HomeMy WebLinkAbout20201132.tiff 1861 DEPARTMENT OF BUILDINGS AND GROUNDS
PHONE: (970)400-2023
FAX: (970) 304-6532
G O u N T WEBSITE: www.co.weld.co.us
1105 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
March 18, 2020
To: Board of County Commissioners
From:Toby Taylor
Subject: Public Works; Parking Lot Electrical Design
Weld County awarded on-call design services to four different vendors. There is a need for design
services for the expansion of the Public Works Parking lot that would include lighting and truck heating
electrical connections. Cairn Design has used the labor rates identified in their bid and quoted a lump
sum of$$5,715.00 for this design scope.
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
2020-1132
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
CAIRN DESIGN LLC
Date:March 17,2020
Task Order Number: Cairn Design LLC—1-2020
Project Title: Weld County Public Works Parking Lot-Electrical Engineering Services
Completion Date:
Design Compensation: $5,715.00
Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional
Task Order Work. In addition to that work described in section 2.1,the Parties may agree
to additional work to be provided by Contractor pursuant to an appropriately executed
Task Order, which shall be negotiated between the Parties on an as needed basis. Any
such Task Order shall be signed by the Weld County Director of Buildings and Grounds
before it shall be effective. In no event shall the total of all Task Orders exceed$25,000 in
any calendar year unless first approved by the Board of County Commissioners. Any
appropriately executed Task Order shall be automatically incorporated herein and
enforceable.
Scope of Task Order:
The project will involve full electrical engineering design and construction administration of the
parking lot extension in Greeley, CO. Cairn Design, LLC will provide engineering design under
this agreement including:
Electrical design and construction administration for the project.The project scope includes:
• Complete electrical design and construction administration for a new parking lot extension at
the building and grounds facility.The scope of work includes designing a new power
distribution system for truck heater connections, relocating the existing truck_heater
connections and new parking lot lighting.The new parking lot lighting will include the parking lot
extension and new driveways as required for complete lighting coverage.
1. Complete services for the project as described in the attached Exhibit-Task Order 1-
2020.
Contractor agrees to perform the services identified above and on the attached exhibit in
accordance with the terms and conditions contained herein and in the Original Agreement
between the parties.
CONTRACTOR:
Cairn Design LLC
- March 18, zozo
By: Date
Name: Ken Caudle, PE
Title: Engineering Manager
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
CAIRN DESIGN LLC
eel
Weld 'ou erk o th- Bard WELD COUNTY, COLORA�:/'�""+►
BY: � _ m 1
Deputy CI. to th Bo.�•, Mike Freeman, BOCC Chi ul
AP APPROVED AS 7 fr : T ®
qi
Controller Elected 0 ial or Department Head —�
APPROVED AS TO FORM:
*S, -0,14.4x/ILL
County Attorney
Task Order 1-2020- Exhibit
DESIGN, L
March 13, 2020
Toby Taylor
Weld County Department of Buildings & Grounds
Weld County Veterans Services
1105 H Street
Greeley, CO 80632
RE: Weld County Buildings and Grounds Parking - Engineering Services
In accordance with the fees identified in our bid, our not to exceed price for this on call work for
this project is $5,715.00. The hourly breakdown is attached to this proposal.
Scope of Work:
The project will involve full electrical engineering design and construction administration of the
parking lot extension in Greeley, CO. Cairn Design, LLC will provide engineering design under
this agreement including:
Electrical design and construction administration for the project. The project scope includes:
• Complete electrical design and construction administration for a new parking lot
extension at the building and grounds facility. The scope of work includes designing a
new power distribution system for truck heater connections, relocating the existing truck
heater connections and new parking lot lighting. The new parking lot lighting will include
the parking lot extension and new driveways as required for complete lighting coverage.
Scope of Services:
The scope of services included in this proposal are limited to the following:
• Development of a parking area plan based on existing drawings and current layouts.
• Field verification of existing dimensions and systems as they relate to the project.
• Coordination with the client as required to execute the scope of work.
• Coordination with the building department as required for the permit.
• Submissions: Design Development, Final Design,and For Construction.
• Construction administration to include construction project meetings, RFIs, submittal and
shop drawing review and approval, and final construction walk-through and punch list.
Compensation:
Total Design Fee - Not to exceed $5,715.00
Changes in scope, additional trips to the site, or added services would be billed hourly identified
in the On-Call contract, unless a fixed fee is agreed to in advance for the specific service.
1805 Sheely Drive Fort Collins,Colorado 80526 [9101286-1968
Reimbursable expenses, +1- $300 (mileage and printing services) invoiced at cost + 10%.
Exclusions:
• Design of any system not listed above.
• Civil, structural, architectural, mechanical and plumbing design.
• Design changes, layout changes, or value engineering requested by client or owner after the
final submission.
Sincerely,
Ken Caudle, PE
Engineering Principal
Approved and Accepted By:
APR 15 2020
Signature Date
Mike Freeman, BOCC Chair
Name Title
aoaO - //5
Project:Weld Building and Grounds Parking
Architecture/Structural Hours :Principal PM Arch/Eng Drafter Aaaumptions
Principal 0
Site Visit 0
Space Planning/Architectural 0
Structural Evaluation 0
Revisions 0 _...
Code Forms 0
Permit Comments 0
Design Meetings 0
Construction Meetings 0
Total 0 hours 0 0 0 0 hours
$175.00 $150.00 $125.00 $90.00.rates
Architecture
$0.00 $0.00 $0.00 $0.00 $0.00 Total
Project Management Hours Principal PM Arch/Eng Drafter Assumptions
General Project Management 4 4
Design Meetings 2 2 2 hour/1 mtg
Construction Meetings 2 2 2 hour/1 mtg
8 hours 0 8 0 0 hours
$175.00 $150.00 $125.00 $90.00 rates
Project Management
$0.00 $1,200.00 $0.00 $0.00 $1,200.00 Total
Electrical Hours Principal PM Arch/Eng Drafter Assumptions
Principal 1 1
Site Visit 2 2
Design 12 6 6
Schedules 3 3
Revisions 0 0
Code Forms/Calculations 2 2
Permit Comments 0 _. .... 0 ..... _..
Design Meetings 4 4 2 hour/2 mtg
Construction Meetings P 0 2.... 2 hour/1 mtg
Total 26 hours 1 0 19 6 hours
$175.00 $150.00 $125.00 $90.00 rates
Electrical
$175.00 $0.00 $2,375.00 $540.00 $3,090.00 Total
$3,090.00.Total Elec
Civil/Site Hours Principal PM Arch/Eng Drafter Assumptions
PM 1 1
Principal 1.... 1
Site Visit/As-Butts - 3 1 2
Site Plan Development 7. 2 5
Design 0
Revisions 0
Code Forms/Schedules 0
Permit Comments 0
Design Meetings 0 2hours/mtgs/1 mtgs
Construction Meetings 0 2hours/mtg/1 mtgs
Construction Admin 0
Total 12 hours _.. 1 2 4 5 hours
$175.00 $150.00 $125.00 $90.00 rates
Civil/Site
$175.00 $300.00, $500.00 $450.00 $1,425.00 Total
Architectural/Structural - $0.00 Total Architectural invoicing Schedule and Submissions
A/E Project Management $1,200.00 Total PM Fee
Electrical $3,090.00',Total Elec/PM Fee 45% $2,571.75 DD
Civil $1,425.00Total M and P fee 45% $2,571.75 CD
10% $571.50 Construction
$5,715.00 Total A/E fee $5,715.00 Total