HomeMy WebLinkAbout20195174.tiffMEMORANDUM
TO: Esther Gesick, Clerk to the Board January 7, 2020
FROM: Ryan Rose, Chief Information Officer
SUBJECT: B1900133 Storage and Data Protection Refresh
BOCC Approval Date: January 13, 2020
Eight (8) RFP responses were received and opened on November 8th, 2019 for
#B1900133 - Storage and Data Protection Refresh. Responses range from
$1,162,217.24 to $2,995,353.62 in cost. Attached to the BOCC packet is the RFP
tabulation document.
The Information Technology staff reviewed all the responses which include pricing,
functionality, technical design and additional benefits. The lowest cost vendors that
meet the RFP requirements are Peak Resources Inc. with a cost of 51,511,702.06 and
Lewan Technology with a cost of $1,580,995.00. Of the two, Lewan Technology
emerged as the vendor with the most comprehensive solution that best meets the
needs of the County and the vendor with the most advantageous long-term price,
technology, and overall design.
Although Peak Resources Inc. proposal is slightly less cost than Lewan ($69,293.94 or
approximately 4.4%), Peak's solution would require additional hardware and
maintenance costs in order to implement the system based on our existing and future
technical architecture. IT staff estimates the Peak solution would cost an additional
$530,000 to fully implement into the existing Weld environment. Attached to the BOCC
packet is the RFP Detailed Analysis document and the Summarized Scoring Sheet.
Based on the above information, I recommend the Board award B1900133 Storage and
Data Protection Refresh to Lewan Technology out of Denver CO, for a total amount of
$1,580,995.00. The cost is within our estimated 2020 capital project budget.
**ANM is disqualified due to not meeting the bid requirements**
i/t3
-iidOO%-'
Consolidated Scoresheet
Respondent
Consolidated
Scores
Aleksei
Churyk Suresh
Peddi
Andrew
Cody
John
Reece
Eric
Lund Ryan Brewer
Lewan
1010 1011 1023 984 1020 1005 1018
Zivaro
1009 1009 1021 982 1009 1019 1016
Sanity
1009 1009 1021 980 1011 1021 1013
Vcore
1009 1011 1023 982 1016 1003 1018
Insight
958 963 972 948 963 972 931
Peak
950 954 954 938 964 929 959
ConvergeOne
874 863 903 800 873 903 904
ANM
856 865 869 753 858 911 880
Scorers:
Aleksei Churyk
Suresh Peddi
Andrew Cody
John Reece
Eric Lund
Ryan Brewer
Title
Director of Technical Operations
Information Technology Architect
System Administrator III
PS System Administrator
IT Security Analyst
System Administrator II
DATE OF BID:
REQUEST FOR:
DEPARTMENT:
BID NO:
PROJECT NAME:
PRESENT DATE:
APPROVAL DATE:
WELD COUNTY Dept. of Information Technology
PO Box 758 / 1401 North 17th Avenue, Greeley CO 80632
E-mail: AChuryk@weldgov.com
Phone: (970) 400-2555
Fax: (970) 304-6572
November 8, 2019
Storage and Data Protection Refresh
INFORMATION TECHNOLOGY
#B1900133
IT -1068 2020 Storage & Data Protection Refresh
December 30, 2019
January 13, 2020
Vendor Name
Total Bid Amount
Address
ANM
304 Inverness Way Ste #400
Englewood, Colorado 80112
$ 1,162,217.24
Peak
2750 W 5th Ave.
Denver, Colorado 80204
$ 1,511,702.06
Lewan
1400 S Colorado Blvd
Denver, CO 80222
$ 1,580,995.00
vCore
1550 Wewatta St.
Denver, Colorado 80202
$ 1,598,452.16
Converge One
8680 Concord Center Dr.
Englewood, Colorado 80122
$ 1,620,226.22
Sanity Solutions
1720 South Bellaire St, Ste 550
Denver, Colorado 80222
$ 1,637,275.00
Zivaro
990 S Broadway
Denver, Colorado 80202
$ 1,665,695.76
Insight
6820 S. Harl Ave.
Tempe, Arizona 85283
$ 2,995,353.62
** Bids are being reviewed at this time by dept.**
2019-5174