Loading...
HomeMy WebLinkAbout20200294.tiffHEARING CERTIFICATION DOCKET NO. 2019-139.6 RE: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT, USR19-0058, FOR OPEN MINING (SAND, GRAVEL, AND STONE) IN THE A (AGRICULTURAL) ZONE DISTRICT - ORRLANDO, LLC, C/O BUCKLEN SERVICES COMPANY A public hearing was conducted on January 22, 2020, at 10:00 a.m., with the following present: Commissioner Mike Freeman, Chair Commissioner Steve Moreno, Chair Pro-Tem Commissioner Sean P. Conway — EXCUSED Commissioner Scott K. James Commissioner Barbara Kirkmeyer Also present: Acting Clerk to the Board, Selena Baltierra Assistant County Attorney, Bob Choate Planning Services Department representative, Angela Snyder The following business was transacted: I hereby certify that pursuant to a notice dated October 24, 2019, and duly published October 30, 2019, in the Greeley Tribune, a public hearing was conducted on December 11, 2019, to consider the request of Orrlando, LLC, c/o Bucklen Services Company, for a Site Specific Development Plan and Use by Special Review Permit, USR19-0058, for Open Mining (sand, gravel, and stone) in the A (Agricultural) Zone District, at which time the matter was continued to allow the applicant adequate time to complete a noise study. Bob Choate, Assistant County Attorney, made this a matter of record. Chair Freeman reviewed for the applicant and the public, the procedures to follow should this case result in a tie vote due to four (4) Commissioners being present and Commissioner Conway being excused. Angela Snyder, Department of Planning Services, presented a brief summary of the proposal and mentioned the case was previously continued to allow the applicant an opportunity to address Development Standard (DS) #24 (noise standard). She reminded the Board that surrounding property owners (SPO), at the previous hearing, requested the noise standard be modified to residential, and in response, the Board requested the applicant consider a berm to mitigate the mine from the subdivision. She stated the pipeline and ditch companies had standards that prohibited the berm, therefore, the applicant was unable to complete the noise study. She indicated the applicant would be proposing an alternative solution to meet the noise standard and confirmed that was the only outstanding issue from the previous hearing. " Daniel Clark, Bucklen Services Company, represented the applicant and acknowledged the Board's request for a noise study, including a berm. He explained the correspondence they had etPL(HS/TO , Pii0(wim), fj-ett ) a-LINN 12O2o 2020-0294 PL2725 HEARING CERTIFICATION - ORRLANDO, LLC, C/O BUCKLEN SERVICES COMPANY (USR19-0058) PAGE 2 with an environmental noise control company, as well as, the Homeowner's Association (HOA), who requested to review the noise study and stated they trusted the Board's determination of the noise limit. He referenced an email from Stormslake Water District, which indicated the existence of a drainage tile at the proposed berm location, creating a conflict. He indicated they were currently doing a noise study with the berm located outside of the existing pipelines area and questioned whether the Board was considering changing the noise level to residential, rather than industrial. He requested a continuance to allow additional time to complete the noise study and stated the acoustic engineer predicted the noise level would not meet the residential standard prior to the operation. In response to Chair Freeman, Commissioner Kirkmeyer clarified DS #24 includes an industrial noise limit; however, at the last meeting, the SPOs requested a residential noise standard for the site. Mr. Clark explained it is uncertain whether the relocated berm would aid in accomplishing the residential noise standard and in response to Mr. Clark, Chair Freeman explained the importance of the noise study. Commissioner Kirkmeyer reiterated the need for a noise study, including potential methods to meet the noise standard, and in response to Commissioner Kirkmeyer, Mr. Clark stated the hours of operation are limited. la Regarding the request for a continuance, the Board and the applicant agreed to schedule the matter for March 11, 2020, at 10:00 a.m. No public testimony was offered regarding the continuance. Commissioner James moved to continue the request of Orrlando, LLC, do Bucklen Services Company, for a Site Specific Development Plan and Use by Special Review Permit, USR19-0058, for Open Mining (sand, gravel, and stone) in the A (Agricultural) Zone District, to March 11, 2020, at 10:00 a.m., to allow the applicant adequate time to finalize the noise study, including the berm location. The motion was seconded by Commissioner Moreno, and it carried unanimously. There being no further discussion, the hearing was completed at 10:17 a.m. 2020-0294 PL2725 HEARING CERTIFICATION - ORRLANDO, LLC, C/O BUCKLEN SERVICES COMPANY (USR19-0058) PAGE 3 This Certification was approved on the 27th day of January, 2020. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: de GI I,..S I Weld County Clerk to the Board t� BY: eputy YV Clerk to the Boar d off" �. cottJames Mike Freeman, Chair Steve Moreno, Pro -Tern EXCUSED Sean P. Conway fbara Kirkmeyer 2020-0294 PL2725 ATTENDANCE LIST as -c,2027) NAME PLEASE PRINT LEGIBLY c.:ADDRESS (CITY; STATE ZIP) ' ,'w. .:!' > ;. 1 EMAIL _x . r ,"': .max e > - i.4.x r COUNTY OF RESIDENCE `• a+ SPEAKING / 9 (YN) Li �Y/NJcoo ��1'r{D s vf ' 1.4-47wnj/Y (4 ) 6/s Y Itle !'AEECer 14 1t e- ,. L .. L/a � IYNb1+or�c.G+r-tick 1-1-75/�p ,. . . IN) tia.eO Clcafi6µ . ot-; 'no' N. a5 �e G br3� �o.A4t( .q..,r: clo.rk.g.reill,tom r4� w kel Y 0,.k sk- l4.vi-K. r 355 ��a "wy .4�/ A kie.., s_cti 4/ZS'T'i•A�c .. G/�lrl •A/ � �1•_1LJ '�� ..s'`-/7 cC 6. C� �c�/�/� C�z. r, rrt�^E1_1M ,�.enu C „A l,cisz cv,:.�/4�ZL l�( /)I)/ /j�)����. C�/�".'itrpLe 1/C,/ /�./ � ���J- �s�s ial-iLegfrs- U/R�1� JU< GGZnattC[X� 4Y 9h -a. 4 enn f0 Zoe- � t /// / Lin,/ fiarrsie;YJ /SPe/2fn+ green eo BIVoyl P0trirSS—zC(((ths27/// . rom- Added /u L,.ILc c-2-‘tukcL I ki o ivL ,7c.,.,e-N, (c ¶0202 tfla oke'`'l.�� ?,.,eke:€:-c,7,v* '\Pflc.cJ /V S-+-e.J .- ire+S P.O. 50iC 99. ccveet- yco J/ Jew J cy e Wrw Lcl F f c gie 4NT 2Y//-2?�-ven1i9P/4.ci (ir+za.1.5,,C, ere, .,l an uw�.,,}z+G�YZIO r70 73 c -Y7 y5/ 9i@ -yon ray ci702-in? CGLQJ�K I /trG K ,La NC Hello