Loading...
HomeMy WebLinkAbout710487.tiff United States Department of the Interior 1/44: b BUREAU OF RECLAMATION -...ver "iI REGIONAL OFFICE, REGION 7 BUILDING 20, DENVER FEDERAL CENTER IN REPLY DENVER, COLORADO 80225 REFER TO: 7-200 FEB 171911 I Mr. Marshall H. Anderson Chairman, Board of County Commissioners Weld County, Colorado Weld County Courthouse Greeley, Colorado 80631 j Dear Mr. Anderson: On January 22, 1971, I, with members of my staff, met with you and other County representatives to discuss alinement and type of construction for the proposed Archer-Weld 230-kv Transmission Line by the Bureau, and the proposed Weld Substation to be jointly constructed with the Public Service Company of Colorado. At that time, it was agreed that you would schedule a meeting with Governor Love, Senator Garnsey, and members of the. Governor's environmental staff to review the recording made of our January 22 meeting. Results of this review which you held with Senator Garnsey and Mr. Bob Bronstein of the Governor's staff were 5rela1yed by telephone by Mr. Billings to Mr. Griffin of my staff on February > 971. It is our understanding that the County and State would be agreeable to (1) wood-pole construction from the State Line to a point approximately 2 miles north of Pierce and (2) a single row of lattice steel structures from 2 miles north of Pierce to the site of the proposed Weld Substation, the steel structures to be located on the new alinement acquired for the originally proposed 230-kv wood-pole line. ice Since a firm agreement has not been reached with Wu1lic cuSetvice Comp pr regard to the joint construction of the proposed pose to construct our facilities in two stages as follows: Stage I 1. Construct a section of 230'-kv wood-pole line from the State Line to a point at the beginning of the irrigated area approximately 2 miles north of Pierce. This section would be on the right-of- way we have acquired for that purpose and parallel to the existing 115-kv wood-pole line. The existing line would be left in place. PA. //TA 710487 2. Construct double circuit lattice steel structures from that point approximately 2 miles north of Pierce to the location we call Ault Tap, which is near the corner common to Sections 5, 6, 7, and 8 of Township 7 North. This would be constructed on the right-of-way we have acquired for the wood-pole transmission line we formerly proposed to build here. The structures would carry the new 230-kv circuit on one side, and the 115-kv circuit now carried on the existing wood-poles in this section would be placed on the other side and connected at Ault Tap to the exist- ing line to Fort Collins. The existing wood-pole line in this section would be removed when the new construction has been completed. 3. No construction would be undertaken south of Ault Tap under. Stage I. The new circuit from Archer Substation in Wyoming to Ault Tap would be temporarily operated at 115-kv and be connected to the existing line from Ault Tap to the Weld Substation site. This line would be connected to and feed into the existing east- west line from Loveland to Greeley. Stage II 1. If we can reach an agreement with Public Service Company on the joint construction of a substation at the Weld site, we would construct lattice steel structures, either single-circuit or double-circuit depending on circumstances then existing, from Ault to the Weld Substation on the right-of-way we have acquired, or are in the process of acquiring, for the 230'-kv wood-pole line we formerly proposed to build in this section. The existing wood-pole line in this section would be removed on completion of the new steel structures. 2. Our further plans in the event we t not inotfable ee,oareach depend an agree- ment with Public Service Company particularly anthd ill of the on the plans of others in the area, p Y cities of Fort Collins, Loveland, and Longmont, and Tri-State Generation & Transmission Association. Our tentative plan at the moment is to convert the Archer-to-Ault Tap section of the new line to 230-kv operation and construct a substation somewhere in the vicinity of Ault Tap. I am enclosing two additional copies of this letter, and I would appreciate it if you would forward one to Senator Garnsey and one to Mr. Bronstein for their information. It would also be appreciated if you would countersign 2 e the duplicate copy as provided below and return to this office to confirm our understanding of your acceptance of our proposed construction. Sincerely yours, 711. 11,(24 James. M. Ingles Regional Directo In duplicate Enclosure Approved: Charm����arid of County Commissioners Weld County, Colorado 3 Hello