HomeMy WebLinkAbout20201372.tiffRESOLUTION
RE: APPROVE AGREEMENT FOR SERVICES FOR COUNTY ROAD 49 PARKWAY
EMERGENCY REPAIR WORK AND AUTHORIZE CHAIR TO SIGN -
TML CONSTRUCTORS, INC.
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with an Agreement for Services for County
Road 49 Parkway Emergency Repair Work between the County of Weld, State of Colorado, by
and through the Board of County Commissioners of Weld County, on behalf of the Department of
Public Works, and TML Constructors, Inc., commencing upon full execution of signatures, with
further terms and conditions being as stated in said agreement, and
WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy
of which is attached hereto and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
Weld County, Colorado, that the Agreement for Services for County Road 49 Parkway Emergency
Repair Work between the County of Weld, State of Colorado, by and through the Board of County
Commissioners of Weld County, on behalf of the Department of Public Works, and
TML Constructors, Inc., be, and hereby is, approved.
BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized
to sign said agreement.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 11th day of May, A.D., 2020.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: ddt.444) JotA
Weld County Clerk to the Board
Mike Freeman, Chair
Stev
BY:
Deputy Clerk to the Board
APPRO D
Attorney
Date of signature: 5115/2-0
Kevin D. Ross
CC: PW (DD Isi4/ER/c H)
511'3 /2O
2020-1372
EG0078
rit
BOARD OF COUNTY COMMISSIONERS
PASS -AROUND REVIEW
PASS -AROUND TITLE: Emergency repair work on 49 Parkway (U.P. Rail Crossing)
DEPARTMENT: Public Works DATE: 4.28.2020
PERSON(S) REQUESTING: Don Dunker and Josh Holbrook
Brief description of the problem/issue:
Weld County Parkway is currently down to two lanes just north of WCR 54 by the Union Pacific Rail Crossing,
due to concrete panels which must be repaired by U.P. Public Works staff had a meeting on site with U.P and
determined that there are a couple of reasons why the U.P panels continue to break. Public Works
recommended that we replace the existing 18" Hot Mix Asphalt section with an Asphaltic Plug Joint to help
with the expansion of the concrete roadway after U.P. replaces the damaged panels and U.P agreed with this
approach.
Public Works has contracted out this work in the past and only one company has been awarded this work, TLM
Constructors out of Greeley. Public Works contacted six companies for price quotes, and we received only two
quotes. One quote is from TLM out of Greeley for a total amount of $43,717.00 and ABCO Contracting, Inc
out of Denver for a total amount of $55,000.00. Both contractors cautioned us that the factory that produces
this product has been shut down due to COVID-19 and they only have few months of supply left. Delays in
securing a contract for this work may lead to a chance that this product will not be available by mid to late June.
We did discuss this with Rob Turf Purchasing Manager, and he agreed to move forward with a pass around.
Attached to this pass around are pictures of the area that needs repaired, the asphaltic plug joint product specs
and price quotes from TLM and ABCO. Public Works will use funds that have been budgeted in 2020 for
WCR 49 Parkway Maintenance.
What options exist for the Board? (include consequences, impacts, costs, etc. of options):
1) Place on the next available BOCC agenda.
2) The Board may request a work session to discuss this further.
Recommendation:
Staff recommends approval for TLM Constructors to complete this emergency repair work on WCR 49
Parkway for a total amount of $43,717.00.
Approve
Recommendation
Mike Freeman, Chair
Scott K. James
Barbara Kirluneyer
Steve Moreno, Pro-Tem
Kevin D. Ross
Attachments: UP Rail Crossing Pictures
Asphaltic Plug Joint product specs
Price Quotes from TLM and ABCO
Schedule
Work Session
Other/Comments:
cc: Jay McDonald, Director of Public Works
Elizabeth Relford, Deputy Director
Curtis Hall, Deputy Director
2020-1372
05 A1
CC'. PLO SH /OO)
OSf 11 / 610
Karla Ford
From:
Sent:
To:
Subject:
Yes I approve
Kevin Ross
Thursday, April 30, 2020 9:00 AM
Karla Ford
Re: Please Reply - WCR 49 Parkway repair work pass around
Sent from my Verizon, Samsung Galaxy smartphone
From: Karla Ford <kford@weldgov.com>
Sent: Wednesday, April 29, 2020 3:31:46 PM
To: Kevin Ross <kross@weldgov.com>
Subject: Please Reply - WCR 49 Parkway repair work pass around
Since you won't be in tomorrow, could you review and let me know if you approve recommendation? Thank you sir.
Karla Ford
Office Manager, Board of Weld County Commissioners
1150 0 Street, P.O. Box 758, Greeley, Colorado 80632
:: 970.336-7204 :: kford@weldgov.com :: www.weldgov.com
**Please note my working hours are Monday -Thursday 7:00a.m.-5:00p.m.**
Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed
and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please
immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of
this communication or any attachments by anyone other than the named recipient is strictly prohibited.
From: Marjorie Caudill <mcaudill@weldgov.com>
Sent: Wednesday, April 29, 2020 1:28 PM
To: Karla Ford <kford@weldgov.com>
Cc: Josh Holbrook <jholbrook@weldgov.com>; Jay McDonald <jmcdonald@weldgov.com>; Don Dunker
<ddunker@weldgov.com>; Elizabeth Relford <erelford@weldgov.com>; Curtis Hall <chall@weldgov.com>
Subject: WCR 49 Parkway repair work pass around
Please ask the Commissioners to review and sign the attached passaround at their convenience.
Thank you!
Marjorie Caudill
Accounting Clerk
Public Works Department
1111 H Street, PO Box 758
Greeley CO 80631
1
•
6
1'dr
�� •• •_
q
' _ ' •• • .. h
4- 1.,
i
ati
a'
.• • -
•L
•
1• `• ( .t
•
r .
ir
r
r
. ♦ ' 4.
,' '
,. I.
:'. ,
.'r t
•
• .
• [ . ',
4 1.,►.•
,:.c ,.'•• t•, tsrileoccorke4 4:Yr
s
_ t.,;` w
•...
' , ,
I.
.•
" I .*
`ti -E a
., i. •• .
• n
414,
I
I
I
1
I
I
Greeley Office:
P.O. Box 336638
Greeley, CO 80633
Ph: (970) 346-8323
Fax: (970) 346-8324
(CONSTRUCTORS;
Swink Office:
P.O. Box 505
Swink, CO 81077
Ph: (719) 384-5956
Fax: (719) 346-5959
QUOTATION
To: Weld County
Attn: Josh Holbrook
jholbrookaweldgov.com
Job or Project: Asphaltic Plug Joints on WCR 49 Parallel to the UP Railroad
Date: April 10, 2020
TLM Constructors, Inc., will furnish all labor, material and equipment to complete the following scope of work at
the following unit prices.
Item
Description
Quantity
Unit
Unit Price
Total
518-01001
Asphaltic Plug Joint (6 Inch Thick)
208
LF
$ 184.00
$ 38,272.00
626-00000
Mobilization
1
Each
$ 5,445.00
$ 5,445.00
Additional Material (Per CF)
1
CF
$ 173.00
$ -
TOTAL
$ 43,717.00
Notes:
• Asphaltic Plug Joint — Quoted price includes sandblast prep and installation of an 18 Inch wide by 6 Inch
thick Asphaltic Plug Joint. Material used will be Thorma-Joint Asphaltic Plug joint and will be from the
CDOT APL. Quoted price excludes steel bridging plate because a joint opening is not present. Quoted
price is based on removal and a 2 inch thick asphalt patch being placed by Weld County forces prior to
TLM Constructors mobilization to the project.
• Mobilization — Price is based on one mobilization. TLM Constructors does anticipate one day prep time
without work between phases 1 and 2 to allow County forces to complete removal and asphalt patching,
this is included in the 1 Each Mobilization unit price. Additional mobilizations beyond this note if required
will be billed at $1,500.00 Each.
• The above quoted work is estimated to be completed in 4 work days (2 days per half of roadway). TLM
Constructors will require that traffic be shifted to north bound lanes then to south bound allowing TLM to
have half of the roadway to work in at a time. Traffic Control to be provided by others. TLM Constructors
will not be held responsible for lane rental fees or additional costs for traffic control.
• TLM Constructors will not be held liable for heaving or settling of the Asphaltic Plug joint caused by
movement of the Concrete Roadway or the existing Railroad Track.
Exclusion:
No Environmental management
No Permits or Fees
No Testing
No Railroad Insurance or Permits
No Traffic Control
No Engineering/Design
No Surveying
No Retainage
Terms: Signature affixed hereon constitutes a binding contract between Contractor and Customer.
Customer agrees to payment terms and conditions and the project unit price(s) as quoted.
Payment in Full upon completion of our work.
A 1.5% FINANCE CHARGE (which is an Annual Percentage Rate of 18%) will be added each
month to all past due accounts.
Conditions: 1. Prices quoted herein include Sales, Use and Transportation taxes.
2. This quotation may be withdrawn or modified by TLM Constructors, Inc. if not accepted
within 10 days from date.
3. Delivery of products or performance of services herein quoted is subject to delays
occasioned by circumstances beyond our control.
Accepted
By
Date
Mike Freeman, BOCC
TLM Constructors, Inc.
ned .(YGit.91L .L-- inelles-
e / Title Aaron L. Mills
President
This quote is submitted in duplica n in the space provided above and retum one copy to us.
00,80 " /c37,—
CONTRACTING, INC.
Contact: Zach Hood
Phone: 303-288-4140
Email: zach@abcocontracting.com
Quote To:
Phone:
Fax:
Weld County Public Works
Joshua Holbrook
970.304.6496
Job Name:
Date of Plans:
Revision Date:
Date:
WCR 49 & 54 UP RR Crossing
4/21/20
ITEM
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
AMOUNT
20
Bridge Expansion Joint - Asphaltic Plug Joint
208.00
LF
250.00
52,000.00
40
Mobilization
1.00
EA
3,000.00
3,000.00
GRAND TOTAL
$55,000.00
NOTES:
Inclusions:
-BRIDGE EXPANSION JOINT(ASPHALTIC PLUG) PRICE IS BASED ON 6"X 18" BLOCKOUT. INCREASE IN DEPTH
OR WIDTH RESULTING IN AN INCREASE OF MATERIAL WILL BE PAID AT $55.00 PER LF INCH.
-INCLUDES PREVAILING WAGE IF NECESSARY.
-EACH MOBILIZAITON @ $1,500 EA.
Exclusions:
-WE SPECIFICALLY EXCLUDE: BOND, TAXES, PERMITS, FEES, TESTING, STAKING, SURVEYING, TRAFFIC
CONTROL,
NIGHT LIGHTING, FALL PROTECTION, EROSION CONTROL, REMOVALS, BACKFILLING, ASPHALT PATCHING,
LANDSCAPE RESTORATION AND DRAINAGE OF LESS THAN 2%, UNLESS OTHERWISE SPECIFIED IN THIS
PROPOSAL.
-WE SPECIFICALLY EXCLUDE THE REMOVAL OF EXISTING ASPHALT AND WATERPROOFING MEMBRANE.
-WE SPECIFICALLY EXCLUDE ANY ASPHALT PATCHING INCLUDING REMOVAL AND SUBGRADE PREP.
Miscellaneous Notes:
-FINAL BILLING WILL BE BASED ON FIELD MEASURED QUANTITIES INSTALLED AT THE ABOVE UNIT
PRICES.
-ADD 1 % FOR BOND, IF REQUIRED FOR ALL CONTRACT ITEMS INCLUDING MOBILIZATION.
Page 1 of 1
■
O
ca
L
O
Dynamic Surface Applications,
Ltd.
373 Village Road
Pennsdale, PA 17756
800-491-5663
www.dsa-ltd.com
PRODUCT DESCRIPTION:
Thorma-Joint is the original asphaltic plug expansion joint system. Introduced to
the US market by DSA, Ltd. in the late 1980's, it continues to be first choice
among bridge engineers seeking a cost effective reliable joint system for low
movement structures.
Thorma-Joint is a combination of BJ Supe 0 (a polymer modified asphalt binder),
specifically graded %"aggregate, A36 mild steel plate and heat resistant backer
rod. When installed properly and according to DSA's specifications, Thorma-Joint
is capable of withstanding up to 2" of cumulative movement and providing a water
tight seal to protect the bridge deck and sub structure.
Why Thorma-Joint?
❖Resistant to puncture by foreign objects
❖ Will not work its way out of joint cavity
❖Uses no metal armors that may come loose and endanger driver safety
❖ Watertight and smooth riding
❖ Requires no maintenance
❖ Highly durable and proven track record
❖ Only product of its kind guaranteed by manufacturer for 3 years
❖ Installed in the United States since 1989 and throughout the world since the late 1970's
❖Quality controlled installation by DSA or factory trained certified installers
•:•AII materials independently tested to ASTM D6297-01 standards
TECHNICAL DETAILS
3/4" Aggregate
The stone used shall primarily consist of Granite. Basalt, Gabbro.
Porphyry or Gritstones. The specified aggregate shall be crushed..
double washed, and shall meet the following gradation requirements:
Sieve Size
GRADATION
Percent Passing
1
100
3/4
90-100
5/8
40-60
1/2
20-50
3/8
0-15
1/4
-
Backer Rod
The backer rod shall be a closed cell, foam expansion joint filler;
capable of withstanding the elevated temperature of the polymeric
binder. The backer rod shall have the following typical physical
properties using a 2' specimen and test method ASTM D5249:
Density:
Tensile Strength:
Compression:
Water Absorption:
Temperature @ 410 F (210°C)
2.0Lbs/Cu. Ft. min
30 psi, min.
5 psi @ 25%, min
0.03 g/cc by weight, min
(1% Max)
No Melting
BJ Supe O Binder
The bridge joint binder shall be a polymer modified asphalt, as manufactured by Dynamic Surface Applications; and shall meet the
following requirements as set forth is ASTM D6297-01 and when independently tested according to those standards. The values below are the
minimum requirements for ASTM D6297-01, typical results for THORMA-JOINT are also indicated.
Cone Penetration @ 77`+
Cone Penetration @ 0°F,
Flow @ 140°F, 5 Hours. (MM)
Non -Immersed Bond @ 20°F,
Three Cycles
Resilience @ 77'F
Asphalt Compatibility
Softening Point
Flexibility/Pliability @ -10'F
Ductility @77° F
Tensile Adhesion @ 77°F
Recommended Pouring Temperature
Safe Heating Temperature
TEST METHOD MINIMUM
ASTM D5329
ASTM D5329
ASTM D5329
ASTM D5329
ASTM D5329
ASTM D5329
ASTM D36
ASTM D5329
ASTM D113
ASTM D5329
7.5 Max
1.0 Minimum
3.0 Max
Pass 3 cycles
40-70%
Pass
180 Minimum
Pass
400% Minimum
700% Minimum
390° F (199° C)
410° F (210° C)
DSA TYPICAL
5.18
1.33
0
Pass
53.43%
Pass
204.84
Pass
757.7%
1018%
.' •
nit�*•:►fPyp: I•►.41 1'+`** M4 A`y37$' OIL♦ 4eal40�JaltZrlj%w•9 Mgt: i
•r' 4%ti�i•r::;;:P �'* PZI ab4fetr�1 � t:tIP.rirWet eP Liats%1 0sw+rss�*~�I�:it1r�.i..
:.Pi fro. ••Ole � 1 •f• I ��I�s2�vp ,+� •a•. �..s ."••••...�!-
tt��esk'�' ��'tI • • tfea! e.►w� 11 :Otte �.��s1►I s 'ea i.'f �I�rj a�'i
��i �ei
IaI�Itee 4401~.r*w 1 ����• I�4 '4i4�+•et aei1g ba
1,:0enalaekii 4' ris •i�ii�.�I 1ila+i� VIAlt 104te �"4 •• 14 a �a# !
Controller
APPROVES TO SUBSTANCE:
EIe€'t fficial or Department -Head
OVER AS TO VYNDIN
APPROVED AS TO FORM:
eitt,et"ct
County Attorney