HomeMy WebLinkAbout20201678.tiffINVENTORY OF ITEMS FOR CONSIDERATION
Applicant Colorado Liberty Pipeline, LLC
Case Number USR20-0004
Submitted or Prepared
Prior to
Hearing
At
Hearing
1
Jose Silver
letter
received May 18, 2020
X
—
2
Erika Valeriano
letter
received May 18, 2020
X
—
3
Craig Sparrow
letter
received May 18, 2020
X
—
4
Sharon Sparrow
—
letter
received May 18, 2020
X
5
Tri-State
Commodities
do Chade Shupe
letter
received May 18, 2020
X
—
6
Presentation
from the
applicant
X
I hereby certify that the six items identified herein was submitted to the Department of Planning Services
at or prior to the scheduled Planning Commissioners hearing.
Diana Aungst, Planner
I
Weld County Board of Commissioners
1150 0 Street
Greeley, CO 80631
Dear Weld County Commissioners,
rt
"at' ek " "`+ee,
MAY 18 2820
vVelu 1,.,f
fit • ,(1ilute:
GREELEY OFFICER.
Lane,
I am writing this letter to voice my enthusiastic support for the Liberty Pipeline Project
currently being considered among your commission.
Oil production is an industry that under siege from uninformed extremists. Projects like
this ensure that development continues and that we keep our local economy strong by
keeping jobs here in Colorado.
Most Coloradans are proud of our legacy with energy development and we want to see it
flourish. The Liberty Pipeline will add much needed capacity to supply other parts of the
United States with energy,.
Finally, building infrastructure that will allow Colorado to continue to be a leader in oil and
gas development is good for our country. We live in a time where the United States has
become a global leader in energy development and that makes all citizens safer.
For Colorado and for the United States, I encourage the Weld Commissioners to approve
this project.
Best regards,
5/
IWo 10401%€, d`
1444040ine.
eFin
EXHIBIT
Weld County Board of Commissioners
1150 0 Street
Greeley, CO S0631
4, 'Pitt IbWINN
AlAY 8 2
GREQEY lort2Fisorref""c"L
Dear Weld County Commissioners,
I would like this letter to reflect my very enthusiastic backing of the Liberty
Pipeline project. This is a great project that will not only support an important
industry for Colorado and the United States, but also support the economic
landscape of the state.
This pipeline construction and maintenance of the pipeline is expected to
bring new jobs to Colorado. New jobs are key to the growth and prosperity of
a community. They support every avenue of the economy with home sales,
increased spending and new tax payers.
I would ask that the Commission give their approvals to this most important
project and allow the construction (and jobs that go with it) to begin.
Enthusiastically,
(lertshic ta A I r .12 ta 1 • te
k'cz Yale Et c. .ct, +.k, 0
./.2. .20.200
a 3 w r sue`' s4-
An/eta, O.)
6co Le 3`(
Weld County Board of Commissioners
11500 Street
Greeley, CO 80631
" ri
r•. MAY Is 2020
hv GliJ Lou ; n / , ;
GREELEY OFFICE
�� �rri��,t
Weld County Commission:
I have submitted this letter to show my support for Liberty Pipeline
project that is being considered by the Weld County Commissioners.
The energy producers in Weld County and other parts of
Northeastern Colorado help maintain a healthy economy for all that
live and work in the community. This comes in the form of short-term
construction jobs as well as full time jobs supporting the pipeline.
Supporting them by adding key infrastructure developments will
make sure that this robust economy is maintained for the
foreseeable future.
I hope your discussions prove that building this pipeline is the right
thing to do and I ask that the approvals be made so construction
can begin.
Best regards,
On1,6 ortrr-)
.Do SS re An
6(c' i.µJ Cu 1743!
Weld County Board of Commissioners
1150 0 Street
Greeley, CO 80631
rriu
11T3. if r(ria. ryr
MAY i s p020
GREELEY OFFICE
letter to the Weld County Board of Commissioners,
Please allow this letter to show my support for the Liberty Pipeline project.
I believe the oil and natural gas has made the United States a safer place to live. We no
longer have to rely on foreign countries, many of them hostile, for our energy resources.
We are safer now and Colorado's oil and natural gas production has been a major
contributor to that.
That makes me proud.
The Liberty Pipeline willfurther our independence from foreign energy and further
Colorado's place among the country's leaders in energy production. Liberty adds
increased pipeline capacity, allowing Cil from our community to reach other areas of the
country safety and efficiently.
I encourage the Weld Commissioners to put their stamp of approval on the Liberty
Pipeline project.
Sincerely,
>6/et/L.
(45hct ro
sa
Sp*rro
tlr
nit L
(Oreedn, Co gr...443
irFryFr)
MAY 18 1010
VV tilU Fknning uepai Uil#ast
GREELEY OFFICE
WELD COUNTY BOARD OF COMMISSIONERS
1150 0 STREET
GREELEY, 80631
DEAR WELD COMMISSIONERS:
THANKYOU FOR YOUR,. THOROUGH REVIEW OF THE LIBERTY PIPELINE. I
WOULD LIKE THIS LETTER TO REPRESENT T Y COMMENTS TO UPPORT THE
APPROVAL OF THE PROJE 'F.
OIL AND GAS PRODUCTION IN WELD COUNTY AND OTHER PARTS OF
NORTHERN RTHEF N COLORADO ARE VITAL TO OUR COMMUNITY AND COUNTRY. IT
IS A SMALL PART T OF THE REASON N THIS AREA IS SUCH A GREAT PLACE TO LIVE
AND WE MUST DO WHAT WE CAN TO SUPPORT THE INDUSTRY.
ADDING LARGE CAPITAL PROJECTS LIKE THIS ARE THE BEST WAY TO SHOW
THE SUPPORT FOR AN INDUSTRY THAT SUPPORTS OUR COMMUNITY. THIS
WILL KEEP THE ENERGY PRODUCERS VIABLE FOR YEARS TO COME,
PLEASE SUPPORT OUR COMMUNITY. PLEASE SUPPORT THE LIBERTY PIPELINE
BEST REGARDS,
Tr-S4ct
„evil
571 4 r
(3a N A\Jea.„
(,..ThineeC tot /Low r63L
.f cr r
EXHIBIT
a
.0
S
COLORADO
LIBERTY
PIPELINE LLC
USR2O 0004
LIBERTY PIPELINE
WELD COUNTY PLANNING COMMISSION
LIBERTY-PIPELI N ESCOM
INTRODUCTIONS
APPLICANT: COLORADO LIBERTY PIPELINE, LLC
TEAM MEMBERS:
• Chad Polak — Right -of -Way Lead
• Monica Howard — Environmental Permitting
On the phone
•
•
•
•
•
•
Joe Frontha — Project Manager
David Marhofer — Environmental Permitting
James Odom — Director of PTO
Brad Dooley — Operations
Marcus Moore — Designing Engineer Consultant, Burns McDonnell
Jake Rosenburg — Planning Permitting Consultant, ERM
COLORADO
LIBERTY
PTPELTNE LL[:
LIBERTY PIPELINE PROJECT OVERVIEW
New, 720 -mile -long 24 -inch diameter pipeline
transporting crude oil from the Rockies and
Bakken production areas to Cushing, Oklahoma.
Adhere to all local, state and federal regulatory
requirements.
Meets strict safety and environmental protection
standards.
Create jobs, increase economic activity and boost
tax revenues in communities along the route and
near facilities.
Pipeline route and terminal location was carefully
chosen to minimize impacts to the greatest
number of stakeholders and the environment.
Guernsey, WY
Platteville, CO
Cushing, OK
OVERVIEW
•
Liberty is a joint venture of Phillips 66 and Casper,
WY -based Bridger Pipeline, LLC, part of the True
Companies.
Phillips 66 will design, construct and operate the
project.
We responsibly manage a 21,000 mile nationwide
network of pipelines and facilities.
We are committed to safe, efficient and reliable
operations with a focus on environmental
stewardship and being good neighbors
Operating assets in Colorado for 50 years.
Main nate.
T.mmi,Wr - INrr
aro.e:.4°' y,w :rotr.•
att
r�nc 3
F.1111 ?anon
Mob
talon am' r
Ind FlTharrvi
givawn gal snaWit dA,sui
trues.
Print
U.S. Pipelines and Facilities
-
cI j. ?.r
!rpm rut goiter r 'ee. s5
* WM.
a�..m--+�-•— Tray
Care
2Nt
rweteaR`
Je teers
iFawn
t9
MPY.rsct2
KSANOS
Wti.aN
war.
#-Lmu
e, Rote ttne
its Taco raa cart.4
trq•tutat
MIS TOM aee+Y
`deco Go3r},a PsruTy
:M_.1 rear:
•
1-51115
ar Add
a L.
Fat tB'ii
w f.ik
Vita
Q
Gam
NGeernri
NOWT
cuppeinTo
Scout
Inws 1G'-`—� I 1mn miis.rlq .
it
S 1KrlISld
Ca -
a \
1
HOS• TS ant
r.Tti _
. /Iii .� ! 7 r
gr9h, ill: - Il 1 N'•nif'.--; r.'sA
I tutted
etr'_' i
r r arty 1,
e
,f
A r 1 -- ..1
1—
Let
's
•� I,F%.t7
tl &Pc-eN
rar nlykenia
South
>,C ate ier
111 Plats
`.ki fir C
tcr.� ; Tit o c e}rrt GIs" qr !•0. „S49��Ls t.
1
Cle74Cg+Y�7�
a.a ir
) nark
a..r,dr is aN.
t„
ISO
GM Of I lsrim
So -
16
U.S. Operated As+ets
I It''} Undo, eracloodiso
A P65 Rattwry
P66 tiaras
Products
MIAS
LPG
Haire
MILE
Idpl
Pt•8 Pb nea
—role
- HOME
— rift
Ilaluw Ga
IMO
t
Atria
COLnR aU0
LIBERTY
PIPELINE LLC
OUR VALUES
Safety. Honor. Commitment.
■ Safety. We protect each other, our environment and our
communities
■ Honor. We stand behind our word and you can count on us
to do the right thing, always
■ Commitment. We are inspired to achieve the highest levels
of performance in everything we do.
WE ARE PHILLIPS 66
Providing Energy, Improving Lives.
Safety. Honor. Commitment.
COLORA DO
LIBERTY
PIPELINE LLC;
OPERATING COMMITMENT
P66 has a comprehensive Terminal Operations and Integrity Management
Program designed to ensure mechanical integrity, safety and reliability.
•
•
•
•
•
Storage tanks designed, constructed, and maintained to meet or exceed
federal and state regulations
Monitored 24/7 for multiple factors to alter detection of anomalies
Measures in place to present tank overfill
Within a lined containment structure surrounded by substantial dykes to
contain liquids in the event of a release
Routine tank and facility inspection to ensure safety and reliability
WE ARE PHILLIPS 66
Providing Energy, Improving Lives.
Safety. Honor. Commitment.
COLORA DO
LIBERTY
PIPELINE LLC;
VICINITY MAP
80 acres purchased
40 to be developed
Accessibility
• Major roads
• Accessible power supply
• Proximity to 3rd party suppliers
Conditions
• Ample size
• Suitable geotechnical conditions
• Desirable topography and hydrology
• No pre-existing environmental risks
Environmental
• No prime farmland
* No sensitive environmental resources
• Similar facilities in the immediate area
SITING CRITERIA
MPLS':rJSMlNi,E.01 tk,tL Jc_un'.GMILIVE.ISuC irrl ',P-R,Peastil al km'. Ai GC IS321320Z3iP ah:illeTerminalLocation At ip+PI�:lied& Tin mi rl UPI X. I R=, 5t0 Or1''LC2U I SCA_E 1 4bt3U
(l:�tid J EY MEC.
Rola32
Road -26
Fort CoIlIns
Platteville Terminal
Overview
Colorado Liberty
Pipeline LLC
Weld Courtly, Colorado
Road
Proposed IJSR Boundary
0 1,250 2.500
1:45,DDO
ERM
Feet
LIBERTY PLATTEVILLE TERMINAL
PRIMARY EQUIPMENT LIST
Office/Warehouse Building
Two, 200 MBBLs Storage Tanks
Three/ 6000 HP Mainline Pumps
Two, 700 HP Vertical Can Pumps
Surge Skid and Tank
Sump Tank and Pump
Two DRA Skids
Launcher and Receiver
Lighting
Power - United Power
CONSTRUCTION SCHEDULE
Environmental Permitting
Weld County Permitting
Clearing & Grading
Tank Construction
Balance of Construction
Commissioning
In -Service
September 2019 — June 2020
December 2019 — June 2020
January 2021— March 2021
February 2021 October 2022
April 2021 February 2022
March 2022
April 2022
COLnR aU0
LIBERTY
PIPELINE LLC
TERMINAL STATUS
ACTIVITIES COMPLETE
■ Land acquired in fee
■ CivilSurveys
■ Environmental Assessment
■ Geotechnical Investigation
PERMITS IN PROGRESS:
Access Permit
Grading Permit
Road Maintenance Agreement
Tank Building Permit
Septic Permit (prior to operation)
PERMITS/CLEARANCES RELIEVED:
CDPHE — Air Quality
• Tank construction permit
• Land disturbance permit
CDPHE Water Quality
• Stormwater Construction Permit
CO DNR — Division of Water Resources
• Well permit
CO Parks & Wildlife
• No sensitive species or habitats
COLORADO
LIBERTY
PIPELINE LLC
NOISE:
MITIGATION
■ Weld County residential noise standards
• Pre -construction survey complete
• Post -construction within 30 -days
of commissioning
LIGHT:
■ Code compliant
• Downward -cast
• opaquely shielded
• 0.0 lumens at property lines
AESTHETICS:
■ On the south portion of the tract
• Significantly setback from roads
• Setback from viewshed of neighboring residences
ENVIRONMENTAL:
■ Layout accommodates potential future West Neres Canal
■ Best management practices for stormwater control in construction and operation
■ Onsite dust control measures
■ CDPHE approved technologies controlling operating emissions
COLORADO
LIBERTY
PIPELINE LLC
WELD COUNTY
COUNTY CRITERIA
Complies with applicable Weld County Codes
Understand Conditions of Approval outlined by Staff
■ Request exception from Landscape/Screening Plan
• Well permit expressly prohibits landscape irrigation
• Existing area terminals
• Screening is not feasible
■ Agree with all other Conditions of Approval
Understand and Agree to all Development Standards
RESPECTFULLY REQUEST RECOMMENDATION OF APPROVAL TO THE BOARD
OF COUNTY COMMISSIONERS �
COLORADO
LIBERTY
PIPELINE LLC
WELD COUNTY
REFEREAL RESPONSES AND AGENCY CONSULTATIONS
Closed
Platteville-Gi Ic rest Fire Protection District
West Neres Canal, Farmer's Reservoir and Irrigation Company (FRICO)
Weld County Office of Emergency Management
State of Colorado, Division of Water Resources
In Progress
• Weld County Department of Public Works
• Weld County Department of Public Health and Environment
COLORADO
RESPECTFULLY REQUEST RECOMMENDATION OF APPROVAL TO THE BOARD OF LIBERTY
COUNTY COMMISSIONERS
PIPELINE LLC
IW Mir
COLORADO
PIPELINE LLC
LIBERTY-PIPELINE.COM
—arr-Za_
- - -
Marne
— _
•
a
s-
irk `
a.-s=r
.l -,
Ian VI I ILIF.1.41i).
FY Fri 71
ip Iu;
on
(.�t•n2�ffai: !F
air
z
•
ffir
f
f
•
.T
r
I -
t4
_ r 7
0
a. liP
L
r
s
r
opi
s -
k.
4
41
• I:i
i
n
u
"3.
4- h ,. j'.
Hello