Loading...
HomeMy WebLinkAbout20203939.tiff 1861 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970)304-6531 FAX: (970)304-6532 G O U_Ni 7 Y - WEBSITE:www.co.weid.co.us 1105 H STREET P.O. BOX 758 GREELEY,COLORADO 80632 September 21,2020 To: Board of County Commissioners From:Toby Taylor Subject:C2D Architectural&Design Services; (2019-2250) As a result of the Architectural&Design Services bid(B1900100),C2D Architects LLC was awarded on-call design services July 31, 2021. There is a need for design services for a remodel at 1105 H Street. Using the fees identified in the bid, C2D has quoted the project at $14,900.00. Buildings & Grounds is recommending approval. If you have any questions,please contact me at extension 2023. Sincerely, Toby Taylor Director 2020-3939 oq/,2 / m 6 C-r1 q,v3, ac" PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND C2D ARCHITECTS,LLC Date:July 6,2020 Task Order Number: C2D Architects,LLC—1-2020 Project Title: Weld County Buildings&Grounds Office Expansion Commencement Date: Completion Date:Design Compensation: $14,900.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 sectlon2.2- Additional Task Order Work. In addition to that work described in section 2.1,the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order,which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective.In no event shall the total of all Task Orders exceed$25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: 1. Design the expansion of the Buildings&Grounds Office 2. The construction drawings will include Architectural, Mechanical,Plumbing and Electrical design. Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. CONTRACTOR: C2D Architects.LLC By: Date Vv LV Zea) Na e: Tile: AI CIA rcr Exhibit-Task Order 1-2020 t C2D ARCHITECTS, LLC CONCEPT 2 DESIGN" FEE PROPOSAL for WELD COUNTY BUILDINGS &GROUNDS NEW OFFICES: CASSEDAY CREATIVE DESIGNS,LLC will enter into a Guaranteed Maximum Price (GMP)Contract. Additional phases of work may be amended to the contract. CASSEDAY CREATIVE DESIGNS,LLC PROPOSES THE FOLLOWING FEE (BASED ON COST OF CONSTRUCTION DRAWINGS: A fee of$14,900.00 to be billed on a phased basis on the work performed. Architecture(CCD): • Sketch Phase $1,000.00 • Design Dev.Phase $2,000.00 • CD Phase $4,500.00 Mech/Plumb(Integrated): $2,100.00 Elec.(RI Assoc.) $2,500.00 SUB-TOTAL: $12,100.00 Construction Administration: Architecture(CCD): $1,500.00 Mech./Plumb.(Integrated) $ 300.00 Elec.(RJ Assoc.): $1,000.00 SUB-TOTAL: $2,800.00 TOTAL: $14,900.00 P.O.Box 337733 Greeley.CO 80633 Phone:970-515-6675 Fax:970-515-6675 E-mail:RCasseday@C2DArchitects.com Carol@CNVDesigns.com Page 1 RE: Task Order#2— Contract Extension/Amendment for Professional Services— C2D Architectural and Design Services ATTEST. Y. • "'�'i1 BOARD OF COUNTY COMMISSIONERS Weld o t Clerk to th Board WELD COUNTY, COLORADO BY: Deputy C to the B d Mike Freeman, Chair SEP 2 3 2020 APPRAElT F DING: APPROVED AS S STANCE: Controller �.�,. Elected O cial or Department Head APPROVED AS TO FORM: s .r • County Attorney tea �r'Y Hello