DATE September 17, 1973
PROJECT Wattenbers Road Repair PROJECT NO. 73-1-CCA-0234
OWNER Weld County. Colorado CONTRACTOR Mountain Aggregates, Inc.
DESCRIPTION OF CHANGE - That said Contract shall be changed in the following particulars:
that estimated quantities will be changed to measured "in place" quantities
and that after the said changes shall have been made with additions and/or deletions are
hereby directed to be a part of the original Contract, the agreement as shown by the
original Contract together with the above-named additions and/or deletions shall, consti-
tute the agreement and Contract of the parties hereto.
JUSTIFICATION
For accounting purposes, the estimated contractual quantities are being changed to
final "in place" quantities per Weld County Engineering Consultants.
CHANGE IN CONTRACT COST
Item Description Quantity Unit Unit Cost Total Cost
See attached sheet. $ $
$ $
Total Amount This Change Order - $ 3.967.60
Net of Previous Change Orders (+) 60 + $17,950.00
Original Contract Amount $?4.368.00
Revised Total Contract Amount $38.350.40
CONTRACT TIME
Original Completion Date 8-31-73 Previous Days Allowed 108
Days Allowed This Change Order o Revised Completion Date 8-31-73
Recommended: Approvedi--)�(j�� �� ) �,,
NELSON, HALEY, PATTERSON and QUIRK, INC. WELD COUNTY, COL9RADO
/} (Owner)
By: -el inzi tf.o�Z/
Fie d Representative By:
Byron Ewing
Date: f% I AGGREGATES INC.
'-/L,_.: �� / / ontra r
Approved: ,._ l
Proje t Manager By: 2
Date: 2// //,7- Date:
•
730954
_. _-_------- - _.- L r
.
PAGE . 2 CHANGE ORDER N0. 2
DATE September 17, 1973
PROJECT Wattenberg Road Repair PROJECT N0. 73-1-CCA-0234
OWNER Weld County, Colorado CONTRACTOR Mountain Aggregates, Inc.
CHANGE IN CONTRACT COST
ITEM DESCRIPTION QUANTITY UNIT UNIT COST AMOUNT
1 EMBANKMENT - 5,662.50 C.Y. .60 -3,397.50
2 CRUSHED BASE COURSE - 511.80 TONS 3.00 -1,535.40
3 GRAVEL SURFACING + 351.80 TONS 3.00 +1.055.40
4 2" ASPHALT (PRIME) + 54.95 TONS 10.00 + 549.50
5 RIPRAP + 35.00 C.Y. 15.00 + 525.00
6 48" C. M. P. - 12.00 L.F. 15.00 - 180.00
CHANGE ORDER N0. 1
1 EMBANKMENT - 303.50 C.Y. .60 - 182.10
2 CRUSHED BASE COURSE + 15.00 TONS 3.00 + 45.00
4 2" ASPHALT (PRIME) - 8t .75 TONS 10.00 - 847.50
TOTAL AMOUNT-3,967.60