HomeMy WebLinkAbout20202455.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 6 BETWEEN COUNTY ROAD 19 AND
U.S. HIGHWAY 85 FOR APPROXIMATELY ONE (1) MONTH, FOR ROAD
CONSTRUCTION
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 6, between County Road 19 and
U.S. Highway 85, be temporarily closed, with said closure being effective August 17, 2020, for
approximately one (1) month for road construction, and further, that standard official traffic control
devices shall be erected at said closure giving notice of the restrictions.
CC: SO&3),b po-ch,CSP
0T/i3/20
2020-2455
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 6
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 10th day of August, A.D., 2020.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: ds,m, v • i
Weld County Clerk to the Board
Kevin D. Ross
ountttorney
Date of signature:
Mike F eeman, Chair
Steve Mor- o, Pro- -m
2020-2455
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: August 6, 2020
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 6 between WCR 19 and HWY 85 is closed from 8/17/2020 thru 9/18/2020 for road construction.
See attached closure diagrams.
2020-2455
ogho E�002�
WCR 10
11F. MP. IPP/y -' "sr- Qom'
S GMI,
-.
-ra ter!- Mr
rn
U
WCR 8
a a a e b -r or R r a ab a i i
DETOUR
M*e
\ \ \
;49
rrS
:~
♦a
c
t
ft
a
co
N
U
--(52)----
BARRICADED CLOSURES
ONLY IN MILE BEING
WORKED DAILY
.f
a -r
JULIUS
STREET
R WCR
23.75 /f
11='9-1'
11
tti
PADEN
Lcg rid
cc ret
WCR
8.5
ar ifa `ate
CLOSED
\AHEAD
N
W
S
E
WCR 6/ WCR 19 to HWY 85 CTB/PAVE project
Day closures only - 1 mile at a time
Project to begin at 19 working to east for
profile work, cement treating to begin HWY 85
working to west.
Project will split at Wattenburg to be sure local
access is available.
Project # HRP-77
Road closure description
WCR 6 closures 19 to HWY 85
Day closures 1 mile at a time
8/17/2020 thru 9/18/2020
Notice to Public
Road signs and barricaded during closure
Message boards to be used
Detour Route
WCR 19 between WCR 6 and HWY 52
HWY 52 between WCR 19 and HWY 85
HWY 85 between WCR 6 and HWY 52
3 mile paved
3 mile paved
3 mile paved
Notes
ADT of WCR 6 is: 3390/2017
Asphalt milling, profile, cement treat, pave
Day closures, local access only
Detour for thru traffic, local traffic will have access
Placement of signs not to scale
Date
8/6/2020
Prepared by
LEE STEPHEN