HomeMy WebLinkAbout20202007RESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 27 BETWEEN COUNTY ROADS 64.5 AND 66 FOR
APPROXIMATELY FIVE (5) DAYS, FOR IRRIGATION PIPELINE REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 27, between County Roads 64.5 and 66,
be temporarily closed, with said closure being effective July 13, 2020, for approximately five (5)
days for a 24 -inch irrigation pipeline replacement, and further, that standard official traffic control
devices shall be erected at said closure giving notice of the restrictions.
Cc: sa(M3), s po.+ch) c5 p
o7/iy /2O
2020-2007
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 27
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 8th day of July, A.D., 2020.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: do/44) JeLtti
Weld County Clerk to the Board
County ttorney
Date of signature: 07/.13/20
Mike Freeman, Chair
• Steve Moreno, Pro -Tern
2020-2007
EO0024
MEMORANDUM
TO: Clerk to the Board DATE: July 6, 2020
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Goodell Construction is requesting permission to close CR 27 between CR 64.5 and CR 66 from 7/13/20
through 7/17/20 in order to replace a damaged 24" Irrigation pipeline for the Storm Lake Drainage
District.
See attached closure diagram.
2020-2007
www invarion.com
I
ROAD CLOSURE NOTES:
1) TRAFFIC PLAN IS BASED ON M A S STANDARDS CASE 620 AND MUTCO TA NO. 20 A II
3) EXACT PLACEMENT OF DEVICES WALL BE DEPENDENT ON SITE CONDITIONS
CHANGES ARE TO BE IMPLEMENTED WHERE APPLICABLE
3) ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE SHALL UTILIZE
PROPER PPE IN ACCORDANCE WITH OSHA REGULATIONS
4I WORKERS SHALL NOT CROSS LIVE LANES Of TRAFFIC ON FOOT WITHOUT
THE ASSISTANCE OF FLAGOERS, USING THE "BUDDY SYSTEM"
OR A DESIGNATED CROSSWALK
5) ALL VEHICLES AND EQUIPMENT MOVING INSIDE OF THE CLOSURE SHALL BE
EQUIPPED WITH BACK UP ALARMS OR UTILIZE A SPOTTER
f) ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL PARK OFF THE
ROADWAY ON THE SAME SIDE AS THE CLOSURE
Ti PLAN IS FOR UTIITY WORK AND SITE DEVELOPMENT
I) WORK IS ESTIMATED TO TAKE 3 DAYS. WORKING HOURS ARE DAYLIGHT HO ORS;
PLAN IS FOR 24/7 CLOSURE
I) SKINS SHALL SE SPACED A MINIMUM OF 100 FT OR AS SPACE ALLOWS
10) NON -VEHICULAR ACCESS. BICYCLISTS ARE TO BE TREATED AS A VEHICLE.
PEDESTRIAN FACILITIES ARE TO BE MAINTAINED WHEN POSSIBLE A VIABLE
DETOUR ROUTE WILL Be PUT INTO PLACE AS REQUIRED
11) PRIVATE ACCESS IS TO BE MAINTAINED AT ALL TIMES WITHIN PROJECT LIMITS
UNLESS OTHERWISE AGREED UPON BY PROPERTY OWNER
12) EMERGENCY VEHICLES WILL BE GIVEN THE RIGHT OF WAY AS SOON AS IT IS
SAFE TO DO SO
mir
tc1 r u ir,_
WAI'ticnw' ftlr. tti
Aa A1.47.
Ut4aa1 fat
N TONYA TONER
MUa..f'o.IHsfP-
a...+r .rwSMalllt
Ww.-,.n-nn• S.. ns s.-In.r
r r.! f.1 •.. • PU Cw .N • aT.1 CO N•....
tOM VA-TOMtJtqsnw •t.M1w.• awn
1 w H.. o.: utaul✓ • L-set9 tr.-rtf. sta..
WELD COUNTY
k�JEtTBJIIaf 7RaiEtT RUMS!
CR 27 RD CLOSURE SJ50345
seam COiTRACTOR -lu!-
'•
GOODELL MACHINE M.C.T.C.
NZINE. H van ISSSIIi* OATS:
....,«.... MHT N / 4/23/2020
FRLKiWoSY
TONYA TONER ,
Itg