Loading...
HomeMy WebLinkAbout20203542INVENTORY OF ITEMS FOR CONSIDERATION Applicant Pawnee Waste, LLC Case Number IMJUSR20-15-0048 R20-15-0048 Submitted or Prepared Prior to At Hearing Hearing 1 Affidavit 6, 2020 of Mineral Interest mailed October 15, 2020, Notarized November 2 Planning Staff Memorandum, dated November 17, 2020 3 I hereby certify that the items identified herein were submitted;to the Department of Planning Services at or prior to the scheduled Planning Commissioners hearing. Kim Ogle L,. Danner �e CERTIFICATION RE: NOTIFICATION OF MINERAL INTEREST OWNERS AND LESSEES The undersigned Applicant certifies compliance with the provisions of C.R.S. § 24-65.5- 103(1), and in support thereof, states and certifies as follows: I. That Applicant has provided notice, (a copy of which is attached hereto as Exhibit "A"), containing the time and place of the initial public hearing on its application for Case Number IMT] O-1 -0048, the nature of the initial public hearing, the legal description by section, township and range of the property which is the subject of the initial public hearing, and the name of the applicant; 2. That said notice was provided thirty (30) days prior to the scheduled public hearing, that it was provided by certified mail, return receipt requested, or by a nationally recognized overnight courier; 3. That said Exhibit A includes the list of the names and addresses of the surface owners, mineral estate owners and lessees of mineral interests to whom the notice was sent, including those persons who have requested receipt of such notices, pursuant to C.R.S. § 24-65S103(3), I HUNTER HOSHIKO Naolary Public Sts;e of Colorado Notary fD ft 20►204015978 +I ,r Commission Expires 05.-06-2024 STATE OF COLORADO COUNTY OF a We.- . Subscribed an /4.017er sworn to before me this day of r , 20 t by P Notary Public Note: This Certification must be received by the Weld County Department of Planning Services prior to or at the initial public hearing. If the Certification is not received by that time, the hearing will be rescheduled to a later date, and Applicant must reenotify all owners of mineral interests. EXHIBIT tazo tt eelLis PUBLIC HEARING NOTIFICATION A Public Hearing will be held before the Weld County Planning Commission on November 17 at 12:30 p.m. regarding Weld County 1 iMIJUSR2O-15-0048. The hearing will take place in the Hearing Room, Weld County Administrative Building, 1150 O Street, Greeley, Colorado. Applicant: Landowner: Proposed Project: Pawnee Waste, LLC Pawnee Waste, LLC A Site Specific Development Plan and Amended Use By Special Review Permit for a solid waste disposal site and facility (a designated commercial exploration and production waste management facility) that will receive non -hazardous wastes that may contain very low concentrations of naturally occurring radioactive materials (NORM) and technically enhanced naturally occurring radioactive materials (TENORM) pursuant to the Colorado State Statute and as defined and regulated by Colorado Department of Public Health and Environment and obtain a Certificate of Designation, pursuant to Section 30-20-104 C.R.S. in addition to accepting Construction and Demolition (C&D) Waste, and Industrial Waste, the addition of two (2) new storage buildings and a company only heavy equipment parking area outside of Subdivisions and Historic Townsites in the A (Agricultural) Zone District. Legal Description: On parcel(s) of land described as: NE4/E2NW4 SECTION 13, T1 ON, R61 W OF THE 6TH P.M., WELD COUNTY, COLORADO Property Zoning: A (Agricultural) Zone District County Planner: Kim Ogle The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. The recommendation will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at httpsliaccelasa.ca4co.weidreo.us/CitizenAccess. 111512020 USPS.corn® - USPS Tracking® Results WICHITA KS DISTRIBUTION CENTER October 19, 2020 In Transit to Next Facility October 15, 2020, 7:55 pm Departed USPS Regional Facility DENVER CO DISTRIBUTION CENTER October 15, 2020, 12:00 am Arrived at USPS Regional Origin Facility DENVER CO DISTRIBUTION CENTER October 14, 2020, 4:31 pm Departed Post Office HYGIENE, CO 80533 October 14, 2020, 10:11 am USPS in possession of item HYGIENE, CO 80533 II CD CD 0 Product Information Postal Features: See tracking for related item: 9590940250429092578328 Product: Certified MailTM (/go/TrackcontirmAction?tLabell=8580940250429092578828) First - Class Mail® See Less ,\ Can't find what you're looking for? https:1/tools.uses.comlgo/TrackConfirmAction?(Ref=fulipage&tLc=2&text28777=&tLabcls=70192281J000231758119%2G&tABt=false 2/3 MEMORANDUM TO: Planning Commission DATE: November 17, 2020 FROM: Kim Ogle, Planning Services SUBJECT: 1 MJUSR2O-15-0048 Pawnee Waste LLC Conditions of Approval The Department of Planning Services is requesting to delete Condition of Approval 1.A under the heading "Prior to recording the map" that states: "The existing Improvements and Road Maintenance Agreement (Document 20170173 Amended per Document 20202400) shall be reviewed and revised appropriately. Road maintenance includes, but is not limited to, dust control and damage repair to specified haul routes. The Agreement shall include provisions addressing engineering requirements, submission of collateral, and testing and approval of completed improvements." (Department of Public Works) The Department of Planning Services is requesting to delete Condition of Approval 1.B under the heading "Prior to recording the map" that states: "A Final Drainage Report and Certification of Compliance stamped and signed by a Professional Engineer registered in the State of Colorado is required." (Department of Public Works) The Department of Public Works indicates that both of these Conditions of Approval have been met. EXHIBIT .. Zc jo,4 From: Melissa King <mking@weldgov.com> Sent: Tuesday, November 10, 2020 1:40 PM To: Kim Ogle <kogle@weldgov.com> Subject: RE: pawnee Hey Kim The Accepted Drainage Report was uploaded to Accela on the 22nd of Oct. (COA1.B. can be omitted) . RMA update has been satisfied per 10 23 email (COA1.A. can be omitted). USR map should include the access point and the roads associated — i.e. unmaintained CR 118 and the intersection where this unmaintained road and CR 95 and maintained CR 118 come together. Hope this helps M Melissa J King, PE Development Review Engineer Department of Public Works Weld County 1111 H Street, P.O. Box 758 Greeley, Co 80632 (970) 400-3762 LEADING WITH RESPONSIVE, INNO VA TI VF AND COST EFFECT! VE SERVICES Hello