Loading...
HomeMy WebLinkAbout20191393.tiffAddress of site: Legal Description: Zone District: USE BY SPECIAL REVIEW (USR) APPLICATION DEPARTMENT OF PLANNING SERVICES * 1555 N. 17TH AVENUE * GREELEY, CO 80631 * 970-3400-6100 * FAX 970-304-6498 FOR PLANNING DEPARTMENT USE: AMOUNT $ APPLICATION RECEIVED BY DATE RECEIVED: CASE # ASSIGNED: PLANNER ASSIGNED: Parcel Number*: aaj/2___ - - - - w_b_ dco 1qq C� Sa herseci t 0 800,E char w S E kiS tA-)L1 Section: Township: QS N (*A 12 digit number on Tax 1.0. information, obtainable at ). toy eke CE I3 Range: Ce7 W creage: 41 9 OFloodplain: Y N Geological Hazard: Y N Airport Overlay: Y N FEE OWNER(S) OF THE PROPERTY: Name: F,aickt t ` \O0.rrck. Company: Tamil 4 Vcane IN Ciro hcc t c 3 Phone #: q -7p--9 - (� ip y Email: rump �qrj %.4 91161415 t e (cmd Street Address: to 1g q % `s- a City/State/Zip Code: V\t.r )- C b % [?(p y 4 Name: on \k CawNt►r Company: Phone #: Street Address: City/State/Zip Code: Name: Email: Company: Phone #: Street Address: City/State/Zip Code: Email: APPLICANT OR AUTHORIZED AGENT: (See below: Authorization must accompany all applications signed by Authorized Agents) Name: Company: Phone #: Street Address: City/State/Zip Code: Email: PROPOSED USE: Comrye,- CAA 1 9O.‘Ackni,Ado Lk s V4x 6 6e1- 4mck-J W)N p - v Ct- a \ M) a \ j\ )nvcta . I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the applicatio . corporation is the fee owner, notarized evidence must be included indicating that the signatory has to legal autho the corporation. Signature'''er or Authorized Agent ?NQ Face _Lba vl Print Name Print Name Dat Signature: Owner or Authorized Agent Date Rev 4/2016 DEPARTMENT OF PLANNING AND BUILDING DEPARTMENT OF PUBLIC HEALTH AND ENVIRONNMENT 1555 NORTH 17T" AVENUE GREELEY, CO 80631 AUTHORIZATION FORM FOR BUILDING, PLANNING AND HEALTH DEPARTMENT PERMITS AND SERVICES I, (We), ?Ac,a I I1KA , give permission to ea, st �yt] (Owner - please print) (Applicant/Agent - please print) to apply for any Planning, Building or Health Department permits or services on our behalf, for the property located at: ,au1eri et. 52, terzcc(, lam, a i;t-t�-f Legal Description: LU≥.c{ < j J df{Section Z8 , Township N, Ranger-( W Subdivision Name: Lot Block Property Owners Information: Phone: 97C6 531-C'? e q E-mail: )-4)/e.)./ ( L C4 V IC) I S r!.. i& Applicant/Agent Contact Information: Phone: / 761 .7/C 9 g E -Mail: Email correspondence to be sent to: Owner art Thr\c) who am` I • Lbw 1/lam; !syn:16 ice.. /- LC Applicant/Agent Both Postal service correspondence to be sent to: (choose only one) Owner Applicant/Agent Additional Info: Owner Signature: r i` Date: Owner Signature:.,! Date: S - ! 5 — / DEPARTMENT OF PLANNING AND BUILDING DEPARTMENT OF PUBLIC HEALTH AND ENVIRONNMENT 1555 NORTH 17T" AVENUE GREELEY, CO 80631 AUTHORIZATION FORM FOR BUILDING, PLANNING AND HEALTH DEPARTMENT PERMITS AND SERVICES we) Rafael Ibarra (Owner - please print) give permission toSheri Lockman. Lockman Land Consulting, LLC (Applicant/Agent - please print) to apply for any Planning. Building or Health Department permits or services on our behalf, for the property located at: 26199 County Road 52. Kersey, CO 80644 Legal Description SW4 of Section 28 Township 5 N, Range 64 14/ Subdivision Name. Lot A RE -1413 Property Owners Information: Phone: 970-5430969 ApplicanUAgent Contact Information: Phone 970-381-O526 Lot Block E-mail hydrobandits@gmail.com E -Mail sherilockman@what•wire.com Email correspondence to be sent to Owner Applicant/Agent x Both Postal service correspondence to be sent to: (choose only one) Owner Applicant/Agent x Additional Info Owner Sig v-uJ Date 4 Z T 7 7 c i `'( Date, Owner Signatures QUESTIONNAIRE 1. Explain, in detail, the proposed use of the property. The applicant owns and operates a trucking company, Front Rage Hydro -Bandits Services, LLC. He would like to park up to 15 trucks of various sizes on the site and 30 employee vehicles. There are plans to construct a building at the north end of the property for business and personal use. The building will include an office, restroom and shop for basic maintenance of the trucks. No sign is being requested. Additional down casting lights will be placed on the future building. 2. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 22 of the Comprehensive Plan. Section 22-2-20.G.A.Goal 7. County land use regulations should protect the individual property owner's right to request a land use change. 2.A.Policy 7.2. Conversion of agricultural land to non -urban residential, commercial and industrial uses should be accommodated when the subject site is in an area that can support such development, and should attempt to be compatible with the region. 3. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 23 (Zoning) and the zone district in which it is located_ Section 23-3-40.S of the Weld County Code states that any use permitted as a Use by Right, an accessory use. or a Use by Special Review in the commercial or industrial zone districts, provided that the property is not a Lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions shall be allowed with the approval of a Use by Special Review Permit. 4. Describe what type of land uses surround the site. Explain how the proposed use is consistent and compatible with surrounding land uses. The property is surrounded by small acreage residential lots. Neighbors have been contacted to discuss the proposed use and concerns have been addressed. 5. What are the hours and days of operation? 5:00 a.m. to 8:00 p.m. Monday thru Friday. Except in the case of emergency which happen very seldom. An emergency requiring after hour work has only happened once in the last year and a half. 6. List the number of full time and/or part time employees proposed to work at this site. The applicant is asking to employ up to thirty full-time employees. The employees park at the site in the morning get into their work trucks and don't return to the site until the end of the work day. 7. If shift work is proposed include the number of employees per shift. Not applicable. 8. List the number of people who will use this site. Include contractors, truck drivers, customers, volunteers, etc. The site will be used by the residents within the existing home and up to thirty employees who drive the trucks. There will also be occasional deliveries. 9. If this is a dairy, livestock confinement operation, kennel, etc., list the number and type of animals. Not applicable 10. Describe the type of lot surface and the square footage of each type. (e.g. asphalt, gravel, landscaping, dirt, grass, buildings) The lot is roughly 3,000 sf buildings/concrete, 58,000 sf gravel, 58,000sf of dirt and 88,500 sf grass. 11. How many parking spaces are proposed? How many handicapped (ADA) parking spaces are proposed? Thirty-three employee parking spaces and fifteen truck/trailer parking spaces have been designated on the plat. An ADA parking space will be included if required. 12. Explain the existing and proposed landscaping for the site. No additional landscaping is proposed. The landscaping surrounding the home is typical grass. 13. Describe the type of fence proposed for the site (e.g. 6 foot chain link with earth tone slats) No fencing is being proposed. if the Board of County Commissioner deem it necessary, a fence will be erected. 14. Describe the proposed screening for all parking and outdoor storage areas. No screening is being proposed at this time. 15. Explain any proposed reclamation procedures when termination of the Use by Special Review activity occurs. The trucks would be removed from the property. 16. Who will provide fire protection to the site? Platte Valley Fire Protection District. 17. List all proposed on -site and off -site improvements associated with the use (e.g. landscaping, fencing, buildings, drainage, turn lanes, etc.) and a timeline of when you will have each one of the improvements completed. The applicants hope to construct a building at the north end of the property. If required a detention pond will be constructed at the northeast corner of the property at that time. It has not been determined when the building will be constructed. Engineering questions: 1. Describe how many roundtrips/day are expected for each vehicle type: Passenger Cars/Pickups, Tandem Trucks, Semi-TrucklTrailer/RV (Roundtrip = 1 trip in and 1 trip out of site) At full buildout an average of 15 round trips per day is expected from the trucks. Business related passenger vehicles would add approximately 30 round trips per day. 2. Describe the expected travel routes for site traffic. Traffic will come from the north and south along County Road 53. 3. Describe the travel distribution along the routes. 20% of the truck traffic is to/from the east along County Road 52. 80% of the truck traffic is to/from the west along County Road 52. 50% of the truck traffic to/from west will turn north and 50% will turn south along County Road 53. 4. Describe the time of day that you expect the highest traffic volumes from above. The highest traffic will be at approximately 6 a.m. and 5-6 p.m 5. Describe where the access to the site is planned. The existing access onto County Road 52 will be utilized. 6. Drainage Design. A. Which exception is being applied for and include supporting documentation. The applicants are requesting an exception using F.1.a.14. which allows for a onetime exception for a new 2,000 sq. ft. building or equivalent imperviousness when the parcel is greater than 5 gross acres in size. B. Where the water originates if it flows onto the property from an off -site source Water is prevented from running onto the property on the north side by the County Road 52 right-of-way. Water originating on the property to the west will flow northeast across the property. C. Where it flows to as it leaves the property Water from the property will flow to properties on the north and east sides. D. The direction of flow across the property Water flows to the northeast. E. If there have been previous drainage problems with the property None that are known of. Environmental Health questions 1. What is the drinking water source on the property? The existing single family residences is serviced by Central Weld County Water District. A Water bill is included with this submittal. Bottled water will be made available for employees. 2. What type of sewage disposal system is on the property? The existing home is serviced by a septic system. A copy of permit G19920185 is attached to this submittal. A port -a -let will be provided for the employees until the proposed building is constructed. 3. If storage or warehousing is proposed, what type of items will be stored? No outside storage is proposed. 4. Describe where and how storage and/or stockpile of wastes, chemicals, and/or petroleum will occur on this site. Not applicable. 5. If there will be fuel storage on site indicate the gallons and the secondary containment. State the number of tanks and gallons per tank. No fuel will be stored on site. 6. If there will be washing of vehicles or equipment on site indicate how the wash water will be contained. No vehicles or equipment are washed on -site. 7. If there will be floor drains indicate how the fluids will be contained. This will be determined when the proposed building is constructed. 8. Indicate if there will be any air emissions. (e.g. painting, oil storage, etc.) Not applicable. 9. Provide a design and operations plan if applicable. (e.g. composting, landfills, etc.) Not applicable. 10. Provide a nuisance management plan if applicable. (e.g. dairies, feedlots, etc.) Not applicable. Building questions: 1. List the type, size (square footage), and number of existing and proposed structures. The site has the following structures: Primary residence 2,072 sf Future building Maximum of 15,000 sf 2. Explain how the existing structures will be used for this USR? The applicant utilizes one room in the residence as an office at this time. This office is not for use by employees or the public. arm Wyo.' o N4 to Front Range Hydro -Bandits Hello neighbors, This is Front Range Hydro - Bandits inviting you over to our home. We would love if you would join us in a get-together so you can get more information of who we are. Our goal is to provide information and answer any questions you might have. The county has asked us to get input from everyone around us for an approval to be able to park our trucks in the property AKA our "yard" from the city. This will take place at 26199 CR 52 Kersey, CO 80644 Saturday July, 14 2018 At 1Y:00 pm We look forward to meeting you! Please feel free to give us a call with any questions or concerns Rafael Ibarra (970) 534-0969 WELD COUNTY COLORADO LAND RECORDS AFFIDAVIT OF INTERESTED LAND OWNERS SURFACE ESTATE 5/25/2018 9:07:41 AM THE UNDERSIGNED, States that to the best of his or her knowledge the attached list is a true and accurate list of the names, addresses, and the corresponding Parcel Identification Number assigned by the Weld County Assessor of the owners of the property (the surface estate) within 500 feet of the property being considered. This list was compiled utilizing the records of the Weld County Assessor available on the Weld County Internet Mapping site, http://www.co.weld.co.us, and has riot been modified from the original. The list compiled for the records of the Weld County Assessor was assembled within thirty days of the applications submission date. Property Owners Within 500 ft of Parcel # 096328000040 Signature Date Account Parcel Owner Mailing Address R0556501 096328000010 GERBERS SARAH M R0556501 096328000010 GERBERS RYAN J PO BOX 676 KERSEY, CO 806440676 R4166086 096328000026 RIDINGS KELLIE A R4166086 096328000026 RIDINGS WILLIAM SHANE 25072 COUNTY ROAD 53 KERSEY, CO 806448811 R4166186 096328000030 GONZALES LEONARD 555 N 71ST AVE GREELEY, CO 806348827 R4166286 096328000031 CRUZ JUAN IGNACIO 25172 COUNTY ROAD 53 KERSEY, CO 806448802 R4166486 096328000033 PENA MARIA A R4166486 096328000033 PENA JOSE RAMON 26245 COUNTY ROAD 52 KERSEY, CO 80644.8805 R0162992 096328000039 SCHOTT MARY E Parcels: 10 Owner Records: 17 Page 1 of 3 WELD COUNTY COLORADO LAND RECORDS AFFIDAVIT OF INTERESTED LAND OWNERS SURFACE ESTATE THE UNDERSIGNED, States that to the best of his or her knowledge the attached list is a true and accurate list of the names, addresses, and the corresponding Parcel Identification Number assigned by the Weld County Assessor of the owners of the property (the surface estate) within 500 feet of the property being considered. This list was compiled utilizing the records of the Weld County Assessor available on the Weld County Internet Mapping site, http://www.co.weld.co.us, and has not been modified from the original. The list compiled for the records of the Weld County Assessor was assembled within thirty days of the applications submission date. Property Owners Within 500 ft of Parcel # 096328000040 5/25/2018 9:07:42 AM Signature Date Account Parcel Owner Mailing Address R0162992 096328000039 SCHOTT ALBERT L 25052 COUNTY ROAD 53 KERSEY, CO 806448811 R0163092 096328000040 IBARRA RAFAEL PO BOX 274 GILCREST, CO 806230274 R0043991 096333000018 HOFFMAN ALICE L R0043991 096333000018 HOFFMAN JEROLD J 12293 ANTELOPE TRL PARKER, CO 801388291 R8945441 096333200001 NAIBAUER SHARI R8945441 096333200001 NAIBAUER DUANE R PO BOX 736 KERSEY, CO 806440736 R8945442 096333200002 SEKICH DANA L R8945442 096333200002 SEKICH RICHARD D 24972 COUNTY ROAD 53 KERSEY, CO 806448804 Parcels: 10 Owner Records: 17 Page 2 of 3 Front Range Hydro- Bandits 26199 C R 52 Kersey, CO 80622 (970) 534-0969 HydroBandits@gmail.com Good Afternoon Neighbors, This is a letter to confirm there is a verbal agreement that there is no need for screening of the trucks and employees vehicles is necessary Please sign below if you would NOT like a fence to be put up, Please let us know of any questions you might have or concerns, Address: Name Signature 2 3 4. Thank you!! Rafael Ibarra FRONT RANGE HYDROSANDITS RAFAEL [BARRA 26199 CR 52 KERSEY, CO 80644 PHONE: 970-534-0969 EMAIL HYDROBANDITS@GMAILCOM Front Range Hydro -Bandits Name Address Comments/ C°ncems) Phone Number Thank you f o r joining us! Please let us know if you have any questions or concerns. Front Range Hydro -Bandits *26199 CR 52 Kersey, CO 80644 *Phone: (970)534-0969 * E-mail: HvdroBandiis(c�gmail.com Letter of minutes meeting On July 14 Front Range Hydro Bandits arranged a meeting to all surrounding neighbors. There was a letter that was sent out inviting them to the event. Neighbor Duane Naibauer arrived with a few questions. "Where will you be parking your truck?" Rafael Ibarra (owner) Answer by explaining and showing. Also he explained that they were not going to be entering any later than 8 pm. So there was no need to be worried about noise. Neighbor Richard Sekich arrived to the meeting and also has a few questions. He asked if there was going to be a fence put up. He asked for the reason that he did not want then fence up. He said that one of the reasons why he moved out to the open was to not see any fences. Also the places where the trucks that are going to be parked were shown to them. The parking spaces for the employees also. Rafael Ibarra made it very clear if they had any questions for concerns to feel free and talk to him about it. He also went to the homes of the neighbors that couldn't assist the meeting to address any questions for concerns that they had. Everyone seems that they don't mind it, also made comments that they didn't even know that he had Hydro Vacs in the back yard. DRAINAGE REPORT For 0=BAhfiD[ITS, LLC 26199 WCR 52 KERSEY. COLORADO Prepared for: Rafael I barra 26199CR52 Kersey, Colorado 80644 Contact: Rafael !barra (970) 534-0969 January 2019 Drexel, Barrel! & Co. Engineers / Surveyors 710 1 1 `1' Avenue. Suite L-45 Greeley, Colorado 8063 I (970) 351-0645 Prepared By: Cameron Knapp, P.E. January 2, 2019 Elayley Balzano Weld County Planning Department 1555 N. 17th Avenue Greeley, CO 80631 RE: Drainage Report 26199 CR 53, Kersey, Colorado. Dear Ms. Balzano: We are pleased to submit, for your review and approval, this Drainage Report for Front Range I lydo-Bandits LLC as part of a USR Application. The investigation and design within this report have been performed according to the criteria established by the Weld County Storm Drainage Criteria as an addendum to the Urban Storm Drainage Manual. We sincerely appreciate your time and consideration in the review of this project. If you should have any questions, please feel free to contact this office. Respectfull zfet-ter Cameron W. Knapp, P.E. Drexel, Barrell & Co. "I hereby certify that this report for the drainage design for Front Range I lydro-Bandits, LW located at 26199 CR 52, was prepared by me (or under my direct supervision) in accordance with the provisions of Weld County Storm Drainage Criteria for the owners thereof." 'ameron W. Knapp, P.E. Registered Professional Engineer State of Colorado No. 38898 Drainage Report 26199 CR 52 USR •• v .3. 1 • ' 38898 - — __I" o tre: .111: :I :1 :II tit January 2019 Drexel, Barrel) & Co TABLE OF CONTENTS JILl 1DLVG' PAGE COVER SHEET COVER LETTER i i TABLE OF CONTENTS i i i I. GENERAL LOCATION & DESCRIPTION 1 A. Location B. Description of Property 1 C. General Project Description II. DRAINAGE BASINS & SUB -BASINS 2 A. Major Basin Description 2 B. Sub -Basin Description III. DRAINAGE DESIGN CRITERIA 2 A. Development Criteria Reference and Constraints B. Hydrological Criteria B. Hydraulic Criteria IV. DRAINAGE FACILITY DESIGN 3 A. General Concept B. Specific Details 4 V. CONCLUSIONS 6 A. Compliance with Weld County Code 6 B. Drainage Concept 6 VI. REFERENCES 6 APPENDICES A. Vicinity Map B. Soils Information from USDA NRCS "Soils Web Survey" C. Hydrologic Computations D. Proposed Stormwater Pond Calculations E. Charts, Tables and Graphs BACK POCKET: 24"x36" Proposed Drainage Plan Drainage Report 26199 CR 52 USR Drexel. Barrell & Co iii January 2019 I. GENERAL LOCATION & DESCRIPTION A. Location 1. The project site is located in the North 1/2 of the Southwest 1/4 of the Southwest 1/4 of Section 28, Township 5 North, Range 64 West, of the 6th Principal Meridian, Weld County, Colorado. 2. The property address is 26199 CR 52 Kersey, Colorado 80644. 3. There are no major irrigation channels, lakes or streams that are located on the site. The Latham Ditch is the nearest water features located approximately '/2 mile to the north. 4. The property is outlined on the south by WCR 52. To the north, east and west, are 5 to 40 acre farmsteads with irrigated or dryland pastures. B. Description of Property 1. The total area of the property is 5.02 acres. 2. The northern half of the property is currently dryland pasture. An existing home and sheds are located in the southwest corner. Gas well facilities are situated at the southeast corner of the property. 3. The "Soil Survey of Weld County Area, Colorado, Southern Part" prepared by the U.S. Department of Agriculture, Soil Conservation Service, indicates that the surface soils on the site consists of Vona Loamy Sand (3-5% slope). a. Vona Loamy Sand soil type is described as well drained soil, with a high capacity to transmit water. The soil is classified in the `A' hydrologic group. C. General Project Description 1. The property is proposed to be used to support the owner's current business, Front Range Hydro -Bandits, LLC. This business provides water hauling for gas and oil operations in the Weld County area. a. Semi -trucks will be parked on the site and a proposed shop/maintenance building will be constructed at the northwest corner of the property. The existing entrance off of CR 52 will remain to access the site. The existing house and sheds will also remain, which the owner will continue to reside at. An all-weather gravel base course will be placed in areas of truck, employee and customer parking. A stormwater detention and water quality pond will be constructed at the northeast corner of the property. Drainage Report 1 January 2019 26199 CR 52 USR Drexel, Barrel) & Co II. DRAINAGE BASINS & SUB -BASINS A. Major Basin Description 1. This agricultural area south of Kersey generally drains to the northeast. There are some low points in the topography, offsite to the northeast, that appear to collect runoff. The Latham Ditch is about 1/2 mile to the northeast and functions a runoff collector. 2. No known master drainage plan or previous drainage report exists for this area. 3. According to the FEMA Flood Insurance Rate Map (FIRM) Community Panel No. 08123C 1775E, the site is not located in a designated 100 -year floodplain or floodway. B. Sub -Basin Description 1. The site slopes from southwest to northeast at approximately 2%-3% slope. The low point is the northeast corner. There are no defined drainage structures or ditches on the site. Runoff generated by the property during large storm events travels overland across the site as sheet flow until passing onto the property to the north. 2. The undeveloped peak runoff rates and runoff coefficients associated with the existing undeveloped conditions are presented in Table 1. The entire 5.02 acres of property was assumed to be undeveloped, having an imperviousness of 2.0%. 3. There are no significant sources of offsite runoff onto the property. WCR 52 acts as a barrier from offsite runoff from the south. The adjacent properties on the west and east generally drain in a south to north direction and don't generally drain onto the site. TABLE 1: EXISTING CONDITIONS RUNOFF RATES Basin Area (acres) 5-yearIlir Runoff Coefficientsilk 10 -year Runoff Coefficients 10 -year Peak Runoff (cfs) 100 -Year Runoff Coefficients 100 -year Peak Runoff (cfs) [;X- I 5.02 0.01 0.01 0.10 0.1 3 2.56 1 l I. DRAINAGE DESIGN CRITERIA Development Criteria Reference and Constraints 1. All aspects of the site drainage design and storm sizing will conform to the Weld County Storm Drainage Criteria and referenced volumes of the Urban Storm Drainage Criteria Manual. Drainage Report 26199 CR 52 USR 2 January 2019 Drexel. Barrell & Co B. Hydrological Criteria 1. The design storm frequencies for un-urbanized land use are the 10 -year and 100 -year storm events per Weld Storm Drainage Criteria. 2. The Rational Method was utilized to calculated peak runoff rates. a. Runoff coefficients and Imperviousness values are taken from Tables 6-3 and 6-5 of the Urban Storm Drainage Criteria Manual, Volume 1 based on the 'A' Hydrologic Soils Group. 3. Rainfall intensities for the 1 -hour point rainfall were taken from the PF table for Kersey Colorado, downloaded from NOAA Atlas 14, Volume 8, Version 2 Precipitation Frequency Data Server. C'. Hydraulic Criteria I. According to Weld County Storm Drainage Criteria, detention of the developed 100 -year runoff will be required with discharge restricted to the 10 - year historic runoff rate. A proposed pond will be constructed at the northeast corner of the property to provide the necessary detention volume. The pond will have a two compartment outlet structure constructed at the low point. 2. The onsite stormwater detention pond will also act as an Extended Dry Detention Basin with a Water Quality Capture Volume (WQCV). The WQCV and outlet design is based on spreadsheets and formulas per the latest edition of Volume III of the Urban Storm Drainage Criteria Manual. The WQCV was calculated using the UDFCD equation and 20% was added to the volume for sediment deposition. 3. The required Water Quality Capture Volume is included in the 100 -year detention volume. 4. A 15" diameter outlet pipe will extend from the outlet structure to a flared end section at the northeast corner of the property. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. No regrading of the site is anticipated except as required for building construction and for the construction of the storm water detention pond. The entire site will sheet flow to the detention pond at the northeast corner. An outlet structure will provide the required discharge restriction and outlet toward the historic drainage path. Runoff will be released at the northeast corner of the site and continue northeasterly onto the neighboring property as it does in the historical condition. 2. The proposed site improvements will not result in any offsite runoff from entering the site. The existing drainage patterns of the surrounding properties will be unaffected. Drainage Report 3 January 2019 26199 CR 52 USR Drexel. Barrel) & Co Table 6-3. Recommended percentage imperviousness values Land Use or Surface Characteristics Percentage imperviousness (%) Business: Downtown Areas 95 Suburban Areas 75 Residential lots (lot area only): Single-family 2.5 acres or larger 1, 0.75 — 2.5 acres 20 0.25 — 0.75 acres 30 0.25 acres or less 45 Apartments 75 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 10 Playgrounds 25 Schools 55 Railroad yard areas 50 Undeveloped Areas: Historic flow analysis Greenbelts, agricultural 2 Off -site flow analysis (when land use not defined) 45 Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 2 Lawns, clayey soil 2 6-8 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 1 March 2017 B. Specific Details 1. No regrading of the site is anticipated except as required for building construction and for the construction of the storm water detention pond. 2. The entire 5.02 acres of the site is defined as a single drainage basin identified on the Proposed Drainage Plan as Basin `PR -1'. The peak runoff rates and runoff coefficients associated with Basin `PR -1' are presented in Table 2. Runoff coefficients values are calculated per the Weld County Storm Drainage Criteria using the current Urban Storm Drainage Criteria Manual Tables 6-3 and 6-5, based on the 'A' Hydrologic Soils Group. TABLE 2: DEVELOPED CONDITIONS RUNOFF RATES Basin Area (acres) 5 -year Runoff Coefficient 10 -year _ Peak Runoff (cfs 100 -Year Runoff Coefficient 100 -year Peak Runoff (cfs) 10 -year Runoff Coefficient PR -I 5.02 0.15 0.15 1.68 0.27 5.78 3. The site will drain to the proposed water quality/detention pond at the northeast corner of the site. Note that all elevations listed are based on Digital Terrain Elevation Data, actual field surveyed elevations may vary. a. The detention pond will be located in the open space outside of the gravel parking area/drives at the west side of the site. A proposed outlet structure will be constructed at the northeast corner of the pond with invert at Elevation 4671.50. b. The pond bottom will slope at 2% towards the outlet structure and have 4:1 side slopes. After final grading operations, the pond will be seeded with a native grass mixture to establish long-term vegetation over the pond. c. The Water Quality Capture Volume for the pond was calculated to be 2,591 cubic feet and is achieved at the Water Surface Elevation of 4673.00. A water quality control plate fixed to the front of the outlet structure will have 1 column & 5 rows consisting of 1/2" diameter holes to regulate the 40 - hour drain time. A well screen NN ill be installed over the water quality plate which will filter sediment from runoff before passing into the second compartment of the outlet structure. d. During a larger storm event, the water surface elevation in the pond will rise beyond the WQCV elevation of 4673.00 and overtop the water quality control plate, spilling into the second compartment of the outlet structure. An orifice plate with a 1-3/8 inch diameter orifice will be affixed to the Drainage Report 4 January 2019 26199 CR 52 USR Drexel. Barrell & Co outlet wall covering the outlet pipe to limit outflow to the 10 -year historic allowable release rate of (0.10 cfs). e. The required 100 -year detention volume of 21,437 cubic feet is achieved at the 100 -year WSL of 4674.50. f. A 15" diameter outlet pipe extending from the outlet structure through the pond berm will discharge to the surface at the northeast property boundary. The pipe will have a flared end section and a 6'x6' riprap pad consisting of Type 'VL' riprap. During larger storm events, or plugging of the outlet structure or pipe, the water surface elevation in the pond may rise beyond the 100 -year water surface elevation of 4674.50. In this case, an emergency overflow spillway will be constructed and set to begin spill over at Elevation 4674.50. The spillway will pass thru the pond berm and spill over at the northeast corner of the pond. A 1.5 -foot wide spillway will allow the release of the full 100 - year peak runoff from the developed property (5.78 cfs) as the water surface elevation reaches 6 -inches above the spillway level. Another 6 - inches of height is provided in the pond to provide 1 foot of total freeboard up to Elevation 4675.50. 4. Routine and extended maintenance of the detention/water quality facility will be needed to preserve the designed function. Maintenance shall be the responsibility of the property owner. a. Mowing of the grass bottom will occur periodically in the spring, summer. and fall months as necessary. The native grass is intended to be higher than manicured sod, so the height will be left to the discretion of the owner. g. b. Quarterly inspection and removal of sediment. debris, and other material is suggested for the trash screen in the first compartment of the outlet structure. c. Periodic inspections (quarterly as a minimum) should be conducted and also after every large storm event. Inspections should include, but not limited to, the inspection of the pond perimeter (sides and bottom), presence of trash and debris, sediment accumulation, erosion at the rip rap overflow spillway, invasive vegetation, standing water, outlet structure damage/clogging/seepage, rodent presence, acts of vandalism, condition of the flared end outlet section and riprap pad, and functioning of the outlet pipe. d. General long term maintenance and repairs as necessary will ensure that the pond will function as intended over the life of the facility and ensure safe and controlled release of stormwater to the historic downstream path. 5. Less than 1 acre of area will be disturbed with the proposed site improvements; therefore, a Colorado Department of Public Health and Environment (CDPHE) Stormwater Discharge Permit will not be required. Drainage Report 5 January 2019 26199 CR 52 USR Drexel Barrell & Co Additionally, a Weld County Grading Permit is not required if less than 1 acre is disturbed. Nevertheless, temporary erosion and sediment control measures will be implemented during construction to prevent sediment from being carried off the site and being deposited onto neighboring properties, roads, or drainage facilities. V. CONCLUSIONS A. Compliance with Weld County Code 1. The proposed drainage improvements designed for this site will be effective for controlling up to the 100 -year storm while also providing a Water Quality component for more frequently, smaller storms. 2. The release of stormwater at the 10 -year historic rate will not jeopardize the health, safety or welfare of public or private property. 3. All design criteria meets Weld County Code requirements Section 23-12-30. B. Drainage Concept 1. The developed site will drain in the historic fashion — from southwest to northeast. At the northeast corner of the property, an Extended Detention Basin will be constructed. Runoff from the site will be directed as overland sheet flow into the pond. A proposed outlet structure will be constructed to regulate and control the release of runoff from the pond. Runoff will be released at the northeast corner of the property following the historic path to the northeast across the neighboring property. The historic drainage path will not be in the way of any existing homes or structures. VI. REFERENCES 1. Weld County Storm Drainage Criteria. 2. Urban Storm Drainage Criteria Manual 2017, Volumes I, II. & III Drainage Report 6 January 2019 26199 CR 52 USR Drexel. Barrell & Co ST HWY 34 KERSEY 54 1 /4 co r -57 SITE- WCR 52 NOT TO SCALE VICINITY MAP Drexel, Barrell & Co. Engineers • Surveyors DATE: 12/12/2018 JOB NO: 21271-0O DWC. NO. VM SHEET 1 01 APPENDIX B NRCS SOILS INFORMATION 40° 21' 54" N 40° 21' 46" N P 3 104° 33' 44" W 104° 33' 44" W 537170 537190 Hydrologic Soil Group —Weld County, Colorado, Southern Part (26199 CR52) 537210 I 53l Soil Map may not be valid at this scale.. 53725 1 I I I I I 537170 537190 537210 537'230 537250 A Map Scale: 1:1,140 if printed on A portrait (8.5" x 11") sheet. 537270 53727'0 0 15 30 60 Meters 90 Feet 0 50 100 200 300 Map projection: Web Mercator Corner coordinates: WGS84 Edge bcs: UFM Zone 13N WGS84 537290 537310 537310 537330 I 537330 A r� F_ V 40° 21' 54" N 40° 21' 46" N USDA Natural Resources Web Soil Survey a Conservation Service National Cooperative Soil Survey 12/19/2018 Page 1 of 4 Hydrologic Soil Group —Weld County, Colorado, Southern Part (26199 CR52) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons I ..., A ND B B/D C C/D D Not rated or not available Soil Rating Lines ,,.tir A assr ND .-v a► D - B Not rated or not available Soil Rating Points A ND • 8 B/D • • • O C C/D D Not rated or not available Water Features Streams and Canals Transportation 4-+-f Rails ^/ Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Weld County, Colorado, Southern Part Survey Area Data: Version 17. Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 17, 2015 —Oct 2, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/19/2018 Page 2 of 4 Hydrologic Soil Group —Weld County, Colorado, Southern Pad 26199 CR52 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres In AOI Percent of AOI 70 73 Valent sand, 3 to 9 percent slopes Vona loamy sand, 3 to 5 A percent slopes Totals for Area of Interest Description A 0.0 4.9 5.0 Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (ND. B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep. moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition 0.9% 99.1% 100.0% USDA Natural Resources Web Soil Survey a Conservation Service National Cooperative Soil Survey 12/19/2018 Page 3 of 4 Hydrologic Soil Group —Weld County, Colorado, Southern Part 26199 CR52 Component Percent Cutoff- None Specified Tie -break Rule: Higher sk Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 12/19/2018 Page 4 of 4 DREXEL, BARRELL & Co. CIVIL ENGINEERS/LAND SURVEYORS _=_ iProject. _tv'_ 26199 CR 52 Job # 21271-0GRCV Engineers/Surveyors Client HYDRO -BANDITS LLC Designed by CWK Date 12-21-2018 COMPOSITE RUNOFF COEFFICIENTS EXISTING CONDITIONS: Basin Area Urban Drainage. Volume 1 2016 Table 6-5 Type A NRCS Soil Group Weighted C2 Weighted C5 Weighted C10 Weighted C100 Weighted Imperv. (sq. ft.) Description Percent Imp. "I" C2 C5 C 1 0 C100 Streets (Asphalt Pavement) 100% 0.84 0.86 0.87 0.90 0.00 0.00 0.00 0.00 0.0% Drives & Walks 90% 0.73 0.75 0.77 0.81 0.00 0.00 0.00 0.00 0.0% 'EX -1' Roofs 90% 0.73 0.75 0.77 0.81 0.00 0.00 0.00 0.00 0.0% Packed Gravel 40% 0.25 0_27 0.28 0.42 0.00 0.00 0.00 0.00 0.0% 218,717 Undeveloped 2% 0.01 0.01 0.01 0.13 0.01 0.01 0.01 0.13 2.0% acres 5.02 218.717 «Total Area Total Weighted Runoff Coefficients C2. C5. C1o.C100 & I>> 0.01 0.01 0.01 0.13 2.0%. DREXEL, BARRELL & CO. CIVIL ENGINEERS/LAND SURVEYORS TABLE 4-2 TIME OF CONCENTRATION RATIONAL METHOD PROJECT: 26199 CR 52 CALC. BY: CWK DATE: 12-21-2 SUB -BASIN DATA TIME INITIAL / OVERLAND (Ti) = 0.395(1.1-05)(L"2)/(S°33) TRAVEL TIME (Tt) = (L)/(V•60) where V = C S,,,`'5 FINAL Tc URBAN BASINS FINAL REMARKS Tc Check Tc (M(n ) CONTRIBUTING BASINS DESIGN PT. COEFF. C5 AREA (Ac) LENGTH (Ft) A ELEV. (ft) SLOPE (ft/ft) Ti (Min.) LENGTH (A) A ELEV. (ft) SLOPE (Wft) Conveyance Coefficient (CO VELOCITY (Fps) Tt (Min.) (Min.) LENGTH (ft) Tc=(U180)+10 EXISTING BASINS 1 0.01 5.02 500 13 0.026 32.5 250 20 0.080 10 2.83 1.5 34.0 34.0 'EX -1' Client: HYDRO -BANDITS, LLC DREXEL BARRELL & CO. CIVIL ENGINEERS/LAND SURVEYORS STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) PROJECT JOB # DATE: CALC. BY CHECKED BY: DESIGN STORM 26199 CR52 21271-00GRCV 12/21/2018 CWK CWK HISTORIC DIRECT RUNOFF TOTAL RUNOFF STREET DESIGN STORM DESIGN POINT z QU-IQ AREA (ac ) RUNOFF COEFF v (_ cr z _ u U a U% i r Q l_ (A STREET FLOW CFS REMARKS 10 -YEAR 1 ' EX -1' 5 02 0 01 34 0 i 0.050 2.07 0.10 Existing Conditions 100 -YEAR 1 'EX -1' 5 02 0 13 34 0 0 653 3 92 2.56 Existing Conditions P2= 0.869 P5= 1.14 ** I=((28.5*Px)/((10+tc)^0.786)) P10 1.42 P100= 2.69 NOAA Atlas 14. Volume 8, Version 2 Kersey, Colorado One -Hour Point Rainfall and USDCM Equation RA -5 DREXEL, CIVIL ENGINEERS/LAND HARRELL & CO. ,--,- SURVEYORS T_ _ - -` Project 26199 CR 52 Job # 21271-0GRCV � Engineers/Surveyors Client HYDRO -BANDITS, LLC Designed by CWK Date 12-21-2018 COMPOSITE RUNOFF COEFFICIENTS PROPOSED CONDITIONS: Basin Area (sq. ft.) Urban Drainage. Volume 1, 2016 Table 6-5 Type D NRCS Soil Group Weighted Weighted C5 Weighted C10 Weighted C100 Weighted Imperv. Description Percent Imp. "I" C2 Cs C10 C100 O2 'PR -1' 3,921 Landscape 2% 0.01 0.01 0.01 0.13 0.00 0.00 0.00 0.00 0.0% 671 Drives & Walks 90% 0.73 0.75 0.77 0.81 0.00 0.00 0.00 0.00 0.3% 10.836 Roofs 90% 0.73 0.75 0.77 0.81 0.04 0.04 0.04 0.04 4.5% 80,875 Packed Gravel 40% 0.25 0.27 0.28 0.42 0.09 0.10 0.10 0.16 14.8% 122,414 Undeveloped (Lawn/Bare Ground) 2% 0.01 0.01 0.01 0.13 0.01 0.01 0.01 0.07 1.1% acres 5.02 218,717 «Total Area Total Weighted Runoff Coefficients C2, Cs. C10.C100 & I>> 0.14 0.15 0.27 20.7% 0.15 MIMS n - v SL AIMS. WOO • Sr IIIII• "NI DREXEL, BARRELL & CO. CIVIL ENGINEERS/LAND SURVEYORS TABLE 4-2 TIME OF CONCENTRATION RATIONAL METHOD PROJECT: 26199 CR 52 CALC. BY: CWK DATE: 12-21-2018 SUB -BASIN DATA INITIAL / OVERLAND TIME (Ti) = 0.395(1.1-05)(L"2)/(S033) TRAVEL TIME (Tt) _ (L)/(V*60) where V = C,.SW°S FINAL Tc FINAL REMARKS Tc (Min.) CONTRIBUTING BASINS DESIGN PT. COEFF. C5 AREA (Ac) LENGTH (Ft) A ELEV. (ft) SLOPE (ft/ft) Ti (Min.) LENGTH (Ft) A ELEV. (ft) SLOPE (ft/ft) Conveyance Coefficient (C) VELOCITY (Fps) Tt (Min.) (Min.) DEVELOPED BASINS 1 0.15 5.02 500 13 0.026 28.5 250 8 0.032 15 2.68 1.6 30.0 30.0 'PR -1' DREXEL BARRELL & CO. CIVIL ENGINEERS/LAND SURVEYORS Client: HYDRO -BANDITS, LLC STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE; PROJECT JOB # DATE: CALC. BY: CHECKED BY: DESIGN STORM 26199 C R 52 21271-00GRCV 12/21/2018 CWK CWK DEVELOPED _. DIRECT RUNOFF TOTAL RUNOFF STREET DESIGN STORM DESIGN POINT z O Li.' a c Q AREA (ac.) RUNOFF COEFF. E U a x Z — 0 ` E � _, L g U z - - J ' SLOPE Rio STREET FLOW CFS REMARKS 10 -YEAR 1 'PR -1' 5.02 0.15 30.0 0.752 2.23 1.68 Developed Conditions 100 -YEAR 1 'PR -1' 5.02 0.27 30.0 1 371 4.22 5.78 Developed Conditions P2= 0.869 P5= 1.14 ** 1=((28.5*Px)/((10+tc)^0.786)) 1 42 P,,,;,= 2 69 NOAA Atlas 14, Volume 8, Version 2 Kersey, Colorado One -Hour Point Rainfall and USDCM Equation RA -5 APPENDIX D PROPOSED STORM WATER POND CALCULATIONS DREXEL, BARRELL & CO. CIVIL ENGINEERS / LAND SURVEYORS Project: 26199 CR 52 Job # 21271-00 Engineers/Surveyors Client: HYDRO -BANDITS, LLC Date: 3/23/2018 WATER QUALITY CAPTURE VOLUME: REQUIRED WATER QUALITY CAPTURE VOLUME FOR POND: 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i = la / 100 ) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WQCV) (WQCV =a * (0.91 *I3 - 1.19 * I2 + 0.78 * I)) Where a = 1.0 based on 40 -hr. drain time D) Design Volume: Vol = (WQCV / 12) * Area * 1.2 la= 20.7 % i = 0.206810627 Area = 5.02 acres WQCV = 0.1185 watershed inches Vol = 0.059 acre-feet Vol = 2,591 cubic -feet 2. Outlet Works A) Outlet Type (Check One) B) Depth at Outlet Above Lowest Perforation (H) C) Recommended Maximum Outlet Area per Row, (Ao) A = 1.8 (WQCV/b)1/c) Based on 40 -hr drain time D) Perforation Dimensions: i) Circular Perforation Diameter or E) Number of Columns (nc, See Table 6a-1 For Max.) F) Actual Design Outlet Area per Row (Ao) G) Number of Rows (nr) H) Total Outlet Area (A0,) X Orifice Plate H = 1.5 feet A0 = 0.210 square inches b = 0.500 c= 0.987 D = 0.5 inches (1/2") ne = 1 number AO = 0.20 square inches nr = 5 number Aot = 0.98 square inches eTh aNI DREXEL, BARRELL & CO. CIVIL ENGINEERS/LAND SURVEYORS Project: 26199 CR 52 Job # 21271-0GRCV Engineers/Surveyors Client: HYDRO -BANDITS. LLC Date: 12-21-2018 REQUIRED 100-yr. STORAGE VOLUME RATIONAL FORMULA METHOD Variables: A= C= QouT = 100-yr.1-hour 5.02 0.27 0.10 2.69 acres (Composite) ft3/s inch 10 -year EX STORM DURATION (min) RAINFALL INTENSITY 'in/hr) RUNOFF VOLUME (ft3) OUTFLOW VOLUME (ft3) STORAGE VOLUME (ft) STORAGE VOLUME acre -ft; 0 12.55 0 0 0 0 000 60 2.72 13.416 360 13,056 0.300 120 1.67 16.495 720 15,775 0.362 180 1.24 18,361 1.080 17,281 0.397 240 1.00 19.731 1.440 18,291 0.420 300 0.84 20.827 1,800 19,027 0.437 360 0.73 21.748 2,160 19,588 0.450 420 0.65 22 546 2.520 20,026 0.460 480 0.59 23.252 2,880 20,372 0.468 540 0.54 23.888 3,240 20,648 0.474 600 0 50 24,468 3.600 20,868 0.479 660 0_46 25.002 3.960 21,042 0.483 720 0.43 25,497 4.320 21,177 0.486 780 0 40 25.959 4.680 21,279 0.488 840 0.38 26,392 5,040 21,352 0.490 900 0.36 26.801 5.400 21,401 0.491 960 0.34 27.189 5,760 21,429 0.492 1020 0.33 27.557 6,120 21,437 0.492 1080 0.31 27,908 6.480 21,428 0.492 REQUIRED VOL. REQUIRED 100-YR VOLUME: 21,437 CF DREXEL, BARRELL & CO. CIVIL ENGINEERS / LAND SURVEYORS Project: 26199 CR 52 Engineers/Surveyors Client: HYDRO -BANDITS, LLC PROPOSED STORAGE VOLUME PROVIDED: Job # 21271-00 GRCV Designed by CWK Date 12/21/2018 CONTOUR ELEVATION*** (ft) SURFACE AREA (A) (ft) SURFACE AREA (B) (ft) DEPTH BETWEEN CONTOURS (ft) INCREMENTAL VOLUME (ft3) CUMULATIVE VOLUME (ft3) CUMULATIVE VOLUME (ac -ft) 4671.50 0 0 0 0 0 0 000 4671.75 168 0 0 25 14 14 0.000 4672 00 664 168 0.25 97 111 0.003 4672.25 1.483 664 0.25 262 373 0.009 4672.50 2,624 1,483 0.25 507 879 0.020 4672 75 4,087 2.624 0.25 832 1,712 0.039 4673.00 5.873 4.087 0.25 1.238 2,950 0 068 4673.25 7,981 5.873 0 25 1.725 4,675 0 107 4673.50 10,412 7.981 0.25 2.292 6,967 0.160 4673.75 13,163 10,412 0.25 2,940 9.907 0.227 4674.00 15.492 13.163 0.25 3,578 13,485 0.310 4674.25 17.689 15.492 0.25 4,145 17,630 0.405 4674.50 19.875 17,689 0 25 4.693 22,323 0.512 4674 75 22.074 19.875 0.25 5.241 27,564 0 633 4675 00 24,281 22,074 0.25 5.792 33,356 0.766 4675.25 26,544 24.281 0 25 6,351 39.707 0.912 4675.50 28,832 26,544 0.25 6,920 46,627 1.070 * WQCV required volume is 2,591 cf and 2.950 is provided at Elevation 4673.00, O.K. ** 100 -year required volume is 21,437 cf and 22,323 is provided at Elevation 4674.50, O.K. INCREMENTAL VOLUME CALCULATED FROM EQN (1/3)*d*(A + B + (A*B)"`') POND INVERT WQCV ELV.* 100-yr WSL** FREEBOARD =ris DREXEL, BARRELL & CO. CIVIL ENGINEERS / LAND SURVEYORS Project: 26199 CR 52 Project No: 21271-00GRCV Engineers/Surveyors Client: HYDRO -BANDITS, LLC Designed by: CWK Date: 12/21/2018 SIZING OF 100-YR. FLOW CONTROL ORIFICE FOR POND: Allowable release rate Qloh st= 0.10 cfs - Orifice opening in plate covering the outlet pipe will provide 10-yr historic release rate from outlet structure as water surface elevation reaches the 100-yr. WSL Pond outlet invert elevation = 4671.50 100-yr WSL elevation = 4674.50 difference = 3.00 ft Orifice Flow Equation: Q=CdA(2gh)112 where: Q = 0.10 cfs Max. release rate Cd = 0.65 Orifice Coefficient 100-yr depth 3.00 ft from pond design 2.89 ft (calculated adjust "h" to match) h = 2.95 ft (Distance from 100-yr WSL to center of orifice opening) g = 32.2 ft/sec2 gravity A = 0.01 ft2 Area in sq. ft. A = 1.61 in2 Area in sq. in. Opening = 1.27 in. square or Round = 1.43 in. 1 3/8 in. diameter fas r Nom. DREXEL, BARRELL & CO. CIVIL ENGINEERS / LAND SURVEYORS Project: 26199 CR 52 Project No: 21271-00GRCV Engineers/Surveyors Client: HYDRO -BANDITS, LLC Designed by: CWK Date: 12/21/2018 SIZING OF EMERGENCY OVERFLOW SPILLWAY FOR DETENTION POND: - O100 Peak Runoff Rate = 5.78 cfs Bottom Width of Weir Side Slope Weir Elev. for Weir Crest Coef. for Rectangular Weir Coef. for Trapezoidal Weir L= 1.5 ft. S= 4 Horizontal to Vertical Ew= 4674 50 elevation Cw= 3.1 Ct= 3.1 Water Surface Elevation feet Depth of Water inches Trapazoidal Weir Flowrate cfs 4674.50 0.0 0.00 4674.55 0.6 0.07 4674.60 1.2 0.23 4674.65 1.8 0.49 4674.70 2.4 0.86 4674.75 3.0 136 4674.80 3.6 1.99 4674.85 4 2 2.76 4674.90 4.8 3.69 4674.95 5.4 4.77 4675.00 6.0 6.03 4675.05 6.6 7.46 4675.10 7.2 9.08 4675.15 7 8 10.88 4675.20 8.4 12.89 4675.25 9.0 15.10 4675.30 9.6 17.52 4675.35 10.2 20.16 4675.40 10.8 23.03 4675.45 11 4 26.12 4675.50 12.0 29.45 - Begin Overflow - 6" depth limit* - Limit of Freeboard * Weld County Storm Drainage Criteria Sec. 23-12-90 indicates that the emergency spillway must be capable of conyeying the peak 100 -year storm at an overflow depth less than 6 inches. NOTE: Output of Overflow Cacapity based on Trapezoidal Shaped Spillway Calculated from USDCM Spreadsheet APPENDIX H CHARTS, TABLES AND GRAPHS r,E 53600UmE JOINS PANEL 1565 J 537UlC.:ft E 538000mE 539OJCi MAP SCALE 1" = 2000' l000 o 2000 4000 l -- I ►---t r 4 f FEET RACTCOCy r Tr2I4 Lrae Tr cat -D) PANEL 1775E FIRM FLOOD INSURANCE RATE MAP WELL) COUNTY, COLORADO AND INCORPORATED AREAS PANEL 1775 OF 2250 (SEE MAP INDEX FOR FIRM PANEL LAYOUT) CONTAINS COMMUNITY NUMBER PANEL SUFFIX WELD COUNTY 060288 1775 C Notice to User l he Map Number shown below should be used when placing map orders, the Community Number shown above should be used on insurance applications for the subject community MAP NUMBER 08123C1775E EFFECTIVE DATE JANUARY 20, 2016 Federal Fmergenes %Ianagement Agent.) , This is an official copy of a portion of the above "eferenced flood map It was extracted using F -MIT On -Line This map does not reflect changes or amendments which may have been made subsequent to the date on the title block For the latest product information about National Flood Insurance Program flood maps check the FEMA Flood Map Store at wvvw.mse fema.gov Precipitation Frequency Data Server https:, hdsc.nws.noaa.gov/hdsc/pfds/pfds__printpage.html?Iat=40.3653&... NOAA Atlas 14, Volume 8, Version 2 Location name: Kersey, Colorado, USA* Latitude: 40.3653°, Longitude: -104.5625° Elevation: 4679.93 ft** source ESRI Maps ** source USGS POINT PRECIPITATION FREQUENCY ESTIMATES Santa Pence. Deborah Martin Sandra Pavlovic Ishant Roy Michael St Laurent, Carl Trypaluk, Dale Unruh, Mchael Yekta Geoffery Bonnin NOM National Weather Service. Silver Spring. Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 2 5 10 25 50 100 200 500 1000 5 -min 0.245 (0.199-0 303) 0.296 (0.241-0.367) 0.393 (0.318-0.488) 0.485 (0.391-0.606) 0.631 (0.495-0 841) 0.758 (0.575-1.02) 0.897 (0.652-1.24) 1.05 (0.727-1 49) 1.27 (0.841-1 86) 1.46 (0.927-2 14) 10 -min 0.358 (0.292-0 444) 0.433 (0.353-0.537) 0.575 (0.466-0 715) 0.710 (0.572-0.888) 0.924 (0 726-1 23) 1.11 (0.842-1.49) 1.31 (0.955-1 81) 1.54 (1.06-2.19) 1.87 (1.23-2 73) 2.13 (1.36-3 14) 15 -min 0.437 (0.356-0.541) 0.528 (0.430-0.655) 0.701 (0.568-0872) 0.866 (0.697-1.08) 1.13 (0.885-1 50) 1.35 (1.03-1.82) 1.60 (1 17-221) 1.88 (1 30-2.67) 2.28 (1.50-3.33) 2.60 (1.66-3.83) 30 -min 0.587 (0.478-0 727) 0.709 (0.577-0 878) 0.940 (0 762-1 17) 1.16 (0 936-1.45) 1.51 (1.19-2 02) 1.82 (1 38-2.45) 2.16 (1.57-2.98) 2.53 (1.75-3.60) 3.07 (2 03-4.49) 3.52 (2.24-5 17) 60 -min 0.730 (0.595-0.904) 0.869 (0.707-1.08) 1.14 (0.927-1.42) 1.42 (114-1.77) 1.86 (1.47-2 50) 2.25 (172-3.05) 2.69 (1.96-373) 3.19 (2.21-4.54) 3.91 (2.59-5.73) 4.51 (2.87-6.63) 2 -hr 1 (0 717-10.873 307) (0.84 33.26) I 1.35 (1 10-1 66) 7 (1 36 2.07) 2.21 (1. 6-2.95) I (2.07-3.61) 3 (2.84.45) I 3.84 (2. 9-5.44) 4.75 (3. -6.91) I 5.51 (3.54-8.01) 3 -hr 0.956 (0 789-1.17) 1.11 (0.918-1.36) 1.45 (1 19-1 78) 1.79 (1 46-2.21) 2.38 (1.91-3 17) 2.91 (2.25-3.89) 3.51 (2.60-4.82) 4.19 (2.96-5.91) 5.21 (3 50-7 54) 6.07 (3 92-8.77) 6 -hr 1.10 (0.910-1 33) 1.29 (1 07-1 56) 1.68 (1 39-2.04) 2.07 (1 70-2.53) 2.71 (2.19-3 56) 3.29 (2.56-4.34) 3.93 (2.93-5.32) 4.65 (3.31-6.48) 5.72 (3.88-8 18) 6.61 (4 31-947) 12 -hr 1.27 (1 07-1 53) 1.52 (1.27-1.82) 1.97 (1 64-2.37) 2.40 (1 99-2.91) 3.07 (2 48-3 95) 3.65 (2.85-4.74) 4.28 (3.21-5 70) 4.98 (3.56-6.82) 5.99 (4.09-8 44) 6.82 (4 49-9 66) 24 -hr 1.51 (1 28-1 80) 1.78 (1 50-2.12) 2.26 (1.90-2.70) 2.71 (2.26-3.26) 3.41 (2.77-4 32) 4.00 (3 15-5.13) 4.64 (3.51-6 11) 5.34 (3 85-7.24) 6.35 (4.38-8 85) 7.17 (4 78-10 1) 2 -day 1.74 (1 48-2.06) 2.05 (1 74-2.42) 2.60 (2 20-3.07) 3.08 (2.59-3.67) 3.81 (3.10-4.75) 4.41 (3.49-5.57) 5.05 (3.84-6.54) 5.73 (4.16-7.65) 6.69 (4.65-9.20) 7.47 (5.02-10.4) 3 -day 1.91 (1 63-2.24) 2.22 (1 89-2.61) 2.77 (2 35-3.26) 3.26 (2 75-3.85) 3.99 (3.27-4 94) 4.59 (3.66-5.77) 5.24 (4.01-6.75) 5.93 (4 33-7.87) 6.90 (4.83-9.43) 7.68 (5 20-10.6) 4 -day 2.04 (175-2.38) 2.35 (2.02-2.75) 2.91 (2.48-3.41) 3.41 (2.89-4 01) 4.14 (3.41-5 11) 4.75 (3 80-5.94) 5.40 (4.15-6.92) 6.09 (446-8.04) 7.06 (4.96-9.59) 7.84 (5.33-10.8) 7 -day 2.31 (2 00-2.68) 2.69 (2.32-3.12) 3.32 (2.85-3.87) 3.86 (3.29-4.52) 4.63 (3.82-5 63) 5.25 (4.21-6.47) 5.88 (4.54-7 45) 6.55 (4.83-8.53) 7.45 (5.26-10.0) 8.16 (5 59-11.1) 10 -day 2.55 (2 21-2.95) 2.97 (2.57-3.44) 3.67 (3.16-4.25) 4.25 (3.64-4.95) 5.06 (4 17-6 09) 5.68 (4 57-6.95) 6.31 (4.89-7 92) 6.95 (5.15-8.99) 7.81 (5.54-10.4) 8.46 (5.84-11.5) 20 -day 3.27 (2 86-3.74) 3.77 (3.29-4.32) 4.58 (3.98-5.26) 5.23 (4.52-6.04) 6.12 (5.08-7 27) 6.79 (5.50-8.19) 7.45 (5.82-9 22) 8.10 (6.04-10.3) 8.94 (6.40-11.8) 9.57 (6.67-12.8) 30 -day 3.85 (3 38-4 38) 4.42 (3.87-5.03) 5.32 (4 64-6.07) 6.04 (5 25-6 94) 7.01 (5 85-8 26) 7.74 (6 30-9.27) 8.44 (6.62-10.4) 9.13 (6.85-11.6) 10.0 (7.20-13.1) 10.6 (7.46-14.2) 45 -day 4.56 (4 02-5 16) 5.22 (4 60-5.92) 6.27 (5.51-7 13) 7.11 (6 21-8.12) 8.21 (6 87-9 60) 9.02 (7 38-10 7) 9.79 (7 72-11.9) 10.5 (7.94-13 2) 11.5 (8.29-14.8) 12.1 (8 55-16.1) 60 -day 5.13 (4 54-5.79) 5.90 (5.22-6.66) 7.11 (6.26-8.05) 8.06 (7.06-9.16) 9.29 (7.80-10.8) 10.2 (8.35-12.0) 11.0 (8.72-13.4) 11.8 (8.93-14.8) 12.8 (9 28-16.4) 13.4 (9 53-17 7) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5% Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical I of 4 3/23/2018, 11:50 AM Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfdsprintpage.htm I?Iat= 40.3653&... Precipitation depth (in) 14 12 10 8 6 4 2 F. 10 t 44 Q. ar 8 v c ru6 a) V 0 4 PDS-based depth -duration -frequency (DDF) curves Latitude: 40.3653°, Longitude: -104.5625° c c_ 6 LA NOAA Atlas 14, Volume 8, Version 2 I- L .c L tb N rul Duration I- , N >1 �0 (0 f0 -O V -o N fit t} M0 R0 (0 r0 v vv I I II Average recurrence interval (years) Created (GMT): Fri Mar 23 17:49:59 2018 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 Duration 5-mrn — 2 -day 10 -mm — 3 -day 15 -mm — 4 -day 30 -mm — 7 -day 60 -mm — 10 -day 2 -hr — 20 -day 3 -hr — 30 -day 6 -hr — 45 -day 12 -hr — 60 -day 24 -hr 2 of4 3/23/2018, 11:50 AM Precipitation Frequency Data Server https:/ hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=40.3653&... V 3 Wet Count Rd 56 2mi -'-I Large scale terrain Large scale map • For tCallins • LDnq Peak 4,345 m . Boulder rjeeley • INS MEI • Langt Denver U r 100km w 4 RI lon rest' _ Chyinne,r —� Fort Colla s a ngtnoti 9Bou oer 100km 60mi Large scale aerial ,,1 i 3/23/2018, 11:50 AM Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfdsj,rintpage.html?lat=40.3653&... • ouldet 'M' r Denver • Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer 4 of 4 3/23/2018, 11:50 AM Table 5-1 Weld County Design Storm Rainfall Comparison 1 -Hour Storm Frequency Longmont 1 Depth (in) Greeley2 Depth (in) New Raymer3 Depth (in) I-25 &Tri-Town4 Depth (in) 2 -year (50% chance) 1.02 1.04 0.86 0.98 5 -year (20% chance) 1.46 1.49 1.35 1.39 10 -year (10% chance) 1.75 1.76 1.54 1.68 25 -year (4% chance) 2.07 1.80 2.04 SO -year (2% chance) 2.42 2.51 2.16 2.37 100 -year (1% chance) 2.72 2.78 2.55 2.68 2 -Hour Storm Frequency Longmont 1 Depth (in) Greeley2 Depth (in) New Raymer3 Depth (in) I-25 &Tri-Town4 Depth (in) 2 -year (50% chance) 1.20 1.16 1.05 1.16 5 -year (20% chance) 1.66 1.60 1.55 1.60 10 -year (10% chance) 2.00 1.91 1.77 1.91 25 -year (4% chance) 2.37 2.10 2.32 50 -year (2% chance) 2.74 2.65 2.45 2.67 100 -year (1% chance) 3.08 2.99 2.82 3.03 6 -Hour Storm Frequency Longmont 1 Depth (in) Greeley2 Depth (in) New Raymer3 Depth (in) I-25 &Tri-Town4 Depth (in) 2 -year (50% chance) 1.56 1.38 1.44 1.50 5 -year (20% chance) 2.05 1.80 1.95 2.00 10 -year (10% chance) 2.47 2.22 2.25 2.35 25 -year (4% chance) 2.95 2.58 2.75 2.87 50 -year (2% chance) 3.35 2.94 3.05 3.25 100 -year (1% chance) 3.77 3.42 3.42 3.70 1. From UDFCD Manual 2. From City of Greeley Manual 3. From NOAA Atlas (nomograph projection) 4. From I-25 and Tri-Town Study, Volume 2, Chapter 2, page 20 5.4.3 Larger Basin Rainfall Methods As noted above, the Rational Method should not be used to determine runoff for basins larger than 160 acres. In areas located in the southwest portion of Weld County and where areas are larger than 160 acres that have drainage characteristics similar to an urban area, the Colorado Urban Hydrograph Procedure (CUHP) is an acceptable model for determining runoff amounts. The CUHP model can be used for basins from 0 to 3,000 acres. The parameter adjustments provided in the runoff chapter of the UDFCD Manual (Volume 1) should be used when dealing with basins that are larger than 160 acres. The CUHP model is not applicable in non -urban areas, including those areas in Weld County that are outside of the Denver metropolitan area. The U.S. Army Corps of Engineers (USACE) HEC-HMS model is more applicable for mixed suburban -agricultural areas. The HEC-HMS model can be used on watersheds and drainage basins larger than 160 acres provided the modeling follows the parameters in the HEC- HMS User's Manual, the HEC-HMS Technical Reference Manual, and the HEC-HMS Application's Guide. WELD COUNTY ENGINEERING & CONSTRUCTION CRITERIA Page 138 Table 6-4. Runoff coefficient equations based on NRCS soil group and storm return period NRCS Soil Group Storm Return Period 2 -Year 5 -Year 10 -Year 25 -Year 50 -Year 100 -Year 500 -Year A CA= 0.84i' "2 C\= 0.86i' 2"' C,= 0.87i'232 C‘= 0.84i' ''' CA= 0.851+0.025 C‘= 0.781+0.110 CA= 0.651+0.254 B CB= 0.8411 169 c13= 0.861' .088 CB= 0.811+0.057 CB= 0.631+0.249 CB= 0.561+0.328 CB= 0.471+0.426 CB= 0.371+0.536 CID CCD= 0.83i' 122 CUD= 0.821+0.035 C( I) = 0.74/+0.132 C( I) 0.56/+0.319 Cc I) - 0.491+0.393 CUD = 0.411+0.484 CUD = 0.321+0.588 Where: i = % imperviousness (expressed as a decimal) CA= Runoff coefficient for Natural Resources Conservation Service (NRCS) HSG A soils CB= Runoff coefficient for NRCS HSG B soils Cc') = Runoff coefficient for NRCS HSG C and D soils. The values for various catchment imperviousness and storm return periods are presented graphically in Figures 6-1 through 6-3, and are tabulated in Table 6-5. These coefficients were developed for the Denver region to work in conjunction with the time of concentration recommendations in Section 2.4. Use of these coefficients and this procedure outside of the semi -arid climate found in the Denver region may not be valid. The UD-Rational Excel workbook performs all the needed calculations to find the runoff coefficient given the soil type and imperviousness and the reader may want to take advantage of this macro -enabled Excel workbook that is available for download from the UDFCD's website www.udfcd.org. See Examples 7.1 and 7.2 that illustrate the Rational Method. March 2017 Urban Drainage and Flood Control District 6-9 Urban Storm Drainage Criteria Manual Volume 1 Table 6-5. Runoff coefficients, c Total or Effective % Impervious NRCS Hydrologic Soil Group A 2 -Year 5 -Year 10 -Year 25 -Year 50 -Year 100 -Year 500 -Year 2°/o 0.01 0.01 0.01 0.01 0.04 0.13 0.27 5% 0.02 0.02 0.02 0.03 0.07 0.15 0.29 10% 0.04 0.05 0.05 0.07 0.11 0.19 0.32 15% 0.07 0.08 0.08 0.1 0.15 0.23 0.35 20% 0.1 0.11 0.12 0.14 0.2 0.27 0.38 25% 0.14 0.15 0.16 0.19 0.24 03 0.42 30% 0.18 0.19 0.2 0.23 0.28 0.34 0.45 35% 0.21 0.23 0.24 0.27 0.32 0.38 0.48 40% 0.25 0.27 0.28 0.32 0.37 0.42 0.51 45% 0.3 0.31 0.33 0.36 0.41 0.46 0.54 50% 0.34 0.36 0.37 0.41 0.45 0.5 0.58 55% 0.39 0.4 0.42 0.45 0.49 0.54 0.61 60% 0.43 0.45 0.47 0.5 0.54 0.58 0.64 65% 0.48 0.5 0.51 0.54 0.58 0.62 0.67 70% 0.53 0.55 0.56 0.59 0.62 0.65 0.71 75% 0.58 0.6 0.61 0.64 0.66 0.69 0.74 80%. 0.63 0.65 0.66 0.69 0.71 0.73 0.77 85% 0.68 0.7 0.71 0.74 0.75 0.77 0.8 90% 0.73 0.75 0.77 0.79 0.79 0.81 0.84 95% 0.79 0.81 0.82 0.83 0.84 0.85 0.87 100% 0.84 0.86 0.87 0.88 0.88 0.89 0.9 Total or Effective Impervious NRCS Hydrologic Soil Group B 2 -Year 5 -Year 10 -Year 25 -Year 50 -Year 100 -Year 500 -Year 2% 0.01 0.01 0.07 0.26 0.34 0.44 0.54 5% 0.03 0.03 0.1 0.28 0.36 0.45 0.55 10% 0.06 0.07 0.14 0.31 0.38 0.47 0.57 15% 0.09 0.11 0.18 0.34 0.41 0.5 0.59 20% 0.13 0.15 0.22 .0.38 0.44 0.52 0.61 25% 0.17 0.19 0.26 0.41 0.47 0.54 0.63 30% 0.2 0.23 0.3 0.44 0.49 0.57 0.65 35% 0.24 0.27 0.34 0.47 0.52 0.59 0.66 40% 0.29 0.32 0.38 0.5 0.55 0.61 0.68 45% 0.33 0.36 0.42 0.53 0.58 0.64 0.7 50% 0.37 0.4 0.46 0.56 0.61 0.66 0.72 55% 0.42 0.45 0.5 0.6 0.63 0.68 0.74 60% 0.46 0.49 0.54 0.63 0.66 0.71 0.76 65"0 0.5 0.54 0.58 0.66 0.69 0.73 0.77 70°,, 0.55 0.58 0.62 0.69 0.72 0.75 0.79 75"0 0.6 0.63 0.66 0.72 0.75 0.78 0.81 80% 0.64 0.67 0.7 0.75 0.77 0.8 0.83 85% 0.69 0.72 0.74 0.78 0.8 0.82 0.85 90% 0.74 0.76 0.78 0.81 0.83 0.84 0.87 95% 0.79 0.81 0.82 0.85 0.86 0.87 0.88 100% 0.84 0.86 0.86 0.88 0.89 0.89 0.9 6- I 0 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 1 March 2017 Outlet Structures T-12 Table OS -1. Orifice Sizing Hole Dia. (in) i Hole Dia. (in) Area per Row (in2) n = 1 n = 2 1/4 0.250 0.05 5/16 0.313 0.08 - 3/8 0.375 0.11 a - 7/16 0.438 0.15 - 1/2 0.500 0.2 9/16 0.563 0.25 5/8 0.625 0.31 11/16 0.688 037 3/4 0.750 0.44 13/16 0.813 0.52 - 7/8 0.875 0.6 15/16 0.938 0.69 - 1 1.000 0.79 1-1/16 1.063 0.89 1-1/8 1.125 0.99 1-3/16 1.188 1.1 I - 1-1/4 1.250 1.23 - 1-5/16 1.313 1.35 1-3/8 1.375 1.48 - 1-7/ 16 1.438 1.62 3.24 1-1/2 1.500 1.77 3.54 1-9/16 1.563 1.92 3.84 1-5/8 1.625 2.07 1-I 1/16 1.688 2.24 - I -3/4 1.750 2.41 - 1-13/16 1.813 2.58 - 1-7/8 1.875 2.76 1-15/16 1.938 2.95 - 2 2.000 3.14 - n = Number of Columns of Orifices Steel Thickness (Min.) 1/4" J 5/16" 1 If desired, interpolate to the nearest 32" to better match the needed area. Use one column of rectangular orifices when the needed area exceeds 3.84 in2 Rectangular Height (in) = 2 Rectangular Width (in) = Required Area / 2 in Rectangular Width (in) Steel Thickness (in) ≤6 /4 ≥1/4 ≤8 ≥5/16 ≤10 ≥3/8 >10 ≥1/2 August 2013 Urban Drainage and Fl&3i Control District OS -3 Urban Storm Drainage Criteria Manual Volume 3 T-12 Outlet Structures 100 M 0 Q Ct as QL —31 10 0 Ct a� a Q 0. C L a 1-r O 1--� CCi 1 j� i t NIA0t770.124D1 - � 1 ♦ I Flood Control Quality — Grates —Water Grates D>24" ♦ ♦ �— ♦ ♦ —t At / Aot = 38.5e-o.o9sD ♦ 0 4 8 12 16 20 ?4 28 32 36 40 44 48 Outlet Diameter or Minimum Dimension D (Inches) J Figure OS -1. Trash Rack Sizing OS -4 Urban Drainage and Floc*Control District Urban Storm Drainage Criteria Manual Volume 3 August 2013 Outlet Structures T-12 Table OS -2a. Trash Rack Sizing for Small Circular Orifices (up to 1-1/4" diameter)" Number of Columns Diameter of Circular Orifice (in) Width of Trash Rack Opening (Wopen;ng) as a Function of Water Depth H Above Lowest Perforation H=2.0' H=3.0' H=4.0' H=5.0' H=6.0' 1 S 1-1/4 12"22 12ii2 12112 12" 13" For use with Johnson VEE WireTM Stainless Steel Screenl (or equivalent screen with 60% open area). Assumes inundation of well screen into the permanent pool 2'4". 2 Represents the minimum recommended width of 12 inches, otherwise width is calculated based on Figure OS -1. This table provides the minimum opening in the concrete, not the minimum width of the well screen. Ensure the well screen is wide enough to properly attach to the structure. Table OS -2b. Trash Rack Specifications for Circular Orifice Plates Max. Width of Opening p g (in) Screen #93 VEE Wire Slot Opening p g (in) Support Rod Type yp Support Rod, On Center, Spacing Total Screen Thickness Carbon Steel Frame Type 518 0.139 TE 0.074"x0.50" 1 " 0.655" 3/4" x 1.0 angle ≤24 0.139 TE 0.074"x0.75" 1" 1.03" 1.0" x 1'/2" angle ≤27 0.139 TE 0.074"x0.75" 1" 1.03" 1.0" x 1'/2" angle ≤30 0.139 TE 0.074"x1.0" I" 1.155" 1 1/4"x 1/2" angle ≤36 0.139 TE 0.074"x1.0" 1" 1.155" 1 1/4"x 1'A" angle ≤42 I 0.139 TE 0.105"x1.0" 1" I.155" 1 1/a"x 11/2" angle ohnson Screens, St. Paul, Minnesota, USA (1-800-833- 9473) August 2013 Urban Drainage and Flat Control District OS -5 Urban Storm Drainage Criteria Manual Volume 3 Chapter 6 Runoff 2.4.1 Initial or Overland Flow Time The initial or overland flow time, t,, may be calculated using Equation 6-3: _ 0.395(1.1— C5 L, t�— So.33 Where: Equation 6-3 t, = overland (initial) flow time (minutes) C5 = runoff coefficient for 5 -year frequency (from Table 6-4) L,= length of overland flow (ft) .S„ = average slope along the overland flow path (ft/ft). Equation 6-3 is adequate for distances up to 300 feet in urban areas and 500 feet in rural areas. Note that in a highly urbanized catchment, the overland flow length is typically shorter than 300 feet due to effective man-made drainage systems that collect and convey runoff 2.4.2 Channelized Flow Time The channelized flow time (travel time) is calculated using the hydraulic properties of the conveyance element. The channelized flow time, t,, is estimated by dividing the length of conveyance by the velocity. The following equation, Equation 6-4 (Guo 2013), can be used to determine the flow velocity in conjunction with Table 6-2 for the conveyance factor. Where: t, L, L, 60K So 60V, = channelized flow time (travel time, min) L, = waterway length (ft) So = waterway slope (ft/fl) V, = travel time velocity (ft/sec) = K -VS. K= NRCS conveyance factor (see Table 6-2). Table 6-2. NRCS Conveyance factors, K Equation 6-4 Type of Land Surface Conveyance Factor, K Heavy meadow 2.5 Tillage/field 5 Short pasture and lawns 7 Nearly bare ground 10 Grassed waterway 15 Paved areas and shallow paved swales 20 August 2018 Urban Drainage and Flood Control District 6-5 Urban Storm Drainage Criteria Manual Volume 1 Runoff Chapter 6 The time of concentration, It, is the sum of the initial (overland) flow time, t,, and the channelized flow time, t,, as per Equation 6-2. 2.4.3 First Design Point Time of Concentration in Urban Catchments Equation 6-4 was solely determined by the waterway characteristics and using a set of empirical formulas. A calibration study between the Rational Method and the Colorado Urban Hydrograph Procedure (CUHP) suggests that the time of concentration shall be the lesser of the values calculated by Equation 6- 2 and Equation 6-5 (Guo and Urbonas 2013). t=(26 -17i)+ Where: L, 60(14i + 9) S, Equation 6-5 = minimum time of concentration for first design point when less than t, from Equation 6-1. L, = length of channelized flow path (ft) i = imperviousness (expressed as a decimal) S, = slope of the channelized flow path (ft/ft). Equation 6-5 is the regional time of concentration that warrants the best agreement on peak flow predictions between the Rational Method and CUHP when the imperviousness of the tributary area is greater than 20 percent. It was developed using the UDFCD database that includes 295 sample urban catchments under 2-, 5-, 10-, 50, and 100-yr storm events (MacKenzie 2010). It suggests that both initial flow time and channelized flow velocity are directly related to the catchment's imperviousness (Guo and MacKenzie 2013). The first design point is defined as a node where surface runoff enters the storm drain system. For example, all inlets are "first design points" because inlets are designed to accept flow into the storm drain. Typically, but not always, Equation 6-5 will result in a lesser time of concentration at the first design point and will govern in an urbanized watershed. For subsequent design points, add the travel time for each relevant segment downstream. 2.4.4 Minimum Time of Concentration Use a minimum t„ value of 5 minutes for urbanized areas and a minimum t„ value of 10 minutes for areas that are not considered urban. Use minimum values even when calculations result in a lesser time of concentration. 2.4.5 Common Errors in Calculating Time of Concentration A common mistake in urbanized areas is to assume travel velocities that are too slow. Another common error is to not check the runoff peak resulting from only part of the catchment. Sometimes a lower portion of the catchment or a highly impervious area produces a larger peak than that computed for the whole catchment. This error is most often encountered when the catchment is long or the upper portion contains grassy open land and the lower portion is more developed. 6-6 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 1 August 2018 25172 CLYAMlr ROW 5J .raw QPVI PROPOSED BUILDING (7.500 S.F.) 25072 COCROY ROW SJ flfl4W t KEIL/! ROCS 75052 cVtW1Y ROAD .53 *way SCnOUT Noto o&W 30.00 331.2E NINT42.0rW 9fiYATl NRATER TENDON R WATER 0 MJ POYO PROPOSED EDGE a ALA- W(AINER CRAVE WRE ACE 5 02 0.15 PROPOSED C's* TYPE 'A' RIP RAP Psi PROPOSED TYPE 'M' BURIED RIP RAP EMERGENCY OVERFLOW SPILLWAY INDICATES EXTENT O WOCY WSL DELL V.441300 INDICATES OMNI OF 100-YR TM RO1.EY .467159 26245 GINAVTY RAW 52 XJSE a AMRY4 Pow PONCATES EXTENT OF FREEBOARD OCLEY-4675.50 ORIGINAL SCALE: 1•.40• DETENTION POND SUMMARY REQMREO w,q.c,id i-C.OIC leen). ?.}91. RSA; v. wa 4471,04 NCO INV(R1 Belt 00 ).44-YR scLI.HE (WA; ref°_ 2!,07 40-YR. why, 4971:50 HIV.I.it QF _F$§-EfOP P . 1675:'§4 Q)R4-YR re96 !Misr (t) Q!9_ _MA%. LRAM FM!. (OP' 5:74 ..GENSY PIA.SYM.Y. FL€Y 37'.59 MAX SPILLWAY WSE 457500 RUNOFF SUMMARY TABLE POIlG CON �UnNG (Oct..) 502 T NOtV cMM) 158 it, KU YR7 576 I VICINITY MAP SCALE. 1' - 1 MILE ASSY La S are es MOMS Jr RIV/OR Er ear SSW t7 990! PEWS M. SPOT (ILIIARON M. MIpEINMIE COMA M. MO COOS Ys aAv LIOMPIECI floe Nrarca4V OOOaOI Poe MOILS 1?AYO. Nu,� MSC WAIN MOON POMP SAW LO MN ARIA (AMPI) ,D h also! cOOTOON a TOO YM. RUNOFF C0OTX:O/I SEPOSED OOEMON ,ou-n a. 0:5)w6 WAIL PROPOSED ORWtL MIOPOMD COCCI PMDPMED Altai - - - - — GEAEI'RAt M21T$ 331.27' S89'48'13 -E CALL. UTILITY NOTIFICATION CENTER OF COLORADO T:MS TWC CU, TOWS N,GIM rait STIONNYR. WAVED ON TPOT4. TIARA' WW1 DATA ACTUAL tit VATIONS NAT VARY :. PROPOSED aADMC a ME OETENTIOI POW AS DEPICIW ON INS PLAN II 70 OLIAON5tRATE ,NE POO's MUMMY AREA MC VOLUMES IRE DESCH (PRIOR TO CYTAPAY G A aADPTO POUR TROY ,OLD COUNTY PIS.C SONS OPARTWONT) MLL BE ADJUSTED ACCORDING TO ACTUAL FIELD SURVEY WORMARON CALL. 2 -BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES PREPARED BY: URI XI I. BARN)(I .% I i,,Pu.V.n. SIOa...,. PREPARED FOR. FRONT RANGE HYDRO -BANDITS, LLC 26199 CR 52 KERSEY, CO 80644 CONTACT: NAIAD. BARRA (770)-5140969 ISSUE DATE PROPOSED DRAINAGE PLAN PROJECT NO 21771-ODORCV SHEET: 1 OF 1 DRAINAGE REPORT REVIEW CHECKLIST Project Name: USR18-0122 IBARRA The purpose of this checklist is to provide the applicants Engineer a basic list of items that County Staff will review in regards to a drainage report. The drainage design shall meet the requirements of the Weld County Code and commonly accepted engineering practices and methodologies A detention pond design (or other stormwater mitigation design) is appropriate for projects which have a potential to adversely affect downstream neighbors and public rights -of -way from changes in stormwater runoff as a result of the development project. The design engineers role is to ensure adjacent property owners are not adversely affected by stormwater runoff created by development of the applicants property. REPORT (0 = complete, ❑ = required) ®Stamped by PE. scanned electronic PDF acceptable iCertification of Compliance I _ (Variance request, if applicable �xl Description/Scope of Work x X Number of acres for the site Methodologies used for drainage report & analysis Design Parameters Design storm ®Release rate ®URBANIZING or NON -URBANIZING COverall post construction site imperviousness 'Soils types ❑Discuss how the offsite drainage is being routed ZConclusion statement must also include the following: Z1 Indicate that the historical flow patterns and run-off amounts will be maintained in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversionsconcentration and/or unplanned ponding of storm run-off for the 100 -year storm. ;How the project impacts are mitigated. Construction Drawings -Drawings stamped by PE, (scanned electronic PDF preferred) Drainage facilities COutlet details ESpillway Maintenance Plan Frequency of onsite inspections .2 Repairs. if needed xiCleaning of sediment and debris from drainage facilities AVegetation maintenance ''Include manufacturer maintenance specifications. if applicable Comments: In the report text. under section IA. please change the project site location from the "North 'A of the Southwest '/4 "to the "South '/Z of the Southwest W. 2. Based on the contours shown on the drainage map and the USGS contours for the area, it appears that there will be off -site flows from the adjacent properties to the west (Schott and Ridings) passing through the site. It is reasonable to assume that off -site flows do not enter the site from west of WCR 53 and south of WCR 52 because of the roadside ditches. Please account for the runoff from the adjacent properties in the calculations. 4:11/2018 Department of Public WorksI Development Review 1111 H Street, Greeley. CO 80631 I Ph: 970-400-3750 I Fax: 970-304-6497 www.weldgov.com/departments/public_works/development_review/ DRAINAGE REPORT REVIEW CHECKLIST Off -site flows can either be routed around the site or pass through the detention pond and over the emergency spillway undetained. We Edt Y.. Borm.nt se ;deems G.c.atawrg • - :750 Dan el 4E• . 4. AAAa • • R - tarn 171 ceµwalt • fa Otmtdalfi • wdd - Planning • U nBI_ .&d._...A4der a❑ Rata ❑ vtaacu r. 0 Pall t ❑ MAXIM x ❑ Ota_Y • U MAIM t 0 Ptet-USR • 0 nr UGI t U ne-edy.t... • ❑ INK'S. SgmerrIklet • 0 n>t.R•o•A►e . Q Pt tAdda.rs • QI ns,utt.aq-Owe, •. 0 RIM LOIAA • ❑ CIO n •d_4 aW_Dralg . . ❑ GS., I 4 Oowb t ❑.maw t ❑ OIR,Gt+MreFler . ❑ nayrwd t 0 t.ee.•trs. 4 ❑ horeast.d a PtST IAAr t.d'..se *sewn . 0 roan*, egg WRtr SAYa • 81 Puss fa Parcae Cattetratagi (R7 IN Rat •.d1 Wren ISMS; NNW Ind • Fur, Nat tempt tat • C) asses r =soma a • ❑ AIS- Ali Ca•t Obese I`u wH rdt tt1102.aea Cwmnece Articimm rt. s'- COL a w 0/1100 nut, -Cs-- . , • M0 e • • f Y a a OM MO • .1011ryN•.el 41,6 91,011 a a ` • Open Ferndale I MS MUM t00011 AR r ra> _ mot_ 'ir)VR} 10 11011 • 111,40 a 601MA. ISriD- 6YE•Ce R1�de Y amttaeea 3. Please provide a drainage swale at the northern edge of the property to direct flows from the northwestern corner of the site and the new shop building into the pond. As it is graded now, those flows will pass undetained to the neighbor on the north. 4. Please provide a drainage swale along the eastern edge of the property to direct stormwater runoff into the detention pond. 5. Please provide calculations for the proposed swales. showing that they can carry the 100 -year developed runoff to the pond with adequate freeboard. For flows under 50 cfs, the County allows for freeboard in swales to be calculated using 1.33x the design flows. 6. When calculating the weighted C value for the proposed site, please model the pond water surface area using a 100% impervious value. 7. In the calculations, adjust the slope on the Existing Basins spreadsheet for concentrated flow. The slope is being calculated with a 20' drop in elevation, instead of an 8' drop as shown in the Proposed Basin spreadsheet. The slope is shown at 8%, which is too high. Please update the calculations to show the correct slope. a. Since the runoff from the existing basin is so low in the 10 -year storm event. keeping the 0.10 cfs release rate for the pond seems reasonable, even if the revised calculation results in a lower value. 8. The composite C -values for the proposed site (for 20.7% impervious) don't match the Urban Drainage Table 6- 5 for Type A soils. The values shown are higher than the table lists, so runoff is higher. It isn't a problem. just a little confusing when reviewing report. 9. Please provide detailed drawings of the outlet structure, orifice plates for water quality and detention release and for the pond's emergency overflow spillway. 4/11/2018 • A Et Department of Public WorksI Development Review 1111 H Street, Greeley. CO 80631 p Ph. 970-400-3750 I Fax: 970-304-6497 www.weldgov.com/departments/public_works/development_review/ DRAINAGE REPORT REVIEW CHECKLIST 10 Once the revised design and drainage report have been submitted, the County may provide additional comments in addition to the ones listed above. Depending on the complexity of the changes made, a full 28 -day review period may be required. 11. Please provide a written response on how the above comments have been addressed when resubmitting the drainage report. Thank -you. 4/11/2018 w Department of Public WorksI Development Review 1111 H Street, Greeley. CO 80631 I Ph: 970-400-3750 I Fax: 970-304-6497 wwwweldgov. com/departments/public_works/development_ review/ PREPARED BY: ST WY 34 15071 CYRAV/Y ROW 51 SWAN a nut RSSCS 25052 COCAWY RtD40 Si M4VY SCHOTT ROTC 061V 30.00 25771 COYAY1Y ROW 5J .X44,1 CRE/I 331.28 PROPOSED BULLRING (7.500 S.F.; tf. b `X t PROPOSED 15" DIA. OUTLET PIPE W/FLARED ENO SE000N -. PROPOSED OUTLET STRUCTURE NBr4t0f rA sA PROPOSED EDGY OT ALE -WEATHER CRAWL SURFACE Nat !t ex ♦ 045 •Acu1xs - r 331.27A SSD'46'13'E IX iDLC O< P7A 1(I Ha40NA "t. 8 PROPOSED 6'N6' TYPE 'K' RIP RAP PAD PROPOSED TYPE 1' BURIED RIP RAP EMERGENCY OVERFLOW SPILLWAY INDICATES EXTENT OF WOCV RSL &LEV .4673.00 INDICATES EXTENT CF 100-YR wSL i ELLY. .4674 50 16145 COUNTY ROW 51 .KTSC At MAIM PERM WOCATES EXTENT OF FREEBOARD ELEV..4675.50 40 20 0 40 BO ORIGINAL SCALE: 1 "40' DETENTION POND SUMMARY REWIR.€D w,II2C,V. (GR4!s VAR), LW. . LY.GIS V. !fa 4472 4Q. -PQ/& p1VERT 44)1.. ..1.12Q-YR. Y4WME WAR tat] 21.1 4.1. IQQ_YR. WS% 4071 9_ ti. X FRiFiLIARD 467J5�. QUM-YR, M9/ in) ._T*Uea _. Mo.itAWAY FLOW (Mt .2..19 5.71 .EMERGENCY 5PgLWAy. ELEV, 4674,50 MAX. "'towWSL 4875.00 RUNOFF SUMMARY TABLE Po CONTRIBUTING EA (acres) RUNOFF cM1 INVIIO dBR 1 5.02 _ 168 5.78 JX1158441.21WES L DORIC CONTOURS "Ca Afl AAPROIONA R. BAWD 04 OCTAL TERRA* M0DO. GAT& ACTUAL G.EVATTOLS SAY VARY T. PfONOWD ORAONG OT Ic OETE TION POND AS DENOTED ON TIES *LAN (S TO DEMONSTRATE TIC POND'S PRELIMARY AREA NC VELURE& tic OESION (P%OR TO OBTAXSNG A DRANK PEWIT FROM VELD MINTY PUBLM: MOMS DEPARTMENT) WI a ADJUSTED ACCORDING TO ACTUAL nap SURVEY VEY NEOMIA ITC% ROI M SITE VICINITY MAP SCALE. 1" - 1 MILE AAYPGTn LAW ROI LAY EX NtDb[L'.n WY/Tat LX oar CLWR&V Er SPOT Etn . PR. SPOT NEWTON A. NO]6EDMR OMTOUO PR NOD CanouS ex ef.Q rw•Awuo r C/ka O CTO IOM .ONO cT[Mtaa UZATO. DRAINAGE MON OtsaN PD.NI Wm ID MSIN AREA (Mt..) -- - _l to 4OIAMT cov71C4Nr _ tE0 vi RUNOFF COEFFICCEI PR0PO LD OETDTTC. too-YR ISL f/Ls ,w G%'A.4 PROPOSID ORAA(L PROPOLLD :.00RETE PROPOSED ASNAL, X4464.20 f l I II CALL UTILITY NOTIFICATION CENTER OF COLORADO 811 CALL 2 -BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTUTIES. IHLE.XF:L, HARRELL A Fngul.WrvrsurveA.. '4- II III .VI 4111 L IT,U - - "In. I .W1,RIiw4A.e r, 111 ISO 'aCAUo MINN PREPARED FOR: FRONT RANGE HYDRO —BANDITS, LLC 25199 CR 52 KERSEY, CO 80644 CONTACT: RAFAEL BAtRA (970)-534-0960 U -r ISSUE DATE USR SUBMITTAL 72/21/2016 [m vIr41P u. L$'. Hr S IN COI' HI A{ NAYF MC I Ar TAIF' HORIZONTAL VERTICAL NA PROPOSED DRAINAGE PLAN PROJECT NO 21271-OOORtY of 1 SHEET: 1 OF 1 Front Range Hydro- Bandits 26199 CR 52 Kersey, CO 80622 (970) 534-0969 HydroBandits@gmail.com Good Afternoon Neighbors, This is a letter to confirm there is a verbal agreement that there is no need for screening of the trucks and employees vehicles is necessary Please sign below if you would NOT like a fence to be put up, Please let us know of any questions you might have or concerns Address: Name Signature 1. r cc> 2 3 4. Thank you!! Rafael Ibarra From: Barb Brunk <barbb@dgmlIc.com> Sent: Friday, November 30, 2018 2:11 PM To: Kim Ogle <kogle@weldgov.com> Cc: R Ibarra <hydrobandits@gmail.com>; 'bbrunk@kerseygov.com' <bbrunk@kerseygov.com>; Julie Piper <JPiper@KerseyGov.com>; Christian Morgan (CMorgan@KerseyGov.com) <CMorgan @ KerseyGov.com> Subject: RE: Notice of Inquiry KERSEY [Ibarra].pdf Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Kim, I got a call from the applicant last week and the applicants' representative this morning. Here is the Notice of Inquiry. I thought we responded to a USR referral on this property? The property is not eligible for annexation at this time. We would request that they consider annexation when they are eligible for at some time in the future. Please require the applicant to install all appropriate screening as you move this through the review process. Barb Barbara Brunk. Town Planner Town of Kersey P.O. Box 657 Kersey. CO 80644 Office: 970-353-1681 Cell: 303-775-6180 www.townofkersey.com bbrunk@kerseygov.com Notice of Inquiry Development within a Coordinated Planning Agreement or Intergovernmental Agreement (CPA or IGA) Boundary Date of Inquiry 5/25/2018 Municipality with CPA or IGA Kersey CPA Name of Person Inquiring Rafael Ibarra Property Owner Rafael Ibarra Planner Kim Ogle kogle@weldgov.com Legal Description Lot A, RE -1413, part W2SE4SW4SW4 28-5-64 Parcel Number 0963-28-0-00-040 Nearest Intersection County Road 52 East of County Road 53 Type of Inquiry USR for Trucking Company The above person inquired about developing a property inside your designated CPA or IGA boundary. This person has been referred to community by Weld County Planning to discuss development options on this site. Visit Chapter 19 of the Weld County Code for specifics on your agreement. Weld County Comments Property is located within the CPA between Weld County and the Town of Kersey. PerCPAAgreementthe County refersapplicantstotheTownforaconversation regarding the benefits of annexation, a pre -annexation agreement with the Town or taking no action and referring the applicant back to the County. Name/Title of Municipality Representative Municipality Comments Kim Ogle Digitally signed by Kim Ogle Date. 2018.11.27 06:30.16 -07'00' Signature of Weld County Planner Barbara Brunk Digitally signed by Barbara Brunk Date 2018 11.30 14.02:03 -07'00' Signature of Municipality Representative Plase return the signed form to: Weld County Planning Department 1555 N 17r' Avenue, Greeley, CO 80631 (970) 353-6100 x3540 (970)304-6498 fax DBC Drexel, BarrelI & Co. Traditional Services, Innovative Solutions Since 1949 DREXEL BARRELL & Co. Engineers - Surveyors MEMORANDUM TO: Front Range Hydro -Bandits, LLC 26199 County Road 52 Kersey, CO 80644 Attn: Rafael lbarra FROM: Derek Schuler. P.E.. PTOE DATE: March 26, 2019 RE: Traffic Analysis for Front Range Hydro -Bandits Services Development Weld County. Colorado (Second Submittal) This traffic analysis serves to summarize the land use. probable trip generation and distribution, and vehicular access to the proposed trucking storage and delivery facility to be located at 26199 County Road 52. The site is generally located due south of the Town of Kersey core. See related site plan for site location and layout. The existing 4.8 acre site is currently occupied by a single family home and three shed structures. The site is zoned as A — agricultural and is generally surrounded by large lot home sites and other farming uses. The existing home and sheds will remain and is planned to serve as owner's residence. The new use will add 12 regular automobile parking spaces for employees on a gravel surface. The site will have parking available for the owner's 10 trucks on a gravel surface. There is one existing access point on site that will be utilized for the new use. This access point on CR 52 is located approximately 675 feet east of CR 53 and about 2 miles south of US 34/downtown Kersey. Proposed Land Use & Trip Generation The proposed land use will be the single family residence and the storage of commercial vehicles and equipment in support of the trucking delivery operation. The business plans to operate from 5:30 AM to 6:30 PM. Monday to Friday. Based on county concerns from the first submittal, the owner has modified and clarified arrival/departure details for all site trips The daily operation will be split up into two work shifts: 6am-4pm and 8am-6pm. Each shift will be staffed by 6 employees who arrive 30 minutes prior to shift start and depart within 15 minutes of shift end. 5 of the employee's then drive 5 of the owner's trucks for deliveries. The daily total is 12 employees and 10 trucks. All trucks are between 20-40 feet in length and a passenger car equivalent (PCE) of 2 is used for each truck for the purposes of this analysis. 1800 38th Street, Boulder, Colorado 8030 I (303) 442-4338 DB Job No. 21271.00GRCV Traffic Analysis for Front Range Hydro -Bandits Services Page 2 Based on this arrangement. there will be two equal but separate peak hours for site traffic in both the morning and afternoon. These are roughly 5.30am-6:30am, 7:30- 8:30am. 3:15-4:15pm., and 5:15-6:15pm. The trip generation calculations show the full daily site traffic but only one AM and one PM peak hour consisting of a single shift operation. Table 1 below shows the probable trip generation numbers. The table shows the number of expected trips for the development using the latest ITE trip rates and the owner supplied data. This manual is currently in its 10th edition and is an industry accepted informational report published by the Institute of Transportation Engineers. Since no land use closely resembles this proposed storage/delivery operation, the owner's shift details were used. which was 64 trips/day (see table for PCE adjustment for trucks). Land use #210. Single Family Home accounts for the existing and remaining home site resulting in 10 trips/day. Using the ITE rates and the owner supplied data. the development is anticipated to generate about 74 daily trips, 17 trips (6 in/11 out) in the morning peak hour and 17 trips (11 in/6 out) in the evening peak hour. L' ITE Code I Land Use Sue Trip Generation Rates Traps Generated Average Weekday TrrFs AU PS -Hour (7 - 9) PLI Peak -Hour (4 - 6) Inbound I % Tops Trgs I%. Outbound Trips Tips Total Inbound %Tnps Taps Outbound IToh,i %Tnps Traps Avg Weekday All PEAK PM PEAK 4210 - Single Farm Home' 1 DU Employees 12 EA Trucics(PCEY 20 EA 9.52 2 2 100 0 50 0 50 1.00 0.50 0.50 10 24 Si) 25% 100% 0% 0 6 75% 0% 100'% 1 - 10 1 6 10 63% 096 100% 1 - 10 37% 100% 0% 0 6 - TOTALS 74 6 11 17 11 6 cu e "Trp Generation' Irtsttule ct Transportation Engneers, 9th Edfdon 2012 'Trucks are 20-40 feet n length A passenger car eguvalent of 2 is used for these trucks Existing Roads & Distribution CR 52. in front of the subject site is classified as a local unpaved road. It is narrow at roughly 18' wide. but can generally accommodate two way travel at low speeds. The latest ADT provided by the county is 121 vehicles per day (vpd) with 29% trucks. Nearby perpendicular (north/south) CR 53 is a paved and striped two lane collector street. The latest ADT provided by the county is 2.681 vpd and 34% trucks. There are no turn lanes or paved shoulders on CR 53 in the immediate area. Based on the owner's trucking destinations: 80% of the site truck traffic will be associated to the west toward CR 53. Of this 80%, the owner states that in the morning 50% of trucks will turn right and 50% of trucks will turn left onto CR 53. These trucks will return at the end of each shift using the same route. The current employees are all coming from the north along CR 53 (a conservative assumption adding southbound left turns). A traffic model for this analysis has been created using Synchro version 10 software. See Figures 1 & 2 for diagrams of peak hour site trip distribution. See Figures 3 & 4 for estimated total traffic during peak hours. 1800 38th Street, Boulder, Colorado 8030I (303) 442-4338 DR Job No 21271-00GRCV Traffic Analysis for Front Range Hydro -Bandits Services Page 3 Figure 1: Site AM Traffic with PCEs) Departing site: 5 trucks (10 PC Es) 1 passenger vehicle Figure 2: Site PM Traffic (with PCEs) Departing site: 6 employees in passenger vehicles Arriving at site: 6 employees in passenger vehicles Arriving at site: 5 trucks (10 PCEs) 1 passenger vehicle 1800 381" Street, Boulder, Colorado 80301 (303) 442-4338 DB Job No 21271.00GRCV Traffic Analysis for Front Range Hydro -Bandits Services Page 4 Figure 3: Total AM Traffic (with PCEs) Figure 4: Total PM Traffic (with PCEs) 1800 38`h Street, Boulder, Colorado 80301 (303) 442-4338 DB Job No 21271-00GRCV Traffic Analysis for Front Range Hydro -Bandits Services Page 5 The proposed site traffic distribution avoids too many turning movements in any hour. The maximum turning volumes are below the thresholds for right and left turn lanes (25 and 10 vph respectively) for a rural highway per the State of Colorado Access Code. Per Table 1. PCEs are provided for all trucks. The applicant is required to either maintain the proposed site traffic patterns or ensure the turning thresholds are not exceeded following any changes (such as new employees or new trucking destinations). The resulting levels of service (LOS) for total traffic at the CR52/CR53 intersection are shown in Figures 5 & 6. LOS is a qualitative measure used to relate the quality of motor vehicle traffic service based on vehicle volume and delay LOS A represents free flowing conditions and LOS F represents highly congested conditions. All approaches to this intersection have LOS B or better during both peak hours. Figure 5: AM Peak LOS - CR 52/53 Intersection RCM 2000 SIGNING SETTINGS EBL -D. EBR k.a t t. NBR i 'm./ SBR c we EBT Lane. and `,t-iaring IttRLI 0 44 4► 4+ 4. Traffic Volume (vph) 1 0. J 8 1 0 180 4a 11 Future Volume I phi i-I 0 8 1 8 0 180 4 9 18.1. Sign Control Stop Stop - - Free Free Median Width Ittl 0 II 0 0 TWLTL Median -- - - - • O O ❑ Right Turn Channetaed - None None - - None None Critical Gap. tC (s) - 15 — i 7.1 6.5 - 6_2 — — H 4_1 ! Follow Up Time tEha 40 35 411 11 - - 22 - Volume to Capacity Ratio 0.00 0.03 0.03 0.03 — 0.00 (toil am am — controlDelayl'l 1' = 10 F, 1116 10 r; 0.0 0.01 01 04 Level of Service B B B B A A A A �� Queue Length '35th itt I .. - ii 1 1 Approach ()Say (s) 11 9 10 6 0 0 0 4 Figure 6: PM Peak LOS - CR52/53 Intersection HCM 2000 SIGNING SETTINGS 1 J ILI EBL EBR WBL 4-t WBR NBL NBT NBR • SBL §aT 1 SBR WBT EBT Lane: and ' 'rNanng #FI L I . 0 4. 4+ 4► 4, Traffic Volume Ivphl 1 0 4 1 9 0 180 8 180 0 Future Volume Ivphl 0 - 0 180 8 8 180 0 Sign Control Stop Stop Free - — MedianWidthIt,I iI 0 — — 0 — TWLTL Median — - (] � Right Turn Channeled None None - Non — — None Critical Gap, tC (s) 6 5 - 7.1 6.5 6.2 - 41 Follow up Ttme rF It 4 u 3 5 4.0 3.3 — — — 22 Volume to Capacity Ratio 0.00 0.02 0.02 O. r i - - I W . _ : Control Delay I::I 11 i 10 2 10 2 10 2 0.0 0. r 0.1 Q4 — Level of Service - 8 - B B 8 - A _= Queue Length 95th fit ' 2 0 I 0 0 - Approach Delay lsl 119 - - 10.2 -I - 0.0 4 1800 38th Street, Boulder, Colorado 80301 (303) 442-4338 DB Job No 21271 -OOGRCV Traffic Analysis for Front Range Hydro -Bandits Services Page 6 Per county comments, tracking control is required for this site. This site requires double cattle guards and 100 feet of road base on all driving surfaces or approved equivalent. This requirement is reasonable for the amount of proposed truck traffic using unpaved CR 52. The related features have been shown on the proposed site plan. Conclusion With the addition of the proposed development. vehicular traffic is adequately accommodated by CR 52 and CR 53. The applicant is required to either maintain the proposed site traffic patterns or ensure the turning thresholds are not exceeded following any future changes. If you have any questions or would like to discuss my analysis further. please don't hesitate to contact me. Sincerely. Drexel, Barrell & Co. (DerekSchuler Derek Schuler. P.E., PTOE Transportation Group Leader 1800 38Th Street, Boulder, Colorado 80301 (303) 442-4338 DB Job No 21271-00GRCV DBC Drexel, Barrel) & Co. Traditional Services. Innovative Solutions Since 1949 DREXEL BARRELL & Co. Engineers - Surveyors MEMORANDUM TO: Front Range Hydro -Bandits, LLC 26199 County Road 52 Kersey, CO 80644 Attn: Rafael Ibarra FROM: Derek Schuler. P . PTOE DATE: December 19. 2018 RE: Traffic Narrative for Front Range Hydro -Bandits Services Development Weld County, Colorado This memorandum serves to summarize the land use. probable trip generation, and vehicular access to the proposed trucking storage and maintenance facility to be located at 26199 County Road 52. The site is generally located due south of the Town of Kersey core. See the attached figure for a vicinity map and proposed site layout The existing 4.8 acre site is currently occupied by a single family home and three shed structures. The site is zoned as A - agricultural and is generally surrounded by large lot home sites and other farming uses. The existing home and sheds will remain and is planned to serve as owner's residence. A location for a future building has been designated at the north end of the property. There are no specific details on the future building at this time except that it will include an office. restroom, and shop for basic maintenance of trucks. The new use will add 33 regular automobile parking spaces for employees on a gravel surface. A handicapped accessible space will also be provided if required. The site will have parking available for 15 semi -trucks on a gravel surface. There is one existing access point on site that will be utilized for the new use. This access point on CR 52 is located approximately 675 feet east of CR 53 and about 2 miles south of US 34/downtown Kersey Proposed Land Use & Trip Generation The proposed land use will be the single family residence and the storage of commercial vehicles, tools. supplies. and equipment in support of the trucking company. The business planned to operate from 5:00 AM to 8:00 PM, Monday to Friday with vehicles arriving and departing generally at the beginning and end of each work day. 30 full-time employees are planned to be on staff. The owner has estimated about 90 trips, 60 from the employee's personal vehicles and 30 from the trucks. The owner claims the employees will arrive and depart in their trucks prior to the morning peak hour. During the evening peak hour, typically all trucks will return and all employees will leave the site. Table 1 below shows the probable trip generation numbers. The table shows the number of expected trips for the development using the latest ITE trip rates and the owner supplied data. This manual is currently in its 10`" edition and is an industry accepted informational report 1800 38`x' Street. Boulder, Colorado 80301 (303) 442-4338 DB Job No 21271-00GRCV Traffic Narrative for Front Range Hydro -Bandits Services Page 2 published by the Institute of Transportation Engineers. Since no land use closely resembles this proposed storage operation. the owner's estimation was used (90 trips/day). Land use #210. Single Family Home accounts for the existing and remaining home site. Using the ITE rates and the owner supplied data. the development is anticipated to generate about 100 daily trips, 1 trip (0 in/1 out) in the morning peak hour and 47 trips (16 in/31 out) in the evening peak hour. an -. = .�.n.,.— rc Table 1 - Trip Generation Estimate for ; Front Range Hydro -Banes Services - Weld Cdurtilip T rip Generation Rates I T rips Generated Average Weekday Trips AM Peak -Hour (7 • 9) PM Peak -Hour (d - 6) Inbound % Trips Trips Outbound % Trips Ira Total Inbound % Trips Tops Outbound Tnps Trips Total Av'g 'beet lay AM PEAK' PM PEAVT. ITE Code / Land Use Size #210 - Single F3mly Hart 1 DL E.rrglc y€es Tun s r 9 r.•13 ? c2 r. a 0 -5 3 1.00 050 10 90 25% 0% 0 - 75% 100% 1 - 1 1 e3% 33% 1 15 37% e7% 3 30 TOTALS 100 3 1 1 IC at 4- Sairoe "Trio Generation' Institute ;f Trarscectebon Ernirees. 9th Edition- 2)12 "ALswrret k ate teSF = 1000 Gross Leasable Floor Area. DU = Dueling Unit Existing Roads & Distribution CR 52, in front of the subject site. is classified as a local unpaved road. It is narrow at roughly 18' wide. but can generally accommodate two way travel at low speeds. Nearby perpendicular (north/south) CR 53 is a paved and striped two lane collector street. There are no turn lane or paved shoulders on CR 53 in the immediate area. It is estimated that about 80% of the site generated traffic will be associated to the west toward CR 53. Of this 80%, the owner states that in the morning 50% of trucks will turn right and 50% of trucks will turn left onto CR 53. These trucks will return at the end of the day using the same route. The employees leaving work will mostly be turning right onto CR 53 toward Kersey and US 34 Under the proposed scenario. the main issue of concern is the roughly 13 trucks that would be projected to turn left into the site during the evening peak hour. Six or seven of these trucks would also be turning left on southbound CR 53 to CR 52 The truck arrivals during the pm peak will usually have several minutes of separation and queuing is not expected. The employee departures are mostly right turns onto CR 52 and then CR 53 which is not a concern. Therefore, additional auxiliary turn lanes are not recommended on both CR 52 and CR 53. Conclusion With the addition of the proposed development, vehicular traffic will be more than adequately accommodated by CR 52 and CR 53. If you have any questions or would like to discuss my analysis further. please don't hesitate to contact me. Sincerely. Drexel, Barrell & Co. DerekSchuCer Derek Schuler. P.E., PTOE Transportation Group Leader 1800 38th Street, Boulder, Colorado 8030 I (303) 442-4338 DB Job No 21271.00ORCV Hello