Loading...
HomeMy WebLinkAbout20201132.tiff 1861 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970)400-2023 FAX: (970) 304-6532 G O u N T WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 March 18, 2020 To: Board of County Commissioners From:Toby Taylor Subject: Public Works; Parking Lot Electrical Design Weld County awarded on-call design services to four different vendors. There is a need for design services for the expansion of the Public Works Parking lot that would include lighting and truck heating electrical connections. Cairn Design has used the labor rates identified in their bid and quoted a lump sum of$$5,715.00 for this design scope. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director 2020-1132 PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Date:March 17,2020 Task Order Number: Cairn Design LLC—1-2020 Project Title: Weld County Public Works Parking Lot-Electrical Engineering Services Completion Date: Design Compensation: $5,715.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional Task Order Work. In addition to that work described in section 2.1,the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed$25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will involve full electrical engineering design and construction administration of the parking lot extension in Greeley, CO. Cairn Design, LLC will provide engineering design under this agreement including: Electrical design and construction administration for the project.The project scope includes: • Complete electrical design and construction administration for a new parking lot extension at the building and grounds facility.The scope of work includes designing a new power distribution system for truck heater connections, relocating the existing truck_heater connections and new parking lot lighting.The new parking lot lighting will include the parking lot extension and new driveways as required for complete lighting coverage. 1. Complete services for the project as described in the attached Exhibit-Task Order 1- 2020. Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. CONTRACTOR: Cairn Design LLC - March 18, zozo By: Date Name: Ken Caudle, PE Title: Engineering Manager PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC eel Weld 'ou erk o th- Bard WELD COUNTY, COLORA�:/'�""+► BY: � _ m 1 Deputy CI. to th Bo.�•, Mike Freeman, BOCC Chi ul AP APPROVED AS 7 fr : T ® qi Controller Elected 0 ial or Department Head —� APPROVED AS TO FORM: *S, -0,14.4x/ILL County Attorney Task Order 1-2020- Exhibit DESIGN, L March 13, 2020 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County Buildings and Grounds Parking - Engineering Services In accordance with the fees identified in our bid, our not to exceed price for this on call work for this project is $5,715.00. The hourly breakdown is attached to this proposal. Scope of Work: The project will involve full electrical engineering design and construction administration of the parking lot extension in Greeley, CO. Cairn Design, LLC will provide engineering design under this agreement including: Electrical design and construction administration for the project. The project scope includes: • Complete electrical design and construction administration for a new parking lot extension at the building and grounds facility. The scope of work includes designing a new power distribution system for truck heater connections, relocating the existing truck heater connections and new parking lot lighting. The new parking lot lighting will include the parking lot extension and new driveways as required for complete lighting coverage. Scope of Services: The scope of services included in this proposal are limited to the following: • Development of a parking area plan based on existing drawings and current layouts. • Field verification of existing dimensions and systems as they relate to the project. • Coordination with the client as required to execute the scope of work. • Coordination with the building department as required for the permit. • Submissions: Design Development, Final Design,and For Construction. • Construction administration to include construction project meetings, RFIs, submittal and shop drawing review and approval, and final construction walk-through and punch list. Compensation: Total Design Fee - Not to exceed $5,715.00 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On-Call contract, unless a fixed fee is agreed to in advance for the specific service. 1805 Sheely Drive Fort Collins,Colorado 80526 [9101286-1968 Reimbursable expenses, +1- $300 (mileage and printing services) invoiced at cost + 10%. Exclusions: • Design of any system not listed above. • Civil, structural, architectural, mechanical and plumbing design. • Design changes, layout changes, or value engineering requested by client or owner after the final submission. Sincerely, Ken Caudle, PE Engineering Principal Approved and Accepted By: APR 15 2020 Signature Date Mike Freeman, BOCC Chair Name Title aoaO - //5 Project:Weld Building and Grounds Parking Architecture/Structural Hours :Principal PM Arch/Eng Drafter Aaaumptions Principal 0 Site Visit 0 Space Planning/Architectural 0 Structural Evaluation 0 Revisions 0 _... Code Forms 0 Permit Comments 0 Design Meetings 0 Construction Meetings 0 Total 0 hours 0 0 0 0 hours $175.00 $150.00 $125.00 $90.00.rates Architecture $0.00 $0.00 $0.00 $0.00 $0.00 Total Project Management Hours Principal PM Arch/Eng Drafter Assumptions General Project Management 4 4 Design Meetings 2 2 2 hour/1 mtg Construction Meetings 2 2 2 hour/1 mtg 8 hours 0 8 0 0 hours $175.00 $150.00 $125.00 $90.00 rates Project Management $0.00 $1,200.00 $0.00 $0.00 $1,200.00 Total Electrical Hours Principal PM Arch/Eng Drafter Assumptions Principal 1 1 Site Visit 2 2 Design 12 6 6 Schedules 3 3 Revisions 0 0 Code Forms/Calculations 2 2 Permit Comments 0 _. .... 0 ..... _.. Design Meetings 4 4 2 hour/2 mtg Construction Meetings P 0 2.... 2 hour/1 mtg Total 26 hours 1 0 19 6 hours $175.00 $150.00 $125.00 $90.00 rates Electrical $175.00 $0.00 $2,375.00 $540.00 $3,090.00 Total $3,090.00.Total Elec Civil/Site Hours Principal PM Arch/Eng Drafter Assumptions PM 1 1 Principal 1.... 1 Site Visit/As-Butts - 3 1 2 Site Plan Development 7. 2 5 Design 0 Revisions 0 Code Forms/Schedules 0 Permit Comments 0 Design Meetings 0 2hours/mtgs/1 mtgs Construction Meetings 0 2hours/mtg/1 mtgs Construction Admin 0 Total 12 hours _.. 1 2 4 5 hours $175.00 $150.00 $125.00 $90.00 rates Civil/Site $175.00 $300.00, $500.00 $450.00 $1,425.00 Total Architectural/Structural - $0.00 Total Architectural invoicing Schedule and Submissions A/E Project Management $1,200.00 Total PM Fee Electrical $3,090.00',Total Elec/PM Fee 45% $2,571.75 DD Civil $1,425.00Total M and P fee 45% $2,571.75 CD 10% $571.50 Construction $5,715.00 Total A/E fee $5,715.00 Total Hello