 0 0 Peak Hour 0 0 16 0 0 0 27 0 0 0 0 0 0 0 0 0 43 0 0 0 0 St. Vrain River Ranch Traffic Impact Study Page 20 (333) 216-2439 www_aihrafficdata. net Peak Hour - All Vehicles itl - 16 0.61 II o s t 0 0 o 0 _DJ l l.. V` a 0� N Oll 11 On E 0 0 S 5 r 0 t 1 7 it OM to Locaton: 2 WCR 19.5 & WCR 38 WCR 19 5 PM Date and Start Time: Saturday. November 10. 2018 Peak Hour: O4:3O PM - O5:3O PM Peak 15 -Minutes: O5:15 PM - O5 -3O PM 0 — 0 toe — 0 0 Not To stidr courts rand in parewheses Traffic Counts Peak Hour - Pedestrians/Bicycles on Crosswalk r1i Jae oaL h f e 0 I 5 C a3 0a WCR 3811VCR 19 5 WCR 381NCR • 9 5 WCR *5 WCR ti5 M enai Easio�a+d Westland NoAiorN Saddmund Ruing Peden Gassings Start Tme U -Tan St Thu Right U-Trw+ Let Thy Right U-Twt Let Tin EW U-Tiw+ 1St Thu Re MS West East Sob Non 400 RI 0 0 0 0 0 0 0 0 0 0 8 0 0 0 3 0 11 39 0 0 0 0 s '5 DV 0 0 0 0 3 0 0 0 0 3 3 0 0 0 4 0 7 37 0 0 0 0 4:30 PII 0 0 0 0 0 0 0 0 0 0 8 0 0 0 2 0 10 43 0 0 0 0 4:45PY 0 0 0 0 0 0 0 0 0 0 6 0 0 0 5 0 11 44 0 0 0 0 5T PM 0 0 0 0 0 0 0 00 0 7 0 0 0 2 0 9 35 0 0 0 0 5 33 DV 0 0 0 0 0 0 0 0 0 0 4 0 0 0 4 3 8 0 0 0 0 5452%J 0 0 0 0 0 0 0 0 0 0 2 0 0 0 3 3 5 0 0 0 0 Can -Cal 0 0 0 0 0 0 0 0 0 0 44 0 0 0 X 0 74 0 0 0 0 Peak 4oa 0 0 3 0 0 0 0 0 0 0 27 0 0 0 '6 0 43 0 0 0 0 St. Vrain River Ranch Traffic Impact Study Page 21 Appendix B: Level of Service LOS) Table Level of Service Definitions Level of Service Signalized Intersection Unsignalized Intersection (LOS) Average Total Delay Average Total Delay (sec/veh) (sec/veh) A ≤10 I≤10 B >l0and ≤20 >10and ≤15 C > 20 and ≤ 35 > 15 and ≤ 25 D >35and≤55 >25and≤35 E >55and≤80 >35and ≤50 F >80 >50 St. Vrain River Ranch Traffic Impact Study Page 22 Appendix D: Weld County Functional Classification Map I I I r- I I -L -I- - 1 1 - 1 - Ma • I • ltttttt. III --F-I I I I I I I I • • _ Legend - Highway Paved Local Gravel Local a 4 -Lane Controlled -Access County Highway a Arterial a Collector a Arterials Not Constructed ® Future Alignment To Be Determined Note. The minimum right-of-way fa WCR 29 between SH 392 and WCR 100 will be 100' except at the following intersections it will be 140': SH 392, WCR 74, SH 14, WCR 90, WCR 100 St. Vrain River Ranch Traffic Impact Study Page 25 Recent Saturday Peak Hour 3: WCR 38/WCR 19.5 & Exist. Access Kellar Engineering LLC 11/27/2018 Int Delay, s/veh ovemen : EBL EBT WBT WBR SBL SBR 0 Lane Configurations 4 1+ V Traffic Vol, veh/h 0 16 27 0 0 0 Future Vol. veh/h 0 16 27 0 0 0 Conflicting Peds. #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - 0 - Veh in Median Storage. # - 0 0 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles. % 8 8 8 8 3 3 Mvmt Flow 0 19 32 0 0 0 Conflicting Flow All 32 Stage 1 Stage 2 Critical Hdwy 4.18 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.272 Pot Cap -1 Maneuver 1542 Stage 1 Stage 2 Platoon blocked. % Mov Cap -1 Maneuver 1542 Mov Cap -2 Maneuver Stage 1 Stage 2 51 32 ▪ 32 - - 19 - 6.43 6.23 - 5.43 - 5A3 - - 3.527 3.327 - 955 1039 - 988 - 1001 - 955 1039 - 955 - 988 - - 1001 Approach EB WB HCM Control Delay. s 0 HCM LOS 0 A Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) 0 HCM Lane LOS A HCM 95th %tile Q(veh) 0 1542 0 A HCM 2010 TWSC Sean Kellar. PE. PTOE Synchro 9 Report 2020 Background Saturday Peak Hour 3: WCR 38/WCR 19.5 & Exist. Access Kellar Engineering LLC 11/27/2018 Int Delay. s/veh 0 Lane Configurations 4 I Traffic Vol, veh/h 0 17 28 0 Future Vol. veh/h 0 17 28 0 Conflicting Peds, #/hr 0 0 0 0 Sign Control Free Free Free Free Stop RT Channelized - None - None Storage Length - - 0 Veh in Median Storage. # - 0 0 - 0 Grade, % 0 0 0 0 0 0 0 0 0 Stop None Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles. Mvmt Flow 8 8 8 8 3 3 0 20 33 0 0 0 Conflicting Flow All 33 Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.272 Pot Cap -1 Maneuver 1541 Stage 1 Stage 2 Platoon blocked, 4.18 53 33 - 33 - 20 - 6.43 6.23 - 5.43 - 5A3 - - 3.527 3.327 - 953 1038 - 987 - - 1000 - Mov Cap -1 Maneuver 1541 Mov Cap -2 Maneuver - 953 1038 - 953 Stage 1 Stage 2 - 987 - 1000 HCM Control Delay, s HCM LOS 0 0 0 Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn 1 Capacity (veh/h) 1541 HCM Lane VIC Ratio HCM Control Delay (s) HCM Lane LOS A A HCM 95th %tile Q(veh) 0 HCM 2010 TWSC Sean Kellar, PE. PTOE Synchro 9 Report 2020 Short Range Total Saturday Peak Hour 3: WCR 38/WCR 19.5 & Exist. Access Kellar Engineering LLC 11/27/2018 Int Delay, s/veh ovement Lane Configurations Traffic Vol, veh/h Future Vol. veh/h 1.7 BIlEBT WBT *BR SBL SB 4 1 V 9 26 42 14 7 5 9 26 42 14 7 5 Conflicting Peds. #Ihr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 0 Veh in Median Storage. # - 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, % 8 8 8 8 3 3 Mvmt Flow 11 31 49 16 8 6 Conflicting Flow All 66 0 0 110 58 Stage 1 Stage 2 - 58 - 52 critical Hdwy 4.18 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.272 Pot Cap -1 Maneuver 1498 Stage 1 - 6.43 6.23 - 5.43 - - 5.43 - - 3.527 3.327 - 885 1005 - 962 - Stage 2 - 968 Platoon blocked. % Mov Cap -1 Maneuver 1498 Mov Cap -2 Maneuver Stage 1 Stage 2 - 879 1005 - 879 - 962 - 961 CM Control Delay. s 1.9 0 8.9 HCM LOS A Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS 1498 - 927 0.007 - 0.015 7.4 0 - - 8.9 A A - A HCM 95th %tile Q(veh) 0 0 HCM 2010 TWSC Sean Kellar. PE, PTOE Synchro 9 Report SILBAUGH OUTDOOR VENUE USE BY SPECIAL REVIEW USR18-XXXX IN THE SW I/4 OF SECTION 34, TOWNSHIP 4 NORTH, RANGE 67 WEST OF THE 6TH P M . WI'I.D C'Ot IN FY. ('O r I I I I Lf_CI NI) X .�u USR 18-XXXX - SITE PLAN r ..Y X X .y DEVELOPERS OF AGRICULTURE 4 S11,13AUGI I OLU 1 DOOR VENUE USR 18-XXXX - SITE PLAN H. I f l .l l I I 1 0 - - I USR-2 AGPROfessionals DEVELOPERS OE AGRICULTURE Nuisance and Waste Management Plan Prepared for Veronica and Cameron Silbaugh Use By Special Review (USR) St. Vrain River Ranch Introduction The St. Vrain River Ranch is an outdoor venue for up to 200 people located in the Southwest Quarter of Section 34, Township 4 North, Range 67 West of the 6t P.M. The venue will be operated on approximately 5 -acres of the 40 -acre parcel near the Saint Vrain River. The venue will offer a cost-effective outdoor space for private gatherings. Weddings are anticipated to be the primary use for the venue. however the facility may be used for quinceaneras, company picnics, retirement parties. rotary clubs. etc. The facility will take advantage of the rustic rural charm of the site. The anticipated users of the facility are the current residents. event attendees. wedding planners. wedding officiants. musicians. caterers/food truck vendors. and contract maintenance workers. The proposed venue will be constructed and utilized in two phases. The use of the venue during phase one will be seasonal and will consist of outdoor use. 6:00 A.M. to 12:00 A.M.. 7 -days a week. April 1St through September 30'. No new structures are proposed with phase one. Phase two includes the construction of a barn for indoor gatherings. At full build out. the facility will be operational 6:00 A.M. to 12:00 A.M.. 7 -days a week. year-round. The primary hours of operation for both phases are expected to be 10:00 A.M. to 11:00 P.M., weekends. Friday through Sunday with the heaviest use anticipated to occur during summer months. The hours of use will vary event to event depending on patron needs_ The facility operators will use the methods described below to minimize potential nuisances and waste produced as a result of the proposed uses. Noise The property owner or operator will attempt to minimize noise generated during operation and maintain compliance with Weld County Noise Requirements. The facility will adhere to the maximum permissible noise levels allowed in the Commercial Zone District. The surrounding area is primarily crop farming. rural residential and undeveloped riparian woodland. The property is located near the confluence of the Saint Vrain and South Platte Rivers. Large undeveloped parcels near and/or containing the rivers owned by Public Service Company of Colorado are east of the subject property. Public Service Company of Colorado also owns the parcel along the northwestern boundary which was historically railroad right-of-way and is ENGINEERING, PL.k\\ING, CO\SI I. LING & REAL ESTATE 3050 67th Avenue. Suite 200 0 Greeley, CO 80634 970.535.9318 /office 0 970.535.9854 fax 0 www.agpros.com Page 2 of 2 currently proposed as a rails -to -trails parcel for recreational use. The St. Vrain River Ranch will be compatible with the surrounding land uses. The existing vegetation and landscaping will be retained as much as possible to preserve the rustic rural charm of the site. The venue is significantly set back from the public right-of-way and existing landowners. Existing trees and shrubs provide sound absorption and screening. Light Outdoor lighting may include wall -mounted lights, low profile garden walkway lights and string - lights. Light poles are not proposed. Sources of light will be shielded so that light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent properties. Neither the direct. nor reflected. light from any light source will create a traffic hazard to operators of motor vehicles on public or private streets. No colored light will be used which may be confused with, or construed as, traffic control devices. Waste Management The property owner or operator will be responsible for controlling noxious weeds on the site. Trash will be collected in a covered. confined trash dumpster and removed at least weekly by an appropriate trash removal company. During phase one, the seasonal use of the venue, portable restroom trailers are proposed. The operator will utilize an appropriate sanitary services provider to manage the toilets and remove and dispose of contents as needed in accordance with applicable requirements. The construction of the barn for phase two will allow year-round use. A septic system is proposed for phase two. Dust Abatement The operation is not expected to generate disproportionate amounts of fugitive dust. Lot surfaces will be rangeland grass and riparian woodland with improved gravel surfaces in roadways and parking areas. The site is located within the forested riparian environment of the Saint Vrain and South Platte Rivers. Parking will be internal to the site. Watering of surfaces will occur as necessary to suppress dust. Directors: Bill Szmyd, President Steve Brandenburg Larry Brandt Paul Bukowski Kathy Gallivan -Grist Ed Martens Emily McMurtrey AGPROfessionals Attn: Kelsey Bruxvoort 3050 67th Ave. Greeley, CO 80631 Dear Ms. Bruxvoort: Little Thompson Water District February 4,2°19 District Manager: Michael T. Cook 835 E Highway 56 Berthoud, CO 80513 P: 970-532-2096 F: 970-532-3734 www.LTWD.org This letter is in response to your request for evaluation of water service for the existing 5/8 -inch standard residential tap for the property generally located at the northeast corner of Weld County Road 38 and Weld County Road 19.5, Platteville, CO, or more generally described as follows: PORTION OF THE SW 1/4 of SEC. 34, T4N, R67W — WELD COUNTY, CO Parcel 105934300047 The District provides water service within its service area as defined by the District. The provision of water service by extension of existing water lines of the District to the above property and the installation of taps for lots is done under the terms of the Rules and Regulations of the District established by the Board of the District from time to time. You may obtain a copy of the Rules and Regulations from the District. The Board of the District may alter and amend the Rules and Regulations at any time, and the provisions of service are subject to alteration and amendment based on changes in the Rules and Regulations of the District. We currently own and operate a 6 -inch waterline that lies along Weld County Road 38, east of WCR 19 that transitions to a 1 -inch waterline before continuing east and crossing the railroad tracks to serve the property through Tap Number 385. through the existing 5/8 -inch standard residential tap for the first phase of the proposed use, subject to the limitations in this letter and the following additional limitations on the provision of water service: We will continue to provide service to the above property 1) All improvements to District facilities required to provide service will be the financial responsibility of the developer in accordance with the District Rules and Regulations. All improvements must conform to District Specifications. 2) Where fire hydrants are required for the site, there is a $2,000 per fire hydrant fee that needs to be paid prior to installation of the fire hydrant (installed by your contractor). The Developer would also be responsible for any system upgrades required to meet any fire flow requirements. No fire flow requirements were identified at this time. This commitment letter will expire two years from the date of this letter. This letter does not commit to providing water for the second phase of the proposed property usage which includes construction of a barn to facilitate indoor functions and likely additional provisions for water and sewer use by the YOU ARE HEREBY ADVISED THAT THE RULES, REGULATIONS AND TARIFFS OF THE DISTRICT ARE SUBJECT TO CHANGE WITHOUT NOTICE; AND attendees. THIS LETTER IS ISSUED WITH THE SPECIFIC LIMITATION THAT THE DISTRICT MAY CHANGE THE RULES, REGULATIONS AND TARIFFS APPLICABLE TO THE ABOVE PROPERTY AT ANY TIME WITHOUT NOTICE TO YOU OR ANY PERSON. If you have questions, please contact me. Regards. Amber Kauffman, PE District Engineer Hello