Loading...
HomeMy WebLinkAbout20201562.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 6 BETWEEN COUNTY ROADS 19 AND 21 FOR APPROXIMATELY SIX (6) WEEKS, FOR BRIDGE RE -DECK WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 6, between County Roads 19 and 21, be temporarily closed, with said closure being effective June 1, 2020, for approximately six (6) weeks for a bridge re -deck, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. CC :50O1S), D;Spo.tc%-,, CS P 6./3 /7P 2020-1562 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 6 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 27th day of May, A.D., 2020. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: diceefoo`%o%t1 Weld County Clerk to the Board ou y Attorney Date of signature: 6 /3 t,2_O Mike Freeman, Chair 2020-1562 EG0024 MEMORANDUM TO: Clerk to the Board DATE: May 19, 2020 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 17 between WCR 38 and WCR 40 is closed from 6/2/2020 thru 6/12/2020 for a culvert replacement. WCR 6 between WCR 23 and US 85 is closed from 6/2/2020 thru 6/19/2020 for a culvert replacement. WCR 6 between WCR 19 and WCR 21 is closed from 6/1/2020 thru 7/10/2020 for a bridge re -deck. See attached closure diagrams. 2020-1562 ©sr F ,(3,•(,.21-1 WCR 10 a -a- a a a one Me a • am— -anf I I I WCR 8 a.aena w 1 V I r i • • -u-*- --r - 4 I n �.._ itrit -)tr: bridge 6/19A - redeck CN CC 4 1 4 culverts to replace .7 & .8 mile east of 23 oARr ati startAin w� JULIU STREET � R WCR fr 23.75 • IMO -a 4 WCR 8.5 arlitsff N S 2 CLOSURES SCHEDULED: BRIDGE DECK REPLACEMENT 6/19 TO 21 4 CULVERTS TO REPLACE 6/23 TO HWY 85 BOTH OF THESE PROJECTS TO BE COMPLETED PRIOR TO MILL,FDR,CTB,PAVE PROJECT TAKING PLACE THIS FALL Project # HRP-77 Road closure description WCR 6 closures 19-21 & 23-hwy85 WCR 6 /19 to 21 close 6/1 thru 7/10 WCR 6/ 23 to hwy85 close 6/2 thru 6/19 Notice to Public Road signs and barricaded during closure Message boards to be used Detour Route WCR 19 between WCR 6 and HWY 52 HWY 52 between WCR 19 and HWY 85 HWY 85 between WCR 6 and HWY 52 3 mile paved 3 mile paved 3 mile paved Notes ADT of WCR 6 is: 3390/2017 4 Culverts replaced are drainage: with new 36" RCPR 6/19A bridge redeck Detour for thru traffic, local traffic will have access Placement of signs not to scale Date 5/19/2020 Prepared by LEE STEPHEN Hello