Loading...
HomeMy WebLinkAbout20191698.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF CEDAR AVENUE BETWEEN EAST 16TH STREET AND EAST 18TH STREET FOR APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that Cedar Avenue, between East 16th Street and East 18th Street, be temporarily closed, with said closure being effective May 14, 2019, for approximately four (4) days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. GG •50 CR5),O��o►��� CO51 o e P,,�coo 2019-1698 EG0024 TEMPORARY CLOSURE - CEDAR AVENUE PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 1st day of May, A.D., 2019. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: d...O4, Weld County Clerk to the Board BY: APP Deputy Cler ttorney Date of signature: 5-a"f EXCUSED Barbara Kirkmeyer, Chair Mike Freeman, P -Tem an P Conway Steve Moreno 2019-1698 EG0024 MEMORANDUM TO: Clerk to the Board DATE: April 30, 2019 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 60.5 between WCR 47 and WCR 49 is closed from 5/13/2019 thru 5/17/2019 for a culvert replacement. Cedar Ave. between East 16th St. and East 18th St. is closed from 5/14/2019 thru 5/17/2019 for a culvert replacement. See attached closure diagrams. 2019-1698 6Gao24 5/1 E 16th St P�. riteRUALOCAOSED ; well ' TRAFFIC ONLY I rt. s . . awe Project # AN -59 Road closure description Cedar between E 16th and E 18th closed 5/14/2019 thru 5/17/2019 for culvert replacement Notice to Public Road signs and barricaded during closure Message boards to be used Detour Route E 16th between Cedar and Balsam .5 mile paved Balsam between E 16th and E 18th .25 mile paved E 18th between Cedar and Balsam .5 mile paved Notes ADT of Cedar is; 665/2016 Culvert replaced is irrigation: with new 15" CSPR No dust control required, paved detour Culvert is 30' south of E 16th on Cedar Ave. Placement of signs not to scale Prepared by Approved by county engineer Date 4/26/2019 LEE STEPHEN CAMERON PARROTT Hello