HomeMy WebLinkAbout20201549.tiffRESOLUTION RE: ACTION OF THE BOARD CONCERNING PETITION FOR VACATION OF PORTIONS OF SECTION LINE RIGHT-OF-WAY AND COUNTY ROAD RIGHT-OF-WAY NEAR COUNTY ROADS 91, 93, 95, AND 34, AND INTERSTATE -76 - BLACK MOUNTAIN LAND COMPANY, LP, C/O BLACK MOUNTAIN SAND WELD, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Road Petition from Black Mountain Land Company, LP, c/o Black Mountain Sand Weld, LLC, 500 Main Street, Suite 1200, Fort Worth, Texas 76102, requesting vacation of portions of Section Line Right -of -Way and County Road Right -of -Way laying near County Roads 91, 93, 95, and 34, and Interstate -76, being more fully described as follows: Portions of Weld County Right -of -Way (ROW) along County Roads (CR) 34, 36, and 93, all within Township 3 North, Range 61 West of the 6th P.M., Weld County, Colorado, being further described as: The 60 -foot ROW along CR 34 as described: starting at the SW corner of Section 11, running east to the SW corner of Section 12, approximately 1 mile in distance. Center line of the ROW being the southern boundary of Section Line 11 and the northern boundary of Section Line 14. The 60 -foot ROW along CR 36 as described: starting at the NW corner of Section 10, running east to the NE corner of Section 11, approximately 2 miles in distance. Center line of the ROW being the southern boundary of Section Lines 2 and 3 and the northern boundary of Section Lines 10 and 11. The 60 -foot ROW along CR 93 as described: starting at the NE corner of Section 3 running south past the SW corner of Section 11, to where Section 14 and Interstate -76 ROW meet, approximately 2.4 miles in distance. Center line of the ROW being the eastern boundary of Section Lines 3, 10, and 15, and the western boundary of Section Lines 2, 11, and 14. GC.: P L CCG ( TP) , Pw C EP/ OA I CAC% C), GLPPL RLP to/ICo(Q0 2020-1549 EG0078 CONTINUE PETITION FOR VACATION OF PORTIONS OF SECTION LINE RIGHT-OF-WAY AND COUNTY ROAD RIGHT-OF-WAY NEAR COUNTY ROADS 91, 93, 95, AND 34, AND INTERSTATE -76 - BLACK MOUNTAIN LAND COMPANY, LP, C/O BLACK MOUNTAIN SAND WELD, LLC PAGE 2 WHEREAS, on May 27, 2020, the Board reviewed the request of Black Mountain Land Company, LP, do Black Mountain Sand Weld, LLC, to continue said petition, and having been fully informed, deemed it advisable to continue the matter to October 7, 2020, to allow the petitioner adequate time to complete the engineering requirements of said petition and the permitting process for the industrial frac sand facility, and WHEREAS, on October 7, 2020, the Board reviewed the request of Black Mountain Land Company, LP, do Black Mountain Sand Weld, LLC, to continue said petition, and having been fully informed, deemed it advisable to continue the matter to January 27, 2021, to allow the petitioner further time to complete the engineering requirements of said petition and the permitting process for the industrial frac sand facility. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Petition for Vacation of Right -of -Way from Black Mountain Land Company, LP, do Black Mountain Sand Weld, LLC, be, and hereby is, continued to January 27, 2021. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 7th day of October, A.D., 2020. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: ddritaik) Weld County Clerk to the Board eputy Clerk to the Boa APIVED County Attorney Kevin D. Ross Date of signature: 1O1 l51DZI EXCUSED Mike Freeman, Chair Steve;Moreno, Pry em t K. James 2020-1549 EO0078 Black Mountain Sand Weld LLC 500 Main St. Suite 1200, Fort Worth, TX 76102 (817) 698-9901 September 29, 2020 Chris Gathman Weld County Department of Planning 1555 N. 17' Avenue Weld, CO 80632 RE: Black Mountain Sand Weld LLC Lost Creek Mine USR19-0057 & Black Mountain Land Company, LP ROW Vacationing: Request for Continuance Mr. Gathman, I want to first thank you all for the patience during these last few months with our project. Black Mountain has been adjusting our project to ensure that the economics of constructing our sand mine work. We are scheduled for a water hearing for Oct 6th that would be expected to last a couple of days. However, we believe we may have successfully vacated that hearing. We are awaiting confirmation from tne Ground Water Commission but if/when received, Black Mountain will have successfully changed over the necessary water for industrial use for this sand mine. With a few things left unfinished at this time, Black Mountain Sand Weld LLC and Black Mountain Land Company, LP (Black Mountain) would like to request a continuance before the Weld County Board of County Commissioners for our hearings set on Oct 7, 2020. Black Mountain is determined to finish tne permitting process for both our industrial frac sand facility and the vacationing of County owned ROW with full intent to build this facility. The below information details our plans and what we will be working on for our new proposed hearing date if such request is granted by the Commission. Black Mountain again appreciates the time from both Staff and Commission and looks forward to continuing this process over the next several months. of January 27, 2021, Item A. To Do List: Black Mountain is committed to continuing to permit and subsequently build this industrial frac sand facility. We understand the requirements of Weld County and we will continue to work through all the items in our draft resolution. The below is a list of some of the main items we understand the Commissioners & Staff will want to see at our new hearing date on January 27, 2021 if such date is accepted by the Commissioners. a. Updated traffic study to reflect the new south entrance with CDOT approval. Information to include any upgrades that CDOT claims necessary for new southern entrance. Plans to be provided with at least 30% completion if any such upgrades are needed. **New southern entrance is a technical revision through the State. We will be filing for a revision once bond has been posted. b. Black Mountain will work with Public Works/Weld County to determine if ROW should or should not be vacated based on our mining plans and facility placement. More detailed plant design/layouts to be included to help with this decision. *"Our air permit is being adjusted with this new info as well. c. Continue monitoring the wells surrounding the mining boundary. Black Mountain has obtained results for O4-2019, O1-2020, Q2-2020, and is scheduled to collect Q3-2020 results Sept 2020. 10/07 aoaa-ts99 EX'007 g Black Mountain Sand Weld LLC 500 Main St. Suite 1200, Fort Worth, TX 76102 (817) 698-9901 d. Show proof of changed over water rights from ag to industrial use: Ground Water Commission hearing set for Oct 6th -8th 2020 until we receive final confirmation from the GWC. With the new hearing date, Black Mountain will be able to provide proof at our next meeting that we have successfully changed the water over for industrial use for our sand facility. Sincerely, Rhett Bennett CEO CC: Kira Coff, Millcreek Engineering Brittany Schamaun, Black Mountain Hello