OWNER El
ARCHORDER CHANGE CONTRACTOR D
AMDOCUMENT G701 FIELDID
OTHER
PROJECT: Weld County Centennial Center Phase II CHANGE ORDER NUMBER: - 5 -
Aname,address) 915 Tenth Street
Greeley, Colorado
TO (Contractor)
• F --1 ARCHITECT'S PROJECT NO: 71-1-CCA-0162
Hensel Phelps Construction Co.
P. 0. Box 0 CONTRACT FOR: Weld County Centennial
Greeley, Colorado 80631 Center, Construction Manager
'Attention Mr. James E. Albertson I CONTRACT DATE: February 11, 1974
You are directed to make the following changes in this Contract:
Code Description Amount
B 1. Architect's Field Order #42 - Counter @ B-22: - $ 409.00
C 2. Clarification Request #107 - Hinge Finish Credit: ( 4,830.00)
C 3. Clarification Request #89 - Electrical Shielding: 3,312.00
C 4. Clarification Request #100 - Borrow Lites 11 & 12: 335.00
C 5. Architect's F.O. #3 — Acid Neutralizing Tanks: — 0 —
B 6. Architect's F.O. #37 — Remoting of Compressors: 1,132.00
C 7. Architect's F.O. #36 - Conduit 284 to 316: 313.00
C 8. Clarification Request #98 - Priming of Expanded Mesh: 315.00
C 9. Architect's F.O. #38 - Additional Levelor Blind @ Bridge: 225.00
C 10. Clarification Request #96 - Additional Tree Grate: 334.00
C 11. Clarification Request #94 - Caulking @ Mechanical Curbs: 72.00
' C 12. Clarification Request #93 - Caulking @ Stairwells: 200.00
C 13. Clarification Request #77 - Caulking @ H.M. Frames: 1,565.00
C 14. Clarification Request #57 - Delete Urinal @ 267: ( 135.00)
C 15. Architect's F. O. #29 - Shower Membranes: 510.00
B 16. Architect's F.O. #39 - 220V Outlet @ Bridge: 289.00
B 17. Architect's F.O. #46 - Additional Phone Conduits @B-19: 699.00
B 18. Olarificatie.. Rcgt.csL #90 R,le._ati..g Bl..cpri-t Machine: 506.00
C 19. Clarification Request #71 -- Sprinkler Heals: 543.00
C 20. Architect's Field Order #49 - L.lete Line to-Fountain ( 160.00)
C 21. Architect's Field Order #33 - Relocate Intrusion Detectors: 115.00
ITEM4IS — NOLD FoR, OWI&E. GWEF, *Co
740634
Page 2 of 2
CHANGE OWNER 0
ARCHITECT
ORDER CONTRACTOR a
FIET
• AM DOCUMENT G701 OTHER
PROJECT; Weld County Centennial Center CHANGE ORDER NUMBER: - 5 -
(name,address)
• TO (Contractor)
• r 7 ARCHITECT'S PROJECT NO: 71-1-CCA-O162
CONTRACT FOR: Weld County Centennial
Center, Construction Manager
L J CONTRACT DATE: February 11, 1974
You are directed to make the following changes in this Contract:
Continued -
Code Description Amount
B&C 22. Architect's Field Order #48 - Carpet & Drapes: $1,317.00
C 23. Architect's Field Order #44 - Jail Tables: - 3,961.00
C 24. Architect's Field Order #24 - Closing Cell Chases: 494.00
0 25. Clarificatze.. R,q.,...,t #108 Archit..ct..ral Lett._:-..s: 376.00
B&C 26. Architect's F.O. #26 - Laundry Room: -999.00
B 27. Architect's F.O. #50 — Telephone Outlets: 738.00
•
B 28. Architect's F.O. #23 - Additional H.M. , Hdwe.,and
masonry for Security Locks: 3,798.00
-
$17,512.00
'I0, 550.00
•
A. Direct Purchase items Due to Fast Track Schedule.
B. Client Requested Changes and/or Additiona Scope.---
C. Interface/Coordination Changes. Vo 550.00
The original Contract Sum was $ 4,228,331.00 Wet change by previous Change Orders
The Contract Sum prior to this Change Order was $ 176,645.00
$
The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order. 4,404,976.00 •
The new Contract Sum including this Change Order will be g $ 22,400.00 •
$ 4,422,400.00
The Contract Time will be (increased) (dec
eased) (unchanged) by
The X4,
Date of Completion as of the date of this Change Order therefore is ( — Pays.
421,526.00 / .
CNC/NHPQ Inc. Hensel Phelps Construction Co. Board of County Commissioners
OWNER Weld County, Ct ado ra
ARCHITECT CONTRACTOR
?091 clubhouse Tlrive,Greelev.COP 0. Box 0, Greeley, CO P. O. Box 758,Greeley, CO
Address Address
J_{,)� �p�� /f ,/�� �� Address ]ey 9 1f 1J2�^c
DATE 1O.2 o•77 DATE /O/2
9/22 DATE /L 7,4 I P' -2 7
AIA DOCUMENT r.7o1 • CHANGE ORnER • APRIL 1970 EDITION • AIA® • O 1970 • THE