Loading...
HomeMy WebLinkAbout20203333.tiff EXEA110 SCHEDIO GROUP Exhibit 28. 1 Soils Report Preliminary Geotechnical Investigation — Keenesburg No. 2 Mine Prepared by CTL Thompson, Inc . and dated February 10, 2020 PROGRAM MANAGEMENT I ENGINEERING CONSULTING I SPECIAL DISTRICTS Exhibit 28 . 1 Page 1 of 49 CTLITHOMPSON INCORPORATED. PRELIMINARY GEOTECHNICAL AL INVESTIGATION COLORADO SAND COMPANY SAND PLANT KEENESBURG NO . 2 MINE WELD COUNTY, COLORADO Prepared For: SCHEDIO GROUP , LLC 808 9th Street Greeley , Colorado 80631 Attention : Timothy A. McCarthy Project No . FC08689- 125 February 10 , 2020 400 North Link Lane I Fort Collins, Colorado 80524 Telephone : 970-206-9455 Fax : 970-206-9441 Exhibit 28 . 1 Page 2 of 49 TABLE OF CONTENTS SCOPE I SUMMARY OF CONCLUSIONSI SITE DESCRIPTION AND PROPOSED CONSTRUCTION GEOLOGIC HARD 2 SUBSURFACE CONDITIONS 4 DEVELOPMENT RECOMMENDATIONS Site Grading 4 Utility Construction . . Preliminary Pavement Thicknesses CONSIDERATIONS FOR STRUCTURES Foundations Floor Systems and Slab-on-Grade Construction 7 Surface Drainage 7 General Design Considerations8 RECOMMENDED FUTURE INVESTIGATIONS AND TESTING9 LIMITATIONS9 FIGURE 1 - LOCATIONS OF EXPLORATORY BORINGS APPENDIX — SUMMARY LOGS F EXPLORATORY BORINGS APPENDIX B — LABORATORY TEST RESULTS Table B- 1 — Summary of Laboratory Test Results APPENDIX A — GUIDELINE SITE GRADING SPECIFICATIONS Exhibit 28 . 1 Page 3 of 49 SCOPE This report presents the results of our Preliminary Geotechnical Investigation for the Colorado Sand Company Sand Plant near Keenesburg , Colorado . We previously provided a Geotechnical Investigation at the site to identify the potential minable sand material . The purpose of the current investigation was to identify geologic hazards that may exist at the sand plant site and to evaluate the subsurface conditions to assist in planning and budgeting for the proposed development . The report includes description of subsoil , bedrock, and groundwater conditions found in our exploratory borings , and discussions of site development as influenced by geotechnical considerations . This report was prepared based upon our understanding of the development plans . The recommendations are considered preliminary and can be used as guidelines for further planning of development and design of grading . We should review final development and grading plans to determine if additional investigation is merited , or if we need to revise our recommendations . Additional investigations will be required to design building foundations and pavements . A summary of our findings and recommendations is presented below. More detailed discussions of the data , analysis and recommendations are presented in the report . SUMMARY OF CONCLUSIONS 1 . No geologic or geotechnical conditions were identified which would preclude development of this site . 2 . Soils encountered in our borings across the site generally consisted of loose to medium dense, interlayered clean to slightly clayey sand and clayey sand with occasional sandy clay . Topsoil depths measured from I to 4 inches in the borings during drilling . No bedrock was encountered during this investigation . 3 . Groundwater was encountered in eleven borings at depths of 5 to 27 feet . We recommend a minimum 3-foot, preferably 5-feet separation from floor 1 SCHEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 4 of 49 slabs and footing foundations to groundwater. 4 . Spread footing foundations are likely appropriate for structures at this site . 5 . The risk of poor slab-on-grade performance is likely to be low across the site . Slab-on -grade floors can be used 6 . Pavement subgrade at this site is non -expansive . Mitigation for swell is likely not necessary . Preliminary pavement thickness recommendations are provided in this report . 7 . Overall surface drainage should be designed to provide rapid run -off of surface water away from the proposed residences . Water should not be allowed to pond near the crest of slopes , on or adjacent to pavements , or adjacent to structures . All permanent slopes should be re-vegetated to reduce erosion . 8 . Further investigations are required to make design recommendations for foundations , floors , and pavements . SITE DESCRIPTION AND PROPOSED CONSTRUCTION The project area is located southeast of County Road 26 and County Road 59 in Weld County, Colorado . At the time of our investigation , the site was undeveloped . The site is relatively flat with ground cover consisting of grasses and weeds . We understand the proposed construction will consist of a sand mine and plant . The plant will be located in the northwest portion of the site near boring OR- 15 (see Figure 1 ) . The plant will include a dry and wet sand storage, equipment shop , maintenance building , quality control lab, supervisor office, mine office, water treatment building , electrical house, scale house, employee breakroom , and wet plant enclosure . GEOLOGIC HAZARDS Colorado is a challenging location to practice geotechnical engineering . The climate is relatively dry and the near-surface soils are typically dry and relatively stiff. These soils and related sedimentary bedrock formations tend to react to changes in 2 SCHEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 5 of 49 flit uu --tiu moisture conditions . Some of the soils swell as they increase in moisture and are called expansive soils . Other soils can settle significantly upon wetting and are referred to as collapsing soils . Most of the land available for development east of the Front Range is underlain by expansive clay or claystone bedrock near the surface . Laboratory tests on samples from this site show generally low swell potential . Areas of more expansive soil may be present . It is normal in the Front Range of Colorado and nearby eastern plains to measure radon gas in poorly ventilated spaces in contact with soil or bedrock . Radon 222 gas is considered a health hazard and is one of several radioactive products in the chain of the natural decay of uranium into stable lead . Radioactive nuclides are common in the soils and sedimentary rocks underlying the subject site . Because these sources exist , there is potential for radon gas accumulation in poorly ventilated spaces . The amount of soil gas that can accumulate is a function of many factors, including the radio-nuclide activity of the soil and bedrock, construction methods and materials , pathways for soil gas , and existence of poorly-ventilated accumulation areas . Typical mitigation methods consist of sealing soil gas entry areas and ventilation of below-grade spaces and perimeter drain systems ( if any) . Radon rarely accumulates to significant levels in above-grade spaces . The only reliable method to determine the concentration of radon is to perform testing after construction . FIELD AND LABORATORY INVESTIGATIONS Subsurface conditions were investigated by drilling 24 exploratory borings . The sand plant will be located near GR- 15 (see Figure 1 ) . The borings were drilled using a truck-mounted drill rig with 4 -inch diameter, continuous-flight augers . Our field representative observed drilling , logged the soils found in the borings and obtained samples . Summary logs of the subsurface conditions found in the borings and field penetration resistance values are presented in Appendix A. 3 SCHEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 6 of 49 Samples recovered from the borings were returned to our laboratory and visually classified by the geotechnical engineer for this project. Laboratory testing included moisture content , dry unit weight , direct shear, and particle-size analyses . Laboratory test results are presented in Appendix B and summarized in Table SUBSURFACE CONDITIONS Soils encountered in our borings generally consisted of loose to medium dense , interlayered clean to slightly clayey sand and clayey sand with occasional sandy clay . Topsoil depths measured from I to 4 inches in the borings during drilling . No bedrock was encountered during this investigation . Groundwater was encountered in eleven borings at depths of 5 to 27 feet . We recommend a minimum 3-foot , preferably 5-feet separation from floor slabs and footing foundations to groundwater. Further description of the subsurface conditions is provided on our boring logs and in our laboratory test results . DEVELOPMENT RECOMMENDATIONS Site Grading The properties of site grading fill will affect the performance of foundations , slabs -on-grade, utilities , and pavements . The ground surface in areas to be filled should be stripped of vegetation , scarified , moisture-conditioned , and densely compacted . The on-site soils can be used as site grading fill provided they are substantially free of organics and other deleterious materials . Permanent cut and fill slopes should be no steeper than 3 : 1 (horizontal to vertical ) and be seeded or mulched to reduce erosion . Use of flatter (4 : 1 ) slopes is preferable . Our experience has shown clay fill moisture treated to optimum moisture content or above will exhibit lower swell than drier material . Clay fill should be 4 SCHEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL T PROJECT NO. FC08689-128 Exhibit 28 . 1 Page 7 of 49 moisture-conditioned to between optimum and 3 percent above optimum moisture content and compacted to at least 95 percent of standard Proctor maximum dry density (ATM D 698 ) . Sand fill should be moisture-conditioned to within 2 percent of optimum moisture content . The placement and compaction of site grading fill should be observed and density tested by our representative during construction . Guideline grading specifications are presented in Appendix A. Permanent slopes should be terraced and re-vegetated to reduce erosion . Utility Construction We believe excavations for utility installation can be performed with heavy- duty trenchers, excavators , or large backhoes . Groundwater will likely be encountered in deep trenches . Bracing and/or temporary dewatering may be required during utility construction . Dewatering may be accomplished by sloping excavations to occasional sumps where water can be removed by pumping . The sumps should be several feet below the bottom of the excavations so that water is pumped down through the soils rather than up through the bottom of the excavations to reduce potential that the support capacity of the subsoils will be compromised . Utility trenches should be sloped or shored to meet local , state , and federal safety regulations . Excavation slopes specified by OSHA are dependent upon soil types and groundwater conditions encountered . Seepage and groundwater conditions in trenches may downgrade the soil type . Initial trench excavations may be unstable and require flatter slopes than required by OSHA. Contractors should identify the soils encountered in the excavations and refer to OSHA standards to determine appropriate slopes . Excavations deeper than 20 feet should be designed by a professional engineer. Water and sewer lines are usually constructed beneath paved roads . Compaction of trench backfill can have a significant effect on the life and 5 SCHEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 8 of 49 serviceability of pavements . Our experience indicates compacted trench backfill may settle 1 to 2 percent . More settlement may occur if wetting of the fill occurs . Trench backfill should be placed in thin loose lifts , moisture-conditioned and compacted as recommended in the Site Grading section of this report . The placement and compaction of backfill should be observed and tested by our firm during construction . Preliminary Pavement Thicknesses We judge the risk of pavement distress due to expansive soils is low at this site . Preliminary pavement thickness alternatives are presented in Table A below . These thicknesses should be used for planning purposes only . We recommend a subgrade investigation and final pavement design after site grading is complete . TABLE A PRELIMINARY PAVEMENT THICKNESS ALTERNATIVES Classification HMA* + ABC* PCC* Parking Areas 4 " HMA + 6" ABC 6" PCC Access Drives I Heavy 5" HMA + 6" ABC 6" PCC Traffic Areas * HMA = Hot Mix Asphalt; ABC = Aggregate Base Course ; PCC = Portland Cement Concrete CONSIDERATIONS FOR STRUCTURES The following discussion is preliminary and not intended for design or construction . After grading is completed , a design level geotechnical investigation should be conducted which provides recommendations and design criteria for the planned construction . 6 SCHEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 9 of 49 IJ u ■ Foundations Subsurface conditions encountered in our borings were relatively consistent . We judge that spread footing foundations are likely appropriate for structures at this site . A design-level geotechnical investigation is necessary to provide more detailed foundation recommendations . We recommend a minimum 3-foot (preferably 5-foot) separation from foundation excavations to groundwater. Floor Systems and Slab-on-Grade construction Soils encountered in our borings were generally low-swelling or non- expansive . The risk of poor slab-on -grade performance due to soil conditions at this site is likely low . Slab-on -grade floors may still experience some movements . Structurally supported floors can be considered in order to minimize movements and associated distress to floor systems . Surface Drainage The performance of improvements will be influenced by surface drainage . The ground surface around proposed structures should be shaped to provide runoff of surface water away from the structure and off of pavements . We generally recommend slopes of at least 12 inches in the first 10 feet where practical in the landscaping areas surrounding structures . There are practical limitations on achieving these slopes . Irrigation should be minimized to control wetting . Roof downspouts should discharge beyond the limits of backfill , Water should not be allowed to pond on or adjacent to pavements . Proper control of surface runoff is also important to limit the erosion of surface soils . Sheet flow should not be directed over unprotected slopes . Water should not be allowed to pond at the crest of slopes. Permanent slopes should be re-vegetated to reduce erosion . 7 SCHEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL T PROJECT NO. FC08689-128 Exhibit 28 . 1 Page 10 of 49 Water can follow poorly compacted fill behind curb and gutter and in utility trenches . This water can soften fill and undermine the performance of the roadways , flatwork, and foundations . We recommend compactive effort be used in placement of all fill . General Design Considerations Exterior sidewalks and pavements supported above the on -site soils are subject to post construction movement . Flat grades should be avoided to prevent possible ponding , particularly next to the building due to soil movement . Positive grades away from the buildings should be used for sidewalks and flatwork around the perimeter of the buildings in order to reduce the possibility of lifting of this flatwork, resulting in ponding next to the structures . Joints next to buildings should be thoroughly sealed to prevent the infiltration of surface water . Where concrete pavement is used , joints should also be sealed to reduce the infiltration of water. Since some post construction movement of pavement and flatwork may occur, joints around the buildings should be periodically observed and resealed where necessary . Roof drains should be discharged well away from the structures , preferably by closed pipe systems . Where roof drains are allowed to discharge on concrete flatwork or pavement areas next to the structures , care should be taken to insure the area is as water tight as practical to eliminate the infiltration of this water next to structures . Investigations in nearby areas have encountered areas of shallow groundwater and heavily cemented sand and gravel (caliche) . Shallow groundwater may limit basement depths preclude basement construction , and caliche may present difficulties during excavations and could require ripping and/or blasting . 8 SCHEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 11 of 49 Based on information from our borings , we judge that shallow groundwater and caliche are unlikely to affect residence construction over most or all of the site . RECOMMENDED FUTURE INVESTIGATIONS AND TESTING Based on the results of this investigation and the proposed development , we recommend our firm perform the following investigations : 1 . Review of site grading plans once the plans are available; 2 . Design -level Soils and Foundation Investigation after grading ; and 3 . Construction testing and observation during site development , and building construction , including compaction testing of grading fill , utility trench backfill and pavements, and foundation installation observations . LIMITATIONS This report has been prepared for the exclusive use of Schedio Group , LLC for the purpose of providing geotechnical design and construction criteria for the proposed project . The information and conclusions presented herein are based upon consideration of many factors including , but not limited to, the type of development proposed , the geologic setting , and the subsurface conditions encountered . The information contained in the report are not valid for use by others . Standards of practice evolve in the area of geotechnical engineering . The information provided is appropriate for about five years . If the development of the site does not occur within five years, we should be contacted to determine if we should update this report. Twenty-four borings were drilled during this investigation to obtain a reasonably accurate picture of the subsurface conditions . Variations in the subsurface conditions not indicated by our borings are possible . We believe this investigation was conducted with that level of skill and care ordinarily used by 9 SCHEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL T PROJECT NO. FC08689-128 Exhibit 28 . 1 Page 12 of 49 geotechnical engineers practicing in this area at this time . No warranty , express or implied , is made . If we can be of further service in discussing the contents of this report or in the analysis of the influence of subsurface conditions on design of the structures , please call . Very truly yours , ,�-- 00 Q"% CTL I THOMPSON , I ' ? ,Fret: . ' %i' it%tea .0 % /At spli, oe, : 4, jrtt I " J o y i P f OM rift/4 IP TAO/ ik W- at4 ' a. Spencer Schram , P " ffr % i : a Alitt4 ..�.r Geotechnical ica l Department Ma �`. - r 10 SCHEDIO GROUP, LLC CSP SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 13 of 49 r1 iCR 26 (f SITE w-► LEGEND : GR- 15 INDICATES APPROXIMATE WCR2o • LOCATION OF EXPLORATORY BORING .er.•••n •n (-9,10 2-3% INDICATES APPROXIMATE SLOPE VICINITY MAP ;, DIRECTION AND GRADE (%) (KEEN ESBURC, COLORADO AREA) 4) NOT TO SCALE 7 a West County Road 26 �,r. Property Lines Dry Sand Storage Building 'stir• Mobile Equipment Shop J frit Iii,A., t tt, W e * to n iii, ... gil. . g•.• iii, 2-3% Electrical House- ,'. ... _ Wet Sand Storage & Decant Scale House 3.� . 'A f g _s_...--9.. - .: 41, - Building *etT sea* is _ease O IF Ali � i —4c"'' Y ilow fibi -� i _-e . " A' i R 15 4F4 y • ;* 111* Maintenance Building ca Em to ee; . :. ` • +r . • .� ilsoe ` Win ► e S ellia eypeyCrai ` ek0eia IL el �' iiIii:it rilll s ; i'�U � � t#_ :Lc +��r tle le;+�� is41. 'tar ?far *lit*;O'er 1--It i , sit s —7= 4-Lr.=_ ..5_ e3., e Pi _ __ _ _ , ,..,. 4,4 tripi. a r..iVAR "SOS 'V�►I�� CCCC�*1YY' I'OCCCCCC��iiiifffff � Quality Control Lab :elk ie :. .� e S.. .. 0. Supervisor of cece # IV,. el v \i=---.4 0404 Mine Office - #�- . �� �I -�`� SCALE : 1 - 400 MI V; a; - _ . d 0' 200' 400' *fir • . 1 4 t i Approximate Location otk ifroativotoot„.....41 of Water Lines rx� }# . .,..; , '� `- . r Water Treatment be sake t '!4 YET Y�T`�iT TYf Wet Plant Enclosure I SCHEDIO GROUP, LLC Locations of Profile Pits COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC09205-132 FIGURE 1 Exhibit 28 . 1 Page 14 of 49 APPENDIX A SUMMARY LOGS OF EXPLORATORY BORINGS Exhibit 28 . 1 Page 15 of 49 GR- 15 GR- 16 GR- 17 GR- 18 GR- 19 • . • ;• . . ... ... •. / . • . . • . • . . • . • ee .. . . . • . • • . . .• . . . • / . . . . . . . . . .. . . . . . • . • • • . . i. • . . • . . • 16/12 .. ..• 7/ 12 � 7/ 12 6/ 12 • ••' 8/ 12 ar• c=8. . • � . . . . ' • •' � • ' � WC=3.2 5 ' • r DD=112 • . • • • ' -200=6 5 • • • . • ••' 6/ 12 24112 .' • . 19/ 12 -110/12 111 /12 • ' •' ' • ( we=1 .9 • . . . WC=4.9 • ' •' WC=3.5 • ' 10 • . oa15=20 • DD 1a ' ' -200=6 • ' 10 • . . er. • . . . . . .• . . . . • . 4". . . . . .. . . . . .. . • • . • • • . . . . . . . • i ..4. •. , • • • ••' 15/12 '•• • .. 23/12 - •• 5/ 15/12 ••' 23/12 • •' 13/12 15 • . j WC=3.8 ' • [ ' . [ ' •' [ WC= .9 -200=4 ;le.' ; • • ' -200=4 15 • f '•• . '.• e 19/12 27/12 22/12117/12 ft • , 116/12 ' • ( WC=20.7 • ' • [ WC=7.4 • ' •' � WC=5.0 • ' , i 20 �`� r`• DD=106 • ' DD=112 • • • ' -200=8 . • ' 20 i I- , • ' -200=40 • • -200=11 .• . .• . • I- w e ..' ..' • ' w "L • • ' .. . im* ?15/12 i 113/12 28/12 • 33/12 ••' 18112 25 I` I : . 25 0.1 22/12 +� /15/12 - 10/12 5 114/12 • •'� 10/12 ta1 30 35 35 40 40 Summary Logs of Exploratory Borings SCNEDIO GROUP, LLC FIGURE A- 1 COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 23 . 1 Page 16 of 49 GR-20 GR-21 GR-22 GR-23 GR-24 . . � : ..: : : . .• • 7112 •' • 18112 /' 111 /12 10112 9112 •• � WC=3.5 [ WC=8.2 . 5 • . S . -200=4 • . Do=112 5 .• . .• . • -200=23 ,/r • •• •••• 6/ 12 • / ; 111 /12 . 18/12 .' 28112 • ' 115/12 I we=22.9 . • .• 'we=1 7.9 [ WC=6.3 10 •S . • . • . • . - DD=1a5 .• -2aa=� DD=1a8 10 .: : • .: : • -200=20 :'. -200=9 1 s...." 18112 -....1 24/12 j .4/ 18112 - 1 12112 " 26/12 S . [ rC=6.4 . [ WC=5.5 [ ' . [ WC=9.1 • • p 15 DD=11a �• -2aa=14 / �• -2aa=13 /• 15 . • / -200=20 • •r /, • •r • / w ' • 24112 ' • 50112 '•• ) 18112 ' • 9/12 9112 w ' +' ' [ ' ' [ WC=19.6 ' • [ [ WC=24.4 _ 20 ,,� ,,; -200= 4 49'` DD=1a2 20 w •� � • • I •� /' -2aa=86 w w / . / w Ie. • A. es • . • • es . : 7 / e / ' ' '' •4 / / 18112 ' • : 37112 , 120/12 ' • ' 18112 +� 9112 25 I -t - -_I 25 I / : , • H / S . / •. , 4, /` 5 , / 111 /12 4, i 20/12 1 ' . 13/12 30 - 30 35 35 40 40 Summary Logs of Exploratory Borings SCNEDIO GROUP, LLC FIGURE A-2 COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 17 of 49 GR-25 GR-26 GR-27 GR-29 GR-31 0 -Tr. .;!' 6 . . ,."..) i.0e.•..40; • 16/ 12 8/ 12 17/ 12 .' • �''� 12112 .' • 19/ 12 • • i WC=3.9 • '. [ WC=8.5 . • WC= .6 ►► ' • [ WC=3.6 • [ WC=6.4 5 . • . -200=5 20 =1 . . -200=5 . . .; DDa108 . DD=110 5 . • � . -200=24 -200= 16 s • st se. , se , . • • e• • or• • . • . . . _ ire .9/ 12 . . /' 18f12 • • 12112 17112 .40A11 { 112 • . ei• .• ..• [ [ WC=5.7 . • ' • ( ( • WC=5.0 f • • WC=5.8 10 DD=107 DD=103 . DD=103 10 . . . -200=20 ,. -200=47 .' -200=28 .▪ • . e• • es • i • i . . .• .•'. . • e. .•• . .. .," . . . . of,. . . . . i. . • . . i. . . . . . .. . -... -4i ei• .. ei• .. .▪ • . '• . • • , • • , • /' 18112 '.'• "''� 12112 :01."."7119/12 • /' 37112 • /' 32112 • [ WC=6.3 ( WC=11 .6 15 ;te -200=j1 / DD=10 -t - "'t ! 15 • • /' . -200=20 e .. t .. . . • 4 ' . / ,`. • . .w LE 3€ 112 ' . 21112 •` ' 32112 w .' _I WC=23.0 DD=105 20 w . • / / w C / •• / O / 11112 ,e 23112 25 —_I -dt._i 25 30 30 35 35 40 40 Summary Logs of Exploratory Borings SCNEDIO GROUP, LLC FIGURE A-3 COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 18 of 49 LEGEND : GR-34 GR-35 GR- 37 GR-38 GR-39 GR-40 GR-41 TOPSOIL : SAND , CLAYEY, WITH ORGANIC MATTER, DARK BROWN , BROWN (SC) lip . •1 • ,.. .▪ •' • . •'• . .. ' • , �j. SAND, CLAYEY, MOIST TO WET, LOOSE TO VERY DENSE, BROWN , LIGHT BROWN, RUST (SC) et ./. ' • . . SAND, CLEAN TO SLIGHTLY CLAYEY, MOIST TO WET, LOOSE TO DENSE, BROWN, LIGHT �I5/1216/12 7/12 4/ 12 9/12 '� - 10/ 12 9/ 12 • • BROWN, RUST (SP, SP-SC) ▪ • • J WC=3.6 I WC=3.6 WC=4.3 7 I 7 e WC=9.6 • 5 -200=8 -200=4 DD=98 - - i. DD=113 5 -200=4 -200= 19 .• / CLAY, SANDY, MOIST TO WET, STIFF TO VERY STIFF, BROWN , LIGHT BROWN, GRAY (CL) . + / ,• . e • . # .. / DRIVE SAMPLE . THE SYMBOL 5/ 12 INDICATES 5 BLOWS OF A 140-POUND HAMMER �±' 18112 25/12 9/12 7/ 12 10/ 12 8/ 12 ;it 16/12 10 • I DD=112 1 • . .' DD=08 I WDDC=19.6 �t I WDC=23.7 I p�1�$3 10 FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2 .5- INCH O . D . SAMPLER 12 INCHES . • J' • . • -200=11 • • . • . -200=11 • . -200=5 -200=90 -200=39 e / / DRIVE SAMPLE. THE SYMBOL 5/12 INDICATES 5 BLOWS OF A 140-POUND HAMMER •' . FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2.0-INCH O. D . SAMPLER 12 INCHES . 22/12 / 22/12 x'10 24/12 - I 8/ 12 114/ 12 9/ 12 15 ?t. .I WC=9.4D : • I WC= 12.3 � WC=16.7 l ' • . -200=41 • / ' -00=15 i -0169 V WATER LEVEL MEASURED AT TIME OF / , p • .▪ • / - DRILLING. • I ▪ / i p: l, p: .• 1 oe • / w '"� '� ' +'� �" w ft / 29/12 20/12 / 18/12 8/ 12 20 / '! a1-200=18 1 / �/ I 20 = 7 '� � / � NOTES: { / 110/12 t] 14/12 12/ 12 1 . THE BORINGS WERE DRILLED ON DECEMBER 10, 11 AND 12, 2018 AND JANUARY 7, 2019 25 �+ / // '- 25 USING 6-INCH DIAMETER HOLLOW-STEM AUGERS , 4- INCH DIAMETER SOLID -STEM AUGERS e / / AND A TRUCK-MOUNTED DRILL RIG . 1 P `, / / 2 . WC - INDICATES MOISTURE CONTENT (% ) . DD - INDICATES DRY DENSITY (PCF) . 10112 / / 19/12 SW - INDICATES SWELL WHEN WETTED UNDER OVERBURDEN PRESSURE (°/a ) . �� -200 - INDICATES PASSING NO. 200 SIEVE (% ) . 3 � 30 LL - INDICATES LIQUID LIMIT. PI - INDICATES PLASTICITY INDEX. UC - INDICATES UNCONFINED COMPRESSIVE STRENGTH (PSF) . SS - INDICATES SOLUBLE SULFATE CONTENT (% ) . 35 35 40 40 Summary Logs of Exploratory Borings SCNEDIO GROUP, LLC COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 FIGURE A-4 Exhibit 28 . 1 Page 19 of 49 a. APPENDIX B LABORATORY TEST RESULTS Exhibit 28 . 1 Page 20 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 MITI. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 1 ,x'2" 3" 5" 6" 8" 100 _ 0 I I I I 90 I l 10 80 I I 20 I I a O70 I ► 30 <60 I I 40 w I I � E50 50 E 0-40 .. 60 o_ 30 70 I � 20 I ► 80 10 90 - 100 0 II III I I I I I I III ! I I I I I I till I I I I I I t I I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , CLAYEY (SC ) GRAVEL 0 % SAND 86 °,%o From GR - 15 AT 4 FEET SILT & CLAY 14 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MII''•1. 1 MITI. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 I I 90 I I -' 10 I I I I 80 I 20 (70 I I 30 w I I <60 I 40 w IZ I I 5050 E w _. 0 I 60 a I I I I 30 I I 70 20 I i 80 I I 10 I I I I90 10o 0 II I II I I I I I I I I 1 I I I I I I I I I I I I I 001 0 002 005 -009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT (NON-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND ( SP ) GRAVEL ( % SAND 96 % From GR - 15 AT 14 FEET SILT & CLAY 4 % LIQUID LIMIT PLASTICITY INDEX SCHEDIO GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT GTL I T PROJECT NO . FC08689-125 Test Results FIGURE E- 1 Exhibit 28 . 1 Page 21 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 11x'2" 3" 5" 6" 8" 100 0 90 I l 10 80 I 20 o O70 I ► 30 <60 40 w E5° �. 50 E 1140 60 o_ 30 i I 70 20 I 80 10 90 - 100 0 II III I I I I I I III ! I I I I I I till I I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample ot SAND , CLAYEY (SC ) GRAVEL 0 % SAND 80 °,%o From GR - 16 AT 9 FEET SILT & CLAY 20 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MIN. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 *40 *30 *16 ¢10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 0 I I 90 I -' 10 1 I I I 80 ► 20 I I (70 I I 30 w I I <60 I 40 I I 50 I I 50 E w H. I 60 a I I I I 30 I 70 20 I 80 I I 10 I I 90 I I - 100 0 II III I I I I I I I I 1 I I I I I I I I I I I I I 001 0 002 005 009 . 019 037 .074 . 149 .297 . 590 1 19 2.0 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 60 % From GR - 16 AT 19 FEET SILT & CLAY 40 % LIQUID LIMIT PLASTICITY INDEX SCHEDIO GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT GTL I T PROJECT NO . FC08689-125 Test Results FIGURE B-2 Exhibit 28 . 1 Page 22 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 MITI. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 - 0 I I 90 I l 10 80 I 20 I I a O70 I ► 30 I c <60 I I 40 w I I E50 50 E 0-40 .. 60 o_ 30 i I 70 I � 20 I I 80 I ► 9 10 0 - 100 0 II III I I I I I I III ! I I I I I I till I I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FEE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 91 °,%o From GR - 17 AT 9 FEET SILT & CLAY 9 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MII''•1. 1 MITI. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 I I 90 I I -' 10 1 I I 80 20 (70 I I 30 w I I <60 ' I 40 w 0_ I I 50 I I 50 E w H. I 60 a I I I I 30 I I 70 20 I i 80 I I 90 10 I I I I - 100 0 II III I I I I I I I I 1 I I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT (NON-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 89 % From GR - 17 AT 19 FEET SILT & CLAY 11 % LIQUID LIMIT °!"o PLASTICITY INDEX % SCHEDIO GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT GTL I T PROJECT NO . FC08689-125 Test Results FIGURE B-3 Exhibit 28 . 1 Page 23 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 ME . 19 MITI. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 11x'2" 3" 5" 6" 8" 100 - 0 I I 90 I 1 10 I I 80 I 20 I I a O70 I ► 30 <60 I I 40 w I I � E50 50 E D-4a 60 o_ 30 H I 70 l 20 ► 80 ►10 - 100 0 II III I I I I I I III ! I I I I I I till I I I I I I t I I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) ENE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 94 °,%o From GR - 18 AT 9 FEET SILT & CLAY 6 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MINI. 60 MITI. 19 MIN . 4 MII''•1. 1 MITI. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I 0 I I 90 I I -' 10 I I I 80 ► I 20 (70 I 30 w I I <60 I 40 w IZ I I 50 I I 50 E lel 0 I 60 a I I I I 30 I I 70 20 I i 80 I I 90 10 I I I I - 100 0 II III I I I I I I I I 1 I I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT (NON-PLASTIC) I TINE MEDIUM COARSE HUE I COARSE COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 92 % From GR - 18 AT 19 FEET SILT & CLAY 8 % LIQUID LIMIT PLASTICITY INDEX SCHEDIO GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT GTL I T PROJECT NO . FC08689-125 Test Results FIGURE B-4 Exhibit 28 . 1 Page 24 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN- *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 I I I I 90 I l 10 80 I 20 I I a O70 I ► 30 <60 I I 40 w I I E50 50 E 0-40 .. 60 o_ 30 70 I � 20 I I 80 I ►10 90 I ► - 100 0 II III I I I I I I III ! I I I , I I till I I I I I I t I I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FEE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 94 °/o From GR - 19 AT 4 FEET SILT & CLAY 6 % LIQUID LIMIT PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 I I 90 I -' 10 1 I I 80 20 I I (70 I 30 w I I <60 I 40 w IZ I I 5050 w w _. 0 I 60 a I I I I 30 I I 70 20 I i 80 I I 90 10 I I I I 10o 0 II III I 001 0 002 005 -009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND ( SP ) GRAVEL ( % SAND 96 % From GR - 19 AT 14 FEET SILT & CLAY 4 % LIQUID LIMIT PLASTICITY INDEX SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B-5 Exhibit 28 . 1 Page 25 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 1 ,x'2" 3" 5" 6" 8" 100 0 I ► 90 I l 10 80 ► ► 20 o O70 ► 30 <60 ► ► 40 w E50 I 50 E 0-40 .. 60 o_ 30 i I 70 20 80 10 90 I ► 100 0 II III I I I I I I III ! I I 11 I I till I I I I I I t I I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample ot SAND (SP ) GRAVEL 0 % SAND 96 °,%o From GR - 20 AT 4 FEET SILT & CLAY 4 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MIN. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I 1 0 I I 90 ► I -' 10 80 ► 20 I I (70 I I 30 w I I <60 I 40 I I 50 ► I 50 E lel 0 I 60 a I I I I 30 I ► 70 20 ► i 80 I I 10 I I 90 I I - 100 0 II III I I I I I I I I 1 I I I I I I I I I I I I I 001 0 002 005 -009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 80 % From GR - 20 AT 14 FEET SILT & CLAY 20 % LIQUID LIMIT PLASTICITY INDEX % SCHEDIC GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B-6 Exhibit 28 . 1 Page 26 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 11x'2" 3" 5" 6" 8" 100 0 I , 90 l 10 80 ► ► 20 o O70 I ► 30 w <60 ► ► 40 w E50 I 50 E wLu 1. . 0-40 .. 60 o_ 30 i I 70 20 ► 80 10 90 ::. ► 1. _ - 100 0 II III I I I I I I III ! I I 11 I I till ► I I I I I t I I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , CLAYEY (SC ) GRAVEL 0 % SAND 77 °,%o From GR - 21 AT 4 FEET SILT & CLAY 23 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 , I 90 ► I -' 10 ► I I I 80 20 ► I (70 ► I 30 w <60 ' I 40 w 0_ ► I 50 ► I 50 E lel 0 I 60 a I I I I 30 I ► 70 20 I i 80 I I 10 I I 90 ► I - 100 0 II III I I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 -009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 86 % From GR - 21 AT 14 FEET SILT & CLAY 14 % LIQUID LIMIT PLASTICITY INDEX SCHEDIC GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE E-7 Exhibit 28 . 1 Page 27 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 MITI. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 I I 90 I l 10 80 I 20 I I a O70 I ► 30 I c <60 I I 40 w I I � E50 50 E 0-40 .. 60 o_ 30 i I 70 I � 20 I ► 80 10 90 - 100 0 II III I I I I I I III ! I I I I I I till I I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , CLAYEY (SC ) GRAVEL 0 % SAND 80 °,%o From GR - 22 AT 9 FEET SILT & CLAY 20 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MIN. 60 MINI. 19 MIN . 4 MII''•1. 1 MITI. *200 `100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I 0 I I 90 I I -' 10 1 I I I 80 ► 20 I I (70 I I 30 w <60 ' I 40 w 0_ I I 50 I I 50 E w H. I 60 a I I I I 30 I I 70 20 I 80 I I 10 I I 90 I I - 100 0 II III I I I I I I I I 1 I I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT (NON-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 66 % From GR - 22 AT 19 FEET SILT & CLAY 34 % LIQUID LIMIT PLASTICITY INDEX SCHEDIC GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE E-8 Exhibit 28 . 1 Page 28 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN_ *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 I ► I , 90 I l 10 80 ► 20 I ► I ► a O70 I ► 30 <60 I I 40 w I ► E50 I 50 E 0-40 .. 60 o_ 30 I ► 70 I � 20 ► 80 I ►10 90I ► - 100 0 II III I I I I I I III ! I I 11 I I till ► I I I I I t I I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FEE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 93 °,%o From GR - 23 AT 9 FEET SILT & CLAY 7 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 I I 90 I -' 10 I I I I 80 ► 20 I I (70 I I 30 w (To cn 0° 40 u I I w 50 I I 50 E w H. I 60 a I I I I 30 I ► 70 20 I i 80 I I 10 I I ► I - 100 0 II III I I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 -009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL ( % SAND 87 % From GR - 23 AT 14 FEET SILT & CLAY 13 % LIQUID LIMIT PLASTICITY INDEX SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B-9 Exhibit 28 . 1 Page 29 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 11x'2" 3" 5" 6" 8" 100 0 I ► 90 I l 10 I I 80 I ► 20 I I a X70 I ► 30on <60 i ► 40 w I I � E50 50 E Lu X40 I ► 60 Lu 30 I ► 70 I � 20 ► ► 80 I ►10 90I ► -- 100 0 II III I I I I I I I I I I I I I I I I till I I I I I I t I I I I I I I I I I .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FPI'JE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 91 °,%o From GR - 24 AT 9 FEET SILT & CLAY 9 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MIN. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 314" 1 'V2" 3" 5" 6" 8" 100 I 0 90 I I -' 10 80 ► 20 I I (2.70 I I 30 w <60 I 40 w IZ I I CC 50 ► I 50 E 0 ' I 60 a I I I I 30 I I 70 20 I i 80 I I 90 10 I I I ' . 100 0 II III I I I I I I I I 1 I I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I 1-FNE MEDIUM COARSE FINE I COARSE COBBLES Sample of CLAY , SANDY ( CL ) GRAVEL 0 % SAND 14 % From GR - 24 AT 19 FEET SILT & CLAY 86 % LIQUID LIMIT PLASTICITY INDEX SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 10 Exhibit 28 . 1 Page 30 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 I I I , 90 I l 10 I I 80 20 I I I a O70 I ► 30 c <60 I 40 w I I E50 I 50 E 1140 .. 60 o_ 30 H I 70 � 20 80 ►10 - 100 0 II III I I I I I I III ! I I 11 I I till I I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FEE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 95 °,%o From GR - 25 AT 4 FEET SILT & CLAY 5 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MII'L. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 90 T I _. 10 1 I I I 80 ► 20 I I (70 I I 30 w I I <60 I 40 w IZ I I 50 I I 50 E lel 0 I 60 a I I I I 30 I , 70 20 I i 80 I I 90 10 I I I I - 100 0 II III I I I I I IIIII I 1 I I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 . 149 .297 . 590 1 19 2.0 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 69 % From GR - 25 AT 14 FEET SILT & CLAY 31 % LIQUID LIMIT °!"o PLASTICITY INDEX % SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 11 Exhibit 28 . 1 Page 31 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 MITI. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 ► 90 10 80 ► ► 20 o O70 i ► 30 c <60 ► ► 40 w E50 , 1. 50 E 0-40 60 o_ 30 i I 70 20 ► 80 10 90 ::. ► ,. _ - 100 0 II III I I I I I I III ! I I I , I I till ► I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , CLAYEY (SC ) GRAVEL 0 % SAND 85 °,%o From GR - 26 AT 4 FEET SILT & CLAY 15 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MII''•1. 1 MITI. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 90 ► I -' 10 I 80 ► 20 ► (70 ► ► 30 w <60 ' ' 40 w 0_ 50 ► 50 E lel 0 ' 60 a ► ► 30 I ► 70 20 ► 80 10 90 ► ► - 100 0 II I III I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 -009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT (NON-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 80 % From GR - 26 AT 9 FEET SILT & CLAY 20 % LIQUID LIMIT PLASTICITY INDEX % SCHEDIC GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 12 Exhibit 28 . 1 Page 32 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 I I I , 90 I l 10 80 20 I I a O70 I ► 30 <60 I 40 w I I � E50 I 50 E I I 0-40 .. 60 o_ 30 H I 70 � 20 80 ►10 - 100 0 II III I I I I I I III ! I I I I I I till I I I I I I t I I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample Cif SAND (SP ) GRAVEL 0 % SAND 95 °,%o From GR - 27 AT 4 FEET SILT & CLAY 5 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 90 I I -' 10 I I 80 ► 20 I I (70 I I 30 w I I <60 I 40 w IZ I I 50 I I 50 E lel 0 I 60 a I I I I 30 I I 70 20 I i 80 I I 10 I I 90 I I - 100 0 II III I I I I I I I I 1 I I I I I I I I I I I I I 001 0 002 005 -009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 80 % From GR - 27 AT 14 FEET SILT & CLAY 20 % LIQUID LIMIT PLASTICITY INDEX % SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 13 Exhibit 28 . 1 Page 33 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 ME . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 90 I l 10 80 I ► 20 o O70 I ► 30 <60 ► I 40 w E50 ► 1. 50 E 1140 60 o_ 30 70 20 ► I 80 10 90 ::. ► 1. _ - 100 0 II III I I I I I I III ! I I 11 I I till ► I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , CLAYEY (SC ) GRAVEL 0 % SAND 76 °,%o From GR - 29 AT 4 FEET SILT & CLAY 24 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MIN. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I 0 f I 90 ► I -' 10 1 I ► I 80 ► I 20 I I (70 1 I 30 w <60 I 40 w ► I 1Y 50 ► I 50 E w _. 0 I 60 a I I I I 30 I I 70 20 I i 80 I I 10 I I 90 ► I . 100 0 II III I I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 53 % From GR - 29 AT 9 FEET SILT & CLAY 47 % LIQUID LIMIT PLASTICITY INDEX SCHEDIC GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 14 Exhibit 28 . 1 Page 34 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 I I 90 I 1 10 80 1 ► 20 I ► I ► a O70 I ► 30 <60 I I 40 w I ► � E50 50 E 0-40 .. 60 o_ 30 I ► 70 I l 20 ► I 80 10 90 - 100 0 II III I I I I I I I I I I I I I , I I till ► I I I I I t I I I I I I I I I I .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , CLAYEY (SC ) GRAVEL 0 % SAND 84 °,%o From GR - 31 AT 4 FEET SILT & CLAY 16 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MIN. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIPIL *200 `100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 90 ► I -' 10 I I 80 ► 20 I I (70 I I 30 w <60 I 40 w IZ I I 50 I I 50 E w H. I 60 a I I I I 30 I ► 70 20 I i 80 I I 10 I I 90 ► I . 100 0 II III I I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 _009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 72 % From GR - 31 AT 9 FEET SILT & CLAY 28 % LIQUID LIMIT PLASTICITY INDEX /o SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 15 Exhibit 28 . 1 Page 35 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 - 0 I I 90 I l 10 80 20 I , a O70 I ► 30 <60 I 40 w I , � E50 I 50 E I I 0-40 .. 60 o_ 30 70 I � 20 I 80 I ►10 90 - 100 0 II III I I I I I I III ! I I I , I I till I I I I I I t I I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FEE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 92 °,%o From GR - 34 AT 4 FEET SILT & CLAY 8 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MINI. 19 MIN . 4 MII`'•1. 1 MIN. *200 `100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I 0 I I 90 I -' 10 1 I I I 80 ► I 20 I I (70 I I 30 w <60 I 40 w IZ I I 50 I I 50 w lel 0 I 60 a I I I I 30 I I 70 20 I i 80 I I 90 10 I I I - 100 0 II III I I I I I I I I 1 I I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL ( % SAND 59 % From GR - 34 AT 14 FEET SILT & CLAY 41 % LIQUID LIMIT °!"o PLASTICITY INDEX % SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 16 Exhibit 28 . 1 Page 36 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 11x'2" 3" 5" 6" 8" 100 0 I ► I I 90 I l 10 I I 80 ► ► 20 I ► a O70 I ► 30 <60 I I 40 w I ► � E50 ► 50 E 0-40 .. 60 o_ 30 H ► 70 � 20 ► 80 ►10 - 100 0 II III I I I I I I III ! I I 11 I I till ► I I I I I t I I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FEE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 89 °,%o From GR - 35 AT 9 FEET SILT & CLAY 11 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 I I 90 ► I -' 10 I I 80 ► I 20 I I (70 I I 30 w <60 I 40 w IZ I I 50 I I 50 E w H. I 60 a I I I I 30 I ► 70 20 I i 80 I I 10 I I 90 I I - 100 0 II III I I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 _009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 82 % From GR - 35 AT 19 FEET SILT & CLAY 18 % LIQUID LIMIT PLASTICITY INDEX SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 17 Exhibit 28 . 1 Page 37 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 ME . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 I ► I I 90 I l 10 80 ► 20 I ► I ► a O70 I ► 30 <60 I I 40 w I ► � E50 ► 50 E D-40 60 o_ 30 70 I � 20 I ► 80 10 90 I ► I ► 100 0 II III I I I I I I III ! I I I I I I till ► I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample Cif SAND (SP ) GRAVEL 0 % SAND 96 %° From GR - 37 AT 4 FEET SILT & CLAY 4 % LIQUID LIMIT %a PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MIN. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 I I 90 I -' 10 1 I I I 80 ► 20 I I (70 I I 30 w <60 ' I 40 w 0_ I I 50 I I 50 E w H. I 60 a I I I I 30 I ► 70 20 I i 80 I I 10 I I 90 ► I . 100 0 II III I I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 -009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 0 % SAND 85 % From GR - 37 AT 14 FEET SILT & CLAY 15 % LIQUID LIMIT PLASTICITY INDEX %o SCHEDIC GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 18 Exhibit 28 . 1 Page 38 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 MITI. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 I ► I , 90 I l 10 80 ► 20 I ► a O70 I ► 30 <60 I ► 40 w I ► � E50 I 50 E 0-40 .. 60 o_ 30 i I 70 I � 20 I ► 80 10 90 I ► I ► 100 0 II III I I I I I I III ! I I I I I I till ► I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample Cif SAND (SP ) GRAVEL 0 % SAND 96 °,%o From GR - 38 AT 4 FEET SILT & CLAY 4 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MII''•1. 1 MITI. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 I I 90 ► I -' 10 I I 80 ► 20 I I (70 I I 30 w <60 I 40 w IZ I I 50 I I 50 E 0 ' I 60 a I I I I 30 I ► 70 20 I i 80 I I 10 I I 90 ► I - 100 0 II III I I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT (NON-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 89 % From GR - 38 AT 9 FEET SILT & CLAY 11 % LIQUID LIMIT °!"o PLASTICITY INDEX % SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B- 19 Exhibit 28 . 1 Page 39 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 MITI. 4 MIN. 1 MIN- *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 I I 90 I l 10 80 I ► 20 I ► o O70 I ► 30 <60 ► 40 w E50 ► 50 E D-40 .. 60 o_ 30 i I 70 I � 20 ► 80 I ► I ►10 90I ► ::. ► 1. _ - 100 0 II III I I I I I I III ! I I 11 I I till ► I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample ot SAND (SP ) GRAVEL 0 % SAND 95 0/0 From GR - 39 AT 9 FEET SILT & CLAY 5 % LIQUID LIMIT %a PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MII''•1. 1 MITI. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I 0 I. I 90 ► I -' 10 I I I I 80 ► 20 ► I (70 ► I 30 w (To cn 0° 40 ~I I w � I � 50 I 50 E lel 0 I 60 a I I I I 30 ► ► 70 20 I i 80 I I 10 ► I 90 - 100 0 II III I I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 . 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT (NON-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , SLIGHTLY CLAYEY (SP-SC ) GRAVEL 0 % SAND 94 % From GR - 39 AT 14 FEET SILT & CLAY 6 % LIQUID LIMIT % PLASTICITY INDEX %o SCHEDIC GROUP . LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B-20 Exhibit 28 . 1 Page 40 of 49 HYDROMETER ANALYSIS SIEVE ANALYSIS {R HR TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 4stMl 1_ 15 MIN 60 MIN . 19 Mlii. 4 MIN. 1 MIN. *200 * 100 *50 *40 *30 * 16 * 10 *8 *4 318" 3/4" 112" 3" 5" 6" 8" 100 0 ► 90 l 10 80 ► ► 20 o O70 ► 30 c <60 ► ► 40 w E50 , 50 E Lu 0-40 1 .. 60 o_ 30 ► 70 20 ► 80 10 90 ::. ► ,. _ - 100 0 II III I I I I I I III ! I I I , I I till ► I I I lilt I I I I I III ! .001 0.002 .005 .009 .019 .037 .074 . 149 .297 .590 1 . 19 2.0 2.38 4.76 9.52 19. 1 36. 1 76.2 127 200 0A2 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) FINE MEDIUM COARSE FINE COARSE I COBBLES Sample of SAND , CLAYEY (SC ) GRAVEL 0 % SAND 81 °/0 From GR - 41 AT 4 FEET SILT & CLAY 19 % LIQUID LIMIT % PLASTICITY INDEX HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U .S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN . 15 MILL. 60 MITI. 19 MIN . 4 MIP''•1. 1 MIN. *200 `100 *50 t40 *30 *16 *10 *8 *4 3/8" 3/4" 1 'V2" 3" 5" 6" 8" 100 I I 0 ►. 90 ► -' 10 I 80 ► 20 ► (70 ► ► 30 w <60 ' 40 w tri50 ► SU E lel 0 ' 60 a ► ► 30 , ► 70 20 ► 80 10 90 ► ► . 100 0 II III I I I I I I I I 1 ► I I I I I I I I I I I I 001 0 002 005 009 _ 019 037 .074 149 .297 . 590 1 19 20 2.38 4 76 9 52 19. 1 36 1 76 2 127 200 0.42 152 DIAMETER OF PARTICLE IN MILLIMETERS SANDS GRAVEL CLAY (PLASTIC) TO SILT MOH-PLASTIC) I FINE MEDIUM COARSE FINE I COARSE COBBLES Sample of SAND , CLAYEY ( SC ) GRAVEL 7 0/0 SAND 54 % From GR - 41 AT 9 FEET SILT & CLAY 39 % LIQUID LIMIT °!"o PLASTICITY INDEX % SCHEDIC GROUP , LLC Gradation COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO . FC08689-125 Test Results FIGURE B-21 Exhibit 28 . 1 Page 41 of 49 Shear Stren th by Direct Shear '� hir iri (Small Shear Box) £!JJL!J ! JJ International Test Summary Reference A B C Normal Stress 6. 94 psi 13 . 89 psi 27. 78 psi Peak Strength 3. 33 psi 4 . 51 psi 12.45 psi Corresponding Horizontal 0. 1585 in 0 . 1947 in 0 . 1369 in Displacement _ Residual Stress N/A N/A N/A Rate of Shear Stage 1 : Stage 1 : Stage 1 : Displacement 0. 029000inlmin 0 . 029000in/min 0 . 029000in/min Final Height 0. 7054 in 0 .6917 in 0 . 6293 in Sample Area 4. 90873 in2 4 . 90873 in2 4 . 90873 in2 Initial Wet Unit Weight 121 . 61 Ibflft3 121 . 61 lbf/ft3 121 . 61 Ibflft3 Initial Dry Unit Weight 84 . 38 Ibflft3 92 .26 Ibf/ft3 92. 78 Ibflft3 Final Wet Unit Weight 108 . 49 I bflft3 118. 63 l bflft3 131 . 94 I bflft3 Final Dry Unit Weight 89 . 72 lbf/ft3 100. 05 lbf/ft3 110 . 57 Ibf/ft3 Final Moisture Content _ 20 . 92 % 18 . 58 % 19. 33 % Particle Specific Gravity 165 . 43 165.43 165.43 Final Void Ratio 114 . 1572 102. 2665 92.4384 Final Saturation 30 . 32% 30 .05% 34. 60% Maximum Shear Stress vs Normal Stress Peak Shear Stress pci' 13 .11 12,00 - 'r Peak • : = Angle of Shear Resistanc: ..------- 10 .00 - _ 1 2449 Degrees lr _1' sr Cohesion r f 6 .00 - 'r Jr -- a 4 .00 ,_ 2.,00 _---- 0 .00 , e_.-----se- _r _,„ _1 i 30�* X - 0.00 2.00 4.00 6.00 8.00 10 .00 12 .00 14 .00 16 .00 18.00 20.00 22.00 24.00 26.00 29.17 N carnal Stress psi FIGURE B-22 ELE International Exhibit 28. 1 Page 42 of 49 TABLE B-I SUMMARY OF LABORATORY TESTING PASSING DIRECT SHEAR RESULTS MOISTURE DRY NO . 200 FRICTION DEPTH CONTENT DENSITY SIEVE COHESION ANGLE BORING ( FEET) (% ) (PCF ) ( % ) (PSF ) ( DEG ) DESCRIPTION GR- 15 4 8 .4 112 14 SAND , CLAYEY (SC ) GR- 15 14 3 . 8 4 SAND ( SP) GR- 16 9 11 . 9 115 20 SAND , CLAYEY (SC ) GR- 16 19 20. 7 106 40 SAND , CLAYEY (SC ) GR- 17 9 4 . 9 103 9 SAND , SLIGHTLY CLAYEY (SP-SC ) GR- 17 19 7 .4 112 11 SAND , SLIGHTLY CLAYEY (SP-SC ) GR- 18 9 3 .5 6 SAND , SLIGHTLY CLAYEY (SP-SC ) GR- 18 19 5 . 0 8 SAND , SLIGHTLY CLAYEY (SP-SC ) GR- 19 4 3 . 2 6 SAND , SLIGHTLY CLAYEY (SP-SC ) GR- 19 14 3 . 9 4 SAND ( SP) GR-20 4 3 . 5 4 SAND ( SP) GR-20 14 6 .4 110 20 SAND , CLAYEY (SC ) GR-21 4 8 . 2 112 23 SAND , CLAYEY (SC ) GR-21 14 5 . 5 14 SAND , CLAYEY (SC ) GR-22 9 22. 9 105 20 SAND , CLAYEY (SC ) GR-22 19 19. 6 34 SAND , CLAYEY (SC ) GR-23 9 17. 9 7 SAND , SLIGHTLY CLAYEY (SP-SC ) GR-23 14 9 . 1 13 SAND , CLAYEY (SC ) GR-24 9 6 . 3 108 9 SAND , SLIGHTLY CLAYEY (SP-SC ) GR-24 19 24.4 102 86 CLAY, SANDY (CL) GR-25 4 3 . 9 5 SAND , SLIGHTLY CLAYEY (SP-SC ) GR-25 14 6 . 3 31 SAND , CLAYEY (SC ) GR-26 4 8 .5 15 SAND , CLAYEY (SC ) GR-26 9 5 . 7 107 20 SAND , CLAYEY (SC ) GR-26 19 23. 0 105 44 SAND , CLAYEY (SC ) GR-27 4 3 . 6 5 SAND ( SP) * NEGATIVE VALUE INDICATES COMPRESSION . SCHEDIO GROUP , LLC COLORADO SAND COMPANY SAND PLANT CTLIT PROJECT NO . FC08689-125 Page 1 of 2 Exhibit 28 . 1 Page 43 of 49 TABLE B-I SUMMARY OF LABORATORY TESTING PASSING DIRECT SHEAR RESULTS MOISTURE DRY NO . 200 FRICTION DEPTH CONTENT DENSITY SIEVE COHESION ANGLE BORING ( FEET) (% ) (PCF ) ( % ) (PSF ) ( DEG ) DESCRIPTION GR-27 14 11 . 6 105 20 SAND , CLAYEY (SC ) G R-29 4 3 . 6 108 24 SAND , CLAYEY (SC ) GR-29 9 5 . 0 103 47 SAND , CLAYEY (SC ) GR-31 4 6 .4 110 16 SAND , CLAYEY (SC ) GR-31 9 5 . 8 103 28 SAND , CLAYEY (SC ) GR-34 4 3 .6 8 SAND , SLIGHTLY CLAYEY (SP-SC ) GR-34 14 9 .4 110 41 SAND , CLAYEY (SC ) GR-35 9 10. 1 112 11 SAND , SLIGHTLY CLAYEY (SP-SC ) GR-35 19 17. 1 114 18 SAND , CLAYEY (SC ) GR-37 4 3 .6 4 SAND ( SP) GR-37 14 12. 3 110 15 SAND , CLAYEY (SC ) GR-38 4 4 . 3 98 4 SAND ( SP) GR-38 9 6 . 5 108 11 SAND , SLIGHTLY CLAYEY (SP-SC ) GR-39 9 19. 6 104 5 SAND ( SP) GR-39 14 16. 7 109 6 SAND , SLIGHTLY CLAYEY (SP-SC ) GR-40 9 23. 7 104 90 CLAY, SANDY (CL) GR-41 4 9 .6 113 19 SAND , CLAYEY (SC ) GR-41 9 11 . 3 118 39 SAND , CLAYEY (SC ) S- 1 4-9 0 24 . 5 SAND ( SP) * NEGATIVE VALUE INDICATES COMPRESSION . SCHEDIO GROUP , LLC COLORADO SAND COMPANY SAND PLANT CTLIT PROJECT NO . FC08689-125 Page 2 of 2 Exhibit 28 . 1 Page 44 of 49 APPENDIX GUIDELINE SITE GRADING SPECIFICATIONS Exhibit 28 . 1 Page 45 of 49 GUIDELINE SITE GRADING SPECIFICATIONS 1 . DESCRIPTION This item shall consist of the excavation , transportation , placement, and compaction of materials from locations indicated on the plans , or staked by the Engineer, as necessary to achieve preliminary street and overlot elevations . These specifications shall also apply to compaction of excess cut materials that may be placed outside of the development boundaries . 2 . GENERAL The Soils Engineer shall be the Owner's representative . The Soils Engineer shall approve fill materials , method of placement, moisture contents and percent compaction , and shall give written approval of the completed fill . 3 . CLEARING JOB SITE The Contractor shall remove all vegetation and debris before excavation or fill placement is begun . The Contractor shall dispose of the cleared material to provide the Owner with a clean , neat appearing job site . Cleared material shall not be placed in areas to receive fill or where the material will support structures of any kind . 4 . SCARIFYING AREA TO BE FILLED All topsoil and vegetable matter shall be removed from the ground surface upon which fill is to be placed . The surface shall then be plowed or scarified until the surface is free from ruts, hummocks or other uneven features , which would prevent uniform compaction . 5 . COMPACTING AREA TO BE FILLED After the foundation for the fill has been cleared and scarified , it shall be disked or bladed until it is free from large clods, brought to the proper moisture content (0 to 3 percent above optimum moisture content for clays and within 2 percent of optimum moisture content for sands ) and compacted to not less than 95 percent of maximum dry density as determined in accordance with ASTM D 698 . 6 . FILL MATERIALS Fill soils shall be free from organics , debris or other deleterious substances, and shall not contain rocks or lumps having a diameter greater than six (6 ) SCHEDIO GROUP,. LLC c- 1 COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 46 of 49 inches . Fill materials shall be obtained from cut areas shown on the plans or staked in the field by the Engineer . On -site materials classifying as CL, CH , SC , SM , SW, SP , GP , GC , and GM are acceptable . Concrete , asphalt, organic matter and other deleterious materials or debris shall not be used as fill . 7 . MOISTURE CONTENT AND DENSITY Fill material shall be moisture conditioned and compacted to the criteria in the table , below . Maximum density and optimum moisture content shall be determined from the appropriate Proctor compaction tests . Sufficient laboratory compaction tests shall be made to determine the optimum moisture content for the various soils encountered in borrow areas . FILL COMPACTION AND MOISTURE REQUIREMENTS Depth from Soil Moisture Requirement Final Grade Density Requirement Type (% from optimum ) (feet) Clay 9 to + 3 95% of ASTM D 598 g to 15 feet Sand -2 to +2 95% of ASTM D 598 Clay Greater than -2 to + 1 98% of ASTM D 698 Sand 15 feet -2 to + 1 95% of ASTM D 1557 The Contractor may be required to add moisture to the excavation materials in the borrow area if, in the opinion of the Soils Engineer, it is not possible to obtain uniform moisture content by adding water on the fill surface . The Contractor may be required to rake or disk the fill soils to provide uniform moisture content through the soils . The application of water to embankment materials shall be made with any type of watering equipment approved by the Soils Engineer, which will give the desired results . Water jets from the spreader shall not be directed at the embankment with such force that fill materials are washed out . Should too much water be added to any part of the fill , such that the material is too wet to permit the desired compaction from being obtained , rolling and all work on that section of the fill shall be delayed until the material has been SCHEDIO GROUP, LLC C-2 COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 47 of 49 allowed to dry to the required moisture content . The Contractor will be permitted to rework wet material in an approved manner to hasten its drying . 8 . COMPACTION OF FILL AREAS Selected fill material shall be placed and mixed in evenly spread layers . After each fill layer has been placed , it shall be uniformly compacted to not less than the specified percentage of maximum density. Fill shall be compacted to the criteria above . At the option of the Soils Engineer, soils classifying as SW, GP , GC , or GM may be compacted to 95 percent of maximum density as determined in accordance with ASTM D 1557 or 70 percent relative density for cohesionless sand soils . Fill materials shall be placed such that the thickness of loose materials does not exceed 12 inches and the compacted lift thickness does not exceed 6 inches . Compaction as specified above shall be obtained by the use of sheepsfoot rollers , multiple-wheel pneumatic-tired rollers, or other equipment approved by the Engineer for soils classifying as CL , CH , or SC . Granular fill shall be compacted using vibratory equipment or other equipment approved by the Soils Engineer . Compaction shall be accomplished while the fill material is at the specified moisture content . Compaction of each layer shall be continuous over the entire area . Compaction equipment shall make sufficient trips to ensure that the required density is obtained . 9 . COMPACTION OF SLOPES Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment . Compaction operations shall be continued until slopes are stable, but not too dense for planting , and there is not appreciable amount of loose soils on the slopes . Compaction of slopes may be done progressively in increments of three to five feet (3' to 5' ) in height or after the fill is brought to its total height . Permanent fill slopes shall not exceed 3 : 1 ( horizontal to vertical ) . 10 . PLACEMENT OF FILL ON NATURAL SLOPES Where natural slopes are steeper than 20 percent in grade and the placement of fill is required , benches shall be cut at the rate of one bench for each 5 feet in height ( minimum of two benches ) . Benches shall be at least 10 feet in width . Larger bench widths may be required by the Engineer. Fill shall be placed on completed benches as outlined within this specification . 11 . DENSITY TESTS Field density tests shall be made by the Soils Engineer at locations and depths of his choosing . Where sheepsfoot rollers are used , the soil may be disturbed to a depth of several inches . Density tests shall be taken in compacted SCHEDIO GROUP,. LLC C-3 COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 48 of 49 material below the disturbed surface . When density tests indicate that the density or moisture content of any layer of fill or portion thereof is not within specification , the particular layer or portion shall be reworked until the required density or moisture content has been achieved . 12 . SEASONAL LIMITS No fill material shall be placed , spread or rolled while it is frozen , thawing , or during unfavorable weather conditions . When work is interrupted by heavy precipitation , fill operations shall not be resumed until the Soils Engineer indicates that the moisture content and density of previously placed materials are as specified . 13 . NOTICE REGARDING START OF GRADING The Contractor shall submit notification to the Soils Engineer and Owner advising them of the start of grading operations at least three (3) days in advance of the starting date . Notification shall also be submitted at least days in advance of any resumption dates when grading operations have been stopped for any reason other than adverse weather conditions . 14 . REPORTING OF FIELD DENSITY TESTS Density tests made by the Soils Engineer, as specified under " Density Tests" above, shall be submitted progressively to the Owner. Dry density, moisture content, and percentage compaction shall be reported for each test taken . 15 . DECLARATION REGARDING COMPLETED FILL The Soils Engineer shall provide a written declaration stating that the site was filled with acceptable materials , and was placed in general accordance with the specifications . SCHEDIO GROUP,. LLC C-4 COLORADO SAND COMPANY SAND PLANT CTL I T PROJECT NO. FC08689-125 Exhibit 28 . 1 Page 49 of 49 Hello