Loading...
HomeMy WebLinkAbout20193860.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 86 BETWEEN COUNTY ROADS 43 AND 45 FOR APPROXIMATELY NINE (9) DAYS, FOR WATER SERVICE MAIN EXTENSION AND NEW SERVICE TIE-INS FOR NORTH WELD COUNTY WATER DISTRICT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 86, between County Roads 43 and 45, be temporarily closed, with said closure being effective September 3, 2019, for approximately nine (9) days for a water service main extension and new service tie-ins for the North Weld County Water District, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc; 50 (ks) i/ 2019-3860 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 86 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 28th day of August, A.D., 2019. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: deedvsj : IA Weld County Clerk to the Board BY: il/ Deputy Clerk to the Board APPROVED AS TO FORM Ack, County Attorney Date of signature: qAO//1 Steve Moreno ouvl EXCUSED Barbara Kirkmeyer, Chair Mike Freeman, Pro-Tem EXCUSED Sea P. Co tt K. James 2019-3860 EG0024 mow• k' Mr..? .s.#.M f r.; ;n MEMO NDUM TO: Clerk to the Board DATE: August 21, 2019 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item North Weld County Water District is requesting permission to close CR 86 between CR 43 and CR 45 from 9/3/19 through 9/11/19 for a water service main extension and new service tie ins. See attached closure diagrarno 2019-3860 4, LEGEND: >i INDICATES PLACEMENT OF SIGN INDICATES FRONT OF SIGN DRUM WORK AREA 3MA BARRICADE • ROAD CLOSED TO n ItU T AFFK CA� NORTHERN COLORADO TRAFFIC CONTROL EPIC, All AWP Coxnpauy Garrett Martinez Project Manager NOT AN ENGINEER Qraelny; 970-366-6681 Morro: 30:3-059-1729 • Fax: 970-358-5882 1712 1atAva , PO Box 490 • Greeley, Co 80823 GARRETT.IVIARTINEZ@nocotraffic.com AFTER HOURS EMERGENCY NUMBER 970-366-6881 (OWNER: Weld County P7JEC NAME: PROJECT NntABER: CR 86, CR45 'PRIME CONTRACTOR SJ21874 TI'tArtIC CO'4TR0l. CON TRACTOR NWCWD N.C.T.C. LP i+- NE_Geffet'M CI< SHEET NUMBER DATE: 970-301-0979 MHT#2 6/26/2019 PREPARED St Garrett Martinez CCA EXP 09-2019 WiWitivarlOn.com • a a Nor BE T SC L 4 - ROAD WORK AHEAD 6 - DETOUR AHEAD 2 - ROAD CLOSED AHEAD - ROAD CLOSED TO THRU TRAFFIC 2 - DOUBLE DETOUR ARROW 3 - ROAD CLOSED 4 - LEFT DETOUR MARKER 4 - RIGHT DETOUR MARKER 1 - NO RIGHT 1 - NO LEFT n{f�}R.� N 1i+Fpt-��Q^ O ROAD CLOSURE NOTES: t) TRAFFIC PLAN IS BASED ON M A S STANDARDS CASE P20, AND MUTCD TA NO. 20 2) EXACT PLACEMENT OF DEVICES WILL BE DEPENDENT ON SITE CONDITIONS CHANGES ARE TO BE IMPLEMENTED WHERE APPLICABLE 3) ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE SHALL UTILIZE PROPER PPE IN ACCORDANCE WITH OSHA REGULATIONS 4) WORKERS SHALL NOT CROSS LIVE LANES OF TRAFFIC ON FOOT WITHOUT THE ASSISTANCE OF FLAGGERS, USING THE "BUDDY SYSTEM" OR A DESIGNATED CROSSWALK 5) ALL VEHICLES AND EQUIPMENT MOVING INSIDE OF THE CLOSURE SHALL BE EQUIPPED WITH BACK UP ALARMS OR UTILIZE A SPOTTER 5) ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL PARK OFF THE ROADWAY ON THE SAME SIDE AS THE CLOSURE 7) PLAN IS FOR UTILITY WORK AND SITE DEVELOPMENT 8) WORK IS ESTIMATED TO TAKE 6 DAYS; CLOSURE WILL STAY UP FOR DURATION OF WORK; INCLUDING NIGHT TIME CLOSURE 9) SIGNS SHALL BE SPACED A MINIMUM OF 500 FT OR AS SPACE ALLOWS 10) NON -VEHICULAR ACCESS: BICYCLISTS ARE TO BE TREATED AS A VEHICLE 11) PRIVATE ACCESS IS TO BE MAINTAINED AT ALL TIMES WITHIN PROJECT LIMITS UNLESS OTHERWISE AGREED UPON BY PROPERTY OWNER 12) EMERGENCY VEHICLES WILL BE GIVEN THE RIGHT OF WAY AS SOON AS IT IS SAFE TO DO SO i Hello