Loading...
HomeMy WebLinkAbout20202512.tiffcorrya_c 1- 9 # 90 A/3 ati8 n Tr e • • • err c r MEMORANDUM Date: August 18, 2020 To: Esther Gesick, CTB From: Clay Kimmi, Project Manager, Public Works RE: OnBase Contract ID #4043 — Hokestra Pre -Fabricated Pedestrian Bridge, B20001554043 Please place the attached agreement on the BOCC Consent Agenda. The BOCC approved the award of this contract to Contech Engineered Solutions, LLC on August 17, 2020. The Consultant has signed the contract. I will plan on attending the BOCC hearing to answer any questions the BOCC may have regarding this contract. 0 - yte4-ia& O slzO ce• oit ta.,,a-c 6° le 0,7 ;so 2020- 23/2 Pktofl.2 gao 7B BID PROPOSAL To: Weld County Purchasing Department Attention: Controller/Purchasing Director P.O. Box 758, 1150 "O" Street Greeley, Colorado 80632 Bid Proposal for: HOKESTRA PEDESTRIAN TRAIL AND BRIDGE PROPOSAL Pursuant to and in full compliance with all Contract Documents the undersigned Bidder hereby proposes to furnish all labor and materials and to perform all Work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the Work above indicated for the monies indicated below which includes all State, County and local taxes normally payable with respect to such Work. The amounts stated include all allowances for profit and overhead, taxes, fees and permits, transportation, services, tools and equipment, labor and materials and other incidental costs. The Bidder and all Sub -Bidders shall include in their bid all Sales and Use Tax, if applicable. State of Colorado and Weld County tax shall not be included. Upon application, the State of Colorado Department of Revenue shall issue to a Bidder or Sub -Bidder a Certificate or Certificates of Exemption indicating that the purchase of construction or building materials is for a purpose stated in Section 39-26-114, CRS, and is free from Colorado State Sales Tax. EXAMINATION OF DOCUMENTS AND SITE The Bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to fully appraise himself of the conditions at the site and to gain a clear understanding of the Work to be executed and is thoroughly familiar with all local, state and federal laws, ordinances, rules, regulations and other factors affecting performance of the Work. METHOD OF AWARD The Owner reserves the right to reject any Bid from any Bidder to complete the Work as specified regardless of the amount of the Bid. It is understood by the Bidder, how Bids shall be awarded and that should the cost of the Bid exceeded budgeted funds, the Owner reserves the right to reject any or all Bids or portions of Work bid or the use of any of the methods stated in the Instructions to Bidders to obtain the most advantageous Bid price. All Bids will be reviewed by the Owner and Engineer. All mathematics will be checked and the correct total used for determining the low Bidder. BID SCHEDULE ITEM f ITEM DESCRIPTION I UNIT ; BID QUANTITY I UNIT PRICE ! TOTAL PRICE Prefabricated i 628-00080 Pedestrian Bridge EA c $68,862 $68,862 Total Bid (Dollars) t $681862 RECEIPT OF ADDENDA The undersigned acknowledges receipt of the following Addenda to the Invitation for Bids, Drawings, Specifications and other Contract Documents. Addendum No. 1 Date: July 30, 2020 Addendum No, 2 By Date: August 10. 2020 B *See attached Quote for additional description of the quoted bridge. BID REQUEST #B2000155 Page 20 BID OPENING WILL BE HELD VIA A SKYPE CONFERENCE CALL To join call: 1 (720) 439-5261 and enter Conference ID: 361703580# Please note that due to the Coronavirus (COVID-19) pandemic, some of us are teleworking. With that said, the following changes have been made to our current bid process until future notice: 1. No hard copies of bids will be accepted. 2. Only one electronic copy of your bid is needed. PDF format is required. 3. Email bids to bidsc weidgov.com. if your bid exceeds 25MB please upload your bid to https://www.bidnetdirect.com/. The maximum file size to upload to BidNet is 500 MB. The undersigned, by his or her signature, hereby acknowledges and represents that: 1. The bid proposed herein meets all of the conditions, specifications and special provisions set forth in the request for proposal for Request No. #B2000155. 2. The quotations set forth herein are exclusive of any federal excise taxes and all other state and local taxes. 3. He or she is authorized to bind the below -named bidder for the amount shown on the accompanying proposal sheets. 4. The signed bid submitted, all of the documents of the Request for Proposal contained herein (including, but not limited to the product specifications and scope of services), the formal acceptance of the bid by Weld County, and signature of the Chair of the Board of County Commissioners, together constitutes a contract, with the contract date being the date of signature by the Chair of the Board of County Commissioners. 5. Weld County reserves the right to reject any and all bids, to waive any informality in the bids, and to accept the bid that, in the opinion of the Board of County Commissioners, is to the best interests of Weld County. The bid(s) may be awarded to more than one vendor. FIRM Contech Engineered Solutions, LLC BUSINESS ADDRESS 19060 County Road 66 CITY, STATE, ZIP CODE Greeley, CO 80634 TELEPHONE NO 970-356-9600 FAX 513-645-7002 TAX ID # 31-1177165 PRINTED NAME AND TITLE Scott D. Aston, Sr. Vice President SIGNATURE E-MAIL saston@conteches.com DATE August 3, 2020 **ALL BIDDERS SHALL PROVIDE A W-9 WITH THE SUBMISSION OF THEIR BID** WELD COUNTY IS EXEMPT FROM COLORADO SALES TAXES. THE CERTIFICATE OF EXEMPTION NUMBER IS #98-03551-0000. YOU DO NOT NEED TO SEND BACK PAGES 1 - 19. ATTEST. Weld C " 6c0 C:rkt. e6•. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO BY: �,_�. ��_•. �-.� .r! 1 Deputy Clerk o the =oar BID REQUEST #B2000155 ke Freeman, Chair AUG 2 4 2020 Page 21 oWb - 02 J`� � Rose Everett From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: Niederberger, Daniel <DNiederberger@conteches.com> Wednesday, August 12, 2020 3:23 PM bids Niemann, Pete Hokestra Pedestrian Trail and Bridge - Bid Submittal Proposal_BID SPECS - PREFABRICATED PEDESTRIAN BRIDGE-155_20200813.pdf; Aston - Authorization to Bind Bidder - Hokestra Pedestrian Trail and Bridge.pdf; Contech Digital Seal Authority and Enforceability (executed 06.08.20).pdf; Bid Bond QR217 - Weld County Colorado.pdf; W9 CESLLC.pdf; Hokestra Bridge - Contech Qualifications_ 20200813.pdf; Hokestra Bridge - Longmont, CO Weld County BRIDGE QUOTE_ 20200811131016455.pdf; Hokestra Bridge - Longmont, CO Weld County APPROACH RAILING QUOTE_20200811131016455.pdf Follow up Flagged Caution: This email originated from outside of Weld County Government Do not click links or open attachments unless you recognize the sender and know the content is safe. To whom it may concern, I hereby waive my right to a sealed bid. Please see the attached documents for you review regarding Contech's bid to provide the pedestrian bridge specified for this project. Please note that even though our corporate address is listed in West Chester, OH, this bridge would be fabricated within Weld County at our facility in Greeley, CO. Additionally I have attached a quote that can be passed along to the selected General Contractor for the approach railing as shown and detailed in the provided plans. If you have any questions regarding the information I have provided, please do not hesitate to contact me. Thanks, Daniel Niederberger, P.E. (CA, NV) Truss/Bridge (NV) Consultant Contech Engineered Solutions LLC 5 Sierra Gate Plaza, Suite 390 I Roseville, CA 95678 Off: 916-945-3625 Mob: 916-990-7594 dniederberger aCfconteches.com www.ContechES.com This email may contain confidential and/or privileged information. If you are not the intended recipient, you are hereby notified that retention, dissemination, or copying of this communication is prohibited. If you have received this email in error, please notify the sender by reply email and permanently delete this email and any attachments. Thank you. 1 C=>NTECH ENGINEERED SOLUTIONS CONTECH ENGINEERED SOLUTIONS LLC DIGITAL SEAL AUTHORITY AND ENFORCEABILITY This communication is being provided on behalf of Contech Engineered Solutions LLC ("Contech"). The use of an electronic image of the corporate seal of Contech (the "Digital Seal") and the attachment of the Digital Seal to any surety bond (or any related document) to which Contech is a principal is authorized. Contech acknowledges and agrees that the Digital Seal may be affixed to any Contech surety bond (or any related document) to which Contech is a principal and relied upon to the same extent as if a raised corporate seal were physically attached to the bond. Delivery of a digital copy of this Digital Seal Authority and Enforceability notice, executed electronically, to a surety, oblige or their respective representative shall constitute effective execution and delivery of this notice and shall have the same legal effect as delivery of a tangible original of the notice with my original "wet" signature. In Witness Whereof, this has been executed by the General Counsel of Contech. Dated this 8' day of June, 2020. Nick Ivezaj General Counsel on behal ontech Engineered Solutions LLC C=.=NTECN ENGINEERED SOLUTIONS Scott D. Aston, Sr. Vice President Contech Engineered Solutions LLC 9025 Centre Pointe Urive, Suite 400 West Chester, OH 45069 saston@conteches-com Phone: (513) 645-7135 www.ContechES.com August 5, 2020 Weld County Purchasing Department Attention: Controller/Purchasing Director P.O. Box 758, 1150 "O" Street Greeley, Colorado 80632 Re: Bid Proposal for: Hokestra Pedestrian Trail and Bridge Please accept this letter as your notice that as Sr. Vice President of Contech Engineered Solutions, I am authorized to bind Contech Engineered Solutions LLC for the bid proposal for Hokestra Pedestrian Trail and Bridge. If you have any questions, please feel free to contact me. Sincerely, A QUIKRETE" Company CNA Bid Bond CONTRACTOR: (Name, legal status and address) Contech Engineered Solutions LLC 9025 Centre Pointe Dr., Suite 400 West Chester, OH 45069 OWNER: (Name, legal status and address) Board of County Commissioners of Weld County, Colorado 1150 O Street Greeley, CO 80631 Bond No. QR217 SURETY: Western Surety Company: South Dakota Corporation (Name, legal status and principal place of business) 333 S. Wabash Avenue 41st Floor Chicago, IL 60604 BOND AMOUNT: Five Percent of Bid Amount (5% of Bid Amount) PROJECT: (Name, location or address, and Project number, if any) Project: Hokestra Trail Pre -Fabricated Pedestrian Bridge This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 3rd day of (Witness) Melinda S. Fugate z7 A% tad 9Jl August , 2020 EC) ate ';c:.SOfG Contech Engineered Solutions LLC 1 Ui sEaL (Principal) D �� (Witness) Dokmai Bell (Title) Scott D. Aston, Sr. VP Western Surety Company (Surety) Seal) ��NglUhleury' a"" J�Ert• y'y .4 70.04,4 0 eal) (Title) ChristopherjOwens- Attorney -in -Fact 3\. ` r.AV*° ' yes 4'. Printed in cooperation with the American Institute of Architects (AIA). The language in this document conforms to the language used in AIA Document A310 - Bid Bond - 2010 Edition. Bid Bond Instructions GENERAL INFORMATION Purpose. AIA Document A310-2010 establishes the maximum penal amount that may be due the Owner if the Bidder fails to execute the contract and to provide the required performance and payment bonds, if any. It provides assurance that, if a bidder is offered a contract based on its tendered proposal but fails to enter into the contract, the Owner will be paid the difference in cost to award the contract to the next qualified bidder, so long as the difference does not exceed the maximum penal amount of the bond. Related Documents. A310 is not incorporated by reference into other AIA documents. For further reference on bonding procedures, see AIA Document A701T"-1997, Instructions to Bidders; and AIA Document G612'-2001, Owner's Instructions to Architect. Use of Non-AIA Forms. AIA Document A310 may be used with any appropriate AIA or non-AIA document. CAUTION SHOULD BE EXERCISED BEFORE ITS USE TO VERIFY ITS COMPLIANCE WITH CURRENT LAWS AND REGULATIONS BY CONSULTING WITH AN ATTORNEY OR A BOND SPECIALIST. USING A310-2010 Modifications. Particularly with respect to professional or contractor licensing laws, building codes, taxes, monetary and interest charges, arbitration, indemnification, format and font size, AIA Contract Documents may require modification to comply with state or local laws. Users are encouraged to consult an attorney before completing or modifying a document. In a purchased paper AIA Contract Document, necessary modifications may be accomplished by writing or typing the appropriate terms in the blank spaces provided on the document, or by attaching Supplementary Conditions, special conditions or referenced amendments. Modifications directly to purchased paper AIA Contract Documents may also be achieved by striking out language. However, care must be taken in making these kinds of deletions. Under NO circumstances should standard language be struck out to render it illegible. For example, users should not apply blocking tape, correction fluid or Xs that would completely obscure text. Such practices may raise suspicion of fraudulent concealment, or suggest that the completed and signed document has been tampered with. Both parties should initial handwritten changes. Using AIA software, modifications to insert information and revise the standard AIA text may be made as the software permits. By reviewing properly made modifications to a standard AIA Contract Document, parties familiar with that document can quickly understand the essence of the proposed relationship. Commercial exchanges are greatly simplified and expedited, good faith dealing is encouraged, and otherwise latent clauses are exposed for scrutiny. AIA Contract Documents may not be retyped or electronically scanned. Retyping can introduce typographic errors and cloud legal interpretation given to a standard clause. Furthermore, retyping and electronic scanning are not permitted under the user's limited license for use of the document, constitute the creation of a derivative work and violate the AIA's copyright. Identification of the Parties. The Contractor, the Surety, and the Owner should be identified using their respective full names and addresses or legal titles under which the bond is to be executed. The state in which the Surety is incorporated also should be identified in the space provided. Bond Amount. The dollar amount of the bond should be provided in both written and numerical form. Project Description. The proposed project should be described in sufficient detail to identify (1) the official name or title of the facility; (2) the location of the site; (3) the proposed building type, size, scope or usage; and (4) the project number required by the owner, if any. A project number may be required by certain public owners to adequately identify the project to which the bond pertains. Execution of the Bond. The bond must be signed by both the Contractor and the Surety. The parties executing (signing) the bond should print their title and impress their corporate seal, if any. Where appropriate, attach a copy of the resolution or bylaw authorizing the individual to act on behalf of the firm or entity. As to the Surety, this usually takes the form of a power of attorney issued by the Surety company to the bond producer (agent) who signs on its behalf. Printed in cooperation with the American Institute of Architects (AIA). The language in this document conforms to the language used in AIA Document A310 - Bid Bond - 2010 Edition. Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation has ing its principal office in the City of Sioux Falls, and State of South Dakota. and that it does by virtue of the signature and seal herein affixed hereby make. constitute and appoint Jeffrey W McCart, Christopher Michael Owens, Catherine Ogilvie, Stephen R Adkins, Individually of Duluth. GA. its true and lawful Attorneytst-in-Fact with lull power and authority hereby conferred to sign, seal :rod execute fur and on its behalf bonds undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to hind it thereby as fully and to the same extent as it such instruments were signed by a duly authorized olficer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed. This Power of Attorney is -made and executed pursuant to and by authority of the By -Law printed on the reverse hereof. duly adopted. as indicated. hs the shareholders of the corporation. In Witness Whereof. WESTERN SURETY COMPANY has caused these presents to he signed by its Vice President and its corporate seal to he hereto affixed on this 19th day of February. 2020 State of South Dakota County of Minnehaha }ss WESTERN SURETY COMPANY 'aul T Brutlat. Vice President On this 19th day of February. 2020, before me personally came Paul T 13nitl:t, to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls. State of South Dakota: that he is the Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument; that he knows the seal of said corporation; that the seal alli,xed to the said insuuntent is such corporate seal: that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authurits and acknowledges same to be the act and deed of said corporation. My commission expires June 23, 2021 J. MOHR (OR)soumuwor CERTIFICATE (--)-7)9x-ii/LJ J Muhl. Notary Public I, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certily that the Power of Attorney heie tahosr set 'mill is still in force, and further certify that the By -Law of the corporation printed on the tevetse hereof is still in force In testimony whcieof I have hereunto subset Med my name and affixed the seal of the said corporation this 3rd day of Au turf ypR• • frig?" (144frAl if WV' en IP k�►N O0r Form 1.4280-7 2012 Go to www.cnasurety.com > Owner / Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity. WESTERN SURETY COMPANY 246Lfril/-". " I_ Nelson, Assistant Secretary Authorizing By -Law ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By -Law duly adopted by the shareholders of the Company. Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall he executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President. or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary. any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies. or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds. policies, undertakings. Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may he printed by facsimile. CNASURETY Digital Seal Authority and Enforceability This communication is being provided on behalf of all CNA Surety companies, including Western Surety Company, Continental Casualty Company, The Continental Insurance Company, American Casualty Company of Reading, Pennsylvania, and National Fire Insurance Company of Hartford (collectively and individually referred to as "CNA Surety"). The use of an electronic image of the corporate seal of any CNA Surety company (the "Digital Seal") and the attachment of the Digital Seal to any surety bond issued by a CNA Surety company is authorized. Each CNA Surety company acknowledges and agrees that the Digital Seal may be affixed to any CNA Surety bond and relied upon to the same extent as i f a raised corporate seal were physically attached to the bond. Delivery of a digital copy of this Digital Seal Authority and Enforceability notice, executed electronically, to an Obligee or Obligee's representative shall constitute effective execution and delivery of this notice and shall have the same legal effect as delivery of a tangible original of the notice with my original "wet" signature. In Witness Whereof, this has been executed by the Vice President and Surety General Counsel for each of the CNA Surety companies. Dated this 31' day of March, 2020. *7n ojaz. Rosemary Quinn Vice President and Surety General Counsel on behalf of Western Surety Company Continental Casualty Company American Casualty Company of Reading, Pennsylvania • ••• • • .I • •••s/ .•• • Cane %. •• • The Continental Insurance Company National Fire Insurance Company of Hanford CNTECH ENGINEERED SOLUTIONS A QUlKREIE'COMPANY 9025 Centre Pointe Drive, Suite 400 West Chester, OH 45069 Phone: (513) 645-7000 Toll Free: (800) 338-1122 www conteches.com August 10, 2020 To whom it may concern, Contech Engineered Solutions submits the following information as a part of our bid to be selected as the bridge manufacturer and supplier for the Hokestra Pedestrian Trail and Bridge in Weld County, CO. For over 40 years we have been designing, fabricating, and delivering prefabricate steel bridges. Nationwide, we are known for our customer service and quality structures. Our Engineering and Drafting team can provide designs for bridges, ramps, towers, and stairways for almost any bridge situation. Each bridge is custom engineered and fabricated to meet your specifications and delivered by truck directly to your jobsite, ready for installation and immediate use. Our bridges utilize cost efficient, tubular shapes of weathering steel or painted carbon steel, offering you a range of material applications. We currently have four fabrication facilities and various other partners to assist in our ability to provide high quality bridges throughout the county. Please see the below list of bridges of similar sized bridges that have previously been provided in the State of Colorado since 2015 and the attached requested documents for your approval. Project No. Year Fabricated Location Name Size Customer 521801 2015 Fort Collins, CO Fossil Creek Ped 110x10 Connell Bridge Resources, Inc (970) 818-6866 523026 2015 Boulder, CO South Boulder 75x10 L&M Creek Ped Bridge Enterprises, Inc (970) 532-3706 529562 2016 Fruita, CO Little Salt Wash 67.17x10 Hudspeth & Riverfront Trail Associates (970) 872-3133 526112 2016 Golden, CO I-70 Bike Path 120x10.5 Hamilton Construction [541) 746-2426 560903 2017 Salida, CO South Arkansas 80x10 Y & K River Bridge Excavation, Inc (719) 539-4108 560406 2017 Silverthorne, CO Nike Bridge 151.83x11.33 Betone Civil Replacement Constructors (970) 485-2688 561473 2018 Denver, CO Globeville Landing 113.57x8.5 Ames Outfall Construction (303) 363-1000 549605 2018 Erie, CO Colliers Hill Metro 80x10 BrightView District 20.5x10 Landscape Improvements (303) 841-8400 567413 2019 Denver, CO Boulder Creek 80x12 Boulder Creek , Neighborhoods Ped Neighborhoods _ Bridge _ (303) 544-5857 593753 2019 Fort Collins, CO Fort Collins 65x10 Connell Pedestrian Bridge 40x10 Resources, Inc (970) 818-6866 CqeSTECH STRUCTURAL PLATE CON ��1`r SPAN DRIC E SYSTEMS BE9SiliPt_ rrh SYslrmc a CONTINENTAL N NENTAL lact.....1,:an I -sio°'"t-`..- CaNTECH ENGINEERED SOLUTIONS A IM ' COMPANY 9025 Centre Pointe Drive, Suite 400 West Chester, OH 45069 Phone: (513) 645-7000 Toll Free: (800) 338-1122 www.conteches.com 628707 2020 Nathrop, CO Mount Ped Bridge Princeton 66x8 Diesslin Structures, Inc (719) 539-0855 631525 2020 Commerce City, CO Access Connections 30x10 ESCO to ROAR 75x10 Construction (2) 35x10 _ (303) 674-9967 For more information and colorful pictures of the many bridges we have done, please visit our Web site at www.conteches.com We look forward to working with you on this and future projects. If you have any questions, please give us a call. Sincerely, Contech Engineered Solutions, Inc 9025 Centre Pointe Drive, Suite 400 West Chester, OH 45 069 Phone: (513) 645-7000 Toll Free: (800) 338-1122 ecru- lAt P AYE CONI SPAN' 1 I ANA *slam a.CONTININTAL BRIDGE tit(1\I �Y. i"hi ENGINEERED SOLUTIONS A QUIKRETP COMPANY 9025 Centre Pointe Drive, Suite 400 West Chester, OH 45069 Phone: (513) 645-7000 Toll Free: (800) 338-1122 www.conteches.com Table of Contents Page Bridge Manufacturer's Product Literature 4 Sample Drawings and Calculations 12 Splicing and Installation Instructions 49 Warranty Information 56 Inspection and Maintenance Procedures 57 AISC Shop Certification 64 AWS Shop Certification 65 CWI Certifications 66 *Note: Contech acquired Big R Bridge in December of 2019. As such there is a mixture of documents from Big R Bridge and Contech Engineered Solutions included with the following qualifications. %MAU ATE 1CONS SPAN' BRIDGE SYSTEMS BEBSIPPIt ._ An:?' Systcrr: �Iilfil�►CO�NINTAt CO min lee rive How Can We Help You? Building Blocks to a Successful Project. Contech prefabricated truss bridges are durable and aesthetic solutions. Prefabricated manufacturing means fast installation and substantial cost -savings. Contech truss bridges are typically erected and installed in one to three days, without the need for field welding. Contech truss bridges feature efficient bridge design and construction that is customized and manufactured to your specifications. SOLUTION DEVELOPMENT • Product Design Worksheet • Structure Selection • Siting & Layout • Design Your Own Bridge (DYOB1 • Engineer Estimates • Site Simulation • Proposal Preparation • Design Build Support DESIGN SUPPORT • Specifications • Contract Drawings • Permitting Assistance • Structural/Fabrication Drawings • Approval Assistance • Custom Solutions • Horizontal/Vertical Alignment • Foundation Support "UPI Steadfast Capstone` Scottsdale, AZ Steadfast Colonial Flat Lansing, MI INSTALLATION • Preconstruction Meeting • On -Site Installation Assistance • Logistics Coordination STEADFAST BRIDGES Steadfast Vehicular Steel Truss Bridges Steadfast Bridges® are known for its safe, durable, affordable and aesthetic solutions. Steadfast truss structures are suitable for residential and commercial developments, Department of Transportation, municipal roads, parks and trails, as well as industrial and mining facilities. Steadfast Bridges Offers: • Clear spans to 200 feet • Bolted or welded construction • Weather, painted, or galvanized finishes • 35 year galvanized warranty • Aesthetic solutions • Quick and straightforward installation with onsite support • Improved hydraulics • A variety of rail, deck, and finish options • Extensive technical support • Manufacturing with AISC major bridge certification • Fracture critical and sophisticated paint coating endorsements S CONTINENTAL• BRIDGE Continental Pedestrian Steel Truss Bridges Since 1972, Continental'. has been North America's premier brand for pedestrian steel truss bridges. With more than 1 4,000 installations worldwide, Continental truss bridges are ideal for parks and trails, golf courses, skywalks, environmentally sensitive areas and developments. Continental Bridge Offers: • Clear spans to 250 feet and more. Spans greater than 250 feet with custom design • Pedestrian crossings over highways, railroad tracks, rivers and wetlands • Pre -fabrication allows for rapid installation • Aesthetic solutions • A variety of rail, deck, and finish options • Extensive technical support • Manufacturing with AJSC Moor/Intermediate bridge certifica`ion • Fracture critical and sophisticated paint coating endorsements EXPRESS TRUSS NN\N\NNIAAAA CONTINENTAL* BRIDGE EXPRESS Connector') Albuquerque, NM beast . mss sw •■ otaietvw -*gab 4 Continental Capstone' Continental Thrust Arch Las Vegas, NV Alcoa, TN Pre -Engineered AASHTO Pedestrian Bridges The EXPRESS" Truss bridge is a pre-engineered pedestrian steel truss bridge designed for owners, engineers and contractors who know "time is money" This standardized truss system provides stamped drawings within one week after receipt of order and a bridge ready for shipment in less than eight weeks, significantly reducing construction time. The speed, quality and value of EXPRESS''.. bridges will ensure you receive the industry's bes- customer experience. EXPRESS Truss Bridges Offer: • Stamped drawings within 1 week after receipt of order • Bridge ready for shipment within 6 - 8 weeks of approved drawings • Quick and straightforward installation • Designed in accordance with AASHTO • IBC design is also available Steadfast Link) Baker, WV Municipalities & Counties Time -sensitive projects and emergency bridge replacements often lead municipalities to a Steadfast vehicular or EXPRESS pedestrian truss structure. The clear span structures can improve hydraulics and m nimize road and trail closure time with a quick installation, while fitting within a budget. Structures are typically installed in 1-3 days and require minimal maintenance. Continental Keystone'' Raleigh, NC Continental Gateway" Apopka, FL e Energy, Mining & Industrial Continental steel truss structures have been utilized for pipe support, conveyor support and other elevated crossings. Steadfast vehicular structures, which meet AASHTO loading criteria, will accommodate large construction vehicles and equipment for the transport of heavy materials. The strength and durability of these systems allow for a wide range of unique solutions. Steadfast Capstone `' Rodanthe, NC Continental Capstone® Beavercreek, OH Continental Connector', Morris, IL Continental Connector'a Stephens Point, WI Steadfast Capstone Haworth, Ni Continental Custom Natchez, MS Continental Custom Connector"' Flight 93 Memorial - Shanksville, PA Moab, UT Continental Connector' IIIMINISWINEMIletaittrattzetrirr-_ _ Continental Gateway' Dedham, MA Continental Gateway` Moline, IL Park, Resorts, Trails, Golf Courses & MORE Resorts, tourist attractions and signature golf courses all over the country have turned to Contech pedestrian and vehicular truss structures with a wide variety of styles, rail, deck and finishing options available. Contech was fortunate to have participated in providing the 800' long multi -span, Connector -style, Continental truss bridge at the site of the Flight 93 National Memorial in Shanksville, PA. The pedestrian bridge allows visitors dry passage over the wetlands area. Continental Custom Gateway' Des Moines, IA PROVIDING COMMUNITY SOLUTIONS Residential & Commercial Continental pedestrian and Steadfast vehicular truss structures have been selected by aevelopers throughout the U.S. to prov'de practical, yet aesthetic structures in residential developments, hospitals, schools and communities. These structures are available in an array of style and finish options to proviae a signature look as well as guarantee safe, reliable bridges for every day use. Developers also look to Continental pedestrian and Steadfast vehicular truss solutions for busy commercial sites. Often times, these bridges are main entrances or centerpieces for business parks, shopping centers and local communities. Steadfast Colonial Harrison County, IN Continental Custom Gateway' Warren, OH Continental Gateway" Kissimmee, FL Continental Cable -Stayed Mishawaka, IN Continental Gateway' Daytona Beach, FL Si-lnate., ;..iii« u:t Custom Designs & Signature Looks Speciality truss bridges by Contech can be custom designed to specifically fit your project's needs. Our bridges have been successfully designed to replicate a particular bridge style or create a brand new signature look. These custom options have included: • Gangways onto floating docks, wildlife crossings, material handling and pipe support systems within buildings • Bridges enclosed with stone, stucco, wood or other materials • Multi -color paint systems and decorative lighting • Cable -stayed bridges and skywalks • Specialized railing, decking and finish options • ADA accessible ramps • Thrust arch, support towers and decorative towers Continental Connector" Dulles, VA Rail Options Cable Deck Options Wood Finish Options Weathering Steel Mesh Panels Steel Grate Painted Steel Safety Rail/Wood Rub Rail Concrete Asphalt' Galvanized Steel Vertical Picket/Pipe Handrail Our truss structures offer a wide ranee of tail, deck and finish options that guarantee a distinctive look for anv bridge. * Aoolies to Vehicular Truss Only. Continental® Pedestrian Truss Styles* Connector' sk ESS Oa SEE EL SEMI la ale SAS aflame a _ ..fir. wig r. a S AS ESE EI1S—r eara gime as �a is...iiiTh— a Se a ea a =MINIM a SS IS • I Janata alIS a Spas IV all.' ---- --".' Keystone' Gateway Tied Arch t. ..r .... =`-mss Capstone` 'Custom styling is available to make your project a reality (e.g. skywalks, cable -stayed bridges). Steadfast Bridges® Vehicular Truss Styles Colonial Flat Colonial Link aromoThn or re• LEI IS AS al al. gr alga NI Ark a SW a sw r • • L Capstone`' • • Keystone" `` Horizon Archway Contech' Engineered Solutions offers a full range of pedestrian and vehicular truss styles for your project's needs. As highly skilled solution providers, we are ready to support you in every phase of your project, from concept to installation. ENGINEERED SOLUTIONS C%'tto'NTECK COMPLETE SITE SOLUTIONS STORMWATER SOLUTIONS Helping -o satisfy stormwoter mana eme•,t rervirer'ents ors development projects • �tormwater Treatment •Detention, lnfiitro-iota • Rainwater Harvesting • Giotiltrat•on, Bioretention PIPE SOLUTIONS Meeting protect needs for durability, land hydraulics, corrosion resistance, and stiffness • Corrugated Metal Pipe (GAP) • Steel Reinforced Polyethylene (SRDE) • Nigh Density Polyethylene (HDPE • Polyvinyl Chloride (PVC) Contech Engineered Solutions is the nation's leading provider of site solutions products and services for the Civil Engineering industry. With more than 40 manufacturing facilities across the United States and around the world, Contech has the resources to support every site development need. Visit us at www.ContechES.com or call Toll Free: 800-338-1122 C NTECH ENGINEERED SOLUTIONS 2016 CONTECH ENGINEERED SOLUTIONS LLC ALL RIGHTS RESERVED PRINTED IN USA. NOTHING IN THIS CATALOG SHOULD BE CONSTRUED AS AN EXPRESSED WARRANTY OR AN IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE. SEE THE CONTECH STANDARD CONDITION OF SALES ;VIEWA3LE AT' WW.CONTEC-IES.COM/COS) FOR MORE INFORMATION. steel steel STRUCTURES SOLUTIONS Providing innovative options a110 support for crossings, culverts, and bridges • Plate, Precast & Tr'. ss brie^es • Hard Armor • Retaining JVails • Tunnel Liner Plate For more information, call one of Contech's Regional Offices located in the following cities: Corporate - Ohio (Cincinnati) California (Roseville; Co oraoo (Denver) Florida (Orlando) Maine (Scarborough) Maryland (Baltimore) Oregon (Portland) Texas (Dallas) Get Social With Us! 6100 We print our brochures enrurely on Folest Stewardship Council certified pope'. FSC certircation ensures roof the paper in Du brochures contain jibe' hop well -managed and recoonsibly loivDsted t0'osts that ;neat strict envi!onmen*cil and socioeconomic stancicuds ?Tinted with soy inks 513-645-7000 800-5-48-4667 720-587-2700 321-348-3520 207-885-9830 410-740-8490 503-258-3I80 972-590-2000 FSC :..Pi' ..:•.c .• R •4$ "/•04t ■'1900 tt >XnczL -014 Orli ;I) Paam {Aar• (•O ar Wilma sdatt ale 411 tot* t v. Ol tft • .9 ✓ "W. X1AZ 4.. 1 •40113•4 a?1Cit0 +•S 4104 40004, PLFwi el LOu!Ma ar ENV V\Aic t f5 6 t i • 1/. J t _ — . t I.Lna tat • IL* -•11• f e •111. .eat / I- 11. bi ). IU C. WEE? Ira( •a•an* ilit lit; Oa ./l J/ a PACC. • S -e ••r-•- • tie Mr-K1ACa luP CNUNC `•_ St,CMAaS 3/t& DEAD .Mat) C4uiii. i41 for. COS ss•—ar 171s ca 1,464 o J 4 or awl ELEVATION rat _ CCNTir: NAILF..R DECK LEVE . FRAMING LEVEL BRIDGE PLAN L0sCa•E'f AR.:Tktrit tlY o1itei 1 aawl-1 \-1\-6- PLA XPJW hc.1 c _ Ir- I w.: tar ONADI • Ito 6SSAa. —••••.“ a3a•�.ow -- BEARING ASSEMBLY t•.o attix taw STM_ T HSS 5 • I • Ai us a BRACING LEVEL HSS 6 • a • aft Ia. 31111 'I II it CorOtt tt •444004 at u a•ut:.) Vice• '3114. t r- w OWN CLOSER MD: 5A.I - or, J • t/; . I I fa ) t y err" C••Itoa 'Wit wan L•t AS RE00 'C. SWIM rk,i (stuereVCR is Liss) 4AT(34!D Eur.LS y (LOOK 9EAU 14 VEJ'MA.S 1.) BC PNt4A' vent 1•Ara4 +AU( * rat t DETAIL •1I1.. 'Y LOSS 0A•t.N9CR 10 01 UC1ERSI NCI. Is ACCORDANCE. VAIN AWS :;I.+ fu:f WELD DETA J . 7 11— 4/s' ►;.n OA As DCCU IQ rums air froir'liseeF IS Lees) 4AI(alt0 Cocfs OF LRAM AL_; W 41014. glow; CPC R35 TG DC '14* nuts ANJ EJ•n •L`Crot SCAM TC O C VCFIIC' IO tip a•N•1iAL P£wttnAfji fiil➢s WELD DETAIL LG.+ER PiCELt MN. 10( ►a in .coo txva •�' •.�•.+ �...pp�� stra.+.cta { TA taf(N Ot1t SO T Rim r?s0R0 *Hi. • as OM, Or t%JA S. altr140a .MItI - t -O' a r-0- a 1- t M/ 2- 5/16• • 1 sr:" tLOrte0 na4 S r -o' • r•-'2' • 1/+' t Y•/ z- I vie 8•A M;1LtS - (a} 0 as Alta• A,$ S *301 44.4d - LRALC} iaymiku'O:i Noon Ea: *A1) 'tilt • I! i 1�:' O . Mali EA • GG•P u: worn will (a.O U1 Dam* Ct+th.R*: SIDE VIEW - BEARING ASSEMBLY (11XLC this, t LOAtx r;;;KCt •tIIL'tt ):t .'LA I! •� n ma \\ Antra ass( pwarsotw / •/1) ale a mat ona i tab.: Laa1f- naN• (.At$ Gtr • • P.aaN• SUY°o•T: -••008 tea .-41•Scot KAY 114 p :INTER N..k(k TaIa3/t6 a+/ '2) 6/14 a Skai - 1 N'ft'I •C %C*L WS LACJ4 P_4414 Nair**. A O. BRIDGE SECTION 'as s u ha 14 --�� RYtA01 •uPa,040 ii Woo nu 4,113 loaf b.aAast Wok, i Ill' Wet- flat. 4rvP CACI' DO) Bones cnLNO tie flare • .'-O• .; r t r/:- —. t vile • 3 ./3 0,,0143 man t'- CA' a 1' •0 • 3/e r./ 2- I S/r6' :AA •NJtt� 3i 1' ba *11w Au NA a)? IKwu. taMJ) •a'•-tt.0 masts natal ti 11) as•tl e ( I ) 3 If . (. A�,at • $p *rat iatirr, •Oti� stft �1 Wail t•tII it al. Xf SUUt'I'1 *1k! WELD DETAIL rC.p OH bOfON CN9AO 4IR1k:44 ass ••• • I/• S DE VIEW - BEARING ASSEMBLY SCHEDULE OF MEMBER SIZES SOflOS C!~Ot3O *5S c • i • l/• ‘401W.A. CS a••.1. OF.AG90444 WE • • 3 • VIII ;&cf tiwtfiau1- MSS 3 * 3 • tit• ,.Cwt 4i5km tau 10 • • • 3 jt0 or F; t T ( : 11 • • 11, a • 1/0 ✓L A?4)L MOLODowN ; ( 1:4 • • 1/41 . 111 stRrtas tats • •: • into Pt AM( %PRAT i 2. 2. 3/1C t eacR faLt Asir KU i in • I 1/1 a 1/8 I)YP-01 Pitleti LW 1 1 1 Ira • t t/1 a ICI GENERAL NOTES 0E96N 5'RES:.EB ARE in AOa3$CANLE Mitt Tat: 4AAVAt Cr Stitt Cati'IRu_'a,N rat ALL(Ns•ViC liRE5S :4.:x;:• +5 AbaP IEC UT Mt AMtRICM Visllturl of step. :orc3MI'Cnrgi (Njr't wall. CCiten 2 OPeca Mt✓a4A. AM tA.�(a:s4 'Sw '.t.N :i4CI.(.t•i .0. •tt0• .rotirMRA Ak.afl-•a[..c• .(A•spK.1q A� Sta••1 ASt+• aj•! . .7.+ICL d:. & %it1.•Af 4.40 It. lipsty,AA rtlK .M :+ ./ *tt.A.046 t••.r1; {rr ..oltaaDorarm PIPE 3 bkca UC4-.•a. : •! i • Tt•ta ITAIUi'IL..i t ,0i.as F hp. numm?' 'CG !t.,.EAN ALL IEAlti• Olt { If {Fir`,' (Aie FACfI W(AOE 4. tip GA] MEtru. AkC tlLD;NC PM(TGESS VAR. UxrLF.N/Mica• SMILLDWC CAS tr•-.. bE Lao. .5 ALL VIP ANC at.r ica cnOAD SIC*' Wt.Ct5 IC BE Cia*btt it #OtmATar a iWC stos •2lu 9tl.tcn ;s' C$UIC AXG :tat riilTCA. Sr1Ati AL AS p TAIL' a. . at *S mutt& • a tratac110ras tnaa I QA M C ••sa G+?TLavt: 1 cA A n t 4 past C011At r(7 ta1( haeLjfw Or tia MA it t.aa •t.,A[O S. lit rtaava Ga NAOS 3a'&L K a As amain. &ct At �ApnO/'i oa St V All AASLO A,s d) fW tf ►wr 1 r4la 4ar Shea Val St SU uEt1f_0 10 C) CtU a4kQJ. FNA1-51MUCIL'FA: UCMU;(.: ANN at STITC•• MICE!) ro InCa StP?3xhkC uimotAS '. W5DC MSC). WAS C•rt` PAW) ON CtA4i 14ASICl.s I 7.1; FOLtOfG :UAW; 1M.1CA it,. PAOcaC-E I•44 AI ICI t41 LAI I: ZN Ml..ii►-A snits -ca A) 3:+ PW UNJCtu 0v( LQAOWc fit fir NU. Debt sets a 0t.! awta roam) %OSA sAAO. n a1.0 1[ ro to a • rt.W-sl•Sp .MM c or n (WD at •.L A sA •KR3 •11.111 S• Of K ao C •• sct"c-cc sir k S,#iitt. tme�X .G.✓xi1r+at• S11io+a114444 a JLCO ai No.. tCS� l.t.3 i>r tsakk QCalifit, A�t vie ll 4O ufD n ttOA i'0 A11G IM(it1.Ork. tNt an POtads Null ISE LAS A•IA LIVE LOAM ;i+Ali aF AFhulfo Ica mats or SAM llC.5S i•iMbi.AS 11. ACCOfaaMuC sa 1s1 SPEOAL Snarl( AEA tECI.OM 11,71 B) lb PSI" vivo LOAu arm 94. tLlt NeiCeit Cl .HE iialOGt. A: a INCLOtt(L. C) ZO PSC UPMAnO fu.iCf Arrtuo Al Da •AM.NMO ]u4NTCR P01•1t1F 1st MAILS VLrtcI, 0Ra•Gf terns (AA_41TO flt.3)- t mast. AtA l4'COR4r &Aa1 raLl3 Cr SIM Imo. 44 a*3t :{'VALb w *c c e wOt W Mitt Ll%.Ct.mfa ►.wtt,a.I:..4.0orl swwwCp rwrA/t.6a•t mischuCA1•wz talks a. 1 (14UW-4t1 lr/t!f hlAw.G till ST. v1>t1T s SV tra 1 • 4 a 3114 MU 1 a••:, teat mate fir to tack t'e a►ttQs sten ••s s •S•3iIt �•-00+13RtK AOtC* 1 I!j ;1• Oe�(+tsl -'—a- • a• . N CI '•Iar1AIt3 1atf. Piste t!b.t•44 OK It; lea 6u.0(a a TOO ISAft •• C. I. • 1/711' NJUa Sago IV IC CA Ca -Ito R t a ICtbea IL Wa10a n•IC CU>L 4414M,) • a. 1 3 :'a• . 3!•' 1• c QQTT;1tt 21a TEFLON BEARING DETAIL A •Lt00 az4 a Paostva - tilt sA.ctaat aM AtCOTA AItC ..v A.d p'taICAao•tt 4WD* K LQ.aAtt 000I•artI•t:. SC Ants that sop relye(tm1. alga Ian as. an iia bttca t t tar •a.0 1?A.,: ct•Ess. 3 R Aa( CI•I4A s ral•PO llttit. 1D war i% R 'QC Mat Mw 04 lay w7M0'. Cm' to conic taut: tan 4143 sacC ii wits= ThESE PLANS, AS INSTRUMESiT:.• OF SERVICE ARE 'RCPERTY SULLY Of CON11NE'TAL BRIDGE. Trier ARE NOT TO 8E (EPRODUCch FOR ANY PJRPOSC OFi USEC en 444Y OTHER LOCA11O1s tteMOUT WITTEN RU1HCRIZAT1i3N. CONTINENTAL FRIDGE ALEXANDRIA MN 320-852-7500 1101 -Or X e'-- 0' PEDESTRIAN BRIDGE REVISED 03/00 PAGE G3 (DRAWING OF 2) { V r A:- earor��= 0 TOP CHORD SPUCE rISS 4444 Tn a1 ills vx•t(. 41111 SE9DON N -B BOTH CHORD SPUCE ELAN NNr.,; .Tip na. �U.n . O DIAGONAL SPUCE Bad O BRACE DIAGONAL SPLICE 1,12,2.1,2? RIPE El ALOES ST LAGER SPLICE C) TYPICAL PICKET LAYOUT EDEN A -A C) PICKET RAIL SPLICE PICKET ATTACHMENT DETAIL I ANCHOR BOLT ELEVATION COME APAD11O6 AS Re LOCAL OR WA.OOANIC sumo OCOt5 AS MAIM t.741,12-4..,-4,„...„ yort tICON ON I6iftiiiiaiICEMI =MEM MI r23172111111111111111 EMI IIEZI w E! tl ERDIG iIa MeeFA, 't ..uvol.uiwa- .o,to Enx eAg JtA1[ la ;u WOG t}lOK M11. n ,necl V�IK�v::_ 114AY,�v A*N • WR a YR ERTL or 111 OW *Vona la* ant to *la t3EMt Y, W: ttSta> • MNYfY at1N4 3K nowt b4 /M 4( al ED, t� •"atA KQ MTIL avw • YGfE kt Y.ina. L` 14.r. Ltl 49E1 Aw _ PLAN TNESE Pi ANS, AS INSYRI,µINIS OF SERVICE ARE PNUPYRTI' SOLELY OF COY SSEN FYI ORIDGE. HEY ARE NDT 1D BE REPNODULO FON ANY PURUDSE DR USED IN AN, EITHER LOCATION IN !NDJT WETS, FUiNONEO N AiSrana.. RIDGE ENTAL ALEXANDRIA MN 320-852-7500 110'-0' X 8'-0' SPLICE DETAILS REVISED 03/00 PAGE G4 (DRAWING 2 OF 2) Appendix G TRUSS DESIGN EXAMPLE The specifications listed at the beginning of this document were written primarily for pedestrian or bicycle truss bridges fabricated using tubular members with simple welded joints. The following example has been selected to illustrate typical design checks encountered when designing a bridge of this type. A half -through or "pony" truss has been selected to illustrate the checks required for lateral stability of the top chord. In addition to designing the appropriate truss members, design checks for typical "simple" welded joints (without stiffening) shall also be shown. Example: Design a 110 foot long x 8 foot wide pedestrian bridge in accordance with the "Special Specifications for Pedestrian Bridge". The following design loads shall be used: Dead load of structure only: Wood decking @ 10 PSF • Steel weight of 230 pounds per lineal foot, including safety system and toe plate. Live load of 85 PSF reduced as per section 3.1.2.1 for main truss member design; therefore, W = 8510.25 + (15 /1110'x81] = 64.2 PSF (say 65 PSF) Vehicle load: An 8,000 pound four -wheeled vehicle with 60% of the load on the rear axle distributed as shown in Figure G 1. INSIDE OF TRUSS 1 tr,_ 1 ISO., ® 0 2400 # ■ 2400 # REAR DIRECTION OF 4 BRIDGE SPAN 102" FIGURE GI WHEEL LOADS 1600.-1- b to 1600 # ► FRONT A horizontal wind load of 25 PSF applied against the full vertical projection of the bridge as if enclosed. Load Combinations The loads listed above shall be considered to act in the following combinations, whichever produce the most unfavorable effects on the bridge superstructure or structural member concerned. [DL=Dead Load; LL=Live Load; WL=Wind Load; VEH=Vehicle Load] DL + LL DL + VEH DL + WL DL + LL + WL DL+VEH +.3WL G1 TRUSS DESIGN EXAMPLE NOTE: Allowable stresses will be increased by 1/3 above the values otherwise provided when design stresses are produced by wind loading, acting alone or in combination with the design dead and live loads. In order to more easily determine the critical load case for each individual member, load combinations which include wind will be multiplied by a factor of 0.75. The stress in members calculated for all load combinations will then be compared to allowable design stresses with no increase. The following design will be for the bridge shown on the drawings on pages G3 and G4. The member forces used for design have been calculated using a three dimensional analysis program. The following assumptions have been made in the analysis: 1. The chords are continuous and therefore each chord panel member is assumed fixed to adjacent chord members. 2. The equal width vertical members are assumed to be fixed to the chords for calculation of truss "in -plane" bending moments. NOTE: The term "in -plane" shall be used in the following analysis to mean moments which act in the plane of the vertical truss. This is defined for discussion so as to be different from "out - of -plane" moments which act in a plane turned 90 -degree to the plane of the truss. An example of "out -of -plane" moments would be those developed in the truss verticals and floor beams (the "U -frames") in laterally supporting the top chord against "out -of -plane" buckling, 3. The floor beam is assumed fixed to the truss verticals. NOTE: In "pony" truss bridges, floor beams must be rigidly attached to verticals (or to the chords and then the chords attached rigidly to the truss verticals as in the case of underhung floor beams) in order to maintain the "U -Frame" stiffness required to laterally support the top chord. In these situations, unless a detailed analysis of the joint stiffness is done to determine its affect on overall "U -Frame" stiffness and therefore on top chord stability, the floor beam to vertical connection should be equal width (have "matched" edges) or be stiffened with reinforcing plates to insure that not only connection strength but also stiffness of the"U-Frames" is maintained. 4. The end floor beam is assumed fixed to the end verticals. The same issues of "U - Frame" stiffness as discussed for the interior "U -Frames" hold true for the end "U - Frame" as well. 5. Chords are assumed fixed to the end verticals. 6. Diagonals and brace diagonals are assumed to have pinned ends. The full truss analysis results are quite lengthy and have not been included here. The controlling loads for critical member and connection design shall be listed for each member or member size in the design. Design note: All structural bridge elements shall be ASTM A847 tubing: F = 50 KSI minimum F 70 KSI minimum G2 BELTED SPLICE LOCATION CHORD 73 CHORD 4 93 OVERLAP JOINT CAP JOINT Tg A AY T 44 7 54 FLOOR BEAM LOCATIONS (145) B SPACES 41 6'-I` = 48'-B' OF BRIDGE TOTAL BRIDGE LENGTH ITp-p- BRIDLE SYMMETRICAL ABOUT OF BRIDGE VERTICAL TRUSS LAYOUT MEMBERS IN ( ) ARE ON THE BACK (LEEWARD) TRUSS 3'IdJ' YX3 twisaa SSf &L TRUSS DESIGN EXAMPLE Deflection: The following deflections have been taken from the computer analysis: Maximum deflections at midspan of truss Dead load = 1.43 in (vertical) Live load = 2.39 in (vertical) Wind load = 1.12 in (horizontal at bottom chord) Deflection Checks: Allowable live load deflection = 400 110 x 12 = 3.3" > 2.3 9" (OK) 400 Allowable wind load deflection = 500 110x12 2.64">1.12" (OK) 500 NOTE: As a minimum, the truss should be cambered to offset 150% of the dead load deflection; therefore, Camber = 1.5 x 1.43" = 2.15" U -Frame Calculations: TOP CHORD BOTTOM CHORD N G6 of Truss VERTICAL HSS6X4X1/4 (Ix = Iv = 20.9 in4) FLOOR BEAM HSS10X4X3/16 (IX= Ib = 57.8 in4) b — 102.0" (8'-6") FIGURE G2 "U -FRAME" T, of Top Chord h=62.5"(5'-21/2") of Truss E of Floorbeam TRUSS DESIGN EXAMPLE The maximum top chord compression loads at the midspan of the truss, as taken from the computer analysis are: 104.0K due to DL + LL 56.0K due to DL + Vehicle the recommended minimum Crum value is L 1.46 P Where "P" is the top chord compression load times the appropriate safety factor: 104.0K x 1.0 = 104.0" for DL + LL (controls) 56.0K x 1.5 = 84.0K for DL + Vehicle "L" is the spacing between verticals (73") and "C him" is the U -Frame spring constant (or "elastic frame stiffness") as determined by the following equation: Cjurn r E h2 Li31 )+ (2b )] v b Where: E = Steel Modulus of Elasticity (29000 ksi) b and h are the dimensions in inches as shown in the "U -frame" drawing I = moment of inertia of the verticals (in4) I = moment of inertia of the floor beans (in4) The minimum Cf"m required = 1.46 (1'04") = 2.08 73 Cfurn 29,000 = 3.95 > 2.08 (OK) 62.5' [( 62.5. ) + ( 102 )) 3x20.9 2x57.8 Using a factor of safety of 1.5 against out -of -plane buckling of the top chord: CL_3.95(73")` 1.85 Pe (1.5)104K Therefore, extrapolating from the table of 1/k values in Appendix A, for 18 bays, 1/k 0.87 and therefore K=1.15 NOTE: Use a minimum K value for design of the top chord of 1.3; However, conservatively use an out - of -plane bending force of 1/100 K times the top chord compression (see Specification Section 3.3.6), with a K value of 1.15, for strength design of the verticals, floor beams and their connections. Bottom Chord Design: The critical combined axial and bending stresses in the bottom chord occur in member #145 (on the leeward truss) due to 0.75 (DL + LL + WL). The following forces are derived from that load combination: G7 TRUSS DESIGN EXAMPLE Axial Tension (P) = 107.3K In -plane bending (MI.) •k = 18.8'" Out-of-plane bending (M") = 3I.0'n•k Use an HSS 6 x 6 x!/ bottom chord member throughout, Area (A) = 5.24 in' Section Modulus (S and S ) = 9.54 in3 K y Wall Thickness (t) = 0.233 in P 107.3 K fQ = --_=20.5ksi A 5.24 in2 Ai 31.0;,,-k fbx (out — of — plane) = — • = 3.3 ksi S 9.54 in' M ;,, = 18.81"-k fby (in — plane) _ = 2.0 ksi Sy 9.54 in' Fn (tension) = 0.6 Fy = 0.6 (50.0 ksi) = 30.0 1CSi Fbx =Fby= 0.66 F, =0.666(50.0ksi) =33.0ksi Check combined axial and bending forces in the chord in accordance with AISC formula H2-1: Jn +J'bx +Jby 51.0 Fa Fbx Fby 20.5ksi+ 3.3 ksi + 2.0 ksi = 0.84 ≤ 1.0 (OK) 30.0ksi 33.0 ksi 33.0 ksi The end three diagonal members are overlapped connections onto the truss verticals. This has been done for two primary reasons: 1. An overlapped connection is more efficient than a gapped one, reducing problems with connection capacities at the ends of the bridge where truss web loads are highest. and 2: To eliminate chord shear problems or "shear lag" failures. All other diagonals shall be gapped; therefore, the bottom (and top) chords in all bays other than the end three bays must be checked for combined axial, bending and shear forces. The critical bay for this check in this bridge was in the fourth bay from each end. Check the bottom chord for shear and for "shear lag" assuming all shear loads in the chord gaps are resisted by the two chord sidewalls or webs only and the moments caused in the gap joint by eccentricity are resisted by an effective section which is calculated assuming the flat portions of the top and bottom flanges are not effective (see Figure G3). G8 TRUSS DESIGN EXAMPLE Member #7 loads (critical for shear lag): Axial Tension (P) = 71.5K Shear (P) = 14.1K Y In -plane bending (M, ') = 23,2"''k m En -plane bending (Min") = 24.11"-k Out -of -plane bending (Mou4) = 24,5in-k * Bending in gap due to joint eccentricity. ** Bending in member due to joint fixity and truss deflections, Use HSS 6 x 6 x 1/4 bottom chord members throughout; therefore, A = 5.24 in2 S = 9.54 in3 x S = 9.54 in3 t = 0.233 in and Full Section Properties Shear area A = 2t (Depth - t) Y = 2(.233) (6 - 0.233 in) = 2.69 hie INEFFECTIVE SECTION DUE TO "SHEAR LAG" pi 2tc 1.4 4 FIGURE G3 SHEAR AND "SHEAR LAG" SECTION PROPERTIES SHEAR AREA (DEPTH-tc) tc In calculating the reduced section properties for the eccentric moment capacity in the chord gap, assume that a section of each flange (top and bottom) equal to the chord width minus four times the wall thickness is ineffective, due to "shear lag", in resisting the eccentric moment; therefore, G9 1KUSS 11ESIUN EXAMPLE S'=S Y Ytube 4t {width —4t"][1`� +(dep2th —t")z] depth 4(.233)[6.0 — 4(.233)] [ (.23 2)2 + (6,0 —0,233) 2 = 9.54 6 =3.0in3 K fa P_ 71.5=13.6ksi A 5.24 in2 P„14.1K _— — =5.2 ksi A„ - 2.69 in2 M 24.5'" -k fbc = out = 2.6 ksi So 9.54 in' = M1, + Iv! • = 23.2°' + 24.2'""F _I0.3 ksi f by Sy I Sy 3.0 in" 9.541n' - Check shear lag in accordance with the following formula: ,l(fa +fbx + fby)2 +3(f„)2 ≤0.6 Fy V(13.6+2.6+10.3)2 + 3(5.2)2 = 28.0 ksi ≤ 30.0 ksi (OK) Use an HSS 6 x 6 x 'A bottom chord throughout. Top Chord Design The critical combined axial and bending stresses in the top chord occur in member #54 due to DL + LL. The following forces are derived from that load combination: Axial compression (P) = 104.1K In -plane bending (Mid= 17. l' Out -of -plane bending (M.)= 3,7" k G1d TRUSS DESIGN EXAMPLE Use an HSS 6 x6 x CIA chord member throughout A = 5.24 in' S =S =9.54 in' x y S' = 3.0 in' (see bottom chord shear lag check) y A = 2.69 in' (see bottom chord shear area calculation) rx = ry = 2.34 in L=L= 73 in x y K = 1.3 (see U -Frame calculations) x K = 1.0 KKLx = (1.3)(73") = 40.6 .. F' = rx 2.34" 23(40.6)2 KyLy = 1.0(73") = 31.2 — 12 n2 (29000) =153.4 /csi ry 2.34" ey23(31.2)2 Fa = 25.7 lcsi (AISC Table C — 50) 12 1r 2 (29,000) = 90.6 /O1 Fbx =Fby=0.66Fy=0.66(50.0lcsi)=33.0lcsi P_104.1x=19.91csi f =A— 5.24in2 M3.71u-k fbx = — 0.4 IasiSout = x 9.54 in' _ M•"' 17.1"`-K = =1.8Jul fbY Sy 9.54 in' Combined Stress Check: J a + C„,„(fax) + Crny (f6) S 1.0 F (1 ;,aex)Fbx (1 F ) F'by ey (H1-1) 19.9 + 0.85(0.4) + 0.85(1.8) 0.84 ≤ 1.0 (OK) 25.7 (1- 19.9 33.0 (1 19.9 ) 33.0 90.6 153.4 OR G11 TRUSS DESIGN EXAMPLE f° +fbx +fby S1.0 (H1-2) 0.6Fy Fbx Fby 19.9 0.4 ' + 1.8 = 0.73 51.0 (OK) (0.6) 50.0 33.0 33.0 Check shear lag in critical bay (member #44) for: Axial compression (P) = 72.0K Shear (P) = 13.9K In -plane bending (Mina) = 23.0' In -plane bending (M) = 4,2 n•K m Out -of -Plane bending (M) = 2.3'"'k out * Bending in gap due to joint eccentricity. ** Bending in member due to joint fixity and truss deflections. Using HSS 6 x 6 x '/a top chord members throughout, A = 5.24 in2 S = 9.54 in3 S = 9.54 in3 r to = 0.233 in A = 2.69in2 } S'= 3.0 in3 See bottom chord design for calculations of shear and "shear lag" member properties P72.0'r f _ _ ° =13,7 ksi A 5.24 in2 f 13 13.9K —_ v =5.2 ksi A,, 2.69 in' ru-k Mouf _ 2.3 = 0.2 /atSx 9.54 in' Mm * + Ad: = 2301n —k + 4.21n —k — 8.1 ksi fby _ Sy' Sy 3.0 in 9.54 in] Check shear lag in accordance with the following formula: �(fo fbx ffby) 2 + 3(fv) 2 ≤ 0.6 Fy V(13.7 + 0.2 + 8.1)2 + 3(5.2)2 = 23.8 ksi 5 30.0 ksi (OK) G12 TRUSS DESIGN EXAMPLE Check local flange buckling of the top chord behind the diagonals by assuming all load applied by the diagonals is carried only by the bottom flange or connected face of the chord. Chord full area = 5.24 in2 Bottom flange area = 6 in x 0.233 in = 1.4 in2 S = S = 9.54 in3 y bo = 6 = 25.75 < 35.0 (OK) to 0.233 Check 15` and 4" bays: 22.1 22.1 K 58.8K 13.2K 72.0 K 4 TH BAY 1 ST BAY 1 ST BAY 29.4 K = DIAGONAL TENSION 22.1 K = HORIZONTAL COMPONENT OF THE DIAGONAL LOAD 22.1 K = TOP CHORD COMPRESSION 1st Bay: G13 FIGURE G4 Full area compression (P) = 0.0K Bottom flange compression (P') = 22,1K In -plane bending (M,) = 27.3'°-k Out -of -plane bending (M.) = 1,21"-k 4 TH BAY 19.3 K = DIAGONAL TENSION 13.2 K = HORIZONTAL COMPONENT OF THE DIAGONAL LOAD 72.0 K = TOP CHORD COMPRESSION (4T" BAY) 58.8 K = TOP CHORD COMPRESSION (3RD Bay) TRUSS DESIGN EXAMPLE Check local flange buckling in conformance with the following formula: P P Mout Mtn + + + :5_ 0.6 Fy Full Area Flange Area Sx Sy O.OK + 22.Ir + I.26_k + 27.3'"_k =18.8 Itsi 5 30.0 ksi (OK) 5.24in2 1.4in2 9.541'13 9.S4in3 4th Bay Check (1st gapped bay): Full Area Compression (P) = 72.0K — 13.2K = 58.8K Bottom Flange Compression (P') = 13.2K In -plane bending (Min) = 21.01n -k Out -of -plane bending (Moue) = 2,21n -k 58.8x I3.2x 2.2 t„ -K 21.01.44 Z + 2 + 3 + 3 23.1 ksi ≤ 30.0 ksi (OK) 5.24 in 1.4 in 9.54 in 9.54 in Check of all other bays was OK; therefore, Use HSS 6 x 6 x 1/a top chord throughout. Check top chord to end vertical connections: CAP/STIFFNER PLATE FIGURE GS TOP CHORD TO END VERTICAL CONNECTION G14 TRUSS DESIGN EXAMPLE NOTES: M out -of -plane is negligible. * With double mitered diagonals, use 1/2 the axial load in the end top chord member for chord to end vertical connection design. This is due to the fact that a portion of the chord axial load is transferred directly from the diagonal to the chord and does not go through the end vertical connection. For a matched edge connection, due to the relative flexibility of the main member face versus the stiffness of the two matched edges, assume all load transfer between the chord and the end vertical is done by the matched edges of the connection plus a 2i return at each corner. Connection Section Properties: 2t (in -plane axis) I 2k -1 MINN G15 2k FIGURE G6 EFFECTIVE CONNECTION Connection Stress: 6" Line properties (for t, = 0.233) : Length = 4(2x0.233) + (6x2) = 13.9 in z s;n—prone = 3 + [2(2x0.233) x 6] =17.6 P + M;,, _ 0.5(22.1) + 27.7 = 2.371cips / in Length Sln-plane 13.9 17.6 Use minimum weld throat of 0,233 in. Allowable weld stress = 0.3 F = 0.3 (70 ksi) = 21.0 ksi u Acting weld stress = 2.37 kips J to =10.2 ksi ≤ 21.0 k si (OK) 0.233 in - TRUSS DESIGN EXAMPLE NOTES: The full length of the weld along the top edge of the connection may be used, if required to carry load, when an opposing stiffener/cap plate is placed at the open end of the end vertical. The end vertical stiffener/cap plate and its weld must then be designed to transfer the "flange" force carried by the top chord face. If additional load capacity is required, an additional stiffener may also be added at the elevation of the bottom flange of the top chord. Progressive failure of the connection and web yielding, crippling, and buckling failure modes are OK by inspection (see main vertical to chord connection design for comparison checks of these failure modes.) End Vertical Member The end vertical shall be designed as a cantilever beam -column, laterally supporting the top chord. DL + LL Loads: Axial Load (P) = 21.9K In -Plane Bending (M1.) = 27.7 in -kips Out -Of -Plane Bending (M.) = 2.1 in -kips (from analysis) + (21.9K x 0.01 x 57 in)' = 14.6 in -kips (DL + LL + Wind) 0.75 Loads: Axial Load (P) = 14.2 kips In -Plane Bending (M) = 20.0 in -kips Out -Of -Plane Bending (Mud= 35.0 in -kips (from analysis) in -kips + (14.2K x 0.01 x 57 in)' = 43.1 *For end verticals of pony truss structures, an additional load of 1% of the axial load in the member shall be applied at the elevation of the top chord for determination of "out -of -plane" bending moments. Al I► .01 x AXIAL LOAD '.t IN END POST END VERTICAL POSTS r'T END FLOOR BEAM G16 FIGURE G7 " END U -FRAME" 4- r- 57" 72" TRUSS DESIGN EXAMPLE Use HSS 6 x 6 x % end vertical members: A = 5.24 in3 S = Sr = 9.54 in3 K = 2.0 (cantilever) K = 1.0 L = 56.0 in z L = 72.0 in r = r = 2.34 in x y K L 2.0 (57.0) - 12 �2 (29,000) - x x = 48.7 .'. F' = — 63.0 ksi rx 2.34, 23(48.7)2 KyLy = 1.0(72.0) , — 12 r2 (29000) =30.8 '.F — =157.4ksi ry 2.34 ey 23 (30.8)2 Fe = 24.6 ksi (AISC Table C-50) Fbx=Fby=0.66Fy=33.0ksi DL + LL: f ,P_ 21.9K=4.2ksi A 5.24 in' { A/ 14.6 Jbx(onl —of —plane) = = 1.5 1CSi Sx 9.54 = 27.7 fbY(inn—plane) = = 2.9 ksi 9.54 Combined Stress Checks: f + 0.8°f) + 0.85(fby) 51.0 (H1-1) Fa (1—. )Fbx (1 'f° )F by F' ey br 4.2 + 0.85(1.5) + 0.85(2.9) = 0.29 51.0 (OK) 24.6 42 (1-4.2 ) 33.0 (1 ) 33.0 63.0157.4 OR + f°" + iby 51.0 (H1— 2) 0.6 Fy Fbx Fby G17 TRUSS DESIGN EXAMPLE 4. + + 2 1.5 19 (OK) 30.0 33.0 33.0 DL + LL + WL is OK by comparison; therefore, to facilitate connections, use HSS 6 x 6 x 1/4 end verticals (same size as top chord). Use an HSS 10 x 6 x % end floor beam (providing a matched connection); therefore, the end U -frame stiffness is OK by comparison with the interior U -frames (see "U -frame" calculations). NOTE: Due to normal tolerances in placing anchor bolts, it is recommended that only one set of anchor bolts at each end of the structure be considered effective in resisting lateral shear loads from wind or seismic forces. To transfer these loads to the appropriate set of anchors, the end "portal" or "U -frame" members (the end floor beam and the end vertical post members below the floor beam) must be adequately sized to transfer these lateral loads, or, struts and/or diagonal bracing must be placed between the lower end vertical post members to accomplish the load transfer. For design, it is assumed that the anchor bolts on the side opposite the point of attachment of the end brace diagonal are the ones which resist the design shear load. An HSS 5x5x3/16 bracing strut was placed in this bridge at the elevation of the base plates (See details 3 and 4 on Page G3). Design of the end "U -frame" for wind load is ok by inspection. Interior Vertical Design The interior verticals shall be designed as a cantilever beam -columns, laterally supporting the top chord. First interior vertical member 93/94: DL + LL: Axial compression (P) = 20.0 kips In -Plane Bending (Mart) = 23.3 in -kips Out -of -Plane Bending (M.i) = 8.4 in -kips (from analysis) + (41.5 x 0.0087 x 62.5')" = 31.0 in -kips *For verticals in a pony truss structure,:. anadditional load of 1/100K times the maximum axial load in the top chord members on either side of the vertical being designed shall be applied laterally at the elevation of the top chord for determination of "out -of -plane" bending moments. Note: Use the calculated "K" value of 1.15 for this determination (See "U -frame" calculations). 1/100 K GI8. IN1LRIOR VERTICALS FIGURE G8 "U -FRAME" TOP CHORD 62.5" 72" V TRUSS DESIGN EXAMPLE Note: The maximum out -of -plane bending moment in the verticals occurs at truss-midspan. DL + LL: M = 18.1 in -kips (from analysis) + (104.1K x 0.0087 x 62.5")' = 74,7 in -kips out (DL + LL + WL) x 0,75: M = 28.1 in -kips (from analysis) + (71.2 x 0.0087 x 62.5 in)' = 66.8 in -kips out *104.1K and 71,2K are the top chord compressions at midspan for the corresponding load combinations. While each vertical member need be checked for its controlling load case, vertical members in pony trusses are many times sized based on "U -frame" stiffness or connection strength requirements; therefore, conservatively combine all maximum loads (axial, in -plane moments, and out -of -plane moments) together for stress checks in the verticals. If this stress check does not work, check each vertical member independently. Use HSS 6 x 4 x k vertical members A = 4.3 in2 S = 6.96 in' (out -of -plane) } G19 Sr = 5.56 in' (in -plane) r = 2.2 in r = 1.61 in K = 2.0 (cantilever) K = 1.0 y L = 62.5 in L = 72.0 in KxLx 2.02(.2602.5) — 122g -32O(62.98720) 46.3 ksi — 56.8 .'. F' — rx ) KyL,, = 1.0 (72.0) 12 ir? O9000) = 44.7 F — = 74.7 lcri ry 1.61 ey — 23 (44.7)2 Fp=23.3ksi (AISCTableC-50) DL + LL: _P_Za.o_4.7ksi fa A 4.3 _ M0,,, — _ 74.7 f S 6.96 —10.7 ksi (At mid span of bridge) x TRUSS DESIGN EXAMPLE _M;n —23.3 = 4.2 ksi by Sy 5.56 Fbx = Fby = 0.66 Fy = 33.0 ksi Combined Stress Checks: + 0.85 lbx + 0.ss fby ≤1.0 (Hl -1) Fa (1 RFt F, )Fbx (1 ,n ) Fby GY ¢y 4.7 + 0.85 (10.7) 23.3 (1 4.7 46 3)33.0 0.85 (4.2) (OK) + -0.62 ≤ 1,0 (1 4.7 ) 33.0 74.7 OR fa +Fbx +fby ≤1,0 (Hl -2) 0.6F y bx by 4.7 +10.7+ 4.2 -0.61≤1.0 (OK) (0.6)50 33.0 33.0 Check diagonal/vertical overlapped connections. NOTE: The maximum out -of -plane moment shown above for design of the verticals occurs in the vertical at the floor beam elevation. The connection checks for this moment will be accounted for in the final floor beam design checks. This moment does hot affect the vertical to chord connection design. Use an HSS 5 x 3 x 3/16 overlapping diagonal and check range of validity and connection stress levels in accordance with ANSI/AWS D1.1-96. Diagonal Tension = 29.4 kips Using HSS 5 x 3 x 3/16 diagonals (A=2.58 in2): f = P = 29.4 kips / 2.5 8 in 2 =11.4 ksi ≤ 30.0 ksi (OK) A Overlap the smaller, thinner web member (HSS 5 x 3 x 3/16 diagonal) onto the larger, thicker web member (HSS 6 x 4 x IA vertical). Check connection criteria in accordance with AWS D1.1-96, Page 37: b" "" , + b, + h + h2 5+6+3"+4° - G20 4bo 4(6") = 0.75 ≥ 0.25 (OK) TRUSS DESIGN EXAMPLE Check for compact sections based on the flat width (b -3t) of the tube wall: HSS 5 x 3 x 3 : b�°` = 5 — 3(.174) — 25.7, hn°r = 3-3( .174) =14.2 16 t .174 t .174 1 b�,°, _ 6 — 3(.233) HSS 6 x 4 x . hfl°, _ 4 —3(.233) =14.2 4 t .233 22.8' t .233 b HSS 6 x 6 x l: fl" 4 t hf _ 6-3(.233) =22.8 t .233 Compact Section defined by 190 — 190 = 26.9 Fy 50 b 26.9 ≥ 25,7 (the Maximum I°` or hl°r for all members at the joint) (OK) Check the full width to thickness ratios (See AWS Figure 2.19). Maximum b for braces = 5 - 28.7 ≤ 35 (OK) ,174 Maximum b for chords = = 25.8 ≤ 40 (OK) t .2633 b,=5=0.833≥0.75 (OK) b2 6 NOTE: Special attention shall be given to the design and detailing of welded tubular truss joints where the ratio of the widths of the members (i.e. bl/b2) exceeds 0.8 or anytime a fillet weld runs onto a tube radius (see Specification Section 7.1.2, Figure 7.1). Using a 50% overlap factor and allowable stress design, P - Fy tb {(2a — 4tb)+ be° + bee] 1.44/0 Where, G21 P is the axial capacity of the overlapping tube ° F = 50 ksi (yield strength of steel) tb = .174" (overlapping web wall thickness) a = 3" b= 5" e = 0.95 TRUSS DESIGN EXAMPLE b is the effective width of the diagonal face welded to the chord as defined by: be= o (Sb) F''° 5 6 Y (r)Fy b is the effective width of the diagonal face welded to the "through" vertical as defined by: 5b bet = S b Yt (zt ) F = F = 50 ksi yo y b° Y = — (of the chord) 2t° bvertical 71 = 41 vertical tb = tchord tb it tvertical (of the through vertical) 6 =12.9 Y - Yt 2(.233) r=z= .174 =0.75 .233 Since Fy,0 = Fy, bb = b (5)(5) ee et _ = 2.58 12.9(0.75) Effective Length = (2a — 4tb + bee + b„) =2(3)-4(.174)+2.58+2.58 =10.5" 50 Irsi (.174)(10.5) K x — =60.3 >29.4 (OK) (1.44 / 0.95) G22 TRUSS DESIGN EXAMPLE Check weld size along effective length: Effective Weld Length = 2 707) 4(0.174 in) + 2(2.58 in) =13.0 in 29'4 K Weld Force — = 2.26 kips / in 13.0 in Allowable weld stress = 70 ksi X 0.3 = 21.0 ksi • (1.35) 2.26 kips / in Required weld throat size — = 0.145 in. 21.0 ksi Use 3/16" weld throat or 9/32" fillet weld around full perimeter of HSS 5 x 3 x 3/16 diagonals. Ultimate weld checks: The minimum welds provided in "K" type connections shall be capable of developing, at their ultimate breaking strength, the lesser of the branch member yield strength or local strength of the main member (or through branch). This requirement shall be met with 50 ksi material, 70 ksi weld filler metal, and fillet weld throats equal to the lesser of the chord wall thickness or 1.07 times the thickness of the branch member. Otherwise, fillet welds which provide weld throats smaller than this minimum, which are sized only to resist design loads, shall be designed with an additional stress multiplier in accordance with ANSIJA WS D1.1, Section 2.40.1.3(4). Check vertical to chord connection: The net transverse load on the combined footprint is OK by inspection; however, conservatively check the vertical connection to chord for in -plane and out -of -plane bending moments due to joint fixity plus one-half of the axial load in the vertical. Using one-half of the axial load is due to the fact that a portion of the axial load in the vertical is transferred directly between the vertical and diagonal in an overlapped joint; therefore, for vertical connection design, Axial Compression (P) = 20 kips/2 = 10.0 kips In -Plane Bending (Min) = 23.3 in -kips Out -of -Plane Bending (Main) = 2.4 in -kips (From analysis at vertical to chord joint) hi addition, check the critical vertical to chord connection for the gapped joints (starting at the 4`s bay) for the full axial compression in the vertical plus all in -plane and out -of -plane moments due to truss deflections and joint eccentricity. Member Number 97/98 (1S' gapped joint) Axial Compression (P) = 13.9 kips In -Plane Bending (Min) = 23.7 in -kips Out -of -Plane Bending (Malt) = 3.7 in -kips By inspection, the critical vertical to chord connection occurs at the first gapped joint. For matched edge connections, due to the relative flexibility of the chord face versus the stiffness of the two matched edges, assume all load in the member is carried by the matched edges plus a 2tc return around each comer. G23 1 KUJS llE61(iN EXAMPLE Connection Section Properties: (in -plane axis) 2tc H f 2tu FIGURE G9 EFFECTIVE VERTICAL CONNECTION Connection Stresses: A 4" Line properties (for t, = 0.233 in) : Length = (2x4 in) + 4(2x0.233) = 9.9 in z Sin -plane = 3 + 2(2 x 0.233) x 4 = 9.1 L2 Soul -of -plane = [4" x (6 —.233)] + 3 [6 — (4x0.233)]2 = 26.5 3 NOTE: Due to the conservative design assumptions of the verticals being "fixed" to the chords for determination of the full in -plane bending moment and only a 2t weld return across the "faces" of the connection being effective at the corners, and the fact that all loads are applied at a 90° angle to the weld axis, an allowable weld stress of 0.5 F(or 0.6 F for the base metal) will be used to resist compression 11 stresses in the vertical members. The tension side of the connection (due to bending moments only) will be checked at an allowable stress level of 0.3 F for the weld material. We will conservatively not subtract any vertical compression loads from the tension side of the connection for determination of tension forces in the weld material; therefore, Min -plane -f- Mout-of-plane Tension = Sin -plane Sour`-of=place 23.7 3.7 — + _ 2.74 kips /in. 9.1 26.5 P Min -plane _ + Mout-oj-plane Compression = Length Sln plane Soul -of -plane 13.9 23.7 3.7 + + = 4.15 kips / in. 9.9 9.1 26.5 G24 TRUSS DESIGN EXAMPLE Using a minimum weld throat of 0.233 in: Allowable weld stress = 0.3 F„ = 0.3 (70 ksi) = 21.0 ksi (tension) (or) = 0.5 F = 0.5 (70 ksi) = 35.0 ksi (compression) (But no more than) = 0.6 F = 0.6 (50 ksi) = 30.0 ksi (use this for compression) Y Tension Weld Stress = 2.74 kips / in =11.8 ksi ≤ 21.0 ksi (OK) 0.233" Compression weld stress — 4. Compression / in =17.8 ksi ≤ 30.0 ksi (OK) 0.233" For progressive failure, conservatively assume all load is taken by the two matched"edge welds only; therefore, Length = 2 x 4" =8" 42 Sin - plane= = 5.33 3 Sout-of-pane = 4 x (6 — 0.233) = 23.1 P + Min + Mop, Length Sin Sou, 13.9+23.7+ 3.7—6.34lcipslin 8 5.33 23.1 Weld /material stress = 27.2 ksi .233 27.21csi ≤ 50 Icsi ultimate material strength ≤ 56* ksi ultimate weld strength (OK) *(0.3x70ksix2.67=56 ksi) Since the ultimate weld stress on the two matched edges is less than 30 ksi (the allowable compressive stress used for the matched edge, partial penetration groove welds at the vertical to chord connection), check to see if the two matched edge welds of the connection can carry the moments in the first vertical at an allowable tensile capacity of 21 KSI: 1km. + Mofit Si„ Sou, 23.3 2.4=4.48kips lin 5.33 23.1 G25 TRUSS D1;SIUN EXAMPLE Tension weld / material stress = 4.48 =19.2 ksi ≤ 21.0 ksi (OK) 0.233 As the compression weld/material check is OK by comparison with the ultimate weld check, weld is not required on the verticals underneath the overlapping diagonals. The two matched edges alone are capable of carrying the entire connection load. NOTE: If the weld design does require the corner returns on the faces of the chord to be effective, it is recommended that a minimum distance of 4 times the chord wall thickness be maintained from the edge of the chord or vertical to the face of the diagonal to insure that the full matched edge plus the 2t, return can be developed. If this minimum dimension cannot be obtained, the full length of the "hidden" face of the vertical, beneath the overlapped diagonal, should be welded. Check web yielding of the main member assuming all load is placed in each chord web along a line equal in length to b + 5to or 4" + 5(0.233") = 5.2": Total length = 2 x 5.2" =10.4" (5.2)2 SIn—plane = 3 = 9.0 Sout—of _ plane = 5.2 x (6 — 0.233) = 30.0 P Mz My +—+ _ Length Sx Sy 13.9+23.7+ 3.7=4.1k/in 10.4 9.0 30.0 4.1 Material Stress = =17.6 ksi ≤ 30.0 ksi (0.6 Fy) (OK) 0.233 Check main member sidewall buckling or crippling in accordance with AISC Chapter K. Determine web crippling Force Pe, or buckling load Pb1 as follows: p = + Min + Mont 2 webs 2 webs (2 x ax ) D — tc 3 Po. =1.67 Per for DL + LL Where: a = Length of diagonal member along chord (4 in) D = Width of vertical and chord faces (6 in) = Chord wall thickness (0.233 in) G26 TRUSS DESIGN EXAMPLE 1 _ 13.9 23.7 3.7 2 + 2(2 (4)) + (6 — 0.23 3) —12.0 kips 3 Pbf =1.67 (12.0) = 20.0 kips Allowable web crippling: R=67.5t„,2 [l+3(N)(t" 1 f (AISC Kl — 4) Where t� = t = thickness of the chord (.233 in) W N= length of bearing (conservatively assumed as Ax/3 = 1.33" for resisting in -plane bending moments) d= depth of chord (6 in) R = 67,5 (.233)2 [1 +3 (133)(:223333)'•1 , J50 = 43.1K >12.0g (OK) 6 Allowable web buckling: 4100 twc'.1F,", Pbf d Where: t = thickness of chord web (0.233 in) tic= web depth clear of radii [6 - (3 x 0.233)] = 5.3 in F = yield strength of the chord (50 ksi) rW Pbf 4100 (.233)3 /5-0- = 69.2K > 20.0K (OK) 5.3 Gapped Diagonal Design Check critical gapped diagonal in the fourth bay, try HSS 4 x 3 x 3/16, A= 2.24 in2 Diagonal tension= 19.3 kips G27 f. P= 19.3 =8.6ksi ≤30 ksi (OK) ` _ A 2.24 Check allowable chord face plastification and punching shear in accordance with the following: Calculate the acting chord face stress (punching shear per AWS D1.1-90, Chapter 10), Note: "punching shear" as defined in AWS D1.1-90 was actually a measure of what is now referred to as "chord face plastification" but with an upper limit of base material shear of 0.4 F . We will refer to this stress in these calculations as "acting chord face stress" or "acting \". P TRUSS DESIGN EXAMPLE Acting V = r fn sin B Thickness of branch member 0.174" Where r = thickness of chord 0.233" = 0.75 f„ = Nominal axial or bending stress in the branch member = 8.6 ksi B = Acute angle between the branch and chord member rz 47° Therefore, Acting V= 0.75 (8.6) Sin 47° = 4.7 ksi P Allowable chord face stress (AWS D1.1-90, Chapter 10) Where: Allow Vp = Qq • Q./. • Basic Vp F Basic V = y p 0.6 y Chord width y 2 x chord wall thickness _ _ 0.25 Qq fir ft (1- A) Width of diagonal across chord face _ Width of chord face Qf=1.0for U≤0.44 OR Qf =1.2-0.5U for U>0.44 Q is the main member stress interaction term and U is the utilization ratio (ratio of actual to allowable stress) for longitudinal compression due to axial and bending forces in the main member at the connection under consideration. u —If 1+Ifbl 0.6 F,, G28 TRUSS DESIGN EXAMPLE __D_ 6" =12.9 2tc 2(0.233) b " Q=D = 4"=0.67 0.25 Qfl = 0.67 (1— 0.67) 1.13 72 2.2 21.0 + + U __ 5.24 9.54 9.54 = 0.54 top chord member 0.6 (50.0) Qf =1.2-0.5(0.54)=0.93 F = Specified minimum yield strength of the main member but no more than 2/3 of the tensile strength F,,=50ksi≥0.67x70ksi=46.9ksi (use 46.9 ksi for F,) 46.9 Basic Vp = =6.1ksi (0.6)12.9 Allow Vp=1.13x0.93x6.1=6.4ksi Acting VP = 4.7 kri < 6.4 Icsi (OK) The diagonal connection to the bottom chord (which is in tension) is OK by comparison. The minimum gap required to develop 3 sides of weld (both edges plus the toe) is: Vertical weld leg size + (Db 2t, ) 2 = .375 + [(6 4) 2 (0.233)] 2 = 0.91" (add 3/8" for fit -up tolerance) required Detail gap =1 4 in (add an additional 3/8 in. fit -up tolerance for design) .'. design gap (for calculation of moments due to eccentricity =1 8 in.) G29 TRUSS DESIGN EXAMPLE Effective member length = 2 (3) — 2 (0.174) + 4" = 9.6" Effective weld length = 2( 3 ) 2(0.174) + 4" =11.9" Sin 47° Allowable tension = 9,6 (.174) 30 ksi = 50K 1g Weld force= '3K =1.6k/in 11.9 Allowable weld stress = 70 ksi x 0.3 = 21.0 ksi Required weld throat size — (1.35)1.6 kips/in 0.103 21.0 ksi Use '/" fillet welds (3/16" weld throat): Check the ultimate breaking strength of the weld to insure it is greater than the smaller of the following values: - Brace member yield strength - Local strength (chord face stress or web crippling) of the main member By inspection, chord face stress will control. Ultimate chord face stress = 1.8 • Allow V D = 1.8 (6,4) = 11.5 ksi Ultimate chord face load = 11.5 ksi x 0.233 in. = 2.68 k/in. 2.68 k /in —15.2 ksi ≤ 50 Icsi * (OK) (.25x0.707) * 50 ksi < (70x0.3) 2.67= 56 ksi (Ultimate breaking strength of the weld). Web buckling or crippling is not a concern for main member webs under branch members loaded in tension; therefore, check allowable main member web yielding: 3 + 2 [ 5 (0.233)1x (0.233 in.) x 30 ksi = 73.6 kips (OK) sin 47 Use PISS 4 x 3 x 3/16 diagonals from 4`h bay on. G30 TRUSS DESIGN EXAMPLE Floor beam design Design the floor beam as a simple span beam with additional end moments applied from the truss verticals due to "U -frame" action (see truss vertical design), PLAT PvEH 1.4-1'- 6"—► 5'- 0„ FLOOR BEAM M PLAT PVEH ► .f- 1'- 6"—H Floor beam loads: 5'-0" '4 - 1'- 9" —► 8'-6" FIGURE G10 FLOOR BEAM LOADS Dead load = 20 psf x 6,083' = 122 plf Live load = 85 psf x 6.083' = 517 plf PVEH 8000x0.6 Vehicle Load ( ) = = 2400 lbs / wheel 2 PLAT 1 x top chord compression due to DL + LL 100k OR 100 x top chord compression due to DL + Vehicle OR 1 0,75 ( x top chord compression due to DL + LL + WL) 100 K + lateral wind load on vertical x 0.75 M=PLAT xh M(DL+LI,) = 1 x 104.1K x 62.5". 56.6" 100 (1.15) G31 h=62.5" FLOOR BEAM TRUSS DESIGN EXAMPLE 5' (25psf x x6.083') M 1 x71.2r x62.5"+0.75[ ]x62.5" (DL+LL+wL)0.75 100 (1.15) 1000 = 61,9'o -k MDL+Vehicle 100 x 56.0 kips x 62.5" = 35.0`"-k Simple span moments: DL + LL = 1.5 WL2 Where: W = Uniform load due to DL + LL (kit) L = Beam span (feet) 1.5 (639 plf) (8.5) 2 r,�-k 1000 69.3 DL + VEHICLE = 1.5 WL2 + PVeh a Where: W =Uniform load due to DL (klf) L = Beam span (feet) Pvett = Vehicle wheel load (kips) a = distance from wheel load to centerline of truss (in.) 1.5(122 plf) (8.5) 2 + (2.4k x 1.75' x 12) = 63.6`"-k 1000 M is the larger of the following: max DL + LL = 56,6 + 69.3 = 125.9'"-k (controls) DL + Vehicle = 35.0 + 63.6 = 98.0' (DL+LL+WL) 0.75 = 61.9 + (0.75) 69.3 = 113.9"•k Use an HSS 10 x 4 x 3/16 floor beam, S =11.6 in3 fb = Mmax = 125.9 =10.0 ksi (OK) SX 11.6 Check the connections of the floor beams to the verticals assuming these connections are "fixed" (required for U -frame consideration). To the moment caused in the connection by this "fixity", add the moment induced by the out -of -plane bending force in the verticals from the 1/100k or 1% lateral load as applicable. Critical end moment (M) = 30.9in-k• + 56.6I"'k" = 87.5 in -kips Corresponding shear (V)= 639 pif x 1/1000 x 8 ft/2 = 2.6 kips * Due to joint fixity under dead load plus live load from 3-D analysis. ** From "U -frame" analysis (moment applied from truss vertical). G32 TRUSS DESIGN EXAMPLE Check the connection of an HSS 10 x 4 x 3/16 floor beam matched to the 4" face of an HSS 6 x4 x truss vertical: FIGURE Gll EFFECTIVE WELD AREA Connection capacity check: Y M shear length S corm 2.6k 87.51"-k + = 2.76 kV in 19.6" 33.2 in2 G33 h _ 10 —3(.174) — t 54.5 .174 — h Limit = 190 = 190 = 26.9 . /Fy 450 Effective height = (26.9) .174 = 4.68" 4.68" = 2.34" effective at top and bottom 2 of each matched edge 2t = 2(0.233) = 0.466" effective corner returns Scam 102 (10-4.68)2 3 3 + 2(0.466)x10 = 33.2 in2 Shear Length = 2(10 —.174) =19.6 in. TRUSS DESIGN EXAMPLE Due to uneven load distribution, use a minimum weld size equal to the material thickness (3/16 groove weld at edges with a '/a" fillet across the vertical faces); therefore, 2.76 /c / to Connection stress = = 15.9 ksi ≤ 21.0 ksi (weld ) ≤ 30 ksi (matt ) (OK) 0.174 in Conservative calculations of vertical member web crippling, buckling, yielding, and shear loads may be determined by the following: M _ 87.5 —11.4K h _ ( effective height ) 10 4.68" 2 2 By comparison of this force (11.4K) with the vertical member forces on the HSS 6 x 6 x '/a chords, the 6" wall of the HSS 6 x 4 x Nauss vertical is capable of carrying the above imposed load; therefore, use HSS 10 x 4 x 3/16 interior floor beams throughout the bridge. Use HSS 10 x 6 x '/ end floor beams matched (equal width connections) on the HSS 6 x 6 x '/ end verticals. These members are ok by comparison with the HSS 10 x 4 x 3/16 interior floor beams. Brace diagonals: BOTTOM CHORD of Chord to. of Chord G34 END FLOOR BEAM 6.08' FIGURE G12 BRACE DIAGONALS - BOTTOM CHORD TRUSS DESIGN EXAMPLE Check critical end bay diagonal: Axial tension or compression in end bay diagonal= 8.3x Use an HSS 3 x 3 x 3/16, A = 1.89 in2, r = r = 1.14 in. Y KL 1.0 (10.5)12 =110.5...F =12.2 kri r 1.14 f° A 1 3 =4.4ksi ≤12.2ksi (OK) Use HSS 3 x 3 x 3/16 brace diagonals with 3/16" fillet weld all around. Connection checks, welds, chord face plastification, etc. of HSS 3 x 3 x 3/16 on HSS 6 x 6 x chord face are ok by inspection. Bottom Chord Splice Design HSS 6 x 6 x '/ bottom chord member (A=5.24 in2) Minimum stress controlled by 50% of member strength Minimum load = 0.5 x 30 x 5.24 = 78.60 kips Maximum stress controlled by member strength on effectivg net area (A ) ' C Maximum load = .85 x 35 x [5.24 - 2(1.125 x .233)] = 140.3 kips Use (8) 1" diameter A325 bolts each side of the splice in single shear. Total bolt capacity = 8 shear planes x 13.4 kips allowable load per shear plane= 107.20 kips (OK) NOTE: Allowable shear load per bolt is in accordance with AISC Table I -D for slip critical connections in tension members. Using 3&" plate, 3'h" wide OnA:Tmax = 0.6 x 50 x .75 x [3.5 - (.17 x 3.5)1 x 2 = 130.7 kips (Conservatively reduce the gross section by the amount of hole area removed which exceeds 15% of the total area: 1.125 (.15) = .17) 3.5 On An: Tmax = 0.5 x 70 x .75 x (3.5 - 1.125) x 2= 124.7 kips Use (2) 31/2" x N" plates. Total splice capacity 107.20 kips. G35 TRUSS DESIGN EXAMPLE Top Chord Splice Design HSS 6 x 6 x '/a chord member (area = 5.24 int) Use (8) 1" diameter A325 bolts each side of splice in single shear. Total Bolt Capacity = 8 shear planes x 16.5 kips allowable load per shear plane = 132 kips NOTE: Allowable shear load per bolt is in accordance with AISC table I -D for a bearing type connection with threads included in shear planes. Check splice plates between Top Chord Sections: Use (2) 3'/2" x'A" plates rY = (h2/12)"2 = [(.75)1/12]112 = .2165 in Assuming a K value of .8 for plate buckling, KL/r = .8(4.00) / .2165 = 14.78 :.F = 28.8 ksi a Allowable compression = 2 x3.5 in x .75 in x 28.8 ksi = 151.2 kips (OK) Total splice capacity = 132 kips Vertical Truss Diagonal Member Splice Design (Tension) HSS 4 x 3 x 3/16 diagonal member (A=2.24 in') Critical stress controlled by 50% of member strength Critical load = 0.5 x 30 x 2.24= 33.60 kips No. of shear planes required =-33.60 / 7.51*= 4.47 *Table I -D, slip critical connection for tension member. Use (3) 3/4" diameter A325 bolts each side of splice in double shear. Total bolt capacity= 6 x 7.51= 45.06 kips Use (2) 3" x 3/8" plates: On A: Tmax = 0.6x50x.375x[3-(.14x3)]x2 = 58.0 kips (Conservatively reduce the gross section by the amount of hole area removed .875 which exceeds 15% of the total area: (.15) = .14) 3.0 On A: Tmax = 0.5 x 70 x .375 x (3 - 0.875) x 2= 55.8 kips n Total splice capacity = 45.06 kips G36 TRUSS DESIGN EXAMPLE Horizontal Truss Diagonal Member Splice Design (tension or compression) HSS 3 x 3 x 3/16 (A=1.89 in') Critical stress controlled by 50% of member strength Critical load= (0.5) (30) (1.89)= 28.35 kips No. of shear planes required = 28.35/7.51' = 3.77 * AISC Table I -D, slip critical connection for tension/compression member Use (2) 3/a" diameter A325 bolts each side of splice in double shear. Total bolt capacity = 4 x 7.51 = 30.04 kips Use (2) 3" x 3/8" plates. On As: T„,u= 0.6 x 50 x .375 x [3 - (.14 x 3)] x 2 = 58.0 kips (Conservatively reduce the gross section by the amount of hole area removed which exceeds 15% of the total area: .875 (.15)=.14 3.0 On An: T„,.„ = 0.5 x 70 x .375 x (3 - .875) x 2= 55.8 kips n Check compression assuming a K value of 0.8 for plate buckling: r= (h2/12)'2= [(.375)2112]' 2= 0.108 KL/r = 0.8 (4.0 in)/0.108= 29.63 .'. F = 27.2 ksi e Allowable compression= 2 x 3.0 in x .375 in x 27.2 ksi= 61.2 kips Total splice capacity= 30.04 kips NOTE: When using A325 bolts and spliced members with F = 70 KSI, all splice bolt capacities were controlled by allowable shear (or friction). Bolt bearing was not controlling. G37 CONTECH® ENGINEERED SOLUTIONS LLC www.ContechES.com .,CERTIFIED FABRICATOR Telephone: Toll Free: Fax: Web Site: CONTINENTAL PEDESTRIAN TRUSS BRIDGE SPLICING INSTRUCTIONS 320-345-9126 800-328-2047 320-566-3148 www.ContechES.com 1. There are two different types of splices used in CONTECH Pedestrian Bridges, unless detailed otherwise on submitted shop drawings. All vertical truss diagonals and horizontal truss brace diagonals will be spliced using plates on the outside of the tube members with bolts then going through the plates and the tubes. Chord splices will have loose splice plates that will be inserted into the tubes at the splice locations. Nuts are attached to these plates. The section is then bolted together by bolting through the wall of the tube and the splice plate, into the attached nut. Examples of both are shown. SPLICE PLATES W/ NUTS SPLICE DESIGN PATENT PENDING, 0281755 THROUGH BOLTS SPLICE PLATES 2. Bridge sections will arrive at the job site with all bolts and splice plates seperate. Remove and discard all auxiliary bracing that has been used to stiffen unsupported members during shipping. Bolts to be installed loose to allow play in the splice plates for splicing. This is illustrated on the next page. INSTALL BOLTS LOOSE TO ALLOW GIVE IN PLATES CHORD SPLICE PRIOR TO SPLICING NUT CAPTURE PLATE ASSEMBLY 3. The bolts used in our splices are A325 high strength structural bolts. The common bolt size for our A325 bolts are 3/4" and 1" diameter. We recommend the usage of an air impact wrench since it is not uncommon to have anywhere from 50 to 100 bolts per splice location. Socket sizes that fit these bolts are listed below. Bolt Size 3/4" diameter 1" diameter Socket Size 1 1/4" 1 5/8" 4. There are three common procedures for splicing bridge sections together. A) The most popluar, for bridges spliced in two sections, is to place one section stationary on a relatively flat surface and then slip the other section into the stationary section. Once totally bolted together, the entire bridge may be lifted into place. This entire process will require one crane with capacity to lift the entire bridge weight for the required reach. When the bridge has camber (arch) in it, it is best to have the end to be spliced of the stationary section cribbed up to match its intended arch. This will ease the slipping together of sections. B) Sections of the bridge may also be spliced in mid-air, utilizing a crane for each of the sections. It is wise to have come -a -longs available in case it becomes difficult to bring the sections together. C) One section may be placed such that the bearing end sits on its appropriate abutment or pier, while the end to be spliced will rest on a temporary cribbing support. The section is then spliced to the first section. NOTE: Any of the above procedures are recommended by CONTECH Construction Products Inc. Use of each is dependent upon site conditions. The procedures may be used for either simple spans or multi -continuous spans. Lifting weights for the total bridge or individual sections will be as listed on the shop drawings or anchor bolt/reaction sheet. 5. Tightening of the bolts shall be in accordance with the Research Council on Structural Connections "Specifications for Structural Joints Using High -Strength Bolts." We recommend using the Turn -Of -Nut Procedure which is described below. First bring all bolts to a "snug tight" condition to insure that the parts of the joint are brought into good contact with each other. Snug tight is defined as the tightness attained by a few impacts of an impact wrench or the full effort of a man using an ordinary spud wrench. Following this intial operation, all bolts shall then be tightened additionally by the applicable amount of nut rotation as specified in the table on the next page, with tightening progressing systematically from the most rigid part of the joint to its free edges. During this operation there shall be no rotation of the part not turned by the wrench. Table 4 Nut Rotation from Snug Tight Condition Bolt Length (as measured from underside of head to extreme end of point) Disposition of Outer Faced of Bolted Parts Both faces normal to bolt axis One face normal to bolt axis and other face sloped not more than (bevel washer not used) Both faces sloped not more than 1:20 from normal to bolt axis (bevel washer not used) Up to and including 4 diameters 1/3 turn 1/2 turn 2/3 turn Over 4 diameters but not exceeding 8 diameters 1/2 turn 2/3 turn 5/6 turn Over 8 diameters but not exceeding 12 diameters 2/3 turn 5/6 turn 1 turn Nut rotation is relative to bolt, regardless of the element (nut or bolt) being turned. For bolts installed by Y2 turn and less, the tolerance should be plus or minus 30°; for bolts installed by % turn and more, the tolerance should be plus or minus 45°. Adapted from: "Specifications for Structural Joints Using High -Strength Bolts". Research Council on Structural Connections, December 31, 2009. 6. Words of Caution A) Splice plates may not interchangeable. If plates are match marked, they must be used in its proper location on the bridge. B) DO NOT TIGHTEN all bolts to the "snug tight" condition in all bridge splices and sections until all of the bolts have been placed and started with nuts. CONTECH has preassembled all bridge sections in the shop with bolts in place to affirm that all connections are aligned and that they can be made in the field. If all of the bolts cannot be started then the bridge sections are either misaligned or else grit has become lodged in the threads. If the latter occurs, use a blast of air to remove the grit. If the bolts still won't start, then possible tapping of the nut may be necessary. Should the bridge sections be misaligned, the sections should either be unbolted and realigned or else seek approval of the Engineer of Record to ream the connections to make way for the bolt to enter the spliced connection. 5A6" Torx ZP Button Head Grade 8 Self Tapping Screw, (1) per plank. (Shipped Loose) Plank Holddown (shipped loose) Center Nailer Plank Support Bottom Chord Tools Required • Drill • %2' Drill Bit • 5/6" Drill Bit • #40 Torx Driver • Countersink Bit 5/e° OD 82 Degree • Drill %2" hole through Plank Holddown, Wood Deck and Plank Support. • Chase Plank Holddown only with 5/6" drill bit. • Screw %6" Torx Button Head Self Tapping Screw into place. Center Nailer Attachment @ Field Splice • Drill %2' hole through Wood Deck and Center Nailer. • Countersink hole with Countersink bit. • Screw 5%6" Torx Flat Head Self Tapping Screw into place. Stringer (if used) 5/16"Torx ZP Flat Head Grade 8 Self Tapping Screw, (2) per plank. (Shipped Loose) Wood Deck Cy:NTECK ENGINEERED SOLUTIONS LLC www.contechES.com Telephone: Toll Free: Fax: Web Site: BRIDGE INSTALLATION AND LIFTING INSTRUCTIONS The purpose of this set of recommended instructions is to familiarize you with the standard procedures for installing and lifting CONTECH Pedestrian Bridges. These instructions are not all inclusive, thus each individual installation must be carefully planned by the erector. 1. Place all loose setting plates on the bridge abutments. These loose setting plates will be delivered along with the bridge. 2. Assure that the plates are at the correct elevation and that good bearing occurs between the abutment and the plate. If needed, shim the plate and grout tight with non -shrink grout under the entire base plate in order to assure full bearing and proper elevation. 3. Lightly grease the tops of all loose setting plates except those that have teflon slide bearings or neoprene bearing pads. The teflon pads, stainless steel plates and/or neoprene pads are factory supplied and will be tack welded or bonded to the loose setting plates and to the bottom of the bridge bearing plates as applicable, unless noted otherwise on the drawings. 320-852-7500 800-328-2047 320-852-7067 www.conteches.com 4. Set the bridge onto the loose setting plates or bearing pads. Adjust the bridge position such that equal space is provided at each end of the bridge, or as shown on the shop drawings. The end of the bridge designated as the expansion end must have no less gap than the gap detailed on the drawings (thermal movement at expansion end = 3/4" per 100° F change in temperature per 100' of bridge length). The fixed end may actually be tight to the abutment if necessary to maintain the expansion end gap. 5. Bolt bridge to anchor bolts. Use one washer and two nuts for each anchor bolt unless detailed otherwise. One end of the bridge shall be designated the fixed end and shall have both nuts installed tight. The opposite end, or the end with teflon/stainless steel slide bearings, is the expansion end and shall have the first nut installed finger tight only and the second nut installed tight. 6. When installing painted bridges, caution should be used to prevent damage to the painted surface. It is recommended that padding be used to protect the paint. It is the contractor/installer/owner's responsibility to touch up all marred areas that have occured during shipping and installation. A quantity of touch-up paint will be provided by CONTECH and shipped along with the bridge. Note: Lifting lugs will not be provided. See attached sheet(s) for lifting locations. LIFTING H -SECTION BRIDGES - Lift only from the floor beam Lifting from the top chord without the use of a spreader bar is prohibited - Use a minimum of four lifting points It is recommended to lift from points that are a distance approximately 1/4 to 1/3 of the span length from the end of the bridge Lifting may also be done from the base plates that are welded to the end of the bridge With some small bridges, only two lifting points may be used by balancing the bridge at its centerpoint Lifting must still occur from the floor beam L/4 to L/3 H -SECTION LIFTING LOCATION * See CONTECH drawings for lifting weights L/4 to L/3 -, Lifting from the floor beam shall be accomplished by wrapping a choker chain, cable, or sling around the floor beam and vertical as shown below Vertical Cable, Chain, Choker or Sling Diagonal RECOMMENDED FOR H-QJ TICAl Floor Beam Bottom Chord STEADFAST BRIDGES NTECH ENGINEERED SOLUTIONS 9025 Centre Pointe Dr. Suite 400 West Chester, OH 45069 (800) 338-1122 www.conteches.com Warranty CONTINENTAL Pedestrian Steel Structures STEADFAST Vehicular Steel Structures EXPRESS Pedestrian Steel Structures The bridge manufacturer shall warrant that it can convey good title to the goods, that they are free of liens and encumbrances and that their steel structure(s) are free of design, material and workmanship defects for a period of ten years from the date of delivery. Durable hardwood decking and hardwood attachments shall carry a ten-year warranty against rot, termite damage or fungal decay. Other types of wood and decking material such as Southern Yellow Pine, Douglas Fir and composites carry no warranty. There are no warranties, expressed or implied with respect to structures sold hereunder which are used, supplied for use or made available for use in any nuclear application of which bridge manufacturer has not been notified in writing at the time of order of the structure(s). This warranty shall not cover defects in the bridge caused by abuse, misuse, overloading, accident, improper installation, maintenance, alteration or any other cause not expressly warranted. This warranty does not cover damage resulting from or relating to the use of any kind of de-icing material. This warranty shall be void unless owner's records are supplied which show compliance with the minimum guidelines specified in the "Recommendations for the Inspection and Maintenance of STEADFAST Vehicular Steel Structures, CONTINENTAL Pedestrian Steel Structures and EXPRESS Pedestrian Steel Structures," attached hereto and incorporated herein by this reference. Repair, replacement or adjustment, at the sole discretion of the bridge manufacturer, shall be the exclusive remedy for defects under this warranty. Under no circumstances shall the bridge manufacturer be liable for any consequential or incidental damages. Any claim under this warranty shall be made promptly and directly to Contech Engineered Solutions who shall have the option, at its sole discretion, to repair, replace or adjust any covered defect without charge to the original purchaser. SELLER MAKES NO OTHER WARRANTY WHATSOEVER, EXCEPT AS STATED IN THE WARRANTY, EXPRESS OR IMPLIED. ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND ALL IMPLIED WARRANTIES OF FITNESS FOR ANY PARTICULAR PURPOSE ARE DISCLAIMED BY SELLER AND EXCLUDED FROM THIS CONTRACT. REV: t116 ass. CONTINENTAL BRIDGE EXPRESS TRUSS NNN\NiN1/144444 CONTINENTAL• BRIDGE evto44ITECHI ENGINEERED SOLUTIONS 9025 Centre Pointe Dr. Suite 400 West Chester, OH 45069 (800) 338-1122 www conteches.com Recommendations for the Inspection and Maintenance of CONTINENTAL Pedestrian Steel Structures and STEADFAST Vehicular Steel Structures The purpose of this set of recommendations is to suggest some minimum guidelines for inspection and maintenance of CONTINENTAL pedestrian, EXPRESS pedestrian and STEADFAST vehicular steel structures, in order to maintain the overall structural integrity and user safety throughout the serviceable life of the structure. These procedures are not all inclusive and more detailed procedures may be warranted depending upon bridge location, environment, and usage. Establishing the requirements for, and verifying the performance of, all field inspection and maintenance is the responsibility of the owner. INSPECTION 1. User Safety (Inspection by others) A. Each bridge should be inspected at regular intervals (at least once per year) to ensure that all items of user safety are accounted for and performing properly. Those areas of special concern should he as follows: . All safety rails, handrails, rub rails, fencing or other types of safety features should be in place with complete structural integrity and capacity. There shall be no sharp edges or protrusions on any feature that could produce bodily harm to be a hazard to the user. 2. All deck surfaces should be without gaps, cracks or projections that could create a trip hazard or interfere with the user in any way. Special consideration should be given to any smooth deck surface that could also create a possible slip hazard. C'ontech Engineered Solutions, LLC recommends some form of broom finish for concrete decks, or other means of providing a non-skid surface. II. Structural Integrity' (Inspection by others) A. Each bridge should be inspected at regular intervals not to exceed one (1) year. The relative sections of Section 4 - Inspection of the American Association of State Highway and Transportation Officials (AASHTO) Manual for Condition Evaluation and Load and Resistance Factor Rating (LR FR) of Highway Bridges provides an excellent guide for this inspection. We recommend its use, particularly in the case of bridges for vehicular Llsc. This visual inspection should include, but not be limited to, the following: NOTE: The owner and/or specifier should be aware that most pedestrian bridge liability claims are statistically slip and fall claims. airs I Check the decking to ensure it is in satisfactory condition. Pay special attention to timber decks at their contact surfaces where they bear on stringers. 1 C' thITECH ENGINEERED SOLUTIONS 9025 Centre Pointe Dr. Suite 400 West Chester, OH 45069 (800) 338-1122 www.conteches.com 2. All steel surfaces should be inspected to ensure that they are performing satisfactorily. Check for any excessive corrosion on weathering steel bridges, or paint and caulk integrity on painted bridges, paying special attention to the following areas: a. All steel below the deck, particularly the tops of stringers supporting wood decks. b. Truss or floor system joints where debris or water may accumulate. c. Anywhere vegetation or other material may have come in contact with the steel. NOTE: Any weathering steel surface not "boldly exposed" to the atmosphere should be checked to ensure it has formed its protected oxide layer. 3. Check all steel surfaces and welded and bolted connections for cracks. Pay special attention to the welded truss and floor beam joints in vehicular or material handling bridges subject to fatigue stresses. 4. Check the ends of the bridge for any damage which may have been caused by vehicular impact. 5 Check the integrity of concrete abutments and/or piers for scour due to water flow if applicable, etc., per AASHTO's Manual for Maintenance Inspection or the foundation engineer's recommendations. 6. Check anchor bolts for damage and see that they are secure. Examine all bearings to ascertain that they are functioning properly. Expansion bearings and the expansion joints at the ends of the bridge must be checked to see that they can move freely and are clear of all foreign material. 7. Spliced Bridges: a. Check the bolted splices for any excessive corrosion or cracking of the steel or fasteners. b. Make sure ail weep holes are open and clear of debris to allow for complete drainage of any moisture which may collect on the interior tube surfaces. See project -specific shop drawings for locations of weep holes. B. If problems are seen during the inspection procedure, cleaning and repair or replacement of weathering steel bridge components may be necessary; painted bridges may require cleaning and repainting or replacement of some or all members. Contact the project foundation engineer and/or Contech Engineered Solutions, LLC for recommendations, if necessary. 2 Ce.MTECH ENGINEERED SOLUTIONS MAINTENANCE FOR PAINTED BRIDGES 9025 Centre Pointe Dr. Suite 400 West Chester, OH 45069 (800) 338-1122 www. conteches. corn Painted bridges, like any painted structure, require periodic inspections and painting. The following steps should help increase the life span of your bridge: A. After inspections, or any time loss or damage of the paint coat is noticeable, problem areas should be repaired as follows: 1. Select a maintenance coating system based on the following: a. Inspection report findings b. Environment (identify any corrosives) c. Degree of surface preparation attainable d. Current paint compatibility NOTES: * Generic type compatibility is a major factor in the selection of a system (some coating systems are not recommended over a particular type of existing material.) * Depending upon the surface performance, an upgrade in the coating system may be necessary at this time. 2. Clean all applicable surfaces as dictated by the repair system chosen (i.e. pressure wash, brush off, blast clean, etc.) 3. Apply repair coats per the coating manufacturer's recommendations. 4. Caulk all un-welded seams which are in need of repair with a good quality clear silicone caulk suitable for exterior use. B The entire bridge structure will require periodic repainting dependent upon varying factors such as the existing paint system, bridge usage, atmospheric environment, etc. Repainting will typically be required every 2-10 years. The frequency of painting will need to be determined by the inspector. The following steps should be followed when repainting the bridge structures: 1. Remove wood decking or grating, fencing, wood rub rails, and any other non -painted items which will not be receiving new paint. Obviously, concrete and asphalt decked bridges will be painted with the deck in place, unless these decks have deteriorated to the point of replacement. If this is the case, remove the deck prior to painting, if not, special care should be exercised to ensure problem areas below deck are cleaned and painted properly. 3 C?..*-NTECH ENGINEERED SOLUTIONS 9025 Centre Pointe Dr. Suite 400 West Chester, OH 45069 (800) 338-1122 www.conteches.com 2. Select a coating system based on parameters similar to those outlined in the repair painting section (A, above), paying attention to the following items: * Environment, specifically any corrosives identified during inspections * Substrate condition * Surface preparation limitations 3. After selecting a system compatible with all existing surface conditions and site limitations, clean all surfaces and apply according to the manufacturer's recommendations. 4. After the coating system has properly cured, caulk all un-welded seams with a good quality clear silicone caulk suitable for exterior use and replace the decking, fencing, etc., which were removed prior to cleaning and repainting the structure. This is also an excellent time to replace the wood rub rail which may have shown excessive deterioration. MAINTENANCE FOR WEATHERING BRIDGES Weathering steel is not a maintenance -free material. The following steps should help increase the life span of your bridge: A. Do not use de-icing salts for snow removal. De-icing salts can severely damage the weathering steel. B. Avoid retention of debris on the steel surfaces. Flush bridges at areas which accumulate debris (including salt) on a regular basis. C. Prevent weathering steel from contact with soil, vegetation, masonry, or other materials so that the weathering process can proceed on a natural basis. D. If excessive corrosion is encountered due to salts from adjacent roadways or roadways beneath an overpass structure, or for any other reason, it may be wise to blast clean and paint the truss joints, steel beneath the deck, or any area which exhibits excessive corrosion. Steel Structures Painting Council's Report 92-08, Maintenance Coating of Weathering Steel: Field Evaluation and Guidelines, provides recommendations for remedial painting of weathering steel bridges. 4 C=:: NTECH ENGINEERED SOLUTIONS 9025 Centre Pointe Dr. Suite 400 West Chester, OH 45069 (800) 338-1122 www.conteches.com MAINTENANCE FOR DECKING I. Wood Decks At the time of installation of the wood decking, Contech Engineered Solutions, LLC personnel take great strides to assure that the edges of each plank are in contact with each other so that no gaps appear between planks. All wood is stored inside, protected from the weather, prior to installation. However, wood is a natural material which exhibits large volume changes with variations in moisture content and time, particularly in the width direction, which can cause gaps to form between the planks. Cupping and splits may also occur which need to be repaired. Contech Engineered Solutions, LLC recommends an assessment of these hazards during the User Safety Inspection with remedial action as follows: A. Replace all planks that have deteriorated past a useful and safe life. B. Eliminate gaps between the planks which might be large enough for a high -heeled shoe to become lodged. Eliminating the gaps should be done as follows: 1. Remove all deck bolts. 2. Remove plank holddown angles. Be sure to mark their locations for ease of reinstallation. 3. Slide wood planks together. 4. Add new plank or planks to fill up the excess space. 5. Reinstall plank holddown angles. 6. Drill new holes in wood planks. 7. Install new deck bolts (see shop drawings for size and material). Replacement planks may be purchased through Contech Engineered Solutions, LLC. D. Over time and with exposure to the environment, wood may become smooth, particularly when wet with rain, dew, snow, sleet, ice, etc. Periodically it may be necessary to "roughen" the surface of the decking with large grit sandpaper. There are also commercially available non- skid coatings which may be applied. Note: It is the owner's responsibility to keep the wood deck free from cupping, splits, gaps and smooth surfaces. Remember, most pedestrian bridge liability claims are statistically slips and falls. nfl NTEC H ENGINEERED SOLUTIONS II. Grating Decks 9025 Centre Pointe Dr. Suite 400 West Chester, OH 45069 (800) 338-1122 www.conteches.com A Repair or replace any grating which shows damage or deterioration to the main bearing bars. B. If galvanized, inspect to see if corrosion has occurred. Wire brush any spots exhibiting corrosion and repair. We recommend the use of either sprayed zinc metalizing or the use of organic zinc rich paint for repairing galvanized surfaces. C. For weathering steel grating, if excessive corrosion is encountered due to salts from adjacent roadways or roadways beneath an overpass structure, or for any other reason, it may be wise to blast clean and paint the grating. HI. Concrete and Asphalt For all concrete and asphalt decks, Contech Engineered Solutions, LLC supplies a steel corrugated form decking to aid in the placement of the concrete or asphalt. For asphalt decks, this steel form is the main load carrying member. For concrete decks, this steel form may or may not be integral to the deck design (as in a composite deck). The contractor places the reinforcing and concrete, or the asphalt, after installation of the bridge. During inspection, the asphalt or concrete covering should be checked for excessive cracking and deterioration. At the same time, the steel form decks should be checked for excessive rusting and/or damage. If the coverings are deemed to require replacement, the steel forms may be reused if they are not damaged or do not show excessive corrosion. Structural form decks (for asphalt decks and composite concrete decks) may require replacement even when the deck surface itself is sound. Concrete and asphalt decks are usually not designed to accept the added dead weight of an overlay. Therefore, the only remedy is repair of the cracking or replacement of the concrete or asphalt covering. See the project -specific shop drawings for recommended concrete strength, reinforcing size, slab and asphalt thickness, control joint location and surface finish. If there are any questions, please contact Contech Engineered Solutions, LLC for consultation. Remember: Maintenance of the bridge decking, including keeping it free from slip or trip hazards, is the owner's responsibility. Most pedestrian bridge liability claims are statistically slips and fails. C'tNTECH ENGINEERED SOLUTIONS GENERAL MAINTENANCE I. Soil Clearance 9025 Centre Pointe Dr. Suite 400 West Chester, OH 45069 (800) 338-1122 www.conteches. corn Soil or dirt must not be left in contact with bare weathering or painted steel surfaces. In addition, adequate clearance for ventilation must be maintained between the ground and weathering steel surfaces to allow the steel to dry after wetting, forming its protective patina. If the initial construction of abutments and back slopes did not allow for adequate ventilation (approximately 18"-24"), enough soil, debris, and/or vegetation should be removed and kept cut back to allow for adequate airflow. If this is not possible, a coating designed for "ground contact" protection of steel may be applied to the members in the affected area. IL Snow Removal Because of possible accumulation of chlorides at truss joints, in the gaps between planks on structures with timber decks, on below deck members, and/or along the edges of decks where runoff occurs, the use of de-icing salts should be avoided on these structures, especially on weathering steel bridges (see Item A in the "Maintenance for Weathering Bridges" section of this document). The best and safest way to remove snow from these bridges, as far as the issue of steel corrosion is concerned, is by shoveling or plowing snow from the bridge deck. Non -corrosive traction aids such as sand may be used on the deck surfaces; however, if corrosive de-icing agents are used on the structure; accelerated corrosion of members which are exposed to the agent will take place, voiding the bridge warranty and necessitating repair or replacement of affected members. De-icing salts have been used on structures where more aggressive measures were taken to protect the steel, such as galvanizing the steel members or utilizing a concrete deck with curbs to channel water away from steel surfaces. In the later case, care must still be taken to protect, or maintain by cleaning or rinsing, areas where water drains or salt gets thrown onto un-galvanized steel surfaces by wheel traffic, spreading, etc. If not, the warranty shall again be voided and replacement of some members or possibly the entire structure may be required. 7 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • a • • • • • • • • • • • • • • • • • AMERICAN INSTITUTE OF STEEL CONSTRUCTION CERTIFICATION PROGRAMS PROUDLY RECOGNIZE THAT Big R Bridge MAINTAINS OPERATIONS LOCATED AT 19060 Weld County Road 66, Greeley, CO THAT SUCCESSFULLY MEET THE QUALITY CERTIFICATION REQUIREMENTS FOR Bridge Fabricator - Advanced (Major) Fracture Critical Endorsement Sophisticated Paint Endorsement - Covered PRESIDENT • • • • • • • • • • • • • • CERTIFICATION NUMBER ISSUED VALID THROUGH 199031021-05RF July 11, 2019 August 31, g2020 a N 1 r American Welding Society • Certifies that Big R has cBridge compiled -with the requirements of the AWS 0S.17 and for te Qualification and flrtfriat7on nC17Stancfards .f?1 WS 'Welding cFa6ricators. 180902E Certificate Number iePtenikerl#2020_ Expiration Date AWS President V Chair, Certi cation Pro rams v4,Aw /1CM/F CERTIFIED WELDING FABRICATOR watiforamusimwai Sr sin American Welding Society Certifies that Welding Inspector James P Carey has compliedwith the requirements ()JAWS QC1, Standard forAWS Certification of Welding Inspectors 10030431 CERTIFICATE NUMBER March 01, 2022 EXPIRATION DATE -• - // :AWS PRESIDENT W etio AWS ()UAI..IIi'ICATION & ('ERTI 1CATION COMMITTEE CHAIR • i . ha. -` •• •`` -:mss a. •J, t ri •1:1;.• I. 4147 • --a:-*„tea. • 4 . I J♦ $4. ••••.- ► CNTECH ENGINEERED SOLUTIONS A QUIKRETE® COMPANY Quotation Page# 1/3 Quote # QUO-412690-N2P8N5 Date Quote # Project Name Project # Project City/State 8/11/2020 QUO-412690-N2P8N5 Hokestra Bridge 649714 Longmont, CO Account Name Contact Name Phone Fax Email Weld County Weld County (970) 356-4000 Reply -To Contech Rep. Address Phone Fax Email Pete Niemann 19060 County Road 66, Greely, CO, 80631 (970) 301-2064 pniemann@conteches.com Contech's offer to sell the products described in this quotation is expressly conditioned upon Buyer's assent to the Contech Conditions of Sale ("Contech COS") included herewith and/or viewable at www.conteches.com/cos. A valid tax exemption certificate must be issued to Contech or sales tax will be added. Description 11. Continental Pedestrian Style: Capstone Truss Bridge Floor: H -Section Length: 81'-6" (CL Brg to CL Brg) Width: 10'-0" (Clear Width) Finish: Self -Weathering Steel Decking: Concrete Deck (Gals. Form Decking provided for purchaser's use to place reinforced concrete deck.) Life Safety System: Horizontal Safety Rails @ 6" max spacing up to 27" and 8" max spacing up to 42" min/54't max Rub Rail/Hand Rail: IPE Rub Rail Toe Plate:4" Steel Chanrel Toe Rail Camber: 100% Dead Load + 1/4" or 150% Dead Load, wh ch ever IS smaller Design/Loading: AASHTO LRFD (Live Load: 90 osf; Vehicle Load: H20 (40,000 lbs GVW); Wind Load: 35 psf, as if enclosed) Special Considerations: • a 0' elevation change oetween abutments • a skew of 0° • top of deck to low steel is 2'-9" • Seismic design per AASHTO LRFD Bridge Design Specifications Bridge will be shipped in two :2) pieces with an assembled shipped weight of approx. +1- 32,000 los (Subject to final design verification) Pieces 4 Quantity Extended Unit 1 Price 1.00 1.00 $68,862.00 EA Total Unit Total $68,862.00 $68,862.00 (Tax not included: Net Total $68,862.00 Standard Notes 1.Allowable unloading time for delivery trucks is two (2) hours. Demurrage charges of $75.00 per hour thereafter will be added 2. Design submittal drawings will be provided. signed and sealed by a Professional Engineer licensed to practice in he State where the project is located. 3.In addition to any other procedures outlined or remedies provided, at the time of order, Contech will request a desired delivery date for the quoted materials from the purchasing customer. After draw ng approval and prior to manufacturing Contech may again confirm the requested delivery date with the purchasing customer. If purchasing customer cannot take delivery of finished materials within 30 days of requested date, and after Contech has manufactured the product(s), Contech will invoice for the total amount of the order with payment due within 30 days. Additionally, Contech may also assess fees in the amount of 5% per month of the selling price of the stored materials that are not shipped within 30 days after the requested delivery date for storage and handling. 4.LRFD Guide Specification for the Design of Pedestrian Bridges - Item 4.2 - Fracture: Fracture Critical Member designation shall be in accordance with Provision 12 3 2 of AASHTO/AWS D1.5M/D1.5:2015 which requires each Fracture Critical Member (FCM) to be individually designated by the Engineer orior to bidding. In the absence of such designation, the Fracture requirements of Item 4.2 shall be deemed to have been waived. 5.One or more of the products quoted herein is nonstandard and not returnable. A down payment equal to 1/3 of the item(s) total is required and must be received prior to commencement of any performance by Contech. 6.Preliminary Assembled ship weight: Approximately +/- 32,000 Ibs. subject to final design. Contech will not be liable for any additional construction or installation costs incurred related to a change from a preliminary bid design weight to a final design, regardless of the reason for the change. 7.Prices are f.o.b. origin with freight allowed to the jobsite with unloading by others at a truck accessible location C'NTECH‘ ENGINEERED SOLUTIONS A QIIIKRETE® COMPANY Quotation Page# 2/3 Quote # QUO-412690-N2P8N5 tandard Notes 8.The estimated lead time for the submittal package is 4-5 weeks from the receipt of a signed purchase document and receipt of the required design and project information. Submittal lead times are subject to adjustment at time of order based upon current Engineering backlog. Approval -eview process is in addition to stated timeframes. The current estimated manufacturing lead time for this material is 12-14 weeks. Manufacturing and delivery lead times are subject to ad;ustrnent at the time Contech is given approval to fabricate based upon production capacity and delivery curfews or other travel restrictions. 9.This material will be manufactured for this particular project and is not subject to cancellation. See Section 19 of the Contech COS. 10.This quotation expires 30 days from the date shown. Prices are firm for shipment within 120 days of the date of quotation and are subject to a maximum escalation of 8% for each 30 days thereafter. 11.This quote is based on live off loading ONLY and is the responsibility of others. The loads will be delivered as close to the project location as trucks can -easorably access and be driven under their own power without specialized equipment. Oversized loads warrant additional cons deration and providing suitable access shall be he responsibility of the contractor/customer. The driver(s) will leave hard surface public roads only at their discretion but is not obligated to do so. If driver agrees to access a site under any other conditions, customer may be subject to additional costs. Due to curfews and other travel time restrictions on over dimensional loads, the customer shall be responsible for additional costs associated with weekend, holiday or Monday delivery requests. Cancellation of scheduled delivery loads requiring permits within 48hrs may result in additional permits and will be the responsibility of the purchaser. Specialized haulers and or equipment are utilized in the shipping of bridge components (ie "trader rental"), costs incurred by CONTECH due to cancellation and or postponement of the delivery of bridge components will be the responsibility of the purchaser. Staging/Jockeying of trailers can be provided upon request for an additional fee. 12.This quote is per site plans dated 7120/2020. Continental Pedestrian Truss bridge pricing includes the steel truss bridge manufactured in sections sized at the discretion of Contech to facilitate optimum shipments. Sections may require final assembly at the jobsite by others using fasteners supplied by Contech. The following work is not a part of this offer and is to be performed by others at no cost to Contech: 1. All construction surveying, including field measurement and verification of abutments and anchor bolt placement. 2. Design of the bridge foundations unless otherwise stated herein. 3. Excavation and construction of the bridge foundations. 4. Anchor bolt design, supply, installation or templates. 5. Erection and installation of the bridge structure(s). 6. Toucn up painting of any and all surfaces damaged during handling, load ng, transport, unloading, rigging, fit up or installation. Touch up paint guidelines are available from Contech. 7. Supply and installation of any expansion joint materials required by the contract. 8. Supply and installation of concrete and reinforcing for bridge deck slab or abutments. 9. Any and all costs associated with special inspection or testing by an independent agency. 10. Bridge approach railing or wing wall rails unless specifically included elsewhere on this proposal. 11. All other associated or appurtenant items not specifically refererced and included elsewhere in this proposal. • PAYMENT TERMS ARE 1/2%-10, NET 30 DAYS FROM DATE OF INVOICE UNLESS MATERIAL IS OTHERWISE NOTED AS NON-STANDARD ABOVE. IF NON-STANDARD. PAYMENT TERMS ARE 1'3 AT ORDER ACCEPTANCE AND PRIOR TO START OF PRODUCTION, 213 NET 30 DAYS FROM DATE OF INVOICE. THIS OFFER IS SUBJECT TO CREDIT APPROVAL. PRICES QUOTED APPLY ONLY TO THE REFERENCED PROJECT AND ARE IN EFFECT FOR 30 DAYS FROM THE DATE OF QUOTATION. SELLER RESERVES THE RIGHT TO ADJUST PRICES AFTER 30 DAYS FROM THE DATE OF QUOTATION BUT THE CONTECH COS REMAIN APPLICABLE. PRICES ARE BASED ON ESTIMATED QUANTITIES SHOWN. IF A DIFFERENT QUANTITY IS PURCHASED, CONTECH RESERVES THE RIGHT TO ADJUST THE PRICES. THIS QUOTATION CONTAINS THE ENTIRE AGREEMENT WITH RESPECT TO PURCHASE AND SALE OF PRODUCTS DESCRIBED AND SUPERSEDES ALL PREVIOUS COMMUNICATIONS, BUYER'S SIGNATURE BELOW, DIRECTION TO MANUFACTURE, OR ACCEPTANCE OF DELIVERY OF GOODS DESCRIBED ABOVE, SHALL BE DEEMED AN ACCEPTANCE OF THE CONTECH COS. SELLER EXPRESSLY REJECTS ANY OTHER TERMS AND CONDITIONS. PRICES ARE F.O.B. ORIGIN WITH FREIGHT ALLOWED TO THE JOBSITE WITH UNLOADING BY OTHERS AT A TRUCK ACCESSIBLE LOCATION.THIS QUOTATION IS ISSUED BY CONTECH ENGINEERED SOLUTIONS LLC FOR ITSELF AND/OR ON BEHALF OF ONE OR MORE OF ITS SUBSIDIARIES, INCLUDING BUT NOT LIMITED TO KEYSTONE RETAINING WALL SYSTEMS LLC. j a - i Acc€piance Contech Engineered Solutions LLC. S VIE TERMS COS HEREBY INCLUDED AND ORDER CONDITIONS HEREWITH THE DESCRIBED OF AND THIS MATERIAL QUOTATION VIEWABLE AT AND www.conteches.comicos SUBJECT IN THE TO ALL Contech By - 4 Pete Niemann Company (O) (970) 301-2064 By fr (F) Title (Cell) fr Date Title C 'NTECH ENGINEERED SOLUTIONS A QU,KRETE® COMPANY L Quote # QUO-412690-N2P8N5 Quotation Page# 3/3 Contech - CONDITIONS OF SALE 1. ACCEPTANCE. This quotation is an offer to sell to potential customer(s). BUYER'S RIGHT TO ACCEPT THIS OFFER IS LIMITED TO BUYER'S ASSENT TO THE TERMS AND CONDITIONS PRINTED HEREON AND THE ATTACHED OR ACCOMPANYING QUOTE, AND NO TERMS ADDITIONAL TO OR DIFFERENT FROM THOSE IN THIS OFFER ARE BINDING ON SELLER THERE ARE NO UNDERSTANDINGS TERMS, CONDITIONS OR WARRANTIES NOT FULLY EXPRESSED HEREIN. 2. LIMITED WARRANTIES. Seller warrants that it can convey good title to the products sold under this contract and that they are free of liens and encumbrances. Seller also warrants that the products sold under this contract are substantially free from defects in material and workmanship for a period of one year after the date of delivery. There are no express or implied warranties with respect to products sold hereunder which are misused, abused or used in conjunction with mechanical equipment improperly designed. used or maintained, or which are used, supplied for use or made available for use in any nuclear application of which Seller has not been notified in writing by Buyer at the time of order for the products sold hereunder. SELLER MAKES NO OTHER WARRANTY WHATSOEVER, EXPRESS OR IMPLIED ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND ALL IMPLIED WARRANTIES OF FITNESS FOR ANY PARTICULAR PURPOSE ARE DISCLAIMED BY SELLER AND EXCLUDED FROM THIS CONTRACT. 3. LIMITATION OF BUYERS REMEDIES AND SELLERS LIABILITY. Seller's liability hereunder shall be limited to the obligation to repair or replace only those products proven to have been defective in material or workmanship at the lime of delivery, or allow credit, at its option. Seller's total cumulative liability in any way arising from or pertaining to any product or service sold or required to be sold under this contract shall NOT n any case exceed the purchase price paid by Buyer for such products or services. IN NO EVENT SHALL SELLER HAVE ANY LIABILITY FOR COMMERCIAL LOSS, LOST PROFITS, CLAIMS FOR LABOR, OR CONSEQUENTIAL, SPECIAL, PUNITIVE OR INCIDENTAL DAMAGES OF ANY TYPE, WHETHER BUYERS CLAW BE BASED IN CONTRACT, TORT. WARRANTY, STRICT LIABILITY. NEGLIGENCE, OR OTHERWISE. IT IS EXPRESSLY AGREED THAT BUYER'S REMEDIES EXPRESSED IN THIS PARAGRAPH ARE BUYERS SOLE AND EXCLUSIVE REMEDIES 4. LIMITATION OF BUYERS REMEDIES AND SELLER'S LIABILITY FOR FAILURE OR DELAY IN DELIVERY. NO DELIVERY DATES ARE GUARANTEED. BUYERS SOLE AND EXCLUSIVE REMEDIES AND SELLER'S ONLY LIABILITY FOR ANY DELAY IN DELIVERY SHALL BE LIMITED AS SET FORTH IN PARAGRAPH 3 OF THIS CONTRACT. 5. FORCE MAJEURE. In any event and in addition to all other limitations stated herein, Seller shall not be liable 'or any act, omission, result or consequence, including but not limited to any delay in delivery or performance, which is (i) due to any act of God, the performance of any government order, any order bearing priority rating or order placed under any allocation program (mandatory or voluntary) established pursuant to law, local labor shortage, fire. flood or other casualty, governmental regulation or requirement, shortage or failure or raw material, supply, fuel, power or transportation breakdown of equipment, or any cause beyond Seller's reasonable control whether of similar or dissimilar nature to those above enumerated, or (ii) due to any strike, labor dispute, or difference with workers, regardless of whether or not Seller is capable of settling any such labor problem. 6. BUYER'S OBLIGATION TO PASS ON LIMITATION OR WARRANTIES AND REMEDIES. In order to protect Seller against claims by Buyer's buyer, if Buyer resells any of the products purchased under this agreement, Buyer shall include the language contained in paragraphs 2 and 3 of this agreement, dealing with Seller's limitations of warranties and remedies, in an enforceable agreement with Buyer's buyer, or otherwise include language in an enforceable agreement with its buyer that makes Seller's limitatior of warranties and remedies binding on its buyer. Buyer shall also include a provision in its agreement with its buyer applying Ohio law to any claims its buyer might assert against Seller with respect to products manufactured by Seller, and requiring its buyer to bring any such action against Seller either ;n federal district court in Cincinnati, Ohio or the common pleas court for Butler County, Ohio. Buyer shall defend, indemnify and hold Seller harmless from any and all claims, causes of action. damages, losses or expenses (including reasonable attorneys' fees) that Seller incurs by reason of Buyer's failure to comply with this paragraph. 7 PASSAGE OF TITLE Title to the products sold hereunder shall pass upon delivery to the carrier at the point of shipment. Neither Buyer nor the consignee shall have the right to divert or reconsign such shipment to any destination other than specified in the bill of lading without permission of the Seller. Unless otherwise agreed Seller reserves the right to select the mode of transportation. 8. PAYMENTS AND LATE CHARGES ON PAST DUE ACCOUNTS. Buyer represents that Buyer is solvent and can and will pay for the products sold to Buyer in accordance with the terms hereof. If Buyer shall fail to comply with any provision or to make payments in accordance with the terms of this contract or any other contract between Buyer and Seller, Seller may at its option defer shipments or, without waiving any other rights it may have, terminate this contract. All deliveries shall be subject to the approval of Seller's Credit Department. Seller reserves the right, before making any delivery, to require payment in cash or security for payment, and if Buyer fails to comply with such requirement, Seller may terminate this contract. A late charge of 1-Y% monthly (18% annual rate) or the maximum allowed by state law, if less, will be imposed on all past due accounts, and Buyer is responsible for all costs of collection including without limitation reasonable attorneys' fees and court costs 9. TRANSPORTAT►ON CHARGES. Delivered prices or prices involving competitive transportation adjustments shall be subject to appropriate adjustment to reflect changes in transportation charges, 10. CLAIMS BY BUYER. Buyer shall thoroughly inspect products sold under this contract immediately upon receipt to verify conformance with the specifications of the contract. Buyer must notify Seller of claims for failure or delay in delivery within 30 days after the scheduled delivery date. Buyer must notify Seller of any claims for nonconforming or defective products within 30 days afte- the nonconformity or defect was or should have been discovered. In addition, Seller must be given an opportunity to investigate the claim before Buyer disposes of the material, or else Buyer's claim will be barred. Seller shall incur no liability for damage, shortages, or other cause alleged to have occurred or existed at or prior to delivery to the carrier unless the Buyer shall have entered full details thereof on its receipt to the carrier. 11. MECHANICAL PROPERTIES; CHEMICAL ANALYSES. Data referring to mechanical properties or chemical analysis are the result of tests performed on specimens obtained from specific locations of the product(s) in accordance with prescribed sampling procedures, any warranty thereof is limited to the values obtained at such locations and by such procedures. There is no warranty with respect to values of the materials at other locations. 12. PATENTS. Seller shall indemnify Buyer against attorneys fees and any damages or costs awarded against Buyer in the event any legal proceeding is brought against Buyer by a third person dawning the material delivered hereunder in itself constitutes an infringement of any U.S. patent, provided Buyer gives Seller prompt notice of ary such suit being brought, gives Seller the opportunity to defend any such suit, and cooperates with Seller with respect to any such defense; unless the material is made in accordance with material designs, or specifications required by Buyer. in which case Buyer shall similarly indemnify Seller, 13. PERMISSIBLE VARIATIONS. The products sold hereunder shall be subject to Seller's standard manufacturing variations, tolerances and classifications. 14. TECHNICAL ADVICE. Buyer represents that it has made its own independent determination that the products it is purchasing under this contract meet the design requirements of Buyer's project and are suitable for Buyer's intended application. Buyer further represents that it has not relied in any respect on any written or oral statements or advice from Seller, other than the standard product specifications set forth in the most recent addition of Seller's published product brochures, in making that determination. 15. TAXES. No taxes imposed with respect of the sale of the products or services sold hereunder are included in any quotation by Seller. All applicable taxes shall be added and paid by Buyer in addition to the purchase price. 16. BUYER'S RIGHT OF TERMINATION. Buyer may terminate this contract in whole or in part upon notice in writing to Seller. Seller shall thereupon cease work and transfer to Buyer title to all completed and partially completed products and to any raw materials or supplies acquired by Seller especially for the purpose of performing this contract, and Buyer shall pay Seller the sum of the following: (1) the contract price for all products which have been completed prior to termination; (2) the cost to Seller of the material or work in process as shown on the books of Seller in accordance with the accounting practice consistently maintained by Seller plus a reasonable profit thereon, but in no event more than the contract price; (3) the cost f.o.b. Seller's plant of materials and supplies acquires' especially for the purpose of performing this contract; and (4) reasonable cancellation charges, if any, paid by Seller on account of any commitment(s) made hereunder. 17. SELLER'S RIGHT OF TERMINATION. In addition to the other rights of termination provided for in this contract, and if this contract is made pursuant to any governmental rule or regulation, plan, order or other directive, upon the directive, effected or impaired.termination thereof, Seller shall have the option of canceling this contract n whole or in part. 18. WAIVER. Failure or inability of either party to enforce any riges hereunder shall net waive any right in respect to any other or future rights or occurrences. 19. DELIVERY Unless otherwise agreed to in writing by the Seller, the Buyer hereby agrees to take delivery of the materials on this order within the later of thirty (30) days after the wanted date shown on the face of the order or within thirty (30) days after notification, oral or written, that the materials are ready for shipment. In the event that the Buyer does not arrange to take delivery of the materials in accordance with this Contract, Seller, at Seller's option, may: (a) invoice the Buyer for the materials less freight if applicable; store the material in Seller's yard for a period not to exceed sixty (60) days from the date of invoice; charge a storage fee not to exceed 5% per month or fraction thereof of the selling price of the stored materials, add any applicable price increases listed on the face of the order; charge for any repair work to protective coatings harmed by weathering while such material is being stored; and charge applicable freight when shipment to the Buyer is made. Materials remaining in storage after sixty (60) days from the invoice date shall become the property of the Seller for disposition at the Seller's discretion. In that event, Buyer shall not be liable for the invoice price of the materials, but shall be liable for the storage fee and any repair work to protective coatings; or (b) cancel the order and invoice the Buyer for cancellation charges, which shall be 25% of the selling price of the materials r the materials are standard, in -stock material, or the full selling price if the materials are special or nonstandard in nature and were especially fabricated for the Buyer. 20. PERIOD OF LIMITATIONS.Buyer and Seller agree that any action by Buyer against Seller relating to this contract or the products sold hereunder, including, without limitation, any action for breach of contract or warranty, or otherwise in connection with the products sold under this contract, must be commenced by Buyer against Seller within one year after the cause of action therefore accrues or one year of delivery of the products sold hereunder, if less. 21. CONFLICTING PROVISIONS OFFERED BY BUYER. Any terms and conditions of any purchase order or other instrument issued by the Buyer, in connection with the subject matter of this document, which are in addition to or inconsistent with the terms and conditions expressed herein, will not be binding on Seller in any matter whatsoever unless accepted by Seller in writing. 22. SEVERABILITY_ In case any provision of this contract shall be declared invalid, illegal or unenforceable, the validity, legality and enforceability of the remaining provisions shall not in any way be affected or impaired. 23. APPLICABLE LAW. This contract shall be governed by, and construed and enforced in accordance with, [he laws of Ohio. Buyer and Seller specifically agree that any legal action brought relating to this contract shall be brought and tried exclusively in the federal district court in Cincinnati, Ohio, or, in the absence of jurisdiction, the Buller County Court of Common Pleas in Hamilton, Ohio. REV. 03/15 C,.\\.1,yaNTECH r;triP'; ENGINEERED SOLUTIONS A QUIKRETE® COMPANY Quotation Page# 1/3 Quote # QUO-412692-X0C9J 1 Date i 8/11/2020 Account Name Weld County Reply _ _ -To Quote # QUO-412692-X0C9J1 Contact Name Weld County Contech Rep. Pete Niemann Phone (970) 356-4000 Address 19060 County Road 66, Greely, 80631 CO. Project Name Hokestra Bridge Fax Phone (970) 301-2064 Project # 649714 , Email Fax Project City/State Longmort, CO Email pniemann@conteches.com Contech's viewable offer to sell the products described in this quotation is expressly conditioned upon Buyer's assent to the Contech Conditions of Sale at www.conteches.com/cos. A valid tax exemption certificate must be issued to Contech or sales tax wilt be added. ("Contech COS") included herewith and/or Item# ,I I Description .. Quantity Extended Price Un .. -' , Unit Total Continental Style: Length: Finish: Railing sheet Each Approach to S-608. railing 13'-5 Galvanized be Pedestrian Rails 3/8" fabricated Stainless component - Approach Rails and Powder Coated using the members steel anchors shall will be shipped in and be provided one (1) layout piece. shown by others. on - 4.00 - 4.00 $5,805.00 EA $23,220.00 Total $23,220.00 (Tax not included) a Net Total $23,220.00 Standard Notes 1.Allowable unloading time for delivery `rucks is two (2) hours. Demurrage charges of $75.00 per hour thereafter will be added. 2.In the manufactured assess for materials addition purchasing storage to from the fees in and the the any other purchasing customer. product(s), amount handling. procedures customer. If purchasing Contech of 5% per outlined will month After customer or remedies drawing cannot invoice for the of the selling provided, approval take total price delivery amount of at the and prior of of the stored the time to finished order materials manufacturing of order, materials with that payment Contech Contech within due are rot will 30 shipped request may days within a desired again confirm of requested 30 days. Additionally. within 30 days delivery the date, requested and after date for the delivery after Contech Contech the requested quoted date may delivery has also with date 3.One or more of the received prior to commencement products quoted of any herein is nonstandard performance by Contech. and not returnable. A down payment equal to 1/3 of the item(s) total is required and must be 4.Preliminary incurred Assembled related to a change ship weight: Is from a preliminary based or the design by Weld County. Contech will not be liable for any additional bid design weight to a final design, regardless of the reason for the construction or installation change. costs 5.Prices are f.o.b. origin with freight allowed to the jobsite with unloading by others at a truck accessible location. 6.Shop drawings will not be stamped. Design liability for the approach railing shall be that of the owner. 7.The estimated lead information. Submittal addition to stated subject to adjustment time timeframes. lead at the for the times The time shop drawings is 4 weeks from the receipt of a signed purchase document and are subject to adjustment at time of order based upon current Engineering backlog. current estimated manufacturing lead time for this material is 6-8 weeks. Manufacturing Contech is given approval to fabricate based upon production capacity and delivery receipt of the Approval and curfews or required review delivery other process lead travel design and project is in times are restrictions. 8.This material will be manufactured for this particular project ands not subject to cancellation. See Section 19 of the Contech COS. 9.This quotation expires 30 days escalation of 8% for each 30 from the days thereafter. date shown. Prices are firm for shipment within 120 days of the date of quotation and are subject to a maximum :o 10.This reasonably suitable obligated travel delivery the provided purchaser. cancellation quote is based access access shall to do so. time restrictions requests. Specialized and upon request and be If driver Cancellation or on be the on postponement for live over an driven off responsibility agrees haulers additional dimensional of loading under to scheduled and access of or the fee. their ONLY of loads, equipment and own power the contractor/customer. a site the delivery delivery is under loads are of the responsibility without specialized any other customer shall requiring utilized in bridge components conditions, the The be permits of others. driver(s) responsible shipping will equipment. customer within be of the The will for 48hrs bridge responsibility loads Oversized leave may additional may components will hard be result subject be surface costs delivered loads in (ie of the warrant public to additional associated additional "trailer purchaser. as close additional roads permits rental"), with Staging/Jockeying to only costs. weekend, the and costs project consideration at their Due to will incurred location as trucks and providing discretion but is curfews and other holiday or Monday be the responsibility by CONTECH of trailers can not can of due be 11.This quote is per site plans dated 07/20/2020. CONT CH ENGINEERED SOLUTIONS MIIKRETf ® COMPANY Quotation Page# 2/3 Quote # QUO-412692-X0C9J 1 Scope Of Work Continental Pedestrian Truss bridge pricing includes the steel truss bridge manufactured in sections sized at the discretion of Contech to facilitate optimum shipments. Sections may require final assembly at the jobsite oy others using fasteners supplied by Contech. The following work is not a part of this offer and is to be performed by others at no cost to Contech: 1. All construction surveying, includinc field measurement and verification of abutments and anchor bolt placement. 2. Design of the bridge foundations unless otherwise stated herein. 3. Excavation and construction of the bridge foundations. 4. Anchor bolt design, supply. installation or templates. 5. Erection and installation of the bridge structure(s). 6. Touch up painting of any and all surfaces damaged during handling, loading, transport, unloading, rigging, fit up or installation. Touch up paint guidelines are available from Contech. 7. Supply and installation of any expansion joint materials required by the contract. 8. Supply and installation of concrete and reinforcing for bridge deck slab or abutments. 9. Any and all costs associated with special inspection or testing by an independent agency. 10. Bridge approach railing or wing wale rails unless specifically included elsewhere on this proposal. 11. All other associated or appurtenant items not specifically referenced and included elsewhere in this proposal. PAYMENT TERMS ARE 1/24-10. NET 30 DAYS FROM DATE OF INVOICE UNLESS MATERIAL IS OTHERWISE NOTED AS NON-STANDARD ABOVE. IF NON-STANDARD. PAYMENT TERMS ARE 1/3 AT ORDER ACCEPTANCE AND PRIOR TO START OF PRODUCTION, 2/3 NET 30 DAYS FROM DATE OF INVOICE. THIS OFFER IS SUBJECT TO CREDIT APPROVAL PRICES QUOTED APPLY ONLY TO THE REFERENCED PROJECT AND ARE N EFFECT FOR 30 DAYS FROM THE DATE OF QUOTATION. SELLER RESERVES THE RIGHT TO ADJUST PRICES AFTER 30 DAYS FROM THE DATE OF QUOTATION BUT THE CONTECH COS REMAIN APPLICABLE. PRICES ARE BASED ON ESTIMATED QUANTITIES SHOWN. IF A DIFFERENT QUANTITY IS PURCHASED, CONTECH RESERVES THE RIGHT TO ADJUST THE PRICES. THIS QUOTATION CONTAINS THE ENTIRE AGREEMENT WITH RESPECT TO PURCHASE AND SALE OF PRODUCTS DESCRIBED AND SUPERSEDES ALL PREVIOUS COMMUNICATIONS BUYER'S SIGNATURE BELOW, DIRECTION TO MANUFACTURE, OR ACCEPTANCE OF DELIVERY OF GOODS DESCRIBED ABOVE, SHALL BE DEEMED AN ACCEPTANCE OF THE CONTECH COS. SELLER EXPRESSLY REJECTS ANY OTHER TERMS AND CONDITIONS. PRICES ARE F.O.B. ORIGIN WITH FREIGHT ALLOWED TO THE JOBSITE WITH UNLOADING BY OTHERS AT A TRL CK ACCESSIBLE LOCATION.THIS QUOTATION IS ISSUED BY CONTECH ENGINEERED SOLUTIONS LLC FOR ITSELF AND/OR ON BEHALF OF ONE OR MORE OF ITS SUBSIDIARIES, INCLUDING BUT NOT LIMITED TO KEYSTONE RETAINING WALL SYSTEMS LLC. Acceptance Contech Engineered Solutions LLC, WE HEREBY TERMS COS INCLUDED ORDER AND CONDITIONS HEREWITH THE DESCRIBED OF THIS AND VIEWABLE MATERIAL QUOTATION AT SUBJECT AND www.conteches.com/cos IN THE TO ALL Contech By Pete Niemann Company . (CO (970) 3)1-2064 By (F) Title (Cell) Date Title CONTECH ENGINEERED SOLUTIONS A QU/NRfTE® COMPANY Quotation Page# 3/3 (Quote # QUO-412692-X0C9J1 i Contech • CONDITIONS OF SALE 1. ACCEPTANCE. This quotation is an offer to sell to potential customer(s). BUYER'S RIGHT TO ACCEPT THIS OFFER IS LIMITED TO BUYER'S ASSENT TO THE TERMS AND CONDITIONS PRINTED HEREON AND THE ATTACHED OR ACCOMPANYING QUOTE, AND NO TERMS ADDITiONAL TO OR DIFFERENT FROM THOSE IN THIS OFFER ARE BINDING ON SELLER. THERE ARE NO UNDERSTANDINGS, TERMS, CONDITIONS OR WARRANTIES NOT FULLY EXPRESSED HEREIN. 2. LIMITED WARRANTIES. Seller warrants that it can convey good title to the products sold under this contract and that they are free of liens and encumbrances. Seller also warrants hat the products sold under this contract are substantially free from defects in material and workmanship for a period of one year after the date of delivery. There are no express or implied warranties with respect to products sold hereunder which are misused, abused or used in conjunction with mechanical equipment improperly designed, used or maintained, or which are used, supplied for use or made available for use in any nuclear application of which Seller has not been notified in writing by Buyer at the time of order for the products sold hereunder. SELLER MAKES NO OTHER WARRANTY WHATSOEVER, EXPRESS OR IMPLIED. ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND ALL IMPLIED WARRANTIES OF FITNESS FOR ANY PARTICULAR PURPOSE ARE DISCLAIMED BY SELLER AND EXCLUDED FROM THIS CONTRACT. 3. LIMITATION OF BUYERS REMEDIES AND SELLER'S LIABILITY. Sellers liability hereunder shall be limited to the obligation to repair or replace only those products proven to have been defective in material or workmanship at the time of delivery, or allow credit, at its option. Seller's total cumulative liability in any way arising from or pertaining to any product or service sold or required to be sold under this contract shall NOT in any case exceed the purchase price paid by Buyer for such products or services. IN NO EVENT SHALL SELLER HAVE ANY LIABILITY FOR COMMERCIAL LOSS, LOST PROFITS, CLAIMS FOR LABOR, OR CONSEQUENTIAL, SPECIAL, PUNITVE OR INCIDENTAL DAMAGES OF ANY TYPE, WHETHER BUYERS CLAIM BE BASED IN CONTRACT, TORT, WARRANTY, STRICT LIABILITY NEGLJGENCE OR OTHERWISE. IT IS EXPRESSLY AGREED THAT BUYERS REMEDIES EXPRESSED IN THIS PARAGRAPH ARE BUYERS SOLE AND EXCLUSIVE REMEDIES. 4. LIMITATION OF BUYERS REMEDIES AND SELLER'S LIABILITY FOR FAILURE OR DELAY IN DELIVERY. NO DELIVERY DATES ARE GUARANTEED. BUYERS SOLE AND EXCLUSIVE REMEDIES AND SELLER'S ONLY LIABILITY FOR ANY DELAY IN DELIVERY SHALL BE LIMITED AS SET FORTH IN PARAGRAPH 3 OF THIS CONTRACT. 5. FORCE MAJEURE. In any event and in addition to all other limitations stated herein, Seller shall not be liable for any act, omission, result or consequence, including but not limited to any delay in delivery or performance, which is (i) due to any act of God, the performance of any government order, any order bearing priority rating or order placed under any allocation program (mandatory or voluntary) established pursuant to taw, local labor shortage, fire. flood or other casualty, governmental regulation or requirement, shortage or failure or raw material, supply, fuel, power or trarsportation, breakdown of equipment, or any cause beyond Seller's reasonable control whether of similar or dissimilar nature to those above enumerated, or (ii) due to any strike, labor dispute, or difference with workers, regardless of whether or not Seller is capable of settling any such labor problem. 6. BUYER'S OBLIGATION TO PASS ON LIMITATION OR WARRANTIES AND REMEDIES. In order to protect Seller against claims by Buyer's buyer, if Buyer resells any of the products purchased under this agreement, Buyer shall include the language contained in paragraphs 2 and 3 of this agreement, dealing with Seller's limitations of warranties and remedies, in an enforceable agreement with Buyer's buyer, or otherwise include language in an enforceable agreement with its buyer that makes Seller's limitation of warranties and remedies binding on its buyer. Buyer shall also include a provision in its agreement with its buyer applying Ohio law to any claims its buyer might assert against Seller with respect to products manufactured by Seller. and requiring its buyer to bring any such action against Seller either in federal district court in Cincinnati, Ohio or the common pleas court for Butler County, Ohio. Buyer shall defend, indemnify and hold Seller harmless from any and all claims, causes of action, damages, losses or expenses (including reasonable attorneys' fees) that Seller incurs by reason of Buyer's failure to comply with this paragraph. 7. PASSAGE OF TITLE. Title to the products sold hereunder shall pass upon del very to the carrier at the point of shipment. Neither Buyer nor the consignee shall have the right to divert or reconsign such shipment to any destination other than specified in the bill of lading without permission of the Seller. Unless otherwise agreed Seller reserves the right to select the mode of transportation. 8. PAYMENTS AND LATE CHARGES ON PAST DUE ACCOUNTS. Buyer represents that Buyer is solvent and can and will pay for the products sold to Buyer in accordance with the terms hereof. If Buyer shall fail to comply with any provision or to make payments in accordance with the terms of this contract or any other contract between Buyer and Seller, Seller may at its option defer shipments or, without waiving any other rights it may have, terminate this contract. All deliveries shall be subject to the approval of Seller's Credit Department, Seller reserves the right, before making any delivery, to require payment in cash or security for payment, and if Buyer fails to comply with such requirement, Seller may terminate this contract. A late charge of 1-Y2% monthly (18% annual rate) or the maximum allowed by state law, if less, will be imposed on all past due accounts, and Buyer is responsible for all costs of collection including without limitation reasonable attorneys' fees and court costs. 9. TRANSPORTATION CHARGES. Delivered prices or prices involving competitive transportation adjustments shall be subject to appropriate adjustment to reflect changes in transportation charges. 10. CLAIMS BY BUYER. Buyer shall thoroughly inspect products sold under this contract immediately upon receipt to verify conformance with the specifications of the contract. Buyer must notify Seller of claims for failure or delay in delivery within 30 days after the scheduled delivery date. Buyer must notify Seller of any claims for nonconforming or defective products within 30 days after the nonconformity or defect was or should have been discovered. In addition, Seller must be given an opportunity to investigate the claim before Buyer disposes of the material, or else Buyer's claim will be barred. Seller shall incur no liability for damage, shortages, or other cause alleged to have occurred or existed at or prior to delivery to the carrier unless the Buyer shall have entered full details thereof on its receipt to the carrier. 11. MECHANICAL PROPERTIES; CHEMICAL ANALYSES. Data referring to mechanical properties or chemical analysis are the result of tests performed on specimens obtained from specific locations of the product(s) in accordance with prescribed sampling procedures; any warranty thereof is limited to the values obtained at such locations and by such procedures. There is no warranty with respect to values of the materials at other locations. 12. PATENTS. Seller shall indemnify Buyer against attorneys fees and any damages or costs awarded against Buyer in the event any legal proceeding is brought against Buyer by a third person claiming the material delivered hereunder in itself constitutes an infringement of any U.S. patent, provided Buyer gives Seller prompt notice of any such suit being brought, gives Seller the opportunity to defend any such suit, and cooperates with Seller with respect to any such defense; unless the material is made in accordance with material designs, or specifications required by Buyer. in which case Buyer shall similarly indemnify Seller. 13. PERMISSIBLE VARIATICNS. The products sold hereunder shall be subject to Seller's standard manufacturing variations, tolerances and classificatiors. 14. TECHNICAL ADVICE. Buyer represents that it has made its own independent determination that the products it is purchasing under this contract meet the design requirements of Buyer's project and are suitable for Buyer's intended application. Buyer further represents that it has not relied in any respect on any written or oral statements or advice from Seller, other than the standard product specifications set forth in the most recent addition of Seller's published product hrechures, in making that determination. 15, TAXES. No taxes imposed with respect of the sale of the products or services sold hereunder are included in any quotation by Seller. All applicable taxes shall be added and paid by Buyer in addition to the purchase price. 16. BUYER'S RIGHT OF TERMINATION. Buyer may terminate this contract in whole or in part upon notice in writing to Seller. Seller shall thereupon cease work and transfer to Buyer title to all completed and partially completed products and to any raw materials or supplies acquired by Seller especially for the purpose of performing this contract. and Buyer shall pay Seller the sum of the following: (1) the contract price for all products which have been completed prior to termination; (2) the cost to Seller of the material or work in process as shown on the books of Seller in accordance with the accounting practice consistently maintained by Seller plus a reasonable profit thereon, but in no event more than the contract price; (3) the cost f.o.b. Seller's plant of materials and supplies acquired especially for the purpose of performing this contract; and (4) reasonable cancellation charges, if any, paid by Seller on account of any commitment(s) made hereunder. 17. SELLER'S RIGHT OF TERMINATION. In addition to the other rights of terminaticn provider] for in this contract, and if this contract is made pursuant to any governmental rule or regulation, plan, order or other directive, upon the directive, effected or impaired.termination thereof, Seiler shall have the option of canceling this contract in whole or in part. 18. WAIVER. Failure or inability of either party to enforce any right hereunder shall not waive any right in respect to any other or future rights or occurrences. 19. DELIVERY. Unless otherwise agreed to in writing by the Seller, the Buyer hereby agrees to take delivery of the materials on this order within the later of thirty (30) days after the wanted date shown on the face of the order or within thirty (30) days after notification, orai or written, that the materials are ready for shipment. In the event that the Buyer does not arrange to take delivery of the materials in accordance with this Contract, Seller, at Seller's option, may: (a) invoice the Buyer for the materials less freight if applicable; store the material in Seller's yard for a period not to exceed sixty (60) days from the date of invoice; charge a storage fee not to exceed 5% per month or fraction thereof of the selling price of the stored materials; add any applicable price increases listed on the face of the order; charge for any repair work to protective coatings harmed by weathering while such material is being stored; and charge applicable freight when shipment to the Buyer is made. Materials remaining in storage after sixty (60) days from the invoice date shall become the property of the Seller for disposition at the Seller's discretion. In that event, Buyer shall not be liable for the invoice price of the materials, but shall be liable for the storage fee and any repair work to protective coatings; or (b) cancel the order and invoice the Buyer for cancellation charges, which shall be 25% of the selling price of the materials if the materials are standard, in -stock material, or the full selling price if the materials are special or nonstandard in nature and were especially fabricated for the buyer. 20. PERIOD OF LIMITATIONS. Buyer and Seller agree that any action by Buyer against Seller relating to this contract or the products sold hereunder, including, without limitation, any action for breach of contract or warranty, or otherwise in connection with the products sold under this contract, must be commenced by Buyer against Seller within one year after the cause of action therefore accrues or one year of delivery of the products sold hereunder, if less. 21. CONFLICTING PROVISIONS OFFERED BY BUYER Ary terms and conditions of any purchase order or other instrument issued by the Buyer, in connection with the subject matter of this document, which are in addition to or inconsistent with the terms and conditions expressed herein, will not be binding on Seller :n any matter whatsoever unless accepted by Seller in writing. 22. SEVERABILITY. In case any provision of this contract shall be declared invalid, illegal or unenforceable, the validity, legality and enforceability of the remaining provisions shall not in any way oe affected or impaired. 23. APPLICABLE LAW. This contract shall be governed by, and construed and enforced in accordance with, the laws of Ohio. Buyer and Seiler specifically agree that any legal action brought relating to this contract shall be brought and tried exclusively in the federal district court in Cincinnati, Ohio, or, in the absence of jurisdiction, the Butler County Court of Common Pleas in Hamilton, Ohio REV 03/15 EMI 0s corm (Rev October 2018) Department of the Treasury Internal Revenue Service Request for Taxpayer identification Number and Certification la Go to www rrs gov/FormW9 for instructions and the latest information Give Form to the requester Do not send to the IRS Print or type See Specrtic Instructions on page 3 f Name (as shown on your income tax return) Name Is required on this line do not leave this line blank QUIKRETE Holdings, Inc 2 Business name/disregarded entity name, if different from above Contech Engineered Solutions, LLC (FEIN #31-1177165) 3 Check appropriate following seven boxes box for proprietor LLC company appropnate is classified is not from the federal tax classification of the person whose name is entered on line 1 Check only one of the ❑ Trust/estate I* 4 Exemptions certain entities, instructions Exempt payee Exemption code (if any) 4A•pir•a o accounts (codes apply only to not individuals, see on page 3) code (if any) 5 In Individual/sole or IS C Corporation S Corporation ❑ Partnership single -member ❑ Limited liability Note Check the LLC tf the LLC another LLC that is disregarded Enter the tax classification (C=C corporation, S=S corporation P=Partnership) box in the line above for the tax classification of the single -member owner as a single -member LLC that is disregarded from the owner unless the disregarded from the owner for U S federal tax purposes Otherwise, a single owner should check the appropriate box for the tax classification of its owner P.. from FATCA reporting N/A Do not check owner of the LLC is member LLC that maintained outside the U S) II Other (see instructions) 5 Address (number street, and apt or suite no ) See Instructions Five Concourse Parkway Suite 1900 Requester's name and address (optional) 6 City state and ZIP code Atlanta, GA 30328-6111 7 List account number(s) here (optional) Taxpayer Identification Number (TIN) Enter your TIN in the appropriate box The TIN provided must match the name given on line 1 to avoid backup withholding For tnd)viduals, this is generally your social security number (SSN) However, for a resident alien, sole proprietor, or disregarded entity, see the instructions for Part I, later For other entities, it Is your employer identification number (EIN) If you do not have a number, see How to get a TIN, later Note If the account is in more than one name, see the instructions for line 1 Also see What Name and Number To Give the Requester for guidelines on whose number to enter Social security number or Employer Identification number 2 0 0 5 2 0 1 6 3 Certification Under penalties of perjury, I certify that 1 The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me), and 2 I am not subject to backup withholding because (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue Service (IRS) that I am subject to backup withholding as a result of a failure to report at interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup v ithholding, and 3 I am a U S citizen or other U S person (defined below), and 4 The FATCA code(s) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct Certification instructions You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return For real estate transactions, item 2 does not apply For mortgage interest paid, acquisition or abandonment of seared property cancellation of debt, contributions to an individual retirement arrangement (IRA), and generally, payments other than interest and dividends, you are not required to sign the certification, but you must provide your correct TIN See the instructions for Part II, later Sign Here Signature of � U S person ®+ '�/(`/ --)=-;-77--- -„ Date General Instru ----- tions Section references are to the Internal Revenue Code unless otherwise noted Future developments For the latest information about developments related to Form W-9 and its instructions, such as legislation enacted after they were published, go to www rrs gov/FormW9 Purpose of Form An individual or entity (Form W-9; requester) who is required to file an information return with the IRS must obtain your correct taxpayer identification number (TiN) whichmay be your social security number (SSN), individual taxpayer identification number (TIN), adoption taxpayer identification number (ATIN), or employer identification number (EIN), to report on an information return the amount paid to you, or other amount reportable on an information return Examples of information returns include, but are not limited to, the following • Form 1099-INT (interest earned or paid) • Form 1099-DIV (dividends, Including those from stocks or mutual funds) • Form 1099-MISC (various types of income, prizes, awards, or gross proceeds) • Form 1099-B (stock or mutual fund sales and certain other transactions by brokers) • Form 1099-S (proceeds from real estate transactions) • Form 1099-1< (merchant card and third party network transactions) • Form 1098 (home mortgage interest), 1098-E (student loan interest) 1098-T (tuition) • Form 1099-C (canceled debt) • Form 1099-A (acquisition or abandonment of secured properly) Use Form W-9 only if you are a U S person (including a resident alien), to provide your correct TIN If you do not return Form W-9 to the requester with a TIN, you might be subject to backup withholding See What is backup withholding, later Cat No 10231X Form W-9 (Rev 10-2018) New Contract Request i ^Entity information - Entity Name* Entity ID* CONTECH ENGINEERED SOLUTIONS @00036835 LLC Contract Name * HOKESTRA PRE -FABRICATED PEDESTRIAN BRIDGE Contract Status CTB REVIEW Contract ID 4043 Contract Lead* CKIMM I ❑ New Entity? Parent Contract ID Requires Board Approval YES Contract Lead Email Department Project # CKtmmi@co weld co us GR-58 Contract Description* CONTRACT FOR A PRE -FABRICATED PEDESTRIAN BRIDGE TO BE LOCATED AT THE HOKESTRA PIT I Contract Description 2 Contract Type* CONTRACT Amount $68,862 00 Renewable* NO Automatic Renewal NO Grant NO !GA NO Department PUBLIC WORKS Department Email CM- PublicWorks@weldgov corn Department Head Email CM-PublicWorks- DeptHead a@weldgov corn County Attorney BOB CHOATE County Attorney Email BCHOATE@CO WELD CO US If this is a renewal enter previous Contract ID If this is part of a MSA enter MSA Contract ID Requested BOCC Agenda Date* 08/19/2020 Due Date 08/15/2020 Will a work session with BOCC be required?* HAD Does Contract require Purchasing Dept_ to be included? NO Note the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in OnBase `Contract, Date's Effective Date Termination Notice Period I Review Date* 08/18/2020 Committed Delivery Date Renewal Date Expiration Date* 01/31/2021 Contact Information Contact Info Contact Name Purchasing Purchasing Approver CONSENT Approval Process Department Head JAY Iv1CDONALD OH Approved Date 08/18/2020 Final Approval BOCC Approved BOCC Signed Date BOCC Agenda Date DS/24/2020 Onginator CKIMMI Contact Type Contact Email Finance Approver CONSENT Contact Phone 1 Purchasing Approved Date 08/18/2020 Finance Approved Date 08/1S/2020 Tyler Ref ## AG 082420 Legal Counsel CONSENT Contact Phone 2 Legal Counsel Approved Date 08/18/2020 RESOLUTION RE: APPROVE EMERGENCY BID #B2000155, PREFABRICATED PEDESTRIAN BRIDGE, AND WAIVER OF TEN-DAY WAITING PERIOD FOR CONSIDERATION AND INVESTIGATION - DEPARTMENT OF PUBLIC WORKS WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Department of Purchasing has requested waiver of the ten-day waiting period for Emergency Bid Request #B2000155, Prefabricated Pedestrian Bridge, for the Department of Public Works, to accelerate the fabrication of the bridge, ensuring it is ready when the abutments and realigned Hokestra Trail are ready, and WHEREAS, the Board of County Commissioners deems it advisable to waive the ten-day waiting period for said emergency bid. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the ten-day waiting period for Emergency Bid Request #B2000155, Prefabricated Pedestrian Bridge, for the Department of Public Works, be, and hereby is, waived. BE IT FURTHER RESOLVED by the Board that the low bid from Contech Engineered Solutions, LLC, in the amount of $68,862.00, be, and hereby is, accepted on an emergency basis. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 17th day of August, A.D., 2020. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: Wd-tyl44) jr1to;edi Weld County Clerk to the Board BY: eputy Clerk to the Board Mike Freeman, Chair SteveAVloreno.-Tem Sbo K. James APP: % D AS :��`' �� ;;� EXCUSED ounty At orney Date of signature: o0Lo% arbara Kirkmeyer Kevin D. Ross cc ; PLJ(CK/cFl/ ER), PuR, AcT(BC/cD) 08/20%20 2020-2512 PO0022 EG0078 MEMORANDUM Date: August 13, 2020 To: Rob Turf, Purchasing Manager From: Clay Kimmi, Senior Engineer, Public Works RE: Bid Request No. B2000155 BOCC Approval Date August 17, 2020 Bids were received and opened on August 13, 2020 for the contracted design, fabrication, and delivery of the Hokestra Pedestrian Bridge. Three (3) bids were received and reviewed to determine if they met specifications and included all required documentation. Two of the bids (Wheeler Lumber, and BCS Fabrication) were discovered to be missing the bid bond as required by Addendum 1 of the Contract Documents. Both of these bids were determined to be unresponsive due to the missing information. The remaining bid was in the amount of $68,862.00. The vendor is Contech Engineered Solutions LLC (Contech). The bid meets the specifications and included all required documentation. The Contech bid is approximately $3,138 less than the engineer's estimate of $72,000. Contech is located in Greeley, CO and is located at the Big R fabrication site on Highway 85 north of Greeley. Contech was worked well with Weld County on past contracts. Public Works is requesting that the contract be presented and awarded on August 17, 2020. The BOCC approved placing the contract on their August 17, 2020 agenda as an emergency award on August 12, 2020 via a pass around request. An emergency award allows the schedule for design and fabrication of the bridge to be advanced by two weeks. The bridge is expected to be fabricated and delivered by the end of December, 2020. Public Works recommends awarding the design, fabrication, and delivery contract to the lowest responsive bidder, Contech Engineered Solutions LLC, for a total amount not to exceed $68,862.00.00. 00/r 7 2020-2512 -Pu oO2.2 EGoa7$ BOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW PASS -AROUND TITLE: Emergency Present and Award for Hokestra Pedestrian Bridge DEPARTMENT: Public Works DATE: 08/11/2020 PERSON REQUESTING: Clay Kimmi Brief description of the problem/issue: The Hokestra Pre -Fabricated Pedestrian Bridge bid is currently scheduled to be opened on August 13 at 10 am. It is scheduled to be presented to the BOCC during the 9 am hearing on August 17. Public Works would like to request an emergency award for the pre -fabricated bridge at the 9 am hearing on August 17 as well. The reason for the emergency award request is to help accelerate the fabrication and delivery schedule for the pedestrian bridge. The lead time for the fabrication and delivery of the bridge is 4 to 5 months. The emergency award would help accelerate the fabrication schedule by two weeks. Accelerating the fabrication schedule helps ensure the pre -fabricated bridge is ready when the bridge abutments and realigned trail are ready. What options exist for the Board? (include consequences, impacts, costs, etc. of options): 1. Do not approve the request for the emergency award. If an emergency award is not granted, the lead time for delivery of the bridge could adversely impact the general contractor's schedule for installing the bridge and completing the Hokestra trail realignment by approximately 2 weeks. 2. Approve the request for the emergency award. If the emergency award is granted, the lead time for delivery of the bridge is accelerated by 2 weeks. The general contractor would then be able to take delivery of the bridge 2 weeks earlier and would be able to complete the Hokestra trail realignment project approximately 2 weeks earlier. Recommendation: Public Works recommends approval of the emergency award. Approve ltccommendation Mike Freeman, Chair Scott K. James Barbara Kirkmeyer Steve Moreno, Pro -Tern Kevin D. Ross Schedule Work Session Other/Comments: Search List Term of records : SAKI Contech Record matching Search Status: Engineered Results your Active search Solutions for : LLC* ENTITY Contech Engineered Solutions LLC Status: Active DUNS: 155294440 +4: CAGE Code: 03876 DoDAAC: Expiration Date: 12/10/2020 Has Active Exclusion?: No Debt Subject to Offset?: No Address: City: West 9025 Chester Ctr Pt Dr Ste 400 State/Province: OHIO ZIP Code: 45069-4987 Country: UNITED STATES Hokestra Pre -Fabricated Pedestrian Bridge ENGINEER'S ESTIMATE OF CONSTRUCTION COSTS (100% DESIGN) ITEM DESCRIPTION UNIT WELD COUNTY ESTIMATE WHEELER LUMBER LLC CONTECH ENGINEERED SOLUTIONS LLC T THE APPROACH DBA BCS FABRICATION COOT ITEM NO. I QUANTITY UNIT PRICE TOTAL COST . UNIT PRICE UNIT PRICE TOTAL COST • TOTAL COST UNIT PRICE TOTAL COST 628-00080 Prefabricated Pedestrian Bridge I EA _ 1 _ $ 72.000.00 $ 72,000 00 + S 63,740.00 S 63,740.00 , S 68.862.00 �° S 68.862.00 S 92,870.00 $ 92,870.00 Bid es non -responsive because no bid bond was provided as required by Addendum 1 Bid is a responsve meets specification bso ar: J Bid is considered because was provided as required 1. no bid bon' by Addendum WELD COUNTY PURCHASING 1150 O Street, Room 107, Greeley, CO 80631 E -Mail: cmpeters(a�weldgov.com E-mail: reverettc weldgov.com E-mail: rturfweldqov.com Phone: (970) 400-4223, 4222 or 4216 Fax: (970) 336-7226 DATE OF BID: AUGUST 13, 2020 REQUEST FOR: PREFABRICATED PEDESTRIAN BRIDGE DEPARTMENT: PUBLIC WORKS BID NO: #62000155 PRESENT DATE: AUGUST 17, 2020 APPROVAL DATE: AUGUST 17, 2020 ( EMERGENCY APPROVAL) VENDORS TOTAL PRICE WHEELER LUMBER LLC 9531 W. 78T" STREET, SUITE 100 EDEN PRAIRIE MN 55344 CONTECH ENGINEERED SOLUTIONS, LLC 19060 COUNTY ROAD 66 GREELEY CO 80634 THE APPROACH-DBA: BCS FABRICATION 825 E 11TH STREET LOVELAND CO 80537 THE DEPARTMENT OF PUBLIC WORKS IS REVIEWING THE BIDS. O8//7 $63,740.00 $68,862.00 $92,870.00 Hello